Sec. 16-140. Flood hazard reduction.
Sobre este texto
- As published by Municode, current through 2020-02-10
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) General regulations. The following regulations apply in all special flood hazard areas:
(1) New construction and substantial improvements of principal buildings (residential or nonresidential), including manufactured homes, are not allowed within the limits of the future-conditions floodplain, unless all requirements of section 16-139(c), (d), and (e) are met;
(2) New construction or substantial improvements of existing structures must be anchored to prevent flotation, collapse or lateral movement of the structure;
(3) New construction or substantial improvements of existing structures must be constructed with materials and utility equipment resistant to flood damage;
(4) New construction or substantial improvements of existing structures must be constructed by methods and practices that minimize flood damage;
(5) All new construction and substantial improvements of existing structures that include any fully enclosed area located
below the lowest floor formed by foundation and other exterior walls must be designed to be an unfinished and flood-
resistant enclosure. The enclosure must be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater.
a. Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:
1. Provide at least two openings having a total net area of at least one square inch for every square foot of enclosed area subject to flooding;
2. The bottom of all openings must be no higher than one foot above grade; and
3. Openings may be equipped with screens, louvers, valves or other coverings or devices, provided that they permit the automatic flow of floodwater in both directions.
b. So as not to violate the "lowest floor" criteria of these regulations, the unfinished and flood-resistant enclosure may only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and,
c. The interior portion of such enclosed area may not be partitioned or finished into separate rooms.
(6) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation,
plumbing, and other service facilities must be designed and/or located at least three feet above the base flood elevation or at least one foot above the future-conditions flood elevation, whichever is higher, so as to prevent water from entering or
accumulating within the components during conditions of flooding;
(7) Manufactured homes must be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard is in addition to and consistent with applicable state requirements for resisting wind forces;
(8) New and replacement water supply systems must be designed to minimize or eliminate infiltration of floodwaters into
the system;
(9) New and replacement sanitary sewage systems must be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters;
(10) On-site waste disposal systems must be located and constructed to avoid impairment to them, or contamination from them, during flooding; and
(11) Any alteration, repair, reconstruction or improvement to structures that do not comply with the provisions of these regulations, may be undertaken only if the nonconformity is not furthered, extended
or replaced.
(12) If the proposed development is located in multiple flood zones or multiple base flood elevation cross the proposed site, the higher or more restrictive base flood elevation or future condition elevation and development standards govern.
(b) Within future-conditions floodplain. In addition to the general regulations of subsection (a), the following additional regulations apply
within the future-conditions floodplain:
(1) Residential buildings.
a. New construction. New construction of principal buildings, including manufactured homes is not allowed
within the limits of the future-conditions floodplain unless all requirements of section 16-139(c), (d) and
(e) have been met. If all of the requirements of section 16-139(c), (d) and (e) have been met, all new
construction must have the lowest floor, including basement, elevated at least three feet above the base flood elevation or at least one foot above the future-conditions flood elevation, whichever is higher. If solid foundation perimeter walls are used to elevate the structure, openings sufficient to equalize the hydrologic flood forces on exterior walls and to facilitate the unimpeded
movements of floodwaters must be provided in accordance with subsection (a)(5).
b. Substantial improvements.Substantial improvements of principal buildings, including manufactured homes, is not allowed within the
limits of the future-conditions floodplain unless all requirements of section 16-139(c), (d), and (e) have been met. If all of the requirements
of section 16-139(c), (d), and (e) have been met, all substantial improvements must have the lowest floor, including basement, elevated
at least three feet above the base flood elevation or at least one foot above the future-conditions flood elevation, whichever is higher. If solid foundation perimeter walls are used to elevate the structure, openings sufficient to equalize the hydrologic flood forces on exterior walls and to facilitate the unimpeded
movements of floodwaters must be provided in accordance with subsection (a)(5).
(2) Nonresidential buildings.
a. New construction. New construction of principal buildings, including manufactured homes, is not allowed within the limits of the futureconditions floodplain unless all requirements of section 16-139(c), (d), and (e) have been met. New construction that has met all of the requirements of section 16-139(c),
(d), and (e) shall have the elevation of the lowest floor, including basement and access to the building, at least three feet above the base flood
elevation or at least one foot above the future-conditions flood elevation, whichever is higher. If solid foundation perimeter walls are used
to elevate the structure, openings sufficient to equalize the hydrologic flood forces on exterior walls and to facilitate the unimpeded movements of floodwaters must be provided in accordance with subsection (a)(5).
New construction that has met all of the requirements of section 16- 139(c), (d), and (e) may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation, or at least as high as the futureconditions flood elevation, whichever is higher, with walls substantially impermeable to the
passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy.A registered professional
engineer or architect must certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and
must provide such certification to the community development director.
b. Substantial improvements.Substantial improvements of principal buildings, including manufactured homes, is not allowed within the
limits of the future-conditions floodplain unless all requirements of section 16-139(c), (d), and (e) have been met. Substantial improvements that have met all of the requirements of section 16-139(c), (d), and (e) shall have the elevation of
the lowest floor, including basement and access to the building, at least three feet above the base flood
elevation or at least one foot above the future-conditions flood elevation, whichever is higher. If solid foundation perimeter walls are used
to elevate the structure, openings sufficient to equalize the hydrologic flood forces on exterior walls and to facilitate the unimpeded movements of floodwaters must be provided in accordance with subsection (a)(5).
Substantial improvements that have met all of the requirements of section 16-139(c), (d), and (e) may be floodproofed in lieu of elevation. The
structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation, or at least as high as the futureconditions flood elevation, whichever is higher, with walls substantially impermeable to the
passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy.A registered professional
engineer or architect must certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and
must provide such certification to the community development director.
(3) Accessory structures and facilities. Accessory structures and facilities (e.g., barns, sheds, gazebos, detached garages, parking lots, recreational facilities and other similar non-habitable strucLAND DEVELOPMENT REGULATIONS § 16-140 tures and facilities) that are permitted to
be located within the limits of the floodplain must be constructed of flood-resistant materials and designed to pass all floodwater in accordance with subsection (a)(5) and be anchored to prevent flotation, collapse or lateral movement
of the structure.
(4) Recreational vehicles.All recreational vehicles placed on sites must either:
a. Be on the site for fewer than 180 consecutive days and be fully licensed and ready for highway use, (a recreational vehicle is ready for
highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or
b. The recreational vehicle must meet all the requirements for substantial improvement of residential buildings in accordance with subsection (b)(1)b., including the anchoring and
elevation requirements.
(5) Manufactured homes.
a. New manufactured homes are not allowed to be placed within the limits of the future-conditions floodplain unless all requirements of section 16-139(c), (d) and (e) have been met.
b. Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision must be elevated so that either:
1. The lowest floor of the manufactured home is elevated at least three feet above the level of the base flood elevation, or at least one foot above the future-conditions flood elevation, whichever is higher; or
2. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.
c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement in accordance with subsection (a)(7).
(c) Adjacent to the future-conditions floodplain.
(1) Residential buildings. For new construction or substantial improvement of any principal residential building or manufactured home, the elevation of the lowest floor, including basement and access to
the building, must be at least three feet above the base flood elevation or at least one foot above the future-conditions flood elevation, whichever is higher.
If solid foundation perimeter walls are used to elevate the structure, openings sufficient to equalize the hydrologic flood forces on exterior walls and to facilitate the unimpeded movements of floodwaters must be provided in accordance with subsection (a)(5).
(2) Nonresidential buildings. For new construction or substantial improvement of any principal nonresidential building, the
elevation of the lowest floor, including basement and access to the building, must be at least one foot above the level of the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. If solid foundation perimeter walls are used to elevate the structure, openings sufficient to equalize the hydrologic flood forces on
exterior walls and to facilitate the unimpeded movements of floodwaters must be provided in accordance with subsection (a)(5).
(d) Streams without established base flood elevations and/or floodway (A-zones).
(1) For a residential single-lot development not part of a subdivision within a special flood hazard area, where streams exist but no base flood data have been provided (A-zones), the community development director must review and reasonably utilize any available scientific or historic flood elevation data, base flood
elevation and floodway data, or futureconditions flood elevation data available from a federal, state, local or other source,
in order to administer the provisions of this division.
(2) If data are not available from any of these sources, the following provisions apply:
a. No encroachments, including structures or fill material, may be located within an area equal to twice the
width of the stream or 50 feet from the top of the bank of the stream, whichever is greater.
b. In special flood hazard areas without base flood or future-conditions flood elevation data, new construction and substantial improvements of existing structures must have the
lowest floor of the lowest enclosed area (including basement) elevated at least three feet above the highest adjacent grade at the building site. Openings sufficient to facilitate
the unimpeded movements of floodwaters must be provided in accordance with subsection (a)(5).
(e) Areas of shallow flooding (AO-zones).
Special flood hazard areas may include designated "AO" shallow flooding areas. These areas have base flood depths of one to three feet
above ground, with no clearly defined channel.
In these areas the following provisions apply:
(1) All substantial improvements of residential and nonresidential structures must have the lowest floor, including basement, elevated at least one foot above the flood depth number in feet specified
on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, must be elevated at least three feet above the
highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of floodwaters must be provided in accordance with subsection (a)(5).
(2) Substantial improvement of a nonresidential structure may be floodproofed in lieu of elevation. The structure, together
with attendant utility and sanitary facilities, must be designed to be watertight to the specified FIRM flood level plus
one foot above the highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy.
A registered professional engineer or architect must certify that the design and methods of construction are in accordance with accepted standards of practice.
(3) Drainage paths must be provided to guide floodwater around and away from any proposed structure.
(f) Subdivisions.
(1) All subdivision proposals must identify the special flood hazard area and provide base flood elevation data and futureconditions flood elevation data;
(2) All residential lots in a subdivision proposal must have sufficient buildable area outside of the future-conditions floodplain so that encroachments into the future-conditions floodplain for residential structures will not be required;
(3) All subdivision plans must provide the elevations of proposed structures in accordance with section 16-138(b);
(4) All subdivision proposals must be consistent with the need to minimize flood damage;
(5) All subdivision proposals must have public utilities and facilities such as water, sanitary sewer, gas, and electrical systems located and constructed to minimize or eliminate infiltration of floodwaters, and discharges from the systems into floodwaters; and
(6) All subdivision proposals must include adequate drainage and stormwater management facilities per the requirements of (jurisdiction) to reduce potential exposure to flood hazards.
Historia
(Ord. No. 2018-10-16, § II, 10-8-2018)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.