Gray · Ordenanza de zonificación
Appendix A - ZONING AND SUBDIVISION REGULATIONS / Article IX - SPECIAL PROVISIONS
100.7. Application procedures.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
100.7.1. General application requirements for all building and conditional use permits.
Application for a building permit or conditional use permit for any telecommunications facility shall be made to the governing authority by the person, company or organization that will own and operate the telecommunications facility. An application will not be considered until it is complete. The following information shall be submitted when applying for any building permit, conditional use permit or other permit or variance included in this section and must be submitted for an application to be considered complete:
(1) Basic information.
a. Site plan or plans to scale specifying the location of telecommunications facilities, transmission building and/or other accessory uses, access, parking, fences, landscaped areas, and adjacent land uses. Applicants shall submit both a paper location map and a digitized location map in a format compatible with the GIS software currently utilized by the City of Gray.
b. Landscape plan to scale indicating size, spacing and type of plantings required in Section 100.6.1(7).
c. A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance, streetscapes or scenic view corridors.
d. A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs, and traffic, noise or safety impacts of such maintenance.
e. Report from a qualified, independent engineer licensed in the State of Georgia, documenting the following:
1. Telecommunications facility height and design, including technical, engineering, economic, and other pertinent factors governing selection of the proposed design;
2. Total anticipated capacity of the telecommunications facility, including numbers and types of antennas which can be accommodated;
3. Evidence of structural integrity of the tower or alternative structure;
and
4. Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to
contain debris.
f. Written certification that the radio frequency emissions from the proposed project are within the limits set by the Federal Communications Commission.
g. The identity of a community liaison officer appointed by the applicant to resolve issues of concern to neighbors and residents relating to the construction and operation of the facility. Include name, address, telephone number, facsimile number and electronic mail address, if applicable.
h. Identification of the geographic service area for the subject installation, including a map showing the site and the nearest or associated telecommunications facility sites within the network. Describe the distance between the telecommunications facility sites. Describe how this service area fits into and is necessary for the service network.
(2) Five year plan and site inventory. Each application shall include a five-year facilities plan and site inventory.
a. A list of all existing, existing to be upgraded or replaced, and proposed telecommunications facility sites within the city limits and within one mile of the city limits and a map showing these sites. The list must include the following information for each site:
1. Street address;
2. Assessor's Block and Lot or other applicable ad valorem tax identification number;
3. Zoning district;
4. Type of building (commercial, residential, mixed use) and number of stores;
5. The number of antennas and base receiver stations per site and the location and type of antenna installation (stand alone rooftop, building facade, etc.) and location of the base transceiver station installations(s);
6. The height from grade to the top of the antenna installation; and
7. The radio frequency range in megahertz, the wattage output of the equipment and effective radiated power.
b. If the applicant does not know specific future tower and antenna site locations but does know of areas where telecommunications facilities will be needed within the next five years to provide service, the applicant shall list the Assessor's Blocks contained within the anticipated geographic service area and identify each geographic service area with a number that will correspond to the future telecommunication facility site.
(3) Additional information requirements for towers:
a. If the proposed site is zoned C-2 or C-3 and there are alternative sites in M-1 or M-2, applicants must justify why those alternate sites have not been proposed. The governing authority will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease agreement. The governing authority shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site.
b. Applicants must identify all existing towers and all towers for which there are applications currently on file with the governing authority. Applicants must provide evidence of the lack of space on all suitable existing towers to locate the proposed antenna and of the lack of space on existing tower sites to construct a tower for the proposed antenna. If co-location on any such towers would result in less visual impact than the visual impact of the proposed tower, applicants must justify why such co-location is not being proposed. If co-location on any such tower would increase negative visual impact, then the applicant must so state and demonstrate. The governing authority will review with special care justifications that appeal only to undue expense and/or to undue difficulties in entering into a lease agreement. The governing authority shall carefully weigh such claims, and the evidence presented in favor of them, against a project's negative impacts at the proposed site.
c. The applicant must provide a utilities inventory showing the locations of all water, sewage, drainage and power lines impacting the proposed tower site.
d. An application fee shall be charged by the governing authority in the amount set forth by the schedule determined by the zoning board.
(4) The applicant must provide any other information which may be requested by the governing authority to fully evaluate and review the application and the potential impact of a proposed telecommunications facility.
(5) The governing authority may share any information submitted by an applicant under this ordinance with other applicants, organizations and persons, provided, however that the governing authority is not, by sharing such information, in any way representing or warranting that such information is accurate or that the sites identified are available or suitable for a telecommunications facility.
100.7.2. Conditional use permit. Application for a conditional use permit shall be required for the construction of any proposed tower or antenna to be located within any site zoned C-2 or C-3, and those towers as set out in Section 100.5.2.
(1) All requirements set forth in Section 100.6.1 shall be met.
(2) Additionally, the following factors may be taken into consideration in acting upon an application for conditional use:
a. The proximity of the tower or antenna(s) to residential structures and residential district boundaries;
b. The nature of uses on adjacent and nearby properties;
c. The surrounding topography;
d. The surrounding tree coverage and foliage;
e. The design of the tower or antenna(s), with particular reference to design characteristics that have the effect of reducing or eliminating visual obtrusiveness;
f. The proposed ingress and egress;
g. The availability of suitable existing towers or other structures for antenna co-location;
h. The impact of the proposed tower or antenna(s) upon scenic views and visual quality of the surrounding area;
i. The needs of the applicant as balanced against the detrimental effects on surrounding properties; and
j. The impact of the proposed tower or antenna(s) on adjacent and nearby properties.
(3) In granting a conditional use permit, the governing authority may impose additional zoning conditions to the extent determined necessary to buffer or otherwise minimize adverse effects of the proposed tower or antenna on surrounding properties.
(4) Any denial of a request to place, construct or modify a telecommunications facility located within a conditional use zoning district shall be in writing and supported by substantial evidence contained in a written record.
100.8. Appeals. Appeals from any decision of the zoning official with regard to this section may be taken by any person aggrieved by the decision. Such appeal shall be to the board of zoning appeals pursuant to Sections 114 and 115 of the Comprehensive Land Development Ordinance. Appeals from any decision of the board of zoning appeals shall be made to the superior court within 30 days of the decision. Any decision by the board of zoning appeals denying a request to place, construct or modify a telecommunications facility shall be in writing and supported by substantial evidence in a written record.
100.9. Nuisances. Telecommunications facilities, including, without limitation, power source, ventilation and cooling, shall be operated at all times within the limits of the City of Gray Noise Ordinance, shall not be operated so as to cause the generation of heat that adversely affects a building occupant and shall not be maintained or operated in such a manner as to be a nuisance.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.