Sec. 104-88. Permit procedures and requirements.
Sobre este texto
- As published by Municode, current through 2026-05-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Permit application requirements. No owner or developer shall be approved for or perform any development activities on a site where an area of special flood hazard or area of future-conditions flood hazard is located without first meeting the applicable requirements, restrictions, and criteria of this chapter prior to commencing the proposed activity. Unless specifically excluded by this article, any landowner or developer desiring a permit for a development activity shall submit to the environmental management department documentation showing compliance with this article.
(b) Floodplain management plan requirements. A floodplain management plan shall be required for all projects with development activities within, either partially or completely, an area of special flood hazard or an area of future-conditions flood hazard. The plan shall include the following items:
(1) Site plan drawn to scale, which includes but is not limited to:
a. Existing and proposed elevations of the area in question and the nature, location and dimensions of existing and/or proposed structures, earthen fill placement, amount and location of excavation material, and storage of materials or equipment;
b. For all proposed structures, spot ground elevations at building corners and 20-foot or smaller intervals along the foundation footprint, or one-foot contour elevations throughout the building site;
c. Proposed locations of water supply, sanitary sewer, and utilities;
d. Proposed locations of drainage and stormwater management facilities;
e. Proposed grading plan;
f. Base flood elevations and future-conditions flood elevations;
g. Boundaries of the base flood floodplain and future-conditions floodplain;
h. If applicable, the location of the floodway; and
i. Certification of the above by a licensed professional engineer or surveyor.
(2) Building and foundation design detail, including but not limited to:
a. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;
b. Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed;
c. Certification that any proposed nonresidential floodproofed structure meets the criteria in section 104-87(b)(2); and
d. For enclosures below the base flood elevation, location and total net area of flood openings as required in section 104-87(a)5.
(3) Description of the extent to which any watercourse will be altered or relocated as a result of the proposed development;
(4) Hard copies and digital files of computer models, if any, copies of work maps, comparison of pre- and post-development conditions base flood elevations, future-conditions flood elevations, flood protection elevations, special flood hazard areas and regulatory floodways, flood profiles and all other computations and other information similar to that presented in the FIS;
(5) Copies of all applicable state and federal permits necessary for proposed development, including but not limited to permits required by Section 404 of the Federal Water Pollution Control Act, Amendments of 1972, 33 U.S.C.
1334; and,
(6) All appropriate certifications required under this chapter.
The approved floodplain management plan shall contain certification by the applicant that all development activities will be done according to the plan or previously approved revisions. Any and all development permits and/or use and occupancy certificates or permits may be revoked at any time if the construction and development activities are not in strict accordance with approved plans.
(c) Construction stage submittals. For all new construction and substantial improvements on sites with a floodplain management plan, the permit holder shall provide to the environmental management department a certified as-built elevation certificate or floodproofing certificate for nonresidential construction that includes the lowest floor elevation or floodproofing level immediately after the lowest floor or floodproofing is constructed. A final elevation certificate shall be provided after completion of construction including final grading of the site. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a licensed land surveyor or professional engineer and certified by the same. Any work undertaken prior to approval of these certifications shall be at the permit holder's risk. The environmental management department shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further work proceeding. Failure to submit certification or failure to make the corrections required hereby shall be cause to issue a stop work order for the project.
(d) Duties and responsibilities of the administrator. Duties of the environmental management department shall include, but are not limited to:
(1) Review of all development applications and permits to assure that the requirements of this article have been satisfied and to determine whether proposed building sites will be reasonably safe from flooding;
(2) Review proposed development to assure that all necessary permits have been received from governmental agencies from which approval is required by federal and/or state law, including but not limited to, section 404 of the Federal Water Pollution Control Act Amendments of 1972, No. 33 USC 1334;
(3) When base flood elevation data or floodway data have not been provided, then the environmental management department shall require the applicant to obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source in order to meet the provisions of sections 104-86 and 104-87;
(4) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new and substantially improved structures;
(5) Review and record the actual elevation, in relation to mean sea level to which any substantially improved structures have been floodproofed;
(6) When floodproofing is utilized for a nonresidential structure, the environmental management department shall review the design and operation and maintenance plans and obtain certification from a licensed professional engineer or architect;
(7) Notify affected adjacent communities and the Georgia Department of Natural Resources (GA DNR) prior to any alteration or relocation of a watercourse and submit evidence of such notification to FEMA;
(8) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (e.g., where there appears to be a conflict between a mapped boundary and actual field conditions) the environmental management director shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this chapter. Where floodplain elevations have been defined, the floodplain shall be determined based on flood elevations rather than the area graphically delineated on the floodplain maps;
(9) All records pertaining to the provisions of this chapter shall be maintained by the county and shall be open for public inspection;
(10) Coordinate all FIRM revisions with the GA DNR and FEMA; and
(11) Review variance applications and make recommendations to the Fayette County Planning Commission.
(e) Engineering study requirements for floodplain encroachments. An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and/or floodways for which the provisions of section 104-87(d) apply. This study shall be prepared by a currently licensed professional engineer in the state and made a part of the application for a permit. This information shall be submitted to and approved by the environmental management department prior to the approval of any permit authorizing the disturbance of land located within the future-conditions floodplain. Such study shall include:
(1) Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development;
(2) Step-backwater analysis, using a FEMA-approved methodology approved by the stormwater management department. Cross sections and flow information shall be obtained whenever available and supplemented by the applicant or by the stormwater management department. Computations will be shown duplicating FIS results and will then be rerun with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles;
(3) Floodplain storage calculations based on cross sections (at least one every 100 feet) showing existing and proposed floodplain conditions to show that base flood floodplain and future-conditions floodplain storage capacity would not be diminished by the development; and
(4) The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future-conditions floodplain encroachments.
Historia
(Ord. No. 2015-07, § 1, 4-23-2015)