Gray · Ordenanza de zonificación
Appendix A - ZONING AND SUBDIVISION REGULATIONS / Article IX - SPECIAL PROVISIONS
100.6. Requirements for telecommunications facilities.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
100.6.1. General requirements for all telecommunications facilities: The requirements set forth in this section shall govern the location and construction of all telecommunications facilities governed by this ordinance unless the governing authority reduces the standards if the goals of this section would be better served thereby:
(1) Building codes and safety standards: To ensure the structural integrity of towers, the owner of a tower shall ensure that it is maintained in compliance with standards for towers that are published by the Electronic Industries Association, as amended from time to time. If, upon inspection, the governing authority concludes that a tower fails to comply with such codes and standards and constitutes a danger to persons or property, then upon notice being provided to the owner of the tower, the owner shall have 30 days to bring such tower into compliance with such standards. If the owner fails to bring such tower into compliance within said 30 days, the governing authority may remove such tower at the owner's expense. Any such removal by the governing authority shall be in the manner provided in sections 41-2-8—41-2-17 of the Official Code of Georgia.
(2) Regulatory compliance:
a. All telecommunications facilities must meet or exceed current standards and regulations of the FAA, the FCC and any other agency of the state or federal government with the authority to regulate telecommunications facilities. If such standards and regulations are changed then the owners of the telecommunications facilities governed by this section shall bring such telecommunications facilities into compliance with such revised standards and regulations within the date established by the agency promulgating the standards or regulations.
b. Owners of telecommunications facilities shall provide documentation showing that each telecommunications facility is in compliance with all applicable federal and state requirements. Evidence of compliance must be submitted every 12 months.
c. Failure to bring towers and antenna into compliance with such revised standards and regulations shall constitute grounds for removal of the tower at the owner's expense. Any such removal by the governing authority shall be in the manner provided in sections 41-2-8—41-2-17 of the Official Code of Georgia.
(3) Security: All telecommunications facilities shall be equipped with an appropriate anti-climbing device or other similar protective device to prevent unauthorized access to the telecommunications facility. A black or non-obtrusive vinyl clad chain link fence or wall not less than eight feet in height from finished grade shall be provided around each communication tower or antenna. Barbed wire shall not be used along the top of the fence or wall. Access to the tower or antenna shall be through a locked gate.
(4) Lighting: For all towers that are required to be illuminated a dual lighting mode of red at night and strobe during day shall be allowed. Strobe at night shall not be permitted.
(5) Advertising: No advertising is permitted on telecommunications facilities. However, a whip antenna may be allowed on any legally permitted permanent billboard or outdoor advertising sign as long as the other requirements of this section are met.
(6) Visual impact:
a. Telecommunications facilities shall either maintain a galvanized steel finish or, subject to any applicable standards of the FAA or other applicable federal or state agency, be painted a neutral color or painted and/or textured to match the existing structure so as to reduce visual obtrusiveness.
b. If an antenna is installed on a structure other than a tower, the antenna and associated electrical and mechanical equipment must be of a neutral color that is identical to, or closely compatible with, the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible. Roof-mounted antennas shall be made visually unobtrusive by screening to match existing air conditioning units, stairs, elevator towers or other background.
c. Where feasible, telecommunications facilities should be placed directly above, below or incorporated with vertical design elements of a building to help in camouflaging.
d. Telecommunications facilities shall not be sited where they negatively affect historic or scenic view corridors as designated by the governing body or any state or federal law or agency or where they will create visual clutter.
e. Any equipment shelter or cabinet that supports telecommunications facilities must be concealed from public view or made compatible with the architecture of the surrounding structures or placed underground. Equipment shelters or cabinets shall be screened from public view by using landscaping or materials and colors consistent with the surrounding backdrop. The shelter or cabinet must be regularly maintained.
(7) Landscaping:
a. Landscaping shall be used to effectively screen the view of the telecommunications facility from adjacent public ways, public property and residential property.
b. Where adequate vegetation is not present, tower facilities shall be landscaped with a landscaped strip of plant materials which effectively screens the view of the tower compound. Landscaped strips shall be a minimum of ten feet in width and located outside the fenced perimeter of the compound.
c. Existing mature tree growth and natural landforms on the site shall be preserved to the maximum extent possible. Where natural vegetation around the perimeter of the site would provide an adequate visual screen, an undisturbed buffer may be utilized. The applicant shall provide a site plan showing existing significant vegetation to be removed, and vegetation to be replanted to replace that lost.
d. Landscaping shall be maintained by the provider and shall be subject to periodic review by the governing authority to assure proper maintenance.
Failure to maintain landscaping shall be deemed a violation of this section.
e. The governing authority may waive or modify the landscaping requirement where lesser requirements are desirable for adequate visibility for security purposes, for continued operation of existing bona fide agricultural or forest uses such as farms, nurseries and tree farms or where an antenna is placed on an existing structure. In certain locations where the visual impact of the tower would be minimal, such as remote agricultural or rural locations or developed heavy industrial areas, the landscaping requirement may be modified or waived by the governing authority.
(8) Maintenance impacts: Equipment at a transmission facility shall be automated to the greatest extent possible to reduce traffic and congestion. Where the site abuts or has access to a collector or local street, access for maintenance vehicles shall be exclusively by means of the collector or local street.
(9) Principal, accessory and joint uses:
a. Accessory structures used in direct support of a telecommunications facility shall be allowed but not be used for offices, vehicle storage or other outdoor storage. Mobile or immobile equipment not used in direct support of a telecommunications facility shall not be stored or parked on the site of the telecommunications facility.
b. Telecommunications facilities may be located on sites containing another principal use in the same buildable area.
(10) Lot size and setbacks:
a. The following setback requirements shall apply to all telecommunications facilities.
1. Telecommunications towers must be set back a distance equal to the height of the tower from any residential property line and all public rights-of-way.
b. For antennas attached to the roof of a supporting structure on a rooftop, a
1.1 setback ratio (example: ten foot high antenna and supporting structure requires ten foot setback from edge of roof) shall be maintained unless an alternative placement is shown to reduce visual impact.
(11) Change of ownership: Upon the transfer of ownership of an interest in any tower, antenna or lot upon which such a structure has been erected, the tower permittee shall notify the governing authority of the transaction in writing within 30 days.
(12) Time limit of project completion: Once a communication tower or antenna is approved, a permit shall be obtained within one year and the project shall be completed within one year of approval by the city.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.