Article XIV - SUBDIVISION ADMINISTRATION

14.1.6. Subdivider’s Responsibility.

Sobre este texto

  • As posted on the county's website, retrieved 2026-11-23

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The subdivider shall incur the cost of construction and installation of all required public improvements based on the following:

a) Streets. Incur the cost for the construction of streets up to twenty-seven feet (27’) in pavement width from back of curb to back of curb, or twenty feet (20’) in pavement width from edge of pavement to edge of pavement if no curbs and gutters are installed.

b) Water and Sewer Systems. Incur the cost for the installation of all water and sewer system which are required to serve the new subdivision and tie in with existing water and sewer systems, based on the specifications set forth herein.

c) Sidewalks. Entire cost if provided.

d) Monuments. Entire cost.

e) Street Signs. Entire cost.

f) Entire cost of painting centerlines and sidelines on all streets and roads.

Leer este código donde se publica (county website (crawfordcountyga.org)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:crawford-county/zoning/14.1.6@2026-11-23-10f50c9e63

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Crawford County Zoning Ordinance, 14.1.6. Subdivider’s Responsibility | Georgia Commons