Sec. 16-139. Standards for development.
Sobre este texto
- As published by Municode, current through 2020-02-10
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Floodplain boundaries.
(1) Studied "A" zones, as identified in the FIS, must be used to establish base flood elevations whenever available.
(2) For all streams with a drainage area of 100 acres or greater, the future-conditions flood elevations must be provided by the community development director.
If future-conditions elevation data is not available from the city, then it must be determined by a registered professional engineer using a method approved by FEMA and the community development director.
(b) Floodway boundaries. The width of a floodway must be determined from the FIS or FEMA approved flood study. For all streams with a drainage area of 100 acres or greater, the floodway must be provided by the community development director. If floodway data is not available from the city, then it must be determined by a registered professional engineer using a method approved by FEMA and the
community development director.
(c) General standards.
(1) No development is allowed within the future-conditions floodplain that could result in any of the following:
a. Raising the base flood elevation or future-conditions flood elevation by
0.01 foot or more;
b. Reducing the base flood or futureconditions flood storage capacity;
c. Changing the flow characteristics as to the depth and velocity of the waters of the base flood or futureconditions flood as they pass both the upstream and the downstream boundaries of the development area; or,
d. Creating hazardous or erosion-producing velocities, or resulting in excessive sedimentation.
(2) Any development that is allowed within the future-conditions floodplain pursuant to the preceding paragraph (1) must also comply with the following conditions:
a. Compensation for storage capacity must occur between the average groundwater table elevation and the base flood elevation for the base flood, and between the average groundwater table elevation and the future-condition flood elevation for the future-conditions flood, and lie either within the boundaries of ownership of the property being developed and must be within the immediate vicinity of the location of the encroachment. Acceptable means
of providing required compensation include lowering of natural ground elevations within the floodplain, or lowering of adjoining land areas to create additional floodplain storage. In no case may any
required compensation be provided via bottom storage or by excavating below the elevation of the top of the natural (predevelopment) stream
channel unless such excavation results from the widening or relocation of the stream channel;
b. Cut areas must be stabilized and graded to a slope of no less than
2.0 percent;
c. Effective transitions must be provided such that flow velocities occurring on both upstream and downstream properties are not increased or decreased;
d. Verification of no-rise conditions (0.01 foot or less), flood storage volumes, and flow characteristics must be provided via a step-backwater analysis meeting the requirements of subsection (d);
e. Public utilities and facilities, such as water, sanitary sewer, gas, and electrical systems, must be located and constructed to minimize or eliminate infiltration or contamination from floodwaters; and
f. Any significant physical changes to the base flood floodplain must be submitted as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable.
The CLOMR submittal is subject to approval by the community development director using the community consent forms before forwarding the submittal package to FEMA for final approval. The applicant is
responsible for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval. Within six months of the completion of construction, the applicant must submit as-built surveys for a final letter of map revision (LOMR).
(d) Engineering study requirements for floodplain encroachments. An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and/or floodways for which the provisions of section
16-140 apply. This study must be prepared by a registered professional engineer and made a part of the application for a permit. This information must be submitted to and approved by the community development director before the approval of any permit that would authorize the disturbance of land located within the futureconditions floodplain. The study must include:
(1) Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development;
(2) Step-backwater analysis, using a FEMAapproved methodology approved by the community development director. Crosssections (which may be supplemented by the applicant) and flow information
must be obtained whenever available.
Computations must be shown duplicating FIS results and must then be rerun with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles;
(3) Floodplain storage calculations based on cross-sections (at least one every 100 feet) showing existing and proposed floodplain conditions to show that base flood floodplain and future-conditions floodplain storage capacity would not be diminished by the development;
(4) The study must include a preliminary plat, grading plan, or site plan, as appropriate, which clearly defines all futureconditions floodplain encroachments.
(e) Floodway encroachments. Located within special flood hazard areas are areas designated as floodway. A floodway may be an exLAND DEVELOPMENT REGULATIONS § 16-139 tremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, floodways must remain free of encroachment in
order to allow for the discharge of the base flood without increasing flood heights. Therefore the following provisions apply within floodways:
(1) Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the floodway, except for activities expressly allowed in the following paragraph (2).
(2) Encroachments for bridges, culverts, roadways and utilities within the floodway may be permitted provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with
standard engineering practice that the encroachment will not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge.
A registered professional engineer must provide the required supporting technical data and certification of the findings.
(3) If the applicant proposes to revise the floodway boundaries, no permit authorizing the encroachment into or an alteration of the floodway may be issued by the city until an affirmative conditional
letter of map revision (CLOMR) is issued by FEMA and no-rise certification is approved by the community development director.
(f) Maintenance requirements. The property owner is responsible for continuing maintenance as may be needed within an altered or relocated portion of a floodplain on the subject
property so that the flood-carrying or flood storage capacity is not diminished. The community development director is authorized to direct the
property owner (at no cost to the city) to restore the flood-carrying or flood storage capacity of the floodplain if the owner has not performed maintenance as required by the approved floodplain management plan on file with the community development director.
Historia
(Ord. No. 2018-10-16, § II, 10-8-2018)