Ir al contenido
Georgia Commons
Menú

Gwinnett County · Ordenanza de zonificación

Gwinnett County Zoning Ordinance

Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.

Sobre este texto

  • As published by Municode, current through 2026-04-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Parte 4 de 6. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.

D. The Director may not approve any Development Plans whereon is shown a proposed buildable lot which would present particularly unusual difficulties for construction of a building, which would clearly require a variance or waiver to be reasonably usable, or which is otherwise "unbuildable" because of its unusability, whether due to the presence of floodplain, unusual configuration, lack of public utilities or for any other reason. A House Location Plan (HLP) may be required to be filed as a part of the Development Plans approval to substantiate the buildability of any such difficult or unusual lot.

E. The subdivider shall be responsible for compliance with all codes, regulations, and zoning requirements and for the satisfaction of all of the noted and written comments of the Director.

F. Should an applicant disagree with the findings or final review comments of the Director or of any other County department, concluding that factual or interpretive errors have been made, the following appeal procedure shall be followed to resolve the issues.

1. Submit to the Department of Planning and Development a written statement clearly defining the nature of the disagreement, the specific reference to the Sections of the regulations at issue, and the applicant's own opinion.

2. Should the Department under appeal fail to respond within 30 working days from the date of transmittal of the appeal, the Director shall automatically forward a copy of the appeal to the Zoning Board of Appeals, or Board of Commissioners, as appropriate, for final action in their normal course of business. This requirement shall not prohibit an applicant from filing an appeal to the Zoning Board of Appeals at any time.

G. When the Director has determined that the Development Plans and related documents are in compliance with all applicable County regulations and zoning requirements, and a Metropolitan River Protection Act Certificate, if applicable, has been issued and approval has been received from all affected County departments, the Director or designee shall sign and date a CERTIFICATE OF DEVELOPMENT PLANS APPROVAL stamped on a reproducible copy of the plans. The approved Development Plans shall be transmitted to the applicant and retained by the Department for its records.

H. Interdepartmental Review and Approval. The Department shall not issue a permit for any development activities until the plans, plats, or construction drawings, as applicable, have been approved by such other departments or agencies as may have authority or jurisdiction over said activities in whole or in part.

I. Following the above approval by all affected County departments, a development permit shall be issued at the developer's request to begin construction activities based on the approved development plans.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 32), 9-26-2023) Section 320-30. Application and Review Process for Development Permits without Subdivision.

320-30.1 Plan Review and Approval Procedures.

A. An application for Development without Subdivision shall be submitted to the Department, as prescribed by the Director. The application shall include the Development Plans, construction drawings, and related documents as appropriate to the project. All construction drawings and other engineering data shall be prepared and sealed by an authorized registered professional currently registered in the State of Georgia, in accordance with the provisions of Georgia Law.

B. The Director may indicate on a review copy of the drawings, in a written memorandum, or electronically all comments related to compliance of the Development Plans with this UDO, principles of good design, conditions of zoning approval, and the regulations of other County departments and State agencies as appropriate. The Director shall have final staff authority to determine the applicability of any and all comments under this UDO or conditions of zoning approval.

C. The developer shall be responsible for compliance with all codes, regulations, and zoning requirements and for the satisfaction of all of the noted and written comments of the Director.

D. Deeds to lands dedicated to Gwinnett County in fee simple, shall be recorded. Copies of recorded deeds shall be submitted to the Department.

E. Should an applicant disagree with the findings or final review comments of the Director or of any other County department, concluding that factual or interpretive errors have been made, the following appeal procedure shall be followed to resolve the issues:

1. Submit to the Department of Planning and Development a written statement clearly defining the nature of the disagreement, the specific reference to the Sections of the regulations at issue, and the applicant's own opinion.

2. Should the Department under appeal fail to respond within 30 working days from the date of transmittal of the appeal, the Director shall automatically forward a copy of the appeal to the Zoning Board of Appeals, or Board of Commissioners, as appropriate, for final action in their normal course of business. This requirement shall not prohibit an applicant from filing an appeal to the Zoning Board of Appeals at any time.

F. When the Director has determined that the Development Plans and related documents are in compliance with all applicable County regulations and zoning requirements, and a Metropolitan River Protection Act Certificate, if applicable, has been issued and approval has been received from all affected County departments, the Director or designee shall sign and date a CERTIFICATE OF DEVELOPMENT PLANS APPROVAL stamped on a reproducible copy of the plan. The approved Development Plans shall be transmitted to the applicant and retained by the Department for its records.

G. Interdepartmental Review and Approval. The Department shall not issue a permit for any development activities until the plans or construction drawings, as applicable, have been approved by such other departments or agencies as may have authority or jurisdiction over said activities in whole or in part.

H. Following the above approval by all affected County departments, a development permit shall be issued at the developer's request to begin construction activities based on the approved development plans.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 32), 9-26-2023) Chapter 330. Development Plan Guidelines* Section 330-10. Development Plans without Subdivision.

330-10.1 Conformance with Zoning Resolution. Development Plans shall conform to all conditions of zoning as indicated on any applicable zoning resolutions pertaining to the property.

330-10.2 Scale. Development Plans and other applicable plans shall be clearly and legibly drawn at an engineering scale convenient to illustrate the details of the project. Sheet size shall not exceed 42 inches by 36 inches. Plan and Profile sheets, if any, shall have a horizontal scale of no less than 100 feet to 1 inch and a vertical scale of no less than 10 feet to 1 inch.

330-10.3 Project Boundary Data.

A. Development Plans shall be based on the boundaries of a lot as recorded on a Final Subdivision Plat or on a certified boundary survey delineating the entirety of the property contained within the project and tied to a point of reference (tie point) with the same degree of accuracy as the boundary survey itself. The survey shall have an accuracy of no less than 1 in to 10,000 feet and shall meet all requirements of Georgia Law regarding the recording of maps and plats.

B. Each Development Plan shall be drawn on, accompanied by, or referenced to a boundary survey which shall at least meet the requirements of Subsection 320-10.3A, above.

330-10.4 List of what is required to be shown. Development Plans shall contain the following (on one or more sheets):

A. Proposed name of development. If the project is located within a subdivision, the name of the subdivision, lot, and block number must also be shown.

B. Name, address, email address, and telephone number of the owner of record, and of the developer (if not the owner).

C. Name, address, email address, and telephone number of each professional firm associated with the Development Plans (engineer, landscape architect, etc.).

D. Date of survey, north point, and graphic scale, source of datum, date of plan drawing, and space for revision dates.

E. Proposed use of the site, including gross square footage for each different use type or building.

F. Location, District, Land Lot(s) and Parcel(s) acreage or area in square feet, and density (if applicable).

G. Location sketch locating the development in relation to the surrounding area with regard to well-known landmarks such as major thoroughfares or railroads. Sketches may be drawn in freehand and at a scale sufficient to show clearly the information required, but not less than 1 inch equal to 2,000 feet. U.S.

Geological Survey maps may be used as a reference guide for the location sketch.

H. Size and location of all buildings, building setback lines, minimum yard lines, and distances between buildings and from buildings to property lines; location of outdoor storage areas; parking and loading areas, driveways, curb cuts and designated fire lanes. Each building shall be identified with a number or letter.

I. Boundary lines of the perimeter of the tract indicated by a heavy line giving lengths to the nearest one-hundredth of a foot and bearings to the nearest second. Bearing and distance to designated tie point.

J. Directional flow arrows for street and lot drainage and minimum floor elevations for all structures.

K. Contour lines based on sea level datum. These shall be drawn at intervals of not more than two feet and shall include the entire site and all abutting public streets. Contour lines shall be based on field surveys or photogrammetric methods from aerial photographs. The basis for the topographic contour shown shall be specified and dated.

L. Natural features within the proposed development, including drainage channels, bodies of water, and other known significant features such as extensive exposed rock. On all water courses the direction of flow shall be indicated. The 100-year floodplain shall be outlined, and the source of the depicted floodplain information shall be indicated. The acreage or area in square feet within the floodplain shall be indicated.

M. Man-made and cultural features existing within and adjacent to the proposed development including existing right-of-way measured from centerline, pavement widths, and names of jurisdiction lines; existing structures on the site and their disposition, Chattahoochee River Corridor information and Chattahoochee River Tributary Protection Areas (if applicable), and other significant information. Location and dimensions of existing bridges; water, sewer, and other existing utility lines and structures; culverts and other existing features shall be indicated.

N. Street names, roadway and right-of-way lines and widths and sites reserved through covenants, easement, dedication or otherwise for public uses.

O. Identify unit number, division, or stage of development, if any, as proposed by the developer.

P. Show all adjoining property owners, subdivision names, lot numbers, lot lines and block letters, and zoning.

Q. Show the location and number of parking spaces according to the size of the building on the plans. Show factors used in determining number of spaces as required in this UDO. Parking spaces for persons with disabilities shall be shown as required by the Official Code of Georgia and any other applicable state laws.

R. Show the zoning district, rezoning and special use permit case number(s), date of approval, and conditions.

Show Modification, Waiver, or Variance case number(s),date of approval, and conditions. .

S. If buffers, other landscaping or screening treatments, or vegetation and landscaping stormwater BMP's are required, show the location, size, and type (natural or planted) on the plans conforming to the Tree Preservation/Replacement Plan or Buffer and Landscape Plan, as applicable.

T. Location, height, and size of all freestanding signs to be erected on the site, and indication whether lighted or unlighted.

U. Location of all known existing landfills and proposed on-site bury pits (State EPD Permit, and Gwinnett County Special Use Permit or other approval may be required).

V. Such additional information as may be reasonably required to permit an adequate evaluation of the project.

W. Certificate of Development Plans Approval.

Each Site Plan shall carry the following certificate printed or stamped thereon:

All requirements of the Gwinnett County Unified Development Ordinance (UDO) relative to the preparation and submission of a development plans having been fulfilled, and said application and all supporting plans and data having been reviewed for code compliance by all affected County Departments as required under their respective and applicable regulations, approval of this development plan is hereby granted and all other development plans associated with this project shall be subject to all further provisions of said

UDO.

Director Date Department of Planning and Development

THIS CERTIFICATE EXPIRES TWELVE MONTHS FROM THE DATE OF APPROVAL UNLESS

A DEVELOPMENT PERMIT IS ISSUED

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-20. Development Plans with Subdivision.

330-20.1 Conformance with Zoning Resolution Development Plans shall conform to all conditions of zoning as required by any applicable zoning resolutions pertaining to the property.

330-20.2 Scale. Development Plans shall be clearly and legibly drawn at a scale of not less than 100 feet to 1 inch.

Sheet size shall not exceed 48 inches by 36 inches. Plan and Profile sheets shall have a horizontal scale of no less than 100 feet to 1 inch and a vertical scale of no less than 10 feet to 1 inch.

330-20.3 Certified Boundary Survey.

A. Development Plans shall be based on a Certified Boundary Survey delineating the entirety of the property contained within the Subdivision and tied to a point of reference (tie point) with the same degree of accuracy as the boundary survey itself. The survey shall have an accuracy of no less than 1 in 10,000 feet and shall meet all requirements of Georgia Law regarding the recording of maps and plats.

B. Development Plans shall be drawn on, accompanied by, or referenced to a Certified Boundary Survey which shall at least meet the requirements as described above.

330-20.4 List of what is required to be shown. Development Plans shall contain the following:

A. Proposed name of subdivision.

B. Name, address, email address, and telephone number of the owner of record, and of the subdivider (if not the owner).

C. Name, address, email address and telephone number of each professional firm associated with the Development Plans (engineer, surveyor, landscape architect, etc.).

D. Date of survey, north point, and graphic scale, source of vertical datum, date of plat drawing, and space for revision dates.

E. Proposed use of the site, such as single-family detached residences, duplexes, townhouses, office park, industrial subdivision, etc. For residential, indicate total number of dwelling units within plat.

F. Location, District, Land Lot(s) and Parcel(s), acreage, and density (if applicable).

G. Location sketch locating the subdivision in relation to the surrounding area with regard to well-known landmarks such as major thoroughfares or railroads. Sketches may be drawn in freehand and at a scale sufficient to show clearly the information required, but not less than 1 inch equal to 2,000 feet. U.S.

Geological Survey maps may be used as a reference guide for the location sketch.

H. Name of former subdivision, if any or all of the land in the Development Plans has been previously subdivided, showing boundaries of same.

I. Boundary lines of the perimeter of the tract indicated by a heavy line giving lengths in feet and hundredths of a foot, and bearings in degrees, minutes, and seconds. Bearing and distance to designated tie point.

J. Directional flow arrows for street drainage and individual lot drainage as well as minimum floor elevations for each lot. Each lot to be labeled as slab, basement, or slab/basement.

K. Contour lines based on sea level datum. These shall be drawn at intervals of not more than 2 feet. Contour lines shall be based on field surveys or photogrammetric methods from aerial photographs. The basis for the topographic contour shown shall be specified and dated.

L. Natural features within the proposed subdivision, including drainage channels, bodies of water, and other known significant features such as extensive exposed rock. On all water courses the direction of flow shall be indicated. The 100-year floodplain shall be outlined, and the source of the depicted floodplain information shall be indicated. For those lots containing floodplain, a Floodplain Lot Chart shall be provided showing the area (in square feet) of each lot lying inside and outside of the floodplain as though the land-disturbing activity were completed.

M. Man-made and cultural features existing within and adjacent to the proposed subdivision including existing right-of-way measured from centerline, pavements widths, and names of existing and platted streets; all easements, city, and County jurisdiction lines; existing structures on the site and their disposition, Chattahoochee River Corridor information and limits of Chattahoochee River Tributary protection Area (if applicable), and other significant information. Location and dimensions of existing bridges; water, sewer, and other existing utility lines and structures; culverts and other existing features shall be indicated.

N. Proposed layout including lot lines, lot numbers, and block letters; proposed street names, roadway, and right-of-way lines; and, sites reserved through covenants, easement, dedication, or otherwise for public uses.

Lots shall be numbered in numerical order and blocks lettered alphabetically.

O. The minimum building setback line from all streets. Streets shall be dimensioned to show right-of-way and roadway widths, central angles, intersection radii, and cul-de-sac roadway and right-of-way radii. Centerline curve data shall be provided for all roadway curves [radius, length, amount of super elevation (if any), point of curvature (P.C.), point of tangency (P.T.), etc.] if not shown separately on construction drawings.

P. Identify unit number, division, or stage of development, if any, as proposed by the subdivider.

Q. Existing zoning of the property. Rezoning, modification, waiver and variance case numbers, dates of approval and conditions (as applicable). Note minimum lot size and minimum building setback requirements, and other applicable zoning requirements. Show and dimension any required buffers, landscape strips, no-access easements, etc.

R. All adjoining property owners, subdivision names, lot numbers and lot lines, block letters, and zoning.

S. Location of all known existing or previously existing landfills.

T. Proposed recreation area, common area, conservation space, if any, the area of each site and percent of site within the 100-year floodplain, proposed disposition of the site (public ownership, homeowners association, etc.). If these areas are required, provide calculation of the required and provided areas.

U. Such additional information as may be reasonably required to permit an adequate evaluation of the subdivision.

V. Certificate of Development Plans approval.

Development Plans shall carry the following certificate printed or stamped thereon:

All requirements of the Gwinnett County Unified Development Ordinance (UDO) relative to the preparation and submission of development plans having been fulfilled, and said application and all supporting plans and data having been reviewed for code compliance by all affected County Departments as required under their respective and applicable regulations, approval of these development plans is hereby granted, on this development plan and all other development plans associated with this subdivision, shall be subject to all further provisions of said UDO.

Director Date Department of Planning and Development

THIS CERTIFICATE EXPIRES TWELVE MONTHS FROM THE DATE OF APPROVAL UNLESS

A DEVELOPMENT PERMIT IS ISSUED.

NOTE: The boundaries of proposed lots shown on these plans have not been surveyed. These plans are not for recording.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-30. Other Plans to Accompany Development Plans without Subdivision.

330-30.1 Development Plans shall be accompanied by other plans showing the following information when same is not shown on, or evident from the Development Plans. The various plans may be combined where appropriate, and clarity can be maintained.

A. Erosion, Sedimentation and Pollution Control Plan prepared in accordance with the requirements of this UDO. Erosion control measures may be shown on the Grading Plan, if allowed by the Department.

B. Grading plan, prepared in accordance with the requirements of this UDO.

C. Stormwater drainage construction data prepared in accordance with the requirements of this UDO and the Gwinnett County Storm Sewer Pipe Standards, including but not limited to:

1. Location and size of all proposed drainage improvements, and all proposed drainage easements to be located outside street right-of-way lines.

2. Profiles of all storm drainage pipes and slope of receiving channels. Hydraulic grade line is to be shown on all pipes (except roof drains) for the required design flow. On storm drainage profiles a pipe chart will be shown which will include: pipe numbers, pipe size, pipe material, pipe slope, pipe length, contributing drainage area, design flow, design storm frequency, runoff coefficient and velocity. On all pipes, the hydraulic grade line shall be shown.

3. Profiles of all open channels and ditches including the design flow, normal depth, and velocity. On storm drainage profiles an open channel chart will be shown which will include: open channel numbers, conveyance size, lining material, length, channel slope, contributing drainage area, design flow, design storm frequency, runoff coefficient and velocity for the required design flow.

4. Acreage of drainage areas and Hydrological study used in determining size of structures, including map of all contributing drainage basins and acreages.

D. Sewage disposal plans prepared in accordance with the requirements of the current Water Main and Sanitary Sewer Design and Construction Standards and Specifications, including but not limited to:

1. Sanitary Sewer Plans, including the profiles and other information as may be required by the Department of Planning and Development.

2. For projects proposed to be served by on-site sewage disposal systems, location, and extent of septic tank, drain field and attendant structures, and other information required by the Environmental Health Section.

E. Street widening and construction data prepared in accordance with the requirements of this UDO, including but not limited to:

1. Centerline profiles and typical roadway sections of all proposed streets, as well as plans and profiles for all proposed major thoroughfares. Profiles (and plans, where required) shall be drawn on standard plan and profile sheet with plan section showing street layout, pavement and right-of-way width, curvature, and required drainage facilities. Typical roadway sections shall be provided for street widenings.

2. Profiles covering roadways that are extensions of existing roadways shall include elevations at 50-foot intervals for such distance as may be adequate to provide continuity consistent with the standards required by this UDO for street improvements, but no less than 200 feet.

3. All elevations shall be coordinated and sited into U.S. Coast and Geodetic Survey or Department of Transportation benchmarks where feasible or into reference monuments established by the Federal Emergency Management Agency.

F. Utility Plans.

G. Specimen Tree Survey.

H. Specimen Tree Concept Plan, if applicable.

I. Tree Preservation and/or Replacement Plan prepared in accordance with this UDO.

J. Buffer and Landscape Plan. If any such areas exist within the site, the plan shall be prepared in accordance with the specifications and requirements contained within this UDO.

K. Floodplain Management Plans if any floodplain areas are located on the property. Such data as is required by this UDO shall be submitted.

L. Water System Plans prepared in accordance with the requirements of the Water Main and Sanitary Sewer Design and Construction Standards and Specifications, including but not limited to:

1. Water Main Extension plans, if any, are to be designed in accordance with the current Water Main Specifications.

2. Private Water System Plans, if any, indicating proposed devices, water main size and location, with fire hydrants, on the site. The distance and direction to all other fire hydrants within 500 feet of the site or buildings along existing streets or other access drives shall also be indicated.

M. Street striping plan, showing striping in accordance with the Manual on Uniform Traffic Control Devices, for any street newly constructed to four or more lanes, and all newly constructed or widened major thoroughfares.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-40. Other Plans to Accompany Development Plans with Subdivision.

330-40.1 Development Plans shall be accompanied by other plans showing the following information when same is not shown on, or evident from the Development Plans. The various plans may be combined where appropriate, and clarity can be maintained.

A. Preliminary Plat prepared in accordance with this UDO.

B. Erosion, Sedimentation and Pollution Control Plan prepared in accordance with the requirements of this

UDO.

C. Grading Plan prepared in accordance with the requirements of this UDO if grading is proposed beyond the street right-of-way.

D. Stormwater drainage construction data prepared in accordance with the requirements of this UDO and the Gwinnett County Stormwater Management Manual, including but not limited to:

1. Location and size of all proposed drainage structures, including stormwater management facilities, catch basins, grates, headwalls, pipes, and any extensions thereof, energy dissipators, improved channels, and all proposed drainage easements to be located outside street right-of-way lines.

2. Profiles of all storm drainage pipes and slope of receiving channels. Hydraulic grade line is to be shown on all pipes (except roof drains) for the required design flow. On storm drainage profiles a pipe chart will be shown which will include pipe numbers, pipe size, pipe material, pipe slope, pipe length, contributing drainage area, design flow, design storm frequency, runoff coefficient and velocity. On all pipes, the hydraulic grade line shall be shown.

3. Profiles of all open channels and ditches including the design flow, normal depth, and velocity. On storm drainage profiles an open channel chart will be shown which will include: open channel numbers, conveyance size, lining material, length, channel slope, contributing drainage area, design flow, design storm frequency, runoff coefficient and velocity for the required design flow.

4. Hydrological study used in determining size of structures, including map of all contributing drainage basins and acreage.

E. Sewage disposal plans prepared in accordance with the requirements of the current Water Main and Sanitary Sewer Design and Construction Standards and Specifications, including but not limited to:

1. Sanitary Sewer Plans, including the profiles and other information as may be required by the Department of Water Resources.

2. For projects proposed to be served by on-site sewage disposal systems, location, and extent of septic tank, drain field and attendant structures, and other information required by the Environmental Health Section.

F. Construction data for new streets and street widenings, including:

1. Centerline profiles and typical roadway sections of all proposed streets, as well as plans and profiles for all proposed major thoroughfares. Typical roadway sections shall be provided for street widenings.

2. Profiles covering roadways that are extensions of existing roadways shall include elevations at 50-foot intervals for such distance as may be adequate to provide continuity consistent with the standards required by Chapter 900 for street improvements, but no less than 200 feet.

3. All elevations shall be coordinated and tied into U.S. Coast and Geodetic Survey or Department of Transportation benchmarks where feasible, or into reference monuments established by the Federal Emergency Management Agency.

4. Stub streets shall be profiled at least 200 feet onto adjoining property (no tree cutting).

G. Utility Plans

H. Specimen Tree Survey.

I. Specimen Tree Concept Plan, if applicable.

J. Tree Preservation and/or Replacement Plan prepared in accordance with this UDO.

K. Buffer and Landscape Plan. If any such areas exist within the subdivision, the plan shall be prepared in accordance with the specifications under this Chapter, and the requirements.

L. Floodplain Management Plans. If any floodplain areas are located on the property, such data as is required by this UDO shall be submitted.

M. Water System Plans prepared in accordance with the requirements of the Water Main and Sanitary Sewer Design and Construction Standards and Specifications, including but not limited to:

1. Water Main Extension plans, if any, are to be designed in accordance with the current Water Main Specifications.

2. Private Water System Plans, if any, indicating proposed devices, water main size and location, with fire hydrants, on the site. The distance and direction to all other fire hydrants within 500 feet of the site or buildings along existing streets or other access drives shall also be indicated.

N. Street striping plan, showing striping in accordance with the Manual on Uniform Traffic Control Devices, for any street newly constructed to four or more lanes, and all newly constructed or widened major thoroughfares.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-50. Preliminary Plat.

330-50.1

A. Plat Specifications Size. The Preliminary Plat for a subdivision development shall be clearly and legibly drawn at a scale of not less than 100 feet to 1 inch. Sheet size shall not exceed 48 inches by 36 inches, provided, however, a scale of 200 feet to 1 inch may be used to avoid sheets in excess of 48 inches by 36 inches. The Director may approve other scales and sheet sizes as deemed appropriate.

B. List of what is required to be shown. The Preliminary Plat shall contain the following:

1. Total acreage.

2. Proposed total number of lots and minimum lot size.

3. Size and location of adjoining existing streets or access drives and proposed rights-of-way, roadways, access drives, and adjoining sidewalks.

4. Topography with contour intervals no greater than 10 feet.

5. Proposed method of sewage disposal (expressed as a note).

6. Boundary lines of the overall property showing bearings and distances along all lines and the bearings and distance to an existing street intersection or other recognized permanent landmark. The source of said boundary information shall be indicated.

7. All contiguous property under the ownership or control of the developer, except those lands of a dissimilar zoning category specifically approved to be excluded by the Department. Areas not planned at the time of the submittal shall be shown as "Future Development".

8. Authorization statement on the Preliminary Plat to read as follows:

I hereby submit this Preliminary Plat as authorized agent/owner of all property shown thereon and certify that all contiguous property under my ownership or control is included within the boundaries of this Preliminary Plat, as required by the Unified Development Ordinance.

Signature of Authorized Agent/Owner Date

9. Location sketch (vicinity map).

10. Location and size (in acres) of lakes, ponds, wetlands and floodplains and the source of the information.

11. Required recreation areas and other public areas to be dedicated to the public or held in common ownership by a homeowner association or other similar entity.

12. Existing zoning of the property and adjoining properties.

13. Land lot and district.

14. Subdivider's name, local and permanent (if different) address, email address, and phone number.

15. Name, address, email address, and phone number of company or person who prepared plan.

16. Boundaries of the Chattahoochee River Corridor and Chattahoochee River Tributary Protection Areas, if applicable to the property.

17. General development data, such as minimum lot size, floor area, and all relevant conditions of zoning.

18. Location of public utilities.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-60. Erosion, Sedimentation and Pollution Control Plan.

330-60.1 Plan Requirements

A. Plans shall meet minimum requirements. Plans shall be prepared to meet the minimum requirements as contained in Section 400-30.2 and Section 400-30.3 of this UDO or through the use of more stringent, alternative design criteria which conform to sound conservation and engineering practices. In addition, plans shall also comply with the data requirements of Chapter 320 of this UDO. Conformance with the minimum requirements may be attained through the use of design criteria in the current issue of the "Manual for Erosion and Sediment Control in Georgia", published by the Georgia Soil and Water Conservation Commission as a guide; or through the use of alternate design criteria which conform to sound conservation and engineering practices. The "Manual for Erosion and Sediment Control in Georgia" is hereby incorporated by reference into this UDO. The plan for the land-disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances or regulations and state laws.

B. Data required for plan. Data shall include all information required from the appropriate Erosion, Sedimentation, and Pollution Control Plan review checklist established by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted. The following data shall be required to be provided on all plans:

1. Narrative or notes required by this Chapter shall be located on the plan in general notes or in erosion and sediment control notes.

2. Description of existing land use at the project site and description of the proposed project.

3. Name, address, email address, and phone number of the property owner.

4. Name and phone number of the 24-hour local contact person who is responsible for erosion and sedimentation controls.

5. Size of the project, or the phase under construction, in acres.

6. Activity schedule, including initial installation and final removal of all best management practices, shall indicate the anticipated start and completion dates for the project.

7. The following statement in bold letters shall be printed on the plan: "The Installation of Erosion and Sedimentation Control Measures And Practices Shall Occur Prior To Or Concurrent With LandDisturbing Activities ONLY AFTER THE REQUIRED PRE-CONSTRUCTION SITE MEETING WITH DEVELOPMENT INSPECTORS."

8. Stormwater and sedimentation management systems, storage capacity, hydrologic study, and calculations, including off-site drainage areas. Vegetative plan for all temporary and permanent vegetative practices, including species, planting dates, and seeding, fertilizer, lime, and mulching rates. The vegetation plan shall show options for year-round seeding.

9. Detail drawings for all structural practices. Specifications shall follow the guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.

10. Maintenance statement shall be printed on the plan as follows: "Erosion and sedimentation control measures shall be maintained at all times. If full implementation of the approved plan does not provide for effective erosion and sediment control, additional erosion and sediment control measures shall be implemented to control or treat the sediment source."

C. Additional plan preparation and data requirements. Maps, drawings, and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land-disturbing activity shall meet the education and training certification requirements, dependent on his or her level of involvement with the process, as developed by the Georgia Soil and Water Conservation Commission and in consultation with the Environmental Protection Division (EPD) of the Department of Natural Resources and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20. The certified plans shall contain the following:

1. Graphic scale and north point or arrow indicating magnetic north.

2. Vicinity map indicating the location of the project and existing streets.

3. Boundary line survey information.

4. Delineation of disturbed areas within the project boundary.

5. Existing and planned contours, with contour lines drawn with an interval in accordance with the following table:

Map Scale Ground Slope Contour Level One (1) inch = 100 feet; or larger scale Flat: 0—2% 0.5 or 1 Rolling: 2—8% 1 or 2 Steep: 8% + 2, 5 or 10

6. Adjacent areas and features such as streams, lakes, residential areas, etc., which might be affected shall be indicated on the plan.

7. Proposed structures or additions to existing structures and paved areas.

8. Delineate the 25-foot horizontal buffer adjacent to state waters and the specified width of buffers in areas required by the Metropolitan River Protection Act.

9. Delineate the specified horizontal buffer along designated trout streams, where applicable.

10. Location of the erosion and sedimentation control measures and practices, using the uniform coding symbols from the "Manual for Erosion and Sediment Control in Georgia," Chapter 6.

D. Property owner responsibility for maintenance. Maintenance of all soil erosion and sedimentation control measures and practices, whether temporary or permanent, shall be at all times the responsibility of the property owner. Section 330-70. Grading Plan.

330-70.1 Compliance with contour line and grade required. Grading shall be done in accordance with the contour lines and grades shown on the approved Grading Plan.

330-70.2 Contour interval of 2 feet required. Grading plans shall show existing and proposed contour lines at an interval of no more than 2 feet. Grading plans shall outline the areas that are required to remain undisturbed (i.e., Tree Protection Areas, buffer, etc.) and shall indicate protective fencing or staking to be placed surrounding such areas.

330-70.3 Consistent with Metropolitan River Protection Act. If the property is within the jurisdiction of the Metropolitan River Protection Act, the grading shall be consistent with the Chattahoochee River Corridor Certificate approved for the project.

330-70.4 Embankment layering shall be consistent with the Gwinnett Stormwater Management Manual.

330-70.5 Maximum Slopes.

A. The maximum slopes for cut or fill shall be 2:1 (two feet of horizontal run for each foot of rise or fall), except for the following:

1) For earthen dam embankments

2) For rock cuts

3) Where certified by a professional engineer

4) As discussed below.

B. Earthen embankments shall be 3:1 maximum unless a modification application is approved. The intent of the earthen dam embankment slope regulation is to provide for public safety, soil stability, and dam maintenance considerations. The depth of cut referred to herein shall be the maximum cut or fill that shall be allowed to occur in any one section of cut or fill. The slope of cut or fill shall be uniform throughout for each section of cut or fill unless benching is approved by the County.

C. Maximum slopes shall otherwise be consistent with the Gwinnett County Stormwater Management Manual.

330-70.6 Special conditions for soil with low shearing resistance and cohesion shall be required as specified in the Gwinnett County Stormwater Management Manual.

330-70.7 Grading plan for building pad locations for residential subdivisions.

A. A grading plan showing building pad locations shall be submitted for residential subdivisions zoned for a lot size of less than 12,000 square feet or a density of 4 units per acre or more unless a modification application is approved.

B. Lot must be graded to ensure adequate lot-to-lot drainage. Granting a modification will not nullify the intent of this UDO when the layout has a minimum lot area of 14,520 square feet and a minimum lot width of 90 feet. The grading plan may be used as a construction document prior to approval of the Final Plat or as a guidance document for individual lot grading after approval of the Final Plat.

C. The grading plan must include the minimum floor elevations, drainage flow arrows and a designation of slab, basement, or slab/basement for each lot.

330-70.8 Grading for roads and improved ditches shall be shown.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-80. Utility Plan.

All utility construction plans within County right-of-way shall be reviewed and approved by the Department before construction begins. Street cuts shall not be allowed unless deemed absolutely necessary due to the presence of rock, the need to tap into an existing line beneath the road surface, or other circumstances which makes boring impossible or infeasible.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-90. Specimen Tree Survey and Specimen Tree Concept Plan.

330-90.1 Specimen Tree Survey. The specimen tree survey shall be to scale and prepared, certified, or sealed by a certified arborist, registered forester, or authorized registered professional.

A. The Specimen Tree Survey P shall be prepared on a closed boundary survey of the property and at minimum the following items shall be shown:

1. Parcel identification number(s).

2. Project name.

3. Property owner's name and contact information.

4. Developer's name, company name, address, phone, and email address.

5. Designer's name, company name, address, phone, and email address.

6. Specimen trees located and labeled with tree identification number, diameter, genus and/or common name.

7. Specimen tree stands located and labeled with their tree identification number, diameter, genus and/or common name.

8. Existing structures and their location.

9. Abandoned and existing wells and their location.

10. Any notes required by this UDO.

B. In chart format, provide specimen tree identification number, genus or common name, size (dbh); and condition description. as listed in Section 630-70.3.A.2).

330-90.2 Specimen Tree Concept Plan. If specimen trees are identified, a Specimen Tree Concept Plan shall be prepared by a qualified professional and submitted with development plans.

A. The Specimen Tree Concept Plan shall be prepared on a closed boundary survey of the property. In addition to items listed in Section 330-20.1., the following shall be shown:

1. Dripline or critical root zone of each specimen tree (whichever is greater) and tree save areas.

2. Building footprint.

3. Driveways.

4. Parking Lot(s).

5. Utility lines and easements (both existing and proposed).

6. Limits of disturbance.

7. Proposed stormwater management areas.

8. Existing and proposed topography.

B. Provide the percentage of disturbance for each specimen tree when critical root zone is partially disturbed.

C. In chart format, provide information that states if a tree is to be removed or preserved/protected; state the tree density unit credit for each specimen tree; and provide a column for assigned recompense in the event the tree is removed or the critical root zone disturbance is greater than 30 percent.

D. Trails and Greenways. In the case of trails and greenways that are not located on public access easements or public or private utility easements show the proposed trail or greenway, show the trail or greenway limits of clearing and a 25-foot corridor on either side of the trail or greenway limits of clearing with any specimen tree identified within that trail or greenway corridor.

E. For Limited Land Disturbance Permits, a tree survey is required for the area within the land disturbance and 50 feet beyond the limits of the disturbance line.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-100. Limited Land Disturbance Plan for Tree Removal.

330-100.1 List of plan requirements for Limited Land Disturbance:

A. Tree Thinning, Timber Harvesting, or Removal of Trees for Disease or Insect Infestation shall meet plan requirements as described in this UDO and shall contain the following information:

1. Owners name, address, email address, and telephone number;

2. Consultant's name, address, email address and telephone number;

3. Contractor's name, address, email address, and telephone number;

4. Twenty-Four (24) Hour Emergency Contact;

5. Location/Vicinity Map;

6. District, Land Lot(s), Parcel number(s);

7. Scale;

8. North Arrow;

9. Closed property boundary showing bearings and distances of all property lines;

10. Zoning;

11. Zoning case numbers, approval date, and all conditions;

12. Zoning of adjacent parcels;

13. Total acreage of property;

14. Total acreage of disturbed area;

15. Tree protection areas;

16. Tree protection fence;

17. Silt fence;

18. Street Name(s);

19. Location of:

a. Streams;

b. Stream Buffers (State Waters)(Gwinnett County);

c. Impervious Surface Setback;

d. Topography;

e. 100-year floodplain;

f. Wetlands.

20. Limits of land disturbance, and;

21. Approximate locations of:

a. Logging decks;

b. Haul roads;

c. Stream crossings;

d. Historical features such as cemeteries.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-110. Tree Preservation and/or Replacement Plan.

330-110.1 Tree Preservation and/or Replacement Plans shall be prepared and certified by an authorized registered professional, registered forester, or certified arborist in accordance with the specifications for such plans contained in this UDO.

330-110.2 The Tree Preservation and/or Replacement Plan shall be shown on a site plan and included with the permit application for a Development Permit and shall be, drawn to the same scale as the other development plans in the set. Specific sections of the Tree Preservation and/or Replacement Plan may be shown at a larger scale for detail purposes provided the overall plan is at the same scale as the other development plans in the set. The Tree Preservation and/or Replacement Plan may be combined with the Buffer and Landscape Plan for the project provided it remains legible.

330-110.3 The Tree Preservation and/or Replacement Plan shall provide sufficient information and detail to clearly demonstrate that all applicable requirements and standards of this UDO will be fully satisfied.

330-110.4 The Tree Preservation and/or Replacement Plan shall, at a minimum, contain the following:

A. Project name, land district, land lot, parcel, north arrow, and scale.

B. Developer's name, address, email address, and telephone number.

C. The name, address, email address, and telephone number of the authorized registered professional, registered forester, or certified arborist.

D. Delineation of overhead power lines and transmission lines.

E. Delineation of all minimum yard areas, buffers, and landscape areas as required by this UDO or conditions of zoning, special use or variance approval.

F. Total acreage of the site and total acreage exclusive of all zoning buffer areas.

G. Delineation of all areas located within a 100-year flood plain.

H. Existing trees to be retained in Tree Protection Areas:

1. Trunk location and size (to the nearest inch in diameter at 4.5 feet above the ground), of individual trees proposed to remain for credit toward meeting the minimum Tree Density Standard on the property.

2. Groups of three or more trees whose driplines combine into a single Tree Protection Area may be outlined as a group and their number, by diameter, shown in the Summary Table.

3. If the number and size of all existing trees to remain on the site exceeds the required tree density standard for the entire site, only those trees required to meet the minimum Tree Density Standard must be shown.

4. All Tree Protection Areas are to be outlined and labeled.

I. Tree Protection Measures:

1. A detail or description of the protective tree fencing to be installed, and the location of such measures, which at a minimum shall follow the dripline of all trees to be retained along adjoining areas of clearing, grading, or other construction activity.

2. Measures to be taken to avoid soil sedimentation intrusion into Tree Protection Areas, and the location of such devices.

3. Proposed location of temporary construction activities such as equipment or worker parking, materials storage, burn holes, equipment washdown areas, and entrance pads.

4. Proposed type and location of any tree save area signs or other pertinent signage.

J. If replacement trees are proposed to be planted in order for the property to achieve the required Tree Density Standard, the replacement trees shall be shown and their spacing and caliper identified, to the extent needed to achieve the minimum requirements. Trees grouped together in tree planting areas may be listed on the Summary Table by total number in the grouping, by size.

K. A Summary Table of the number of existing trees to remain by diameter to the nearest inch at 4.5 feet above the ground for preserved trees and for new trees to be planted by caliper at 6 inches above the ground for replaced trees, shall be shown along with calculations showing the tree density achieved for the site.

Additional credits shall be noted where applicable.

L. Tree Canopy Calculations. (See Chapter 630)

M. The plan sheet which shows the grading plan, including existing and proposed contour lines, shall indicate the dripline location of all Tree Protection Areas through the use of shading on the plans. The exact location of each tree is not desired to be shown, only the limits of the Tree Protection Area and any other areas which are not to be disturbed.

N. The location of all easements.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-120. Buffer and Landscape Plan.

330-120.1 A Buffer and Landscape Plan shall be prepared for any project wherein buffer areas or other landscaping areas, or treatment are required and when conditions of zoning, special use or variance approval, or other regulations of Gwinnett County require them, and shall be approved prior to issuance of a development permit. While the plan shall cover, at a minimum, the required buffer and landscape areas, it may be combined with the Tree Preservation and/or Replacement Plan into a general landscaping plan for the entire project at the developer's option provided it remains legible.

330-120.2 The Buffer and Landscape Plan shall be shown on a site plan or boundary survey and included in the Development Plans and drawn to the same scale as the other development plans in the set or at a larger scale for detail purposes.

330-120.3 The Buffer and Landscape Plan shall, at a minimum, contain the following:

A. Project name and land district, land lot, parcel acreage, north arrow, and scale.

B. Developer's name, address, email address, and telephone number.

C. The name, address, email address and telephone number of the authorized registered professional, registered forester, or certified arborist responsible for preparation of the plan.

D. Boundary lines of each buffer or other landscape area, appropriately labeled.

E. Delineation of undisturbed buffer areas along the dripline of the trees or groups of trees contained therein, and any other areas wherein trees are proposed to be retained to meet County requirements. These areas shall be treated in accordance with Tree Protection Area requirements contained in this UDO and labeled as such.

F. Protective barriers and signage as required by this UDO shall be shown as to location and detailed.

G. Delineation of overhead power lines and overhead transmission lines.

H. General location of all proposed trees, shrubs, vines, groundcovers, mulching, and other features proposed within the buffer/landscape area. The layout of the vegetation and landscaping required for the proposed stormwater management facilities as well as the plant names are to be shown.

I. Within areas involving or adjacent to landform changes, existing and finish grade topographic lines at an interval of no more than 2 feet may be required.

J. For new plant materials to be installed, a plant material list including but not limited to:

1. Common and botanical names of all proposed plants.

2. Plant quantities.

3. Size and condition of plants. (Example: 2-inch caliper, 6 feet height, balled and burlapped).

4. Spacing.

5. Remarks as necessary to ensure proper plant selection upon installation. (Example: specimen, multi-trunked).

K. The location of easements.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-130. Floodplain Management Plan and Plat.

330-130.1 An application for a development project with any Area of Special Flood Hazard or Area of Future-conditions Flood Hazard located on site shall include a floodplain management/flood damage plan. This plan shall include the following items:

A. Site plan drawn to scale, which includes but is not limited to:

1. Existing and proposed elevations of the area in question and the nature, location, and dimension of existing and/or proposed structures, earthen fill placement, amount and location of excavation material, and storage of materials or equipment;

2. For all proposed structures, spot ground elevations at the building corners and 20-foot or smaller intervals along the foundation footprint, or one foot contour elevations throughout the building site;

3. Proposed locations of water supply, sanitary sewer, and utilities;

4. Proposed locations of drainage and stormwater management facilities;

5. Proposed grading plan;

6. Base flood elevations and future-conditions flood elevations;

7. Boundaries of the base flood floodplain and future-conditions floodplain;

8. Location of the floodway, if applicable; and

9. Certification of the above by a licensed professional engineer or surveyor.

B. Building and foundation design detail, including but not limited to:

1. Design plans certified by a licensed professional engineer or architect for all proposed structure(s).

2. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;

3. Certification that any proposed non-residential floodproofed structure meets the criteria in Chapter 700.

4. For enclosures below the base flood elevation, location and total net area of flood openings as required in Chapter 700.

C. Hard copies and digital files of computer models, copy of work maps, comparison of pre- and postdevelopment conditions base flood elevations, future-conditions flood elevations, flood protection elevations, Special Flood Hazard Areas and regulatory floodways, flood profiles and all other computations and other information similar to that presented in the FIS;

D. The approved floodplain management/flood damage prevention plan shall contain certification by the applicant that all development activities will be done according to the plan or previously approved revisions.

Any and all development permits and/or use and occupancy certificates or permits may be revoked at any time if the construction and development activities are not in accordance with approved plans.

E. All residential lots in a proposed subdivision shall have sufficient buildable area outside of the future conditions floodplain such that encroachments into the future-conditions floodplain for residential structures will not be required.

F. All preliminary plats and site development plans will provide the elevations of proposed structures in accordance with this Chapter.

G. All preliminary plats and site development plans shall be consistent with the need to minimize flood damage.

H. All construction plans for land development shall show public utilities and facilities such as water, sanitary sewer, gas, and electrical systems located and constructed to minimize or eliminate infiltration of flood waters, and discharges from the systems into flood waters.

I. All construction plans for land development include adequate drainage and stormwater management facilities per the requirements of Chapter 800 to reduce potential exposure to flood hazards.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Section 330-140. Structure Location Plans.

330-140.1 House Location Plan.

A. Size and description. House Location Plans shall be drawn to scale and may be shown on a certified boundary survey of the lot or any other drawing showing the information required below. The Department may accept a House Location Plan drawn to the same scale as shown on the Final Plat where sufficient detail can be shown to support an adequate review and approval. The House Location Plan may be combined with a Residential Drainage Plan (RDP) if a RDP is required for the lot.

B. May be drawn by an individual. It is not the intent of the Department that the House Location Plan be prepared by an authorized registered professional but may be done by the individual proposing the improvements on the lot. It is the intent, however, to receive a drawing with sufficient readability and accuracy to ensure that the proposed improvements will be constructed on the lot in conformance with the requirements of this UDO, or other regulations as applicable.

C. List of what is to be shown. House Location Plans shall show the following, as applicable:

1. Boundary lines of the lot, giving distances to the nearest one-tenth of a foot and bearing to the nearest minute.

2. Location and names of all abutting streets or other rights-of-way.

3. Minimum required front, side and rear building setback lines with dimensions, and notation of the existing zoning on the property.

4. All easements, public water, sewer, or storm drainage facilities traversing or located on the property, septic tank, and septic tank drain field.

5. Subdivision name, lot designation, land lot, district, and parcel number.

6. North arrow and scale.

7. Limit of the 100-year floodplain and any applicable buffers or special building setback lines.

8. If the lot is located within the Chattahoochee River Corridor, the location of each area by vulnerability category and calculations of impervious surface and clearance by category, or other such data in accordance with the Certificate for the subdivision approved under the Metropolitan River Protection Act. Show also any buffer or setback required by the Metropolitan River Protection Act.

9. All other applicable requirements of this UDO and conditions of zoning approval.

10. Name, address, email address, and telephone number of the owner and the person who prepared the

HLP.

D. Certificate of Occupancy. If a lot is located in the Chattahoochee River Corridor, a Certificate of Occupancy shall not be issued for the structure or other improvements until conformance to the provisions or other requirements of the House Location Plan have been field verified by a survey prepared by a registered land surveyor and submitted to the Department.

330-140.2 Residential Drainage Plan (RDP).

A. Certified boundary survey required. Prior to issuance of a Building Permit, Residential Drainage Plans shall be drawn to scale on a certified boundary survey of the lot and prepared by an authorized registered professional and be approved by the Department of Planning and Development. The Residential Drainage Plan may be combined with a House Location Plan (HLP) if an HLP is required for the lot. The requirements contained herein shall also apply to lots which formerly required SPED (Site Plan - Engineering Division) approval.

B. A list of what is required to be shown. Residential Drainage Plans shall show the following, as applicable:

1. Boundary lines of the lot, giving distances to the nearest one-tenth of a foot and bearings to the nearest minute.

2. Location and names of all abutting streets or other rights-of-way.

3. The outline of all buildings, driveways, parking areas, swimming pools, recreational courts, patios, accessory structures, and other improvements existing or proposed on the property, and dimensions of buildings and distances between all structures and the nearest property lines as required to locate the major improvements on the lot.

4. All easements, public water or sewer facilities traversing or located on the property, and septic tank drain field.

5. Subdivision name, lot designation, land lot, and district.

6. North arrow and scale.

7. Contour lines based on sea level datum. These shall be drawn at intervals of not more than two feet and shall be based on a field survey. Proposed grading of the lot shall be shown along with the finished floor elevation of the lowest habitable floor of the house.

8. Stormwater features, including swales, pipes, stormwater management facilities and other structures, all drainage easements (DE), and directions of flow.

9. Floodplain features, including the limits of the flood hazard area, 100-year flood high water elevation, origin of the floodplain data, and any proposed modifications to the floodplain limits.

10. Sedimentation and erosion control measures to be taken or placed on the lot during construction.

11. Names, address, email address, and telephone number of the owner and person who prepared the

RDP.

12. Seal, registration number, and date of expiration of the authorized registered professional who prepared the drainage improvements or modifications shown on the RDP.

330-140.3 Residential Drainage Study (RDS).

A. A Residential Drainage Study (RDS) shall be conducted by the developer's or builder's authorized registered professional prior to issuance of a Certificate of Occupancy on those lots so noted on the Final Plat. The requirements for a RDS contained herein shall also apply to lots that formerly required SSED (Site Study - Engineering Division) approval. The grading and construction of the lot shall be field verified by the developer's or builder's authorized registered professional as being in conformance with grading plans and stormwater management studies approved for the subdivision. A Certificate of Occupancy shall not be issued for the structure until a written certification has been received from the developer's or the builder's authorized registered professional stating that the provisions or improvements required by the Residential Drainage Plan or as a result of the Residential Drainage Study have been field verified.

330-140.4 Certificate - Department approval. If an RDP or RDS is required because a stream or floodplain is on or adjacent to the lot, the notation on the development plans and plat shall be "RDP" or "RDS" as appropriate.

330-140.5 Swimming Pool Location Plan.

A. A Swimming Pool Location Plan is required for residential lots in order to obtain a building permit for a swimming pool. Its purpose is to ensure that the rear yard location and accessory structure setback requirements are met and that easements are kept free of encroachments.

B. Size and description. Swimming Pool Location Plans shall be drawn to scale and may be shown on a certified boundary survey of the lot or any other drawing showing the information required below. The Department may accept a Swimming Pool Location Plan drawn to the same scale as shown on the Final Plat where sufficient detail can be shown to support an adequate review and approval.

C. May be drawn by an individual. It is not the intent of the Department that the Swimming Pool Location Plan be prepared by an authorized registered professional but may be done by the individual proposing the pool on the lot. It is the intent, however, to receive a drawing with sufficient readability and accuracy to ensure that the proposed improvements will be constructed on the lot in conformance with the requirements of this UDO, or other regulations as applicable.

D. List of what is required to be shown:

1. Boundary lines of the lot with distances.

2. Location and names of all abutting streets or other street rights-of-way.

3. Minimum required front building setback lines with dimensions.

4. Minimum required 5-foot accessory structure setback from side and rear property lines.

5. Self-closing and self-latching gate equipped with a locking device.

6. Pump, equipment structures and decking.

7. Septic tank and drain field (if applicable).

8. Height, type, and location of required pool fencing.

9. The approximate outline of all buildings, driveways, swimming pools, recreational courts, patios, accessory structures, and other improvements, existing or proposed, on the property, and dimensions of buildings and distances between all structures and the nearest property lines.

10. Location and dimensions of any water, sewer, drainage or other easements, stormwater management facilities, septic tank, and septic tank drain field located on the lot.

11. Subdivision name, lot, and block designation.

12. North arrow and scale.

13. The 100-year floodplain limits, any applicable stream buffers, or other special building setback lines.

14. Names, address, email address, and telephone number of the owner and person who prepared the plan.

15. Any other applicable requirements of this UDO or conditions of zoning approval.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 33), 9-26-2023) Chapter 340. Inspections* Section 340-10. Initiation of Development Activities.

340-10.1 Initial Activities Required.

A. Following the issuance of any permit authorizing clearing, grubbing, grading or development of a site, a preconstruction conference shall be mandatory for all phases of construction and conducted before erosion and sediment control installation or any land disturbance takes place. Utility construction permits and retaining wall permits shall be issued prior to scheduling a pre-construction conference.

B. The Department shall be contacted no less than 2 business days prior to scheduled start of construction to schedule the mandatory pre-construction conference. Attendees to include owner's representative, engineer, site work contractors, and utility contractors.

C. Site development related activities prior to this required pre-construction conference shall be a violation of the permitted scope of work. A Notice of Violation and a Stop Work Order may be issued on site and all work must stop until the pre-construction conference has been completed and all work prior to the pre-construction conference inspected for compliance with the rules, appropriate standards, regulations, codes, and ordinances, then, if warranted corrections to illegal work completed before the work associated with the approved permit can proceed.

340-10.2 Erosion and Sediment Control Measures. Required preliminary erosion and sediment control measures must be installed in the field per the developer's authorized plans and inspected by the Department prior to actual grading or removal of vegetation. All erosion and sediment control measures shall be in place per State and County regulations as soon as or in conjunction with the commencement of activities and in continual coordination with the progress of the project and as per the authorized Erosion, Sedimentation and Pollution Control Plan.

A. Preliminary erosion and sedimentation control measures must be installed and operational prior to major grading operations.

B. Buffer areas required to be undisturbed per this UDO, conditions of zoning approval, per the Metropolitan River Protection Act, or any other applicable ordinance, or regulation shall be designated by approved protective tree fencing and shall be inspected by the Department prior to the commencement of any clearing, grubbing, grading, or development activities.

340-10.3 Tree Protection Areas. Prior to the initiation of land-disturbing activities and throughout the clearing, grubbing and grading process the following must be accomplished for a designated tree protection area in accordance with any approved Buffer and Landscape Plan or Tree Protection Plan for the property, as set forth in this UDO:

A. For trees which are not to be disturbed or removed, required protective fencing, and tree protection area signage shall be established and maintained in place. These barriers must be maintained throughout the land disturbance process and shall not be removed until the final landscaping phase has begun.

B. The tree protection areas shall not be encroached for any reason or be used for storage of earth and other materials resulting from or used during the development process.

C. Construction site activities such as parking, materials storage, concrete washout, burning, etc., shall be arranged to prevent disturbance or damage within or to the tree protection areas.

340-10.4 Stabilization for Erosion Control. If for any reason a lapse of 14 days occurs after initial land clearing, grubbing, and grading, or development activities have commenced, the developer and/or builder shall be responsible for reestablishing temporary vegetation cover of the site. If the lapse in construction activity extends beyond 30 days, permanent vegetative measures are required under the direction of the Department.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 34), 9-26-2023) Section 340-20. Development Inspections.

340-20.1 Development Inspections. The developer or contractor shall request all inspections at least 2 business days prior to commencement of any development or construction activity for each of the phases below as authorized by any permit for site work or development. Inspections shall be made by the Department and passed prior to authorization for continuation of further activity or proceeding into new phases. Newly installed underground infrastructure including but not limited to; stormwater pipes and water and sewer lines must be installed per design standards and inspected prior to cover up of any portion.

The following items refer to construction activities that require approval before the next phase of construction occurs:

A. Development of the site. Clearing, grubbing, grading or development of the site or any portion included under the permit.

B. Grading. Installation of slope and grade stakes, erosion controls and detention facilities.

C. Road Construction. The grading of areas for placement of the new roadway(s) shall be staked by the proper responsible parties as per the authorized plan.

D. Installation of storm drainage pipe, detention, or other storm water facilities. Installation of storm drainage pipe, detention, or other stormwater management facilities require a pre-construction conference before commencement.

E. Installation of sanitary sewer and appurtenances and/or water main extensions and appurtenances.

Notification shall be made by the authorized utility contractor after obtaining a utility construction permit from the Department of Planning and Development.

F. Curbing of roadways. Inspection shall be requested before the forms have been set (if used). Roadway width will be spot checked by string line between curb stakes. The developer or representative must be present for all "string line" related field inspections.

G. Sub-base or subgrade of streets. After compaction, the subgrade shall be string-lined for depth and crown.

The subgrade shall pass a roll test with no defects, to the satisfaction of the Department.

H. Street base. The base will be string-lined for depth and crown and shall pass a roll test with no movement to the satisfaction of the Department.

I. Paving. A Department inspector shall be on site during the paving process to check consistency, depth, and workmanship, as applicable. For asphalt paving, the temperature of the material will be spot-checked, and evidence provided of quantity, thickness, and mix of installation.

J. Water Line. Shall install curb and gutter prior to installing the water lines.

340-20.2 Responsibility for Quality and Design. The completion of inspections by Gwinnett County officials or employees and authorization for work continuation shall not transfer responsibility for the quality of the work performed or materials used from the contractor or developer, nor imply or transfer acceptance of responsibility for project design or engineering from the professional corporation or individual under whose hand or supervision the plans were prepared.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 34), 9-26-2023) Chapter 350. Development Design Standards* Section 350-10. Incorporation of Standard Drawings.

350-10.1 Department to Maintain Standard Drawings on File. The Department shall maintain on file for consultation and distribution a set of Standard Drawings, which may be updated administratively from time to time, illustrating details of construction and design of streets, stormwater management facilities, site improvements and other elements related to the development of land in accordance with this UDO and under the jurisdiction of the Department.

350-10.2 Standard Drawings to Illustrate Standards. The Standard Drawings shall illustrate minimum acceptable standards for land development activities authorized under this UDO but shall not supersede more restrictive prudent design requirements or good engineering practices as applied to specific situations on a case-by-case basis.

350-10.3 Standard Drawings Incorporated as Part of the Unified Development Ordinance. The Standard Drawings shall be treated as though a part of this UDO for application to the minimum standards for design and construction of improvements required herein and subject to the modification and waiver provisions of this UDO.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 35), 9-26-2023) Section 350-20. Incorporation of the Gwinnett Countywide Trail Master Plan.

350-20.1 All development shall be consistent with the guidelines and policies of the Gwinnett Countywide Trails Master Plan.

350-20.2 The Gwinnett Countywide Trails Master Plan shall be treated as though a part of these regulations for application to the minimum standards for design, construction of improvements, and/or dedication of easements required herein and subject to the modification and waiver provisions of Section 340-40.

350-20.3 Where conflicts exist between the Gwinnett Countywide Trails Master Plan and this UDO, the recommendations within the Master Plan shall prevail.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 35), 9-26-2023) Section 350-30. Design of Lots.

350-30.1 Building Setback Conformity. Building setback lines shall conform to the minimum setback requirements of Title 2 of this UDO except where a greater distance is required by the Gwinnett County Construction Code.

350-30.2 Lots.

A. Lots to conform to the Title 2 of this UDO. Lots shall conform to requirements of this UDO. No lot shall be created that is of a lesser dimension than that required to meet the standards established in Title 2 of this UDO, unless a variance is granted. However, this provision shall not apply when a conforming lot is made non-conforming as a result of public acquisition.

B. Subdivisions shall be designed to minimize direct lot access to major thoroughfares.

1. Double frontage and reverse frontage lots shall be required for subdivisions along major thoroughfares where internal access can be provided. A no-access easement of at least ten feet in width, across which there shall be no right of access, shall be provided along the line of lots abutting such a traffic artery. When located along a major thoroughfare, the no-access easement shall be planted and/or screened as required by Chapter 620-80 of this UDO, when the backs of homes are oriented toward the street.

2. No-access easement planting or other screening treatments which are required by the UDO, or as a condition of zoning, shall be installed by the developer at no cost to Gwinnett County.

C. Flag lots prohibited. No plat shall be approved on which is shown a flag lot, as defined in this UDO.

D. Side Lot Lines. Side lot lines generally should be at right angles (90 degrees) to straight street lines or radial to curved street lines as much as practical. Side lot lines should be radial to the radius points of all cul-de-sacs. Variations of more than 10 degrees shall require modification approval from the Department and shall be approved when appropriate to the reasonable design pattern of the subdivision and efficient use of the land relative to topographic conditions.

E. The Department may require notation that a House Location Plan (HLP) is required to be approved prior to issuance of a Building Permit on certain lots when particular care in locating the house or other improvements will be necessary. Such lots include, but are not limited to:

1. A lot which presents particular or unusual difficulties for a builder to meet minimum required building setbacks;

2. A lot upon which is located an easement of unusual configuration;

3. A lot containing floodplain;

4. A lot upon which is located all or a part of a stormwater management facility;

5. A lot upon which is located a buffer which was required by Title 2, and Title 3 of this UDO or as a condition of zoning approval;

6. All duplex lots; and

7. All lots within, or partially within, the Chattahoochee River Corridor, or containing a River Corridor Tributary Buffer Zone.

F. The Department may require notation that a Residential Drainage Plan (RDP) is required to be approved prior to issuance of a Building Permit on certain lots where additional (site specific) engineering will be necessary to properly grade the lot or locate the building or other improvements. Such lots include, but are not limited to:

1. A lot containing floodplain where fill or other encroachment into the floodplain is planned or reasonably expected;

2. A lot containing severe topographic features intersecting the building site;

3. A lot containing a drainage easement with a pipe discharge or other facilities, or flow characteristics which may adversely affect the location of a building or other site improvement.

G. The Department may require notation that a Residential Drainage Study (RDS) is required to be approved prior to issuance of a Building Permit on certain lots where particular attention to site grading will be necessary, but formal engineering is not needed. Such an RDS is conducted in the field where the effect of the site grading must be accomplished with adequate care so as not to create a drainage problem on neighboring property.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 35), 9-26-2023) Section 350-40. Exceptions to Design of Lots.

350-40.1 Signage and Landscape Features. The creation of an unbuildable lot in a proposed subdivision for the exclusive purpose of subdivision identification signage or subdivision entrance landscape features is authorized only under the following circumstances (modification applications from the circumstances of this exception shall not be accepted):

A. The lot shall be located at an entrance to the subdivision as an "island" in the right-of-way of a local or minor collector street; and,

B. A mandatory property owner's association shall be required for the subdivision for ownership and maintenance of the lot as common area; and,

C. Right-of-way of a minimum width of 6 feet from back of curb shall be provided adjacent to the perimeter of the lot; and,

D. Landscape plantings within the right-of-way shall not extend more than 2.5 feet above the street grade.

350-40.2 Stormwater Management and Utility Facilities. The creation of an unbuildable lot for the exclusive purpose of providing and maintaining a stormwater management or utility facility is authorized, provided that such a lot meets all applicable requirements set forth in this UDO and under the jurisdiction of the Department.

350-40.3 Open Space. The creation of an unbuildable lot for the exclusive purpose of providing and maintaining open space or conservation space for the enjoyment of the community is authorized.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 35), 9-26-2023) Section 350-50. Access and Right-of-Way.

350-50.1 Project Access Improvements.

A. Every developer of land shall provide the project access improvements included in this UDO as shall be appropriate to serve the project, in accordance with these regulations and other pertinent Codes, Ordinances, and regulations of Gwinnett County. Said improvements and associated lands shall be provided at no cost to Gwinnett County, and shall be dedicated or otherwise transferred, as required, to the public in perpetuity and without covenant or reservation, except as otherwise provided herein.

B. For all business and industrial developments fronting a state highway, no land disturbance or building permits shall be issued until the approval of the Georgia Department of Transportation (DOT) has been obtained by the applicant on the entrances and exits, curb radii, drainage and other matters that are the appropriate concern of Georgia DOT.

350-50.2 Access.

A. Large parcels to provide future street access. When land is subdivided into larger parcels than ordinary building lots, such parcels shall be arranged and designed so as to allow for the opening of future streets and to provide access to those areas not presently served by streets.

B. Landlocking of adjacent property prohibited. No development shall be designed so as to completely eliminate street access to adjoining parcels of land. Every development shall be designed to facilitate access to adjoining properties which are developed or anticipated to be developed in a manner substantially similar to the subject property. Locations of inter-parcel access shall be as required by and subject to the approval of the Department.

C. Private streets to be constructed pursuant to roadway construction standards. Private streets as may be approved under the provisions of this UDO shall be constructed to the street construction standards of Gwinnett County, as contained in Chapter 360.

350-50.3 Vehicular Access Easements. Vehicular access easements may be provided from a public street indirectly via easement subject to the following:

A. The easement shall be in a location and the access driveway shall have a width and alignment acceptable to the Department and the Department of Fire and Emergency Services.

B. The access easement serves a single-family residence on a lot which is otherwise a buildable lot of record, and which is sharing a common driveway with more than one other single-family residence.

C. The sharing of a common driveway (or alley) by multiple residences.

D. The access easement was lawfully established as such under the code, ordinances, or regulations of Gwinnett County prior to the adoption of this UDO.

E. The access easement coincides with a private roadway or alley approved under the code, ordinances, or regulations of Gwinnett County.

350-50.4 Dedication of Street Right-of-Way. Right-of-Way for all public streets, existing and proposed, shall be dedicated in accordance with the street classifications as shown on the officially adopted Gwinnett County Long Range Road Classification Map or as required by Director or Designee of Gwinnett DOT.

350-50.5 Greenway Access Dedication of Easement and Construction Requirements. Access, dedication of easement and/or construction of greenway trails shall be provided in accordance with the prioritized greenway network map of the most currently approved Gwinnett Countywide Trails Master Plan, as follows:

A. Greenway Access. All properties or assemblages of parcels abutting designated greenways as shown on the prioritized greenway network map of the Gwinnett Countywide Trails Master Plan shall provide at least one multi-use path to the programmed or existing greenway. The multi-use path shall be paved or constructed with materials approved by Gwinnett County , and the route segment shall be a minimum of 10 feet in width. Multi-use path locations shall be reviewed and approved by the Department of Community Services.

B. Greenway Construction and Easement Dedication.

1. Within flood plains and stream buffers, greenway easements shall be dedicated and constructed to provide public access to trails as shown on the prioritized greenway network map of the Gwinnett Countywide Trails Master Plan. Greenways shall be located so that the route is feasible for both construction and long-term maintenance. The specific location of the greenway shall be verified on the ground before approval and project release of the development. The amount of land required for greenway construction shall not exceed 5 percent of the land within the development excluding greenways located within a standard street right-of-way.

2. For all other locations, as established by the prioritized greenway network map of the Gwinnett Countywide Trails Master Plan, dedication of easement shall be required for greenways lying outside of any floodplain or stream buffer or shall be reserved either for public access greenway easement, dedication and construction, or other terms negotiated with the County.

3. In coordination with the Department of Community Services and the Director of Planning and Development, greenways with public access may be allowed to substitute for required sidewalks if the greenway alignment coincides with locations intended to be served by sidewalks.

C. Limitations.

1. Single-family residential zoning districts. The dedication or construction of greenways in singlefamily residential zoning districts is required for subdivisions that involve the creation of a new street.

Existing single-family lots are exempt from greenway easement dedication and construction.

2. All other zoning districts. Construction of the greenway is required in the following situations:

a. Whenever there is new development; or

b. Whenever alterations to existing development are 25 percent or greater of the total improvements on the site; or

c. Whenever new streets are constructed.

D. The construction and dedication of greenways shall be in accordance with the approved Gwinnett Countywide Trails Master Plan design standards. Any deviation or modification of the construction standards contained herein shall be subject to the approval of a modification or waiver.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 35), 9-26-2023) Section 350-60. Design of Blocks.

350-60.1 Length, Width, and Shape. The lengths, widths, and shapes of blocks shall be determined with regard to:

A. Provision of adequate building sites suitable to the special needs of the type of use contemplated;

B. Applicable zoning requirements as to maximum length of street, lot size and dimensions;

C. Needs for convenient access, circulation, control, and safety of street traffic; and

D. Limitations and opportunities of topography.

350-60.2 Pedestrian Access. In blocks over 500 feet long, an alley, sidewalks, pedestrian way, or pedestrian access easement, shall be provided through the block to other streets within the development.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 35), 9-26-2023) Section 350-70. Residential Amenities, Open Space.

350-70.1 Residential Amenities and Common Areas.

A. In subdivisions where land is required for open space use in accordance with this UDO, such land shall be deeded to a qualified Property Owners or Homeowner's Association, or other legal entity incorporated under the laws of Georgia upon the approval of the Final Plat containing said land. Said land shall be deeded with a restriction that the land shall be used exclusively for recreational purposes and shall be made available to all residents of the subdivision project on an equal basis. The qualified Property Association shall provide for the mandatory membership of all of the owners within the subdivision, and shall be responsible for the perpetuation, maintenance and function of the recreation areas and uses or facilities therein. The association shall have the authority and duty to assess its members for such maintenance and improvements as set forth in the instrument creating the association. All covenants shall be recorded simultaneously with the final subdivision plat.

B. In multifamily rental or condominium projects, land provided for open space in accordance with these requirements shall be held in the ownership of the owner of the project.

C. Gwinnett County may lease or sell land reserved for public parks to a qualified Property Owners Association with a deed restriction that the land be used exclusively for open space, common area or public recreational purposes in perpetuity. The organization of a qualified Property Owners Association and its adequate financing for the discharge of its responsibilities shall be assured through acceptable private deed covenants running with the land or other such documents as approved by the Boards of Commissioners of Gwinnett County.

D. In a residential development, where usable open space is to be developed, permits for any amenities must be issued prior to 25 percent of the proposed residential units receiving a certificate of occupancy. All amenity areas must be completed prior to 75 percent of the proposed residential units receiving a certificate of occupancy.

350-70.2 Open Space in Big Haynes Creek Watershed Protection Area. Open space provided in projects located in the Big Haynes Creek Watershed Protection Area shall meet the following requirements:

A. Open Space shall be permanent and shall remain in its natural state, undisturbed and unoccupied by any structures or impervious surfaces to include septic tanks and septic tank fields and except for approved access or utility crossings. Pedestrian access shall be subject to the approval of the Director. Buffers, floodplains, and wetlands may be used as open space.

B. Ownership Requirements. Open Space provided in a development located in the Big Haynes Creek Watershed Protection Area shall be owned and maintained by the property owner, or in the case of subdivision, by a property owner's association. The association shall be established by the developer prior to or concurrent with the recording of the Final Plat of the subdivision. The association by laws shall include the following provisions:

1. Automatic (mandatory) membership of all purchasers of lots therein and their successors.

2. Conditions and timing of transferring control of the association from the developer to the lot owners shall be specified which shall not exceed four years from the date of recording of the Final Plat of the subdivision

3. Responsibility for maintenance, insurance, and taxes.

4. Sharing of the costs of maintenance among the lot owners with shares defined by the association bylaws.

5. Authority to place liens on the real property of members who fail to pay their dues or assessments.

6. Prohibition of the dissolution of the association without the approval of the Board of Commissioners.

C. Maintenance. The property owner, or the property owner's association, shall be responsible for the maintenance of open space. Open Space shall be kept in reasonable order and condition.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 35), 9-26-2023) Chapter 360. Infrastructure, Streets, Sidewalks, Multi-Use Paths, and Greenways* Section 360-10. Street Classification and Right-of-Way Requirements.

360-10.1 Street Classifications.

A. Dedication of Street Right-of-Way. Right-of-way for all existing and proposed public streets within a project shall be dedicated in accordance with the street classifications as shown on the officially adopted Gwinnett County Long Range Road Classification Map.

B. Street Improvements. All streets and project access improvements shall be constructed or improved to the standards as established in the UDO. Roadway improvements shall be made in accordance with the street classifications as shown on the officially adopted Long Range Road Classification Map or the UDO as applicable, or as otherwise required by the Board of Commissioners.

360-10.2 Minimum Right-of-Way and Street Improvements.

A. Right-of-Way and Pavement Widths. Minimum widths of street right-of-way and roadway pavement shall be as shown on Table 360.1 unless a modification is granted by the Director, except as follows:

1. New Local Residential Streets in OSC, TND and Mixed-Use Districts. New local streets in subdivisions developed in the OSC District and in exclusively residential areas of TND, MU-N, MU-C and MU-R Districts shall be as follows:

a. Right-of-way width of new interior local streets.

i. Entrance Streets: at least 50 feet for a depth of 300 feet from the subdivision entrance (measured from exterior road right-of-way) after which street right-of-way width shall be at least 46 feet.

ii. Other Interior Streets: at least 44 feet.

iii. Right-of-Way Radii: at least 60 feet for cul-de-sac or "eyebrow" turnarounds.

b. Pavement width of new interior local streets.

i. Entrance Streets: at least 27 feet (measured to back of curb) for a depth of 300 feet from the subdivision entrance (measured from exterior road right-of-way) after which pavement width shall be at least 24 feet (measured to back of curb).

ii. Other Interior Streets: at least 24 feet (measured to back-of-curb).

iii. Pavement Radii: at least 50 feet for cul-de-sac or "eyebrow" turnarounds (measured to back of curb).

c. Additional right-of-way shall be provided to accommodate additional travel lanes, sidewalks, multi-use paths, trails and greenways, and underground utilities.

2. New Local non-residential streets in the MU-N, MU-C and MU-R Districts.

a. New local non-residential streets developed in the mixed-use areas of TND, MU-N, MU-C and MU-R Districts shall meet the minimum right-of-way and roadway pavement widths for local non-residential street as shown in Table 360.1.

b. Additional pavement and right-of-way width.

i. Additional Travel Lanes: at least 11 feet of pavement width.

ii. On-Street Parallel Parking: at least 9 feet of pavement width.

iii. On-Street Angled Parking: at least 18 feet of pavement width.

iv. Right-of-Way: additional right-of-way shall be provided to accommodate additional travel lanes, sidewalks, underground utilities, multi-use paths, trails, and greenways located between lots and street right-of-way.

Table 360.1. Minimum Right-of-Way and Roadway Widths for New Streets and Project Access Improvements.

Street Category Minimum Right-Of-Way1 Minimum Roadway2 Principal Arterial 120 TO 150 6 through lanes with median Major Arterial 100 TO 120 67 4 to 6 through lanes with median Minor Arterial 80 TO 100 52 TO 66 4 through lanes with median Major Collector 80 52 Minor Collector 60 TO 80 28 Local Street Non-residential Non-residential Cul-De-Sac 60 3 32 60 radius 50 radius Local Street Residential — Urban Residential — Urban Cul-de-sac 50 27 50 radius 40 radius Local Street Residential - Rural4 Residential — Rural Cul-de-sac4 60 5 24 6 60 5 radius 40 radius 1 The greater right-of-way width shall apply under circumstances as described in Section 360-10.2.

2 Roadway width dimensions are back-of-curb to back-of-curb except where noted.

3 Utility easement shall be provided in a location and size as required by the Department of Water Resources.

4 Subdivisions zoned RA-200.

5 May be reduced to 50 feet if curb, gutter, and piped drainage system is provided.

6 Measured to edge of pavement. Curb and gutter is not required in RA-200 subdivision. Roadway width may be reduced to 23 feet if curb and gutter is provided (27 feet total width).

B. Street Rights-of-Way.

1. The minimum width of street right-of-way shall be dedicated based upon the street classification as shown on the officially adopted Gwinnett County Long Range Road Classification Map and as contained in the UDO.

2. Additional street right-of-way width shall be required to be dedicated at intersections or other locations to accommodate required traffic safety improvements (e.g., deceleration lanes, turning lanes, storage lanes, medians, or realignments), future projects identified in official planning documents, or within 500 feet of a major intersection and minimum right-of-way standards would be inadequate to accommodate the improvements.

3. If a new street or thoroughfare is proposed by the officially adopted Gwinnett County Long Range Road Classification Map or the State of Georgia to adjoin or traverse the property, permits shall not be issued until the Department of Transportation has submitted the project to the Board of Commissioners for review in order to seek a determination if Gwinnett County should acquire the right-of-way or if a study of alternate routes should be undertaken.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-20. Requirements for New Streets and Roadways.

360-20.1 Construction Standards. Streets, whether public or private, shall be constructed or improved at least to the standards contained in this UDO in accordance with the category of said streets or as otherwise required by the Board of Commissioners.

360-20.2 General Layout Requirements.

A. Conformance. The arrangement, character, extent, width, grade, and location of all streets shall conform at a minimum to the officially adopted Gwinnett County Long Range Road Classification Map and this

UDO.

B. Local Streets and Minor Collectors.

1. Local streets shall be laid out so that their use by through traffic will be discouraged. Minor collectors shall be provided to channel through traffic movements within a development, where appropriate to the design and a major thoroughfare is not proposed by the officially adopted Gwinnett County Long Range Road Classification Map. Minor collectors also may be provided as central routes within large residential subdivisions, where appropriate to the design, based on project traffic demands exceeding 2,000 trips per day (ADT). Traffic calming measures for new local streets are required to encourage and maintain maximum vehicle operating speeds of 25 mph. In order to achieve this objective, the maximum length of roadway section between speed control points shall be 500 feet. Such design and construction should be in substantial conformance with the Gwinnett County Department of Transportation Traffic Calming Design Guide for traffic calming measures and requirements.

C. Cul-de-sac Streets.

1. Dead end streets designed to have one end permanently closed shall provide a cul-de-sac or other approved turnaround and may be no more than 600 feet in length. Additional length necessitated by topography or property configuration may be approved by the Director.

2. The length of a cul-de-sac street shall be measured from the center of the cul-de-sac or other approved turnaround to the center of the intersection with another street, whether a through street or another cul-de-sac or dead-end street.

3. Eyebrow cul-de-sac (half cul-de-sacs) will be allowed only at "right-angled" intersections having an interior angle between 80 degrees and 100 degrees.

4. Cul-de-sacs shall conform to the layout and dimensional requirements as shown in the Standard Drawings maintained by the Department.

D. Substandard Streets. In the event that a development has access to a substandard street (i.e., a dirt or gravel road), the following project access improvements shall be required:

1. If the abutting substandard street provides access to the development and is dirt or gravel, the street shall be upgraded by the developer to a paved roadway from the project entrance to the nearest standard paved road along the route of access.

2. Off-site project access improvements required under Subsection 360-20.2.D.1, above, and Chapter 360 shall at a minimum, result in a full-section roadway meeting the requirements of a local residential rural roadway (24 feet edge to edge of pavement, with drainage swale ditches as needed). Responsibilities shall be as follows:

a. The Developer shall design the road and provide the labor, equipment, and materials required for roadway improvements and necessary drainage improvements.

b. If the County desires the roadway to be improved to a standard greater than that for a local residential rural roadway, the County shall provide or pay the cost of the additional materials and labor.

c. All right-of-way required for these off-site improvements shall be acquired by the developer at no expense to the County.

d. In the event that access to a new development is through an existing local County-maintained Road, the Developer and/or Builder is responsible for any and all damages to the existing road.

Developer and/or Builder may be required to document existing conditions of this access road prior to any construction, may be required to post a bond or some form of guarantee and make necessary repairs as deemed appropriate per the Director.

3. Half Streets. Half-streets (new boundary streets having one-half of the minimum required right-ofway or pavement width) shall not be allowed nor access to same be permitted should it exist.

E. Improvements along State Highways. For any development which abuts a state highway or other right-ofway controlled by the State of Georgia, improvements to the roadway and the location and design of any street or driveway providing access from the state highway shall comply with the standards and requirements of the Georgia Department of Transportation. A permit for the proposed access or improvements shall be required to have been approved by the Georgia Department of Transportation and incorporated into the construction drawings for the project prior to issuance of a development permit by the Department.

F. Dead End Streets.

1. A dead-end street shall be provided to the boundary of a subdivision where necessary to provide access to a land-locked abutting property, for planned continuity of future circulation, for improved access for public safety vehicles, or for the extension of public water or other utilities to neighboring lands. Such dead-end streets shall be designed so as to allow their reasonable extension and shall be located so as to be reasonably incorporated into a street design for the neighboring property. The stub street requirement may be waived by the Director.

2. Dead end streets on abutting property shall be extended into a proposed subdivision and incorporated into the street design of the development. This requirement may be modified by the Director in cases of serious topographical hardship or dissimilar zoning which would create unacceptable land use conflicts between the two developments. This modification may be conditioned on the provision of easements necessary for the extension of public utilities, the provision of cul-de-sac or other permanent turnaround on the dead-end street, or the removal of the dead-end street back to its nearest intersection.

3. Where a dead-end street (other than a cul-de-sac) serves more than three lots, the developer shall be required to provide a temporary vehicular turnaround within the right-of-way. This requirement may be waived if extension of the dead-end street is approved and under construction prior to its inclusion in a Final Plat.

4. Where a street dead ends at the property boundary and the street exceeds 1000 feet in length, a permanent cul-de-sac or other approved turnaround shall be required. In this situation, right-of-way to the property boundary shall be required, but the pavement shall not be extended to the property boundary beyond the edge of the paved cul-de-sac or other approved turnaround. In no case shall a dead-end street exceed 2000 feet in length unless approved by the Department of Transportation due to unusual topographic conditions or property configuration.

5. Connections for future extension of all public utilities shall be constructed as part of the subdivision.

Curb returns shall be constructed as part of the subdivision. Curb returns shall be provided to the future "stub" street roadway location, and curb and gutter shall be installed across the roadway stub at the right-of-way line (extended).

6. The right-of-way for the "stub" street shall be dedicated as part of the Final Plat. Slope easements or construction easements, if required by the street design, shall be shown on the Final Plat.

G. Service Roads. Where a development borders on or contains a railroad right-of-way, or limited access highway right-of-way or major thoroughfare, a public street may be required to be constructed and dedicated within the development approximately parallel to and on each side of such right-of-way.

360-20.6 Reserve Strips. Land in private ownership adjacent to public rights-of-way which could control or are intended to control access to streets, alleys, or public lands shall not be permitted unless their control is given to the County under ownership, dedication, or easement conditions approved by the County Attorney or acceptable to the Director. No development shall be designed so as to deny access to abutting properties.

360-20.7 Street Jogs.

A. Street jogs shall either directly align or have offsets as shown in Table 360.3, as measured between centerlines of said streets.

B. All Major Thoroughfares shall provide offsets as required by the Department, where alignment is not desirable or feasible, but in no case be spaced less than 600 feet apart as measured between centerlines of said streets.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-30. Project Access Improvements.

360-30.1 Project access improvements for single-family detached, single-family attached, and duplex residential subdivisions.

A. When property that abuts upon an existing or proposed County road is to be developed or redeveloped as a single-family detached, attached, or duplex subdivision and the County street will provide access to the property, project access improvements to the County road (deceleration lanes, turn lanes, etc.) shall be provided by the developer as required herein. Two remote entrances shall be required for developments with more than 120 dwelling units unless an administrative modification is granted by the Department and an administrative variance is granted by the Gwinnett County Fire Marshall.

B. A deceleration lane shall be required to be provided at each project driveway or subdivision street entrance that is provided street access to a Minor Collector Street or Major Thoroughfare. In the event a street has an existing or proposed median, and the developer desires to construct a median break to serve the subdivision, a left turn lane leading to the median break shall be required to be provided by the developer if approved by the Department of Transportation and shall meet the standards contained herein. The preferred spacing for median breaks shall be 2,000 feet between the centerlines of the openings, and the minimum spacing for median breaks shall be 1,000 feet between centerlines of the openings. Other factors will also be considered, such as distance to other median openings, adjacent land use, expected traffic volumes, and the resulting volume of U-turns that are likely to occur without the median opening. Meeting the spacing criteria is not, in itself, an indication that median openings will be allowed.

C. Deceleration lanes shall have a length of 200 feet, with an additional 50-foot taper length, a pavement width of 12 feet (exclusive of curb and gutter) and shall be provided with curb and gutter. Additional right-of-way to accommodate the deceleration lane and an 11-foot shoulder measured from back of curb shall be dedicated by the developer to Gwinnett County at no cost. Associated stormwater infrastructure as deemed necessary by the construction of the deceleration lane shall also be required.

D. A left turn lane shall be provided into each project driveway or subdivision street that accesses a Minor Collector or Major Thoroughfare in accordance with the Department of Transportation's "Criteria and Guidelines for Left Turn Lanes".

E. Other project access improvements may be required by the Department upon the recommendation of the Department of Transportation in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public.

F. The developer shall be responsible for the relocation of public or private utilities and stormwater infrastructure, as may be occasioned by the required Project Access Improvements.

360-30.2 Project Access Improvements for Multifamily and Non-residential Developments.

A. When property that abuts upon an existing or proposed County road is to be developed or redeveloped for multifamily or non-residential uses and the County road will provide access to the property, project access improvements to the County road (deceleration lanes, turn lanes, etc.) shall be provided by the developer.

B. A deceleration lane shall be required to be provided at each project driveway or subdivision street entrance, as applicable, that is provided street access to a Minor Collector Street or Major Thoroughfare. In the event a street has an existing or proposed median, and the developer desires to construct a median break to serve the project, a left turn lane leading to the median break shall be required to be provided by the developer if approved by the Department of Transportation and shall meet the standards contained herein. The preferred spacing for median breaks shall be 2000 feet between the centerlines of the openings, and the minimum spacing for median breaks shall be 1000 feet between centerlines of the openings. Other factors will also be considered, such as distance to other median openings, adjacent land use, expected traffic volumes, and the resulting volume of U-turns that are likely to occur without the median opening. Meeting the spacing criteria is not, in itself, an indication that median opening will be allowed.

C. Deceleration lanes shall have a length of 200 feet, with an additional 50-foot taper length, pavement width of 12 feet (exclusive of curb and gutter) and shall be provided with curb and gutter. Additional right-of-way to accommodate the deceleration lane and an 11-foot shoulder shall be dedicated by the developer to Gwinnett County at no cost. Associated drainage improvements as deemed necessary by the construction of the deceleration lane shall also be required.

D. A left turn lane shall be provided into each project driveway or subdivision street that accesses a Minor Collector or Major Thoroughfare in accordance with the Department of Transportation's "Criteria and Guidelines for Left Turn Lanes."

E. Other project access improvements may be required by the Department upon the recommendation of the Department of Transportation in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public.

F. The developer shall be responsible for the relocation of public or private utilities and stormwater infrastructure, as may be occasioned by the required Project Access Improvements.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-40. Driveway Design Standards.

360-40.1 Angle and Improvements. Driveways shall generally intersect streets at right angles. The portion of a driveway located within a public right-of-way shall be paved. Driveways providing access to parking lots which contain five or more spaces shall be paved in accordance with the parking lot requirements in Chapter 240.

360-40.2 Driveway Design Standards. Driveways serving single-family detached or duplex residences may be no less than 10 feet wide at the right-of-way line and shall provide a radius to the back of curb or edge of pavement of the roadway of no less than 5 feet. Driveways shall provide a parking area of at least 18 feet deep measured from the edge of the sidewalk or curb if a sidewalk is not present or required. All other driveway curb cuts on public streets shall conform to the standards shown on the driveway details contained in the Standard Drawings in the Appendix of the UDO and by land use type as follows:

A. Driveway Detail 1 (32-foot Width, 25-foot Radius) for:

1. Commercial and Retail Uses (over 80,000 Square Feet).

2. Office/Institutional/Cultural Uses (Over 100,000 Square Feet).

3. Multifamily Residential Developments (Over 200 Units).

4. Mobile or Manufactured Home Developments (Over 200 Lots).

5. Service Stations.

B. Driveway Detail 2 (28-foot Width, 25-foot Radius) for:

1. Commercial and Retail Use Sites (80,000 Square Feet or Less).

2. Office/Institutional/Cultural Use Complexes (100,000 Square Feet or Less).

3. Multifamily Residential Developments (200 Units or Fewer).

4. Mobile or Manufactured Home Developments (200 Lots or Fewer).

C. Driveway Detail 3 (32-foot Width, 40-foot Radius) for:

1. Industrial Sites.

D. Driveway Detail 4 (Optional Design with Island) for:

1. Private Commercial/Office Street Entrances.

2. Private Entrances to Multifamily Residential Developments (Over 200 Units).

3. Private Entrances to Mobile or Manufactured Home Developments (Over 200 Lots).

4. All driveways and driveway curb cuts on State highways shall conform to Georgia Department of Transportation standards.

360-40.3 Auxiliary Lanes. Along any Major Thoroughfare, a deceleration lane, acceleration lane, larger turning radius, traffic islands, or other devices or designs may be required to avoid specific traffic hazards which would otherwise be created by the proposed driveway location.

360-40.4 Corner Sight Distance. All driveways approaching a Minor Collector or Major Thoroughfare shall provide adequate corner sight distance, and shall meet or exceed the following design standards:

A. The sight distance criteria are based on the time required for a vehicle to make a left turn from a stop-controlled approach to the Highway (AASHTO Case B1). The time to execute the maneuver is based on recommendations contained in NCHRP Report 383, Intersection Sight Distance. The sight distances, for a two-lane road, are the distances traveled at the arterial speed during 7.5 seconds. The time is increased by 0.5 seconds for each additional lane to be crossed.

B. The sight distances given in Table 360.2 are for undivided highways and streets. If the highway or street is divided, the effect of the median should be considered in determining the required sight distance. Based on the conditions, it may be feasible for the crossing maneuver to be done in two stages with a stop in the median. However, the intersection should only be treated in this manner if the signing and marking is accordingly provided. Otherwise, the sight distance requirements should be increased to account for the additional width that must be crossed. See AASHTO Green Book, Chapter 9 Intersections, for adjustments due to grades greater than 3 percent and design vehicles other than passenger cars.

Table 360.2. Sight Distance.

SIGHT DISTANCE (FEET)

SPEED,

MPH 2 Lane 3 Lanes 4 Lanes 5 Lanes

SDL=SDR SDL SDR SDL SDR SDL SDR

25 280 280 295 280 310 295 335 30 335 335 355 335 375 355 400 35 390 390 415 390 440 415 465 40 445 445 475 445 500 475 530 45 500 500 530 500 565 530 600 50 555 555 590 555 625 590 665 55 610 610 650 610 690 650 730 60 665 665 710 665 750 710 795 65 720 720 765 720 815 765 860 360-40.5 Separation and Spacing. All driveways except those serving residential units on individual lots shall meet the following criteria:

A. Minimum separation for driveways, public roads, and side streets:

Table 360.3. Minimum Separation for Driveways, Public Roads, and Side Streets.

Posted Speed Minimum MPH Driveway Spacing 25 125 30 219 35 244 40 294 45 369 50 419 55 444 60 494 65 550

B. Driveway Spacing. Spacing shall be measured from centerline to centerline of driveways, public roads, or side streets. Where there is an arterial or major collector intersecting with a side street, the measurement may be taken from the edge of pavement or back of curb, as opposed to the centerline of the arterial/major collector. Greater separation may be required for safe operation of intersections and right or left turning lanes. Whenever possible, proposed driveways along one side of a street shall coincide with existing or proposed driveways on the opposite side of such street. If offset driveways cannot be avoided, the same driveway spacing criteria as given in Table 360.3 should be provided. Spacing shall be measured from centerline to centerline. If the Highway involved is a divided facility and the driveways do not align with a median crossover, the driveway spacing would only apply to the adjacent driveway on the same side of the Highway as provided in Table 360.3.

C. Maximum Number of Driveways. Developments shall be limited to one driveway access on countymaintained roadways. Additional driveways may be permitted subject to the review and approval of the Gwinnett County Department of Transportation.

D. Interior Driveways. The placement of the first interior drive which intersects the driveway from a countymaintained roadway should be as far as possible from the road for safe, more efficient operation. The distance between the roadway traffic and the first internal movement shall be a minimum of 200 feet as referenced in the Georgia Department of Transportation Regulations for Driveway Encroachment Control Manual, Figure 3-1.2. Lots less than 500 deep should maintain, a minimum distance of 100 feet. The distance required should be maintained or increased so as to avoid interference with the mainline traffic flow for large sites with high volumes, heavy truck traffic, and on high volume roadways. If no other design alternatives exist and interior drives are proposed which do not meet minimum spacing, the left turning movement should be restricted with a raised barrier. Site planning should be done such that Interior Driveways accommodate the right of way at least 100 feet of storage.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-50. Street Intersections.

360-50.1 Angle of Intersection. Intersections shall generally be at right angles and shall not be at an angle of less than 85 degrees, unless approved by the Department, nor less than 80 degrees unless the intersection is signalized, in which case the angle of the intersection may be reduced subject to the review and approval of the Gwinnett County Department of Transportation.

360-50.2 Maximum Grade. Street intersections should be designed with a flat grade wherever possible, but in no case should the grade exceed 2 percent in normal situations (or 4 percent in topographical hardship situations on local streets).

360-50.3 Intersection Approaches: Horizontal Alignment.

A. New local streets which approach an intersection with a street in a category higher than itself on a horizontal curve having a centerline radius less than 240 feet shall provide a tangent section of roadway at least 30 feet long. Minor Collectors approaching an intersection with a Major Thoroughfare on a horizontal curve having a centerline radius of less than 550 feet shall also provide the 30-foot tangent section. The tangent length shall be measured along the centerline of the street, from the right-of-way line of the intersecting street, extended, to the point of tangency with the centerline of the curve section.

B. New Major Thoroughfares shall provide tangent sections at intersections with streets in equal or higher categories as needed to provide adequate stopping distances at their design speeds.

360-50.4 Intersection Approaches: Vertical Alignment.

A. For intersections with local or minor collector streets, a leveling of the street at a grade not exceeding 2 percent shall be provided but no level approach distance is required for streets approaching at less than 7 percent, and a minimum 25-foot level approach distance shall be provided for streets approaching at a grade of 7 percent or more.

B. As a street approaches an intersection with a major thoroughfare, there shall be a suitable leveling of the street at a grade not exceeding two percent and for a distance not less than the following minimums, as set forth in Table 360.4 below:

Table 360.4. Approach Distances at Major Intersections.

Approaching Street Category Minimum Approach Distance Principal Arterial 100 Feet Major Arterial 100 Feet Minor Arterial 100 Feet Major Collector 75 Feet Minor Collector 75 Feet Local 50 Feet

* Distance of the approach is measured from edge of pavement of the intersecting street to the point of curvature in the approaching street.

360-50.5 Intersection Radii. Intersection radii for roadways measured at back of curb and for the right-of-way lines shall be as set forth in Table 360.5 below. For intersecting streets of different classifications, the larger radii shall be provided. In all cases, adequate right-of-way shall be provided to maintain minimum of 11 feet from back-ofcurb. Larger radii may be required for streets intersecting at angles less than 90 degrees.

Table 360.5. Intersection Radii.

Street Category Roadway Radii R/W Radii Arterial 40 Feet 20 Feet Major Collector 40 Feet 20 Feet Minor Collector-Residential 25 Feet 9 Feet Minor Collector-Non-residential 40 Feet 20 Feet Local Residential 20 Feet 9 Feet Local-Commercial or Office 25 Feet 11 Feet Local-Industrial 40 Feet 25 Feet

* Intersecting right-of-way lines may be joined by an arc having the minimum radius shown, or by a miter which cuts across the right-of-way lines connecting the points where the required radius would have otherwise been tangent.

360-50.6 Islands. Islands in street intersections shall conform to the design requirements of the Standard Drawings in the Appendix of the UDO. In no case shall anything in an island extend more than three feet above the street grade within the right-of-way, except traffic regulatory devices and other infrastructure erected or approved by Gwinnett County. No island shall be approved which contains less than 100 square feet.

360-50.7 Intersection Corner Sight Distance.

A. Intersections shall be designed with adequate corner sight distance for each street which approaches a street in an equal or higher street category (except an intersection of two local streets). Where necessary, backslopes shall be flattened and horizontal or vertical curves lengthened to provide the minimum required sight distance.

B. The minimum corner sight distance shall meet the standards as shown in Table 360.2 Sight Distance.

C. The sight distance criteria are based on the time required for a vehicle to make a left turn from a stop-controlled approach to the Highway (AASHTO Case B1). The time to execute the maneuver is based on recommendations contained in NCHRP Report 383, Intersection Sight Distance. The sight distances, for a two-lane road, are the distances traveled at the arterial speed during 7.5 seconds. The time is increased by 0.5 seconds for each additional lane to be crossed. The sight distances given in Table 360.2 are for undivided highways. If the highway is divided, the effect of the median should be considered in determining the required sight distance. Based on the conditions, it may be feasible for the crossing maneuver to be done in two stages with a stop in the median. However, the intersection should only be treated in this manner if the signing and marking is accordingly provided. Otherwise, the sight distance requirements should be increased to account for the additional width that must be crossed. See AASHTO Green Book, Chapter 9 Intersections, for adjustments due to grades greater than 3 percent and design vehicles other than passenger cars.

360-50.8 Obstructing Visibility at Intersections. In all zoning districts, no fence, wall, structure, shrubbery, or other obstruction to vision between the heights of 3 feet and 15 feet, except utility poles, light or street sign standards or tree trunks shall be permitted within 20 feet of the intersection of the right-of-way lines of streets, roads, highways, or railroads.

360-50.9 Turning Lanes at Intersections. Right turning lanes may be required to meet traffic demands or safety concerns. When provided, turning lanes shall meet the following criteria:

A. Storage length — A minimum of 150 feet of storage length for turning lanes on any arterial roadway shall be used. A minimum of 100 feet of storage length for turning lanes on all collectors shall be used.

B. Taper Length — The minimum taper length shall be 50 feet.

C. Left turning lanes from arterial roads shall be subject to longer storage lengths and tapers and as determined on a case-by-case basis.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-60. Street Design Standards.

360-60.1 Street Grades and Design Speeds.

A. Minimum grade for all Local and Minor Collector Streets shall be 1.5 percent. Minimum grades for all major collector and arterial streets shall conform to Georgia Department of Transportation standards and regulations.

B. Minimum grade of less than 1.5 percent on a local street may be approved by the Department, based on adequate engineering designs, where at least 1.5 percent cannot reasonably be achieved due to topographical limitations imposed by the land. In such cases, a Record Drawing, and such computations as necessary shall be provided after construction to establish that the street will drain in accordance with this UDO.

Street sections where unacceptable pooling, excessive spread at catch basins, or other hazardous conditions occur shall be reconstructed or otherwise improved to eliminate such conditions.

C. Minimum vehicle design speeds and maximum grades allowable in Gwinnett County by street classification shall be as shown in Table 360.6.

D. Maximum grade on any cul-de-sac turnaround shall be 6 percent.

Table 360.6. Minimum Design Speeds and Maximum Grades.

Street Category Maximum Grade Design Speed Principal Arterial 8% 60 MPH Major Arterial 9% 50 MPH Minor Arterial 10% 40 MPH Major Collector 10% 40 MPH Minor Collector 10% 30 MPH Street Category Maximum Grade Design Speed Local 15%* 25 MPH

* Grades between 11 percent and 15 percent shall not exceed a length of 150 feet and shall require an "as graded" survey prior to the installation of the curb or utilities. The distance shall be measured as the tangent length between points of curvature.

360-60.2 Vertical Street Alignment.

A. All changes in street profile grades having algebraic difference greater than one percent shall be connected by a parabolic curve having a minimum length (L) equal to the product of the algebraic difference between the grades in percent (A) and the design constant (K) assigned to the street according to its category (i.e.,

L=KA).

B. Constant (K) values are shown in the Table 360.7 for both desirable and minimum acceptable ("hardship") conditions. In all cases, the "desirable" value shall be used, unless it cannot be achieved due to topographic conditions beyond the developer's control. In such hardship situations, the Department may approve a lesser value to the extent required by the hardship situation, but in no event less than the value shown in Table 360.7 as "minimum."

Table 360.7. Constant (K) Values for Vertical Curves.

Crest Curves Sag Curves Street Category Minimum Desirable Minimum Desirable Principal Arterial 151 320 136 155 Major Arterial 84 170 96 110 Minor Arterial 44 80 64 70 Major Collector 44 80 64 70 Minor Collector 19 30 37 37 Local 12 20 26 26 360-60.3 Horizontal Street Alignment.

A. All new streets shall adhere to the standards governing horizontal curvature and superelevation as set forth in Table 360.8 below:

Table 360.8. Horizontal Curves.

Street Category Minimum Radio (Ft.) Maximum Superelevation Principal Arterial 1,333 0.06 Major Arterial 833 0.06 Minor Arterial 560 0.04 Major Collector 560 0.04 Minor Collector 300 0.04* Local 181 0.00

* No superelevation will be allowed on Minor Collectors internal to residential subdivisions

B. Superelevation for horizontal curves shall be calculated utilizing the following formula:

R = minimum radius curve v = vehicle design speed (MPH) e = rate of superelevation (decimal of a foot rise per foot roadway) f = side friction factor Vehicle Design Speed (v) 30 40 50 60 Side Friction Factor (f) .16 .15 .14 .12

C. Widening section along existing streets shall be designed reflecting existing curvature and superelevation, if any, unless the existing street has been included in a specific design by the Gwinnett County Department of Transportation or Georgia Department of Transportation which calls for different standards, in which case the project will be coordinated with the overall design.

D. Superelevation runoff. Roadway edge curves shall be provided for tangent runout (bringing edge from a normal crown to centerline elevation) and superelevation runoff (from the end of tangent runout to the point of design superelevation) in accordance with design standards of the Georgia Department of Transportation or other professional engineering standards.

E. Tangents and compound curves. Between reverse horizontal curves there shall be not less than the minimum centerline tangents shown in Table 360.9 unless otherwise specified by the Georgia Department of Transportation. Compound radii curves are prohibited. At least the "desirable" length shall be provided unless hardship conditions of topography or property configuration will not allow lengths greater than those shown as "minimum." For compound circular curves, the ratio of the flatter radius to the sharper radius shall not exceed 1.5 to 1.

Table 360.9. Tangents.

Street Category Minimum Tangent Length Desirable Tangent Length Principal Arterial 150 180 Feet Major Arterial 125 150 Feet Minor Arterial 100 120 Feet Major Collector 100 120 Feet Minor Collector 75 90 Feet Local 50 60 Feet Note: Minimum tangents are based on the distance traveled in 1.7 seconds at the design speed for each category of street. Desirable length is based on distance traveled in 2.0 seconds.

360-60.4 Horizontal and Vertical Clearances.

A. Horizontal clearances.

1. A shoulder of no less than 11 feet from the back of curb or edge of pavement, appropriately graded and having gentle slopes of not more than 0.5 inch per foot and rounded cross-sectional design shall be maintained along all streets. Beyond the shoulder but within the right-of-way, slopes shall not exceed 1 foot of rise for each 2 feet of horizontal distance on a cut slope, and 1 foot of fall for each 3 feet of horizontal distance on a fill slope.

2. Along all public streets, a clear zone shall be provided per current AASHTO standards wherein nothing may be located above ground level except traffic/street signs, public utility structures, driveways, and mailboxes.

3. At selected locations, such as the outside of a sharp curve, a wider clear zone with greater horizontal clearances provided to any roadside obstruction may be required.

4. The Department of Transportation, in accordance with O.C.G.A. § 32-6-51, is authorized to remove or direct the removal of any sign, signal, device, or other structure erected, placed, or maintained on the right-of-way of a public road which because of its nature, construction, or operation constitutes a danger to or interferes with the vision of drivers of motor vehicles.

B. Vertical clearances. Vertical clearance at underpasses shall be at least 14.5 feet over the entire roadway width.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-70. Street Construction Standards and Specifications.

360-70.1 Specifications. Unless otherwise specifically set forth herein, all of the materials, methods of construction, and workmanship for the work covered in reference to street construction shall conform to the latest specifications of the Georgia Department of Transportation.

360-70.2 Subgrade Preparation for All Streets.

A. Subgrade preparation shall be in accordance with Georgia Department of Transportation specifications.

B. Removal of unsuitable material. If any sections of the subgrade are composed of topsoil, organic, or other unsuitable or unstable material, such material shall be removed and replaced with suitable material and then thoroughly compacted as specified for fill or stabilized.

C. Compaction. Fill shall be placed in uniform, horizontal layers not more than 8 inch thick (loose measurement). Moisture content shall be adjusted as necessary to compact material to 95 percent of maximum dry density except for the top 12 inches which shall be compacted to 100 percent of maximum dry density.

D. Brought to line and grade. After the earthwork has been completed, all storm drainage, water, and sanitary sewer utilities have been installed within the right-of-way as appropriate, and the backfill in all such ditches thoroughly compacted, the subgrade shall be brought to the lines, grades, and typical roadway section shown on the plans.

E. Utility trenches to be compacted. All utility crossings within the right-of-way must be installed prior to subgrade approval. All manhole covers must be flush with top of intermediate course if there is a delay in applying the final surface course for new roadway pavement. Manhole covers will be required to be adjusted flush when final surface course is installed. Utility trenches cut in the subgrade shall be backfilled as specified herein. Compaction tests at the rate of 1 per 150 feet of trench shall be provided to verify compaction.

F. Roll testing required. The subgrade must pass roll testing prior to placement of the base material. The roll test of the subgrade and base material shall be observed and approved by a Department Development Inspector prior to paving.

G. Temporary traffic surface. When the street is to be used for construction traffic before the paving work is completed, a layer of stone (except crusher run) shall be laid as a traffic surface. This material shall not be used as a part of the base material. It may be worked into the subgrade, or it shall be removed before the base course is set up for paving.

H. Provisions to drain low points. Provisions shall be made to drain low points in the road construction when the final paving is delayed. A break in the berm section is required when the curbing has not been constructed. Drainage under the curb to side slopes after installation is required, using minimum four-inch diameter pipe sections. Vegetated or stabilized swales should be considered for managing road construction runoff. Swales shall be constructed in accordance with the Gwinnett County Stormwater Management Manual.

360-70.3 Project Access Improvement Standards.

A. Sections wider than 4 feet in width. For sections 4 feet or greater in width, the section shall comply with the construction standards for new streets, in accordance with the street's category as shown on the officially adopted Gwinnett County Long Range Road Classification Map. The base course must pass all testing prior to paving. If a delay is expected, then the base must be sealed and retested prior to paving.

B. Sections less than 4 feet in width. For sections less than 4 feet in width, 6 inches of class "B" concrete shall be poured flush with the adjacent pavement surface and dyed black. A minimum of 8 inches of Graded Aggregate Base shall be provided below the widening section.

360-70.4 New Local and Minor Collector Streets.

A. The following standards shall apply to new local and minor collector streets in residential subdivision and non-residential projects.

1. The base course shall consist of at least 8 inches of graded aggregate base. After being thoroughly compacted and brought to proper section, an intermediate course of 2 inches of 19 mm Superpave shall be applied.

2. The final asphaltic surface course of 1.25 inches of 9.5 mm Superpave Type II shall be applied.

3. If a delay in paving is anticipated, then the base course shall be primed the same day it is compacted and cured in accordance to Georgia DOT standards.

4. Upon the final acceptance of the final surface course, a maintenance bond for a period not to exceed 18 months following the date of approval of Development Conformance shall be required.

B. Local residential-rural streets. Where allowed, local residential-rural streets may install streets without curb and gutter. In such cases, the road base shall be extended 1 foot beyond the edge of pavement, and the shoulders shall extend eight feet from the edge of pavement to a standard ditch section on each side (see Standard Drawings in the Appendix of this UDO). Otherwise, the roadway shall comply with the standards for new residential subdivision streets set forth in Section 360-70.4.A.

360-70.5 New Major Thoroughfares. Minor collectors or greater shall be constructed in accordance with designs prepared by Gwinnett County or Georgia DOT, or, if no design has been prepared, to the following standards:

A. Arterials Pavement Section:

1. 10 inches GAB.

2. 4 inches of 25mm Superpave.

3. 2 inches of 19mm Superpave.

4. 1.5 inches of 9.5mm Type II Superpave (volumes less than 10,000 ADT), OR;

5. 1.5 inches of 12.5mm Superpave (volumes greater than 10,000 ADT).

B. Collectors Pavement Section:

1. 10 inches GAB.

2. 4 inches of 19mm Superpave.

3. 1.5 inches of 9.5mm Type II Superpave (volumes less than 10,000 ADT), OR;

4. 1.5 inches of 12.5mm Superpave (volumes greater than 10,000 ADT).

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-80. Curbs and Gutters.

360-80.1 Curb and Gutter Required. All new streets and Project Access Improvements shall be provided with curb and gutter except in subdivisions zoned RA-200, where swale ditches may be provided in lieu of curb and gutter. All gutters shall drain smoothly with no areas of ponding.

360-80.2 Residential Curbing. Residential curbing shall meet the following requirements:

A. Concrete shall be Class "B" (as defined by Georgia Department of Transportation) and have a minimum strength of 3,000 PSI at 28 days.

B. Typical minimum section shall be 6 × 24 × 12.

C. Vertical curbing only. Rollback curbing may be specified in townhouse on the garage side the townhouse street,

360-80.3 Industrial or Commercial Curbing. Industrial or commercial curbing shall meet the following requirements:

A. Concrete shall be Class "B" (as defined by Georgia Department of Transportation) and have a minimum strength of 3,000 PSI at 28 days.

B. Typical minimum section shall be 8 × 24 × 14.

C. Vertical curbing only.

360-80.4 Collector and Arterial Curbing. Collector and Arterial curbing shall meet the following requirements:

A. Concrete shall be Class "B" (as defined by Georgia Department of Transportation) and have a minimum strength of 3,000 PSI at 28 days.

B. Typical minimum section shall be 8 × 30 × 14.

C. Vertical curbing only.

360-80.5 Construction Methods.

A. Curb and gutter shall be set true to line and grade, be field staked, and finished to the section shown on the plans. Along the Project Access Improvements of a road which the Department of Transportation has identified for resurfacing within one year of the new construction, the grade of the new gutter shall be placed 1 inch above the Project Access Improvement pavement grade in areas where drainage will not be adversely affected.

B. Line and grade shall be field staked for grades less than two percent and grades over 12 percent, and within 100 feet in both directions from all low points.

C. One-half inch expansion joints or premolded bituminous expansion joint material shall be provided at all structures and radius points and at intervals not to exceed 250 feet in the remainder of the curb and gutter.

D. Inferior workmanship or unprofessional construction methods resulting in unacceptable curb and gutter will be cause for rejection of the finished work.

E. Disturbed areas along all curbing shall be backfilled, stabilized, and grassed.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-90. Sidewalk Requirements.

360-90.1 Sidewalks. Sidewalks and curb ramps shall be constructed in all new development or redevelopment along all abutting or internal streets, existing or new, private, or public. Whenever a discrepancy occurs between the design and construction standards of this UDO and any state or federal regulation, then the most restrictive shall apply.

360-90.2 Sidewalk and curb ramp installation and timing. Sidewalks and curb ramps shall be installed as follows:

A. Developers shall connect proposed sidewalks on developed property to the adjacent property's sidewalks.

B. Residential subdivision projects. Sidewalks and curb ramps, where required, shall be installed on new internal streets (both sides including "eyebrow" turnarounds and cul-de-sacs) and on abutting external streets (abutting side).

C. Residential subdivision developer's responsibility. Developers shall install sidewalks and curb ramps on abutting external streets, "passive" recreation areas, common area and open space prior to the approval of the Final Plat. Sidewalks on "active" recreation area lots shall be installed prior to issuance of a Certificate of Occupancy.

D. Homebuilder responsibility. Homebuilders shall install sidewalks, and curb ramps not required to be installed by developers, on residential lots prior to release of the Certificate of Occupancy for a home.

E. Non-residential and non-subdivision projects. Sidewalks shall be installed on new internal streets (both sides including cul-de-sac and "eyebrow" turnarounds) and on abutting external streets (abutting side) by the lot owner or developer prior to the issuance of a Certificate of Occupancy.

F. Performance surety. Performance surety for sidewalks and ramps not yet installed must be approved by the Director. The surety shall be in an amount acceptable to the County.

G. Escrow alternative. The cost of sidewalk installation may be set aside in escrow with the Department of Transportation if proposed road improvements by the County may impact the location of a sidewalk or if the sidewalk cannot be constructed due to topographic or utility constraints. Costs shall be set at a linear rate by Gwinnett DOT and are subject to include construction, acquisition, and engineering costs for sidewalk projects within the County.

360-90.3 Sidewalk design and construction standards. Sidewalks shall be constructed in accordance with the requirements of this section. The Director is authorized to grant Modifications upon specific application due to topographic or drainage difficulty as well as alternative design proposals after receiving a recommendation from the Department of Transportation.

A. Width. Sidewalks shall be at least 4 feet wide on new internal subdivision streets and at least 5 feet wide on abutting external streets with the following exceptions:

1. Sidewalks shall be at least 5 feet wide on new internal streets or drives within the Senior Oriented Residence District (R-SR) and Office-Residential District (O-R).

2. Sidewalks shall be at least 5 feet in width on new local non-residential streets and 5 feet in width for new local residential streets in the TND and Mixed-Use Districts (MU-N, MU-C and MU-R) and shall conform with this Section and any additional requirements of Sections 210-190 through 210-225.

B. Setback. Sidewalks shall be located at least 2 feet from the back of curb. The area between the curb and the sidewalk shall consist of grass or landscaping and shall be consistent with the requirements of this UDO.

Where no curb exists, or if road improvements are proposed for installation by the County, sidewalks, including appropriate storm-water infrastructure, shall be constructed in a location acceptable to the Gwinnett County Department of Transportation.

C. Cross slope. Sidewalks shall be constructed with a cross slope of 0.25 inch per foot. Sidewalks shall maintain this cross slope at driveway crossings or transition the sidewalk to a driveway with ramps and detectable warnings.

D. Material. Class "B" concrete (as defined by Georgia Department of Transportation) with a minimum strength of 2,200 PSI at 28 days.

E. Final stabilization. Disturbed areas resulting from sidewalk construction shall be backfilled, stabilized, and grassed or landscaped.

F. Georgia Department of Transportation controlled roads. Sidewalks located in the right-of-way of roads under the jurisdiction of the Georgia Department of Transportation shall be constructed in accordance with Georgia Department of Transportation design and construction standards.

G. Sidewalk curb ramp design and construction standards. Intersection radius curb ramps shall be provided at street intersections. Straight ramps may be provided at intersections of curbed driveways and at streets without sidewalks. Curb ramps shall meet the requirements of the Americans with Disabilities Act.

H. Damage repair. Damage to roads, sidewalks, curbs, and ramps caused by construction or development activity shall be repaired at no cost to the County within 30 days or prior to issuance of a Certificate of Occupancy, whichever is earlier.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-100. Multi-Use Path Requirements.

360-100.1 Multi-use paths shall be provided along all arterial streets. Also, where a proposed development is shown with roadway frontage along a roadway that is classified as being within the Gwinnett Countywide Trails Master Plan, the developer shall be responsible for the construction of a minimum 12-foot trail along the road frontage. The developer/builder shall coordinate with the Department of Transportation for location and approval.

Where provided multi-use paths shall comply with the provisions of this section as well as the provisions contained in Chapter 360 of this UDO and shall meet the following requirements:

360-100.2 Width. Multi-use trails and paths shall be a minimum of 12 feet in width.

360-100.3 Material and construction details.

A. A multi-use path that is constructed in a floodplain, adjacent to a stream, or adjacent to undisturbed land shall be asphalt or concrete or approved alternative such as pervious asphalt, or pervious pavement. In all other cases, a multiuse path shall be concrete.

B. Multi-use paths shall be designed to minimize direct auto-pedestrian and/or auto-conflicts by such means as striping and signs.

C. Multi-use paths shall be connected to crosswalks at intersections where applicable.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-110. Greenway Requirements.

360-110.1 Greenways shall be designed and developed in coordination with the Gwinnett Countywide Trails Master Plan Trails Master Plan. Greenways, where provided, shall comply with the provisions of this section as well as the provisions contained in Chapter 360 of this UDO and shall meet the following requirements:

A. For width, materials, and design standards, refer to the Gwinnett Countywide Trails Master Plan Update.

B. Construction Obligation. The greenway shall be constructed by the developer prior to issuance of a Certificate of Occupancy, or in the case of residential subdivisions, prior to the approval of the Final Plat.

1. Residential subdivision developer's responsibility. Where required, developers shall install greenways on open space, common area and abutting external streets, prior to the approval of the Final Plat.

Greenways on "active" recreation area lots shall be installed prior to issuance of a Certificate of Occupancy.

2. Homebuilder responsibility. Homebuilders shall install greenways not required to be installed by developers on building lots prior to release of the Certificate of Occupancy for a home.

3. Non-residential projects. Greenways, where required, shall be installed prior to the issuance of a Certificate of Occupancy.

4. Performance surety. Performance surety for greenways not yet installed must be approved by the Director. The surety shall be in an amount and form acceptable to the County.

360-110.2 Greenway Maintenance and Liability.

County Maintenance. The County will accept maintenance responsibility similar to its maintenance for Countyowned park property, for a greenway if the Director of Community Services or designee finds all of the following:

A. The applicant requests that the County assume the responsibilities

B. The greenway lies within an easement or right-of-way granted to the County for trail purposes

C. The greenway has been constructed to County standards

D. The greenway is physically continuous for at least 1/4-mile along the designated route. This requirement for a minimum length of route segment or route spur will be waived if the primary network greenway has not been made part of a physically continuous segment of at least 1/4-mile within two years after completion of the segment under consideration.

E. If the applicant desires to use a private security force to patrol the greenway area, the owner has signed an agreement holding the County harmless from all claims, suits, or actions of any nature, caused, or arising out of the actions of the private security force, its subcontractors, agents, or employees 360-110.3 Owner/Applicant maintenance. The owner/applicant retains maintenance responsibilities unless these responsibilities are accepted by the County. Where the applicant retains maintenance responsibilities, the greenway must be maintained at a level at least equal to those design standards as required by the Gwinnett Countywide Trails Master Plan.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-120. Traffic Control Devices.

360-120.1 Traffic Control Signs. Street signs, traffic control signs, and devices such as striping and signalization, shall be provided through payment of fees to the Department of Transportation for the installation thereof.

360-120.2 Street Name Signs. Public street name signs shall have a green background with white legends mounted on channelized posts. Private street name signs shall have a blue background with white legends mounted on channelized posts. Alternate post material shall be subject to the review and approval of the Department of Transportation. The posts and signs will be furnished and installed by the County at all street intersections. The developer (or homeowners association in the event an alternate signpost is chosen at a later date) shall pay the County's costs.

360-120.3 Traffic Signals and Signs. All traffic signals and signs shall conform to the Manual on Uniform Traffic Control Devices (no decorative traffic control devices will be allowed) or as per Gwinnett County Department of Transportation.

360-120.4 Striping Requirements. All newly constructed streets having four or more lanes (including auxiliary lanes) and existing streets being widened with one or more additional lanes shall be striped or the payment of said striping costs shall be required from the Developer by the Department of Transportation prior to the Approval of Development Conformance for the project. Striping shall be accomplished with paint meeting Georgia Department of Transportation standards conforming to the Manual on Uniform Traffic Control Devices.

360-120.5 Payment of Fees. Payment for materials and installation of street name and traffic control signs in new developments shall be required by the Department of Transportation prior to the approval of the Final Plat for new subdivision streets and the Approval of the Development Conformance for all other developments.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-130. Traffic Calming Devices.

360-130.1 Subdivision streets shall be designed in accordance with the Gwinnett County Traffic Calming Guide.

The maximum length of roadway section between speed control points, as defined by the Traffic Calming Guide, shall be 500 feet.

360-130.2 The traffic-calming plan is subject to review and approval by the Department of Transportation. The Director of the Department of Transportation may grant modifications.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Section 360-140. Private Streets and Alleys.

360-140.1 Private Streets and Alleys Permitted.

A. Application for approval of private streets shall be considered by the Board of Commissioners. Notwithstanding other provisions of the UDO, the Board of Commissioners may impose conditions on the approval of private streets to ensure the health, safety, and welfare of the general public and to mitigate potential problems with private streets.

B. Alleys intended to serve as private access route in the rear of buildings shall be permitted, constructed, and maintained as private driveways, and in substantial conformance with the UDO Design Guidelines.

Application for approval of such private alleys may be considered by the Director of Department of Planning and Development.

360-140.2 General Provisions.

A. It shall be unlawful for any person, firm, or corporation to construct a new private street or alley, or alter an existing private street or alley, or to cause the same to be done without first obtaining a development permit, for such construction or alteration, from the Department.

1. All private streets shall be constructed to the roadway construction standards for public streets as required by the UDO and contained herein. All private alleys shall be designed and constructed as private driveways as required by the UDO. No permit for a private street or alley shall be issued unless the proposed roadway improvements are in conformity with the standards and requirements for public streets and the applicable provisions of the UDO.

2. For setback purposes, front setbacks shall be measured as if the streets were public streets, or as approved by individual variances. Rear setbacks of lots adjacent to alleys shall be a minimum of 5 feet measured from the rear property line of such lot.

3. The subdivider/developer shall comply with the Department of Fire and Emergency Services general order for security gate access if a gated development is proposed.

4. All provisions of the UDO regarding roadways, water lines, sewer lines, stormwater facilities and their appurtenances, including the design, submittal of plans, required improvements, etc., shall apply to all developments with private streets or alleys approved pursuant to this section.

5. The subdivider/developer shall comply with the standards and requirements of the Department of Water Resources for the installation of water and sanitary sewer mains within private developments/ subdivisions.

6. The subdivider/developer shall establish a mandatory property owners association, with bylaws and/or covenants which shall include the following:

a. Mandatory membership of all purchasers of lots therein and their successors

b. Responsibility for maintenance, insurance, and taxes

c. Equitable sharing of the cost of maintenance

d. Authority to place liens on the real property of members who fail to pay their dues or assessments

7. No Final Plat or development permit involving any private street shall be approved unless said Final Plat or development permit conforms to the requirements of this section.

360-140.3 Street Names and Address Assignments for Private Streets.

A. Proposed names for private streets shall follow the same rules as for public streets.

1. The subdivider of land involving a private street shall install street signs with the street name and designation "private," as approved by the Department.

2. Address assignments will be in accordance with this UDO.

360-140.4 Easements for Private Streets or Alleys.

A. Easements for private streets shall be designated on Final Plats as general purpose public access and utility easements, along with the name of said street. Said easement shall at minimum be of the same width as that required for the right-of-way of a public street as shown on the Long Range Road Classification Map for the type of public street (local, collector, etc.) most closely resembling the proposed private street.

B. In cases where alleys are intended to serve as private service or access route, either with or without utility easement, for more than two properties, then the alleys shall have a minimum easement width of 20 feet and shall be designated on Final Plats as private access and utility easement, as applicable, and on its own discrete parcel to be dedicated to a private property association.

1. Easements for private streets and alleys shall not be included in any calculation of minimum lot size as established by this UDO.

2. In the cases of private streets where roadway improvements are not required (i.e., exemption plat, minor subdivision), the general purpose public access and utility easement for the private street shall be shown in a manner on the plat such that each lot fronting the private street extends to the centerline of the private street. No lot shall be permitted to be divided by the general purpose public access and utility easement required and established for a private street.

3. In the cases of private streets where roadway improvements are required, the general purpose public access and utility easement for a private street shall be drawn as its own discrete parcel to be dedicated to a private homeowners association (i.e., not shown to be a part of any lot).

360-140.5 Maintenance.

A. Gwinnett County shall not maintain, repair, resurface, rebuild, or otherwise improve streets, signs, drainage improvements, or any other appurtenances within general purpose public access and utility easements established for private streets or alleys.

1. Gwinnett County assumes full responsibility for the repair and maintenance of the water and/or sanitary sewer mains and appurtenances and any areas disturbed by repair or maintenance efforts will be restored to as near to its original condition as is feasible. Permanent repairs to the streets shall be made by the homeowners associations or other entity having maintenance responsibility for the development. Driveways and sidewalks will be repaved, sodded or landscape areas will be graded, smoothed, reseeded or resodded where appropriate. Maintenance responsibility by Gwinnett County for individual sanitary sewer stubs shall extend to the end of the standard six-inch stub, and to the water meter for individual water lines.

2. A private maintenance covenant recorded with the Clerk of the Superior Court shall be required for any private street, alley and other improvements within general purpose public access and utility easements established for private streets and alleys. The covenant shall set out the distribution of expenses, remedies for non-compliance with the terms of the agreement, rights to the use of easements, and other pertinent considerations. The covenant shall specifically include the following terms:

a. The covenant shall establish minimum annual assessments in an amount adequate to defray costs of ordinary maintenance and procedures for approval of additional needed assessments.

The covenant shall also specify that the funds from such assessments will be held by a homeowners or property owners association in cases of a subdivision fronting on a private street or containing a private alley.

b. The covenant shall specify that the property owners association shall be responsible for the maintenance and repair of the stormwater drainage system and all common areas within the development.

c. The covenant shall include a periodic maintenance schedule.

d. The covenant for maintenance shall be enforceable by any property owner served by the private street or alley.

e. The covenant shall establish a formula for assessing maintenance and repair costs equitably to property owners served by the private street or alley.

f. The covenant shall run with the land.

3. The Board of Commissioners may, at its discretion, as a condition of approving private streets, require a performance bond and/or maintenance bond be submitted by the subdivider and held by a homeowners or property owners association, or the Board may require that the subdivider pay an amount of money as recommended by the Director into an escrow account or other suitable account for the construction, maintenance and repair of private streets and stormwater management improvements, to be drawn from by the homeowners or property owners association as the need may arise.

360-140.6 Specifications for Final Plats Involving Private Streets. No Final Plat involving a private street shall be approved by the Department for recording unless and until it shall contain the following on the face of the plat:

A. Deed book and page reference to the recorded covenant required in Section 360-120.5 Maintenance, as listed above.

1. "Gwinnett County has no responsibility to build, improve, maintain, or otherwise service the private streets, drainage improvements, and other appurtenances contained within the general public purpose access and utility easement or easements for private streets shown on this plat."

2. "Grant of Easement. The general purpose public access and utility easement(s) shown on this plat for private street(s) is hereby granted and said grant of rights shall be liberally construed to provide all necessary authority to the County, and to public or private utility companies serving the subdivision, for the installation and maintenance of utilities, including, but not limited to electric lines, gas lines, telephone lines, water lines, sewer lines, cable television lines, and fiber optic cables, together with the right to trim interfering trees and brush, together with a perpetual right of ingress and egress for installation, maintenance, and replacement of such lines.

Signature of Property Owner Date

3. "Certificate of Dedication." All water and sewer lines installed within the general purpose public access and utility easement(s) shown on this plat for private street(s) are hereby dedicated to Gwinnett County.

360-140.7 Requirement for Purchaser's Acknowledgement of Responsibilities for Private Street and/or Alley.

A. Prior to the sale or as a condition of the closing of a real estate transaction involving any lot served by a private street or alley in Gwinnett County, the purchaser of said lot shall execute a notarized Purchaser's Acknowledgement of Private Street and/or Alley Construction and Drainage Maintenance ResponsibiliAPPENDIX A—UNIFIED DEVELOPMENT ORDINANCE § 360-140 ties set forth below. A copy of the purchaser's acknowledgement shall be retained by the subdivider or seller and shall be required to be submitted as a condition of a Building Permit for a principal building on said lot:

"Purchaser's Acknowledgement of Private Street and/or Alley and Drainage Maintenance Responsibility."

(I) (We) have read the Declaration of Covenant which pertains to the lot that is the subject of this real estate transaction (insert address or attach legal description). (I) (We) understand that the Declaration of Covenant applies to the lot that (I am) (we are) purchasing and requires (me) (us) to provide a specified percentage or amount of the financing for the construction and maintenance of any private street (and/or alleys) and drainage facilities serving the lot which (I am) (we are) purchasing, and that owners of other lots in this plat may sue and recover for those costs which this covenant requires (me) (us) to pay, plus their damages resulting from (my) (our) refusal to contribute, plus reasonable attorney's fees. (I) (we) further understand that the County has no obligation to assist with the maintenance and improvement of the private street or alley, drainage facilities, and other appurtenances within the general purpose public access and utility easement for the private road serving the lot in question. (I) (we) understand that a copy of this purchaser's acknowledgement shall be required as a condition of the issuance of a building permit for a principal building on the lot (I am) (we are) purchasing.

Purchaser Date Purchaser Date (Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 36), 9-26-2023) Chapter 370. Street Lighting Section 370-10. Responsibility for Street Lighting on Public Roads.

Except as otherwise provided for in this UDO, the responsibility for providing street lighting for the public streets, roads, highways, and sidewalks in the unincorporated area of the County rests with the Board of Commissioners.

No street or roadway lighting of the public streets, roads, highways, or sidewalks in the unincorporated area of the County is permitted unless provided for by the Board of Commissioners.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 37), 9-26-2023) Section 370-20. Street Lighting in Overlay Zoning Districts.

In addition to the requirements of Chapter 370, street lighting for overlay districts shall also meet the requirements of Chapter 220. Should a conflict arise between the requirements of Chapter 220 and this Chapter 370, the requirements of Chapter 220 shall take precedence.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 37), 9-26-2023) Section 370-30. Specifications.

Unless otherwise specifically set forth herein, all of the materials, methods of construction, and workmanship for the work covered in reference to street construction shall conform to the latest specifications of the Georgia Department of Transportation (Georgia DOT).

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 37), 9-26-2023) Section 370-40. Installation of Street Lights.

The installation and operation of lighting fixtures located within the rights-of-way of any public street, road, highway, sidewalk, or alley in the unincorporated areas of the County or fixed to any pole, lamppost, standard or other supporting device, which is located within such rights-of-way, will comply the following procedures:

A. Plans and specifications for the proposed installation showing compliance with the standards in this Chapter shall be submitted to the Director of the Department of Transportation or a designee thereof for approval. No installations will be made without this approval.

B. Roadway or street lighting luminaries or fixtures installed within the public rights-of-way as "security lights" or for the purpose of lighting areas other than the public streets shall require the approval of the Director of the Department of Transportation or a designee thereof before installation of such lights.

C. Fixtures for illuminating areas adjoining the public streets, roads, and the like, such as parking areas and driveways, shall be mounted in such a manner as to ensure that the light pattern is kept off the public roadway. When street or roadway lighting luminaries are to be used for security lighting, they will be mounted on the side of the pole that is opposite from the public street and will be mounted to ensure that the lateral light distribution pattern is parallel to the street and the vertical light distribution at the initial light source is perpendicular to the street.

D. If lighting fixtures of a type other than those in the classification of street or roadway luminaries are to be used or if the proposed lighting is to be installed outside of public rights-of-way, the plans and specifications submitted shall be sufficiently detailed to clearly show that such shall be installed and operated in such a manner to prevent glare from being a hazard to or interfering with the normal use of the public rights-of-way.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 37), 9-26-2023) Section 370-50. Street Lights for New Subdivisions.

370-50.1 Street lights shall be provided by the developer in new subdivisions which propose the construction of a new street to be dedicated to the County or which propose lot access to existing County streets.

370-50.2 Prior to the approval of a Final Plat, the developer shall submit a copy of the approved Subdivision Development Plan to the Traffic and Operations Division of the Department of Transportation. The Traffic and Operations Division shall prepare a street light design drawn on the Subdivision Development Plan based upon the requirements of this Chapter 370. The design shall be forwarded to the appropriate power provider and the developer shall pay the power provider the appropriate cost for materials and installation. Proof of payment to the power provider shall be required.

370-50.3 All fixtures and poles shall meet the requirements of the County and all maintenance shall be the responsibility of the power provider. Fixtures shall be mounted a minimum of 16 feet above the ground. For subdivisions with street trees, fixtures shall be mounted a maximum of 14 feet above the ground. The County, in addition to other requirements, may require a light to be located at street intersections within the development.

370-50.4 Upon acceptance of the street light installation by the County, the power provider shall submit monthly bills to the Traffic and Operations Division of the Department of Transportation for payment which will be assessed to the individual lots.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 37), 9-26-2023) Chapter 380. Public Utilities Installation Section 380-10. Placement of Utilities.

380-10.1 Underground Utilities to be in Right-of-Way or Easement. All authorized public underground utilities shall be located within the right-of-way of a public street or within an easement designated for such use. Within a public street right-of-way, placement of the various authorized utilities (power, gas, cable TV, water, and sewer) shall conform to the specific locations designated for such use by Gwinnett County, as illustrated in the Standard Drawings in the Appendix of this UDO.

380-10.2 Private Underground Utilities Require Department Approval if in the Right-of-Way. No other underground utilities, such as private lawn sprinkler systems, yard lighting, etc., shall be installed within a public right-of-way or easement except by authorization of the Operations and Maintenance Section of the Gwinnett County Department of Transportation Gwinnett County. Such authorization, if issued, shall require the applicant to assume all repair costs of the applicant's facilities should they be damaged during the course of installation, maintenance, or repair of any roadway facilities or any of the public utilities authorized to occupy said right-of-way or easement.

380-10.3 Easements.

A. Dedication requirement. Temporary construction easements and permanent easements for public utilities, stormwater infrastructure or other public facilities shall be dedicated to Gwinnett County in accordance with County requirements.

B. Cleared, opened, and stabilized. Drainage easements are required for any part of the stormwater infrastructure system or undisturbed drainage features which are designed to carry existing or proposed stormwater runoff. Drainage easements for improved ditches, pipe construction, and stormwater facilities shall be cleared, opened, and stabilized at the time of development to control surface water run-off (See also Chapter 800). Run-off slope and side slopes shall be specified by the authorized registered professional, according to good engineering practice. Drainage easements for stormwater that convey water shall be provided according to the minimum requirements found in Table 380.1 below, conform to County Standards, and centered over the conveyance system. The minimum easement width shall be based on the pipe diameter (span) plus 2 feet plus 2 times the pipe invert depth. This value shall be rounded up to the nearest 5 feet. For pipes exceeding 16 feet in depth, a pre-submittal conference shall be held with the County to determine what additional requirements may be required.

Table 380.1. Easement Width for Stormwater Infrastructure.

Pipe Size (In) Maximum Pipe Invert Depth (Ft.)

4 5 6 7 8 9 10 11 12 13 14 15 16 15 20 20 20 20 20 25 25 30 30 30 35 35 40 18 20 20 20 20 20 25 25 30 30 30 35 35 40 24 20 20 20 20 20 25 25 30 30 30 35 35 40 30 20 20 20 20 25 25 25 30 30 35 35 35 40 36 20 20 20 20 25 25 25 30 30 35 35 35 40 42 20 20 20 25 25 30 30 30 35 35 40 40 48 20 20 20 25 25 30 30 30 35 35 40 40 54 20 25 25 25 30 30 35 35 35 40 40 60 20 25 25 25 30 30 35 35 35 40 40 66 25 25 30 30 30 35 35 40 40 40 Pipe Size (In) Maximum Pipe Invert Depth (Ft.)

72 25 25 30 30 30 35 35 40 40 40

C. Width of permanent sanitary sewer easements. Permanent sanitary sewer easements shall be no less than 20 feet in width when no other parallel utilities are located therein. When warranted, temporary construction easement widths shall be determined by the authorized registered professional.

D. Provision for common sanitary/drainage easement. A common easement for sanitary sewer and drainage purposes may be allowed if the pipes are parallel and at least 10 feet is provided between pipes (on center).

The easement width shall be equal to the width shown in Table 380.1 plus the width distance separating the pipes (minimum of 10 feet).

E. Watercourse easements. Drainage easements shall be provided where a development is traversed by or contains a watercourse, impoundment, detention facility, improved channel, floodplain, natural stream, or channel. It shall conform substantially to the flooding limits of the 100-year storm based on fully developed conditions per the Gwinnett County Unified Plan but shall be no less than 20 feet in width.

F. Off street right-of-way easements. Drainage easements off the street right-of-way shall be clearly defined on the Final Plat. The property owner will be required to keep the easement free of obstruction in such a way as to assure the maximum designed flow at all times. The property owner shall not alter any drainage improvements without the prior written approval from the County. Structures shall not be constructed or erected in an easement without the prior written approval from the County. Driveways shall cross an easement as close to perpendicular as practical. Property owners may plant landscaping in an easement that is piped; however, the County is not responsible for replacing the landscape material located in the easement when it is removed to maintain the drainage system.

G. Cleared easements to be grassed. All drainage, sewer, access, or other easements that were required to be cleared shall be fine graded and grassed within 10 days of completing construction work. The use of sediment control measures may be required to protect the area until a comprehensive vegetative cover is obtained.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 38), 9-26-2023) Section 380-20. Water Supply Systems.

Refer to Gwinnett County, Georgia, Code of Ordinances, Part II, Chapter 106, Utilities.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 38), 9-26-2023) Section 380-30. Cross-Connection Control and Backflow Prevention.

Refer to Gwinnett County, Georgia, Code of Ordinances, Part II, Chapter 106, Utilities.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 38), 9-26-2023) Section 380-40. Disposal of Sanitary Waste.

Refer to Gwinnett County, Georgia, Code of Ordinances, Part II, Chapter 106, Utilities.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 38), 9-26-2023) Section 380-50. Private Wastewater Disposal.

Refer to Gwinnett County, Georgia, Code of Ordinances, Part II, Chapter 106, Utilities.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 38), 9-26-2023) Section 380-60. Sewer Construction Standards.

Refer to Gwinnett County, Georgia, Code of Ordinances, Part II, Chapter 106, Utilities.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 38), 9-26-2023) Section 380-70. Water and Sanitary Sewer Installation Standards.

380-70.1 Installation and Compaction Required before Pavement or Base. All water and sanitary sewer utilities and stormwater infrastructure facilities within the curbs shall be installed and the ditches backfilled and thoroughly compacted before any pavement or base is installed. A minimum of 95 percent compaction is required.

380-70.2 After Base Installed, Utilities to be Bored. Once the base has been placed, all further installation of utilities under the roadway shall be bored or otherwise comply with Section 380-80.

380-70.3 Manholes Flush with Finished Grade. All utility manholes and valve boxes shall be brought flush to the finished grade within the roadway section. If there is a delay in applying the final surface course for new roadway pavement, then the utility manholes and valve boxes shall be brought flush with the finished grade of the intermediate course of the roadway pavement.

380-70.4 Standard Drawings Apply. All utility locations shall adhere to the details found in the Standard Drawings in the Appendix of this UDO.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 38), 9-26-2023) Section 380-80. Street Cuts.

380-80.1 Review and Approval by the Gwinnett County Department of Transportation. All utility construction plans within County right-of-way shall be reviewed and approved by the Gwinnett County Department of Transportation before construction begins. Street cuts shall not be allowed unless deemed absolutely necessary due to the presence of rock, the need to tap into an existing line beneath the road surface, or other circumstance which makes boring impossible or infeasible.

380-80.2 Fees Required.

A. No street cut shall be authorized until such Street Cut Fees have been paid.

B. All street cut repairs must be inspected and approved prior to the release of street cut fees.

380-80.3 Trenches to be Backfilled.

A. If approved, all trenches shall be backfilled and compacted the same day the trench is opened.

B. Trenches under the paving shall be returned to 95 percent compaction.

C. Trenches elsewhere shall be returned to 90 percent compaction.

D. See Section 360-70.2 for trench compaction and test requirements.

380-80.4 Trenches under Paving. All trenches under paving shall be concreted with 8 inches of Class "A" concrete base and 2 inches of 9.5 mm Superpave Type II wearing course asphalt is to be spread.

A. The paving cut shall be widened to a minimum of 9 inches beyond the edges of the trench.

B. The edges of the paving cut shall be smooth.

C. If the final course of asphalt has been completed prior to the street cut, then milling and inlay of the surrounding area will be required. Limits of mill and inlay are subject to Gwinnett County Department of Transportation approval.

380-80.5 Utility Extension Information.

A. Contact the Department of Water Resources or the Department of Planning and Development for public utility extension information from the existing to the proposed development.

B. Contact Gwinnett County Department of Transportation at least 24 hours in advance of closure of traffic lanes. All lane closures must meet Manual on Uniform Traffic Control Devices (MUTCD) guidelines.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 38), 9-26-2023) Chapter 400. Soil Erosion, Sedimentation, and Pollution Control* Section 400-10. Title and Purpose.

The real potential exists for excessive quantities of soil to erode from areas that are undergoing land disturbance. The resulting sediment could clog storm sewers and road ditches, add mud to streams and silt lakes, rivers, and reservoirs.

Excessive sediment limits the use of water for most beneficial purposes. Sediment choked streams are unsightly and their reduced channel capacity can result in flooding and associated damages, including the threat to the public health and safety. Therefore, it is the purpose of this chapter is to effectively contain soil erosion and sedimentation on the parcels where land is being disturbed by requiring provisions for water disposal and the protection of soil surfaces prior to, during, and after the land disturbance in order to promote the safety, public health, convenience, and general welfare of the citizens of Gwinnett County.

400-10.1 In the interpretation and application of Chapter 400 of this UDO, all provisions shall be:

1. Considered as minimum requirements.

2. Liberally construed in favor of Gwinnett County.

3. Deemed neither to limit nor repeal any other powers granted under state statutes.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 39), 9-26-2023) Section 400-20. Exemptions.

This Chapter shall apply to any land-disturbing activity undertaken by any person on any land except for the following:

400-20.1 Surface mining, as the same is defined in O.C.G.A. § 12-4-72, The Georgia Surface Mining Act of 1968.

400-20.2 Granite quarrying and land clearing for such quarrying.

400-20.3 Such minor land-disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion.

400-20.4 The construction of single-family residences, when such construction disturbs less than one acre and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements set forth in Sections 400-30.1, 400-30.2, and 400-30.3 of this UDO, O.C.G.A. § 12-7-6, and this paragraph. For single-family residence construction covered by the provisions of this paragraph, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to O.C.G.A. § 12-5-20 et seq. In any such buffer zone, no land disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the Director of the Environmental Protection Division may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The general provision and minimum requirements of 400-30.1 and the minimum requirements of Sections 400-30.2 and 400-30.3 of this UDO, O.C.G.A. § 12-7-6(b) and the buffer zones provided by this section shall be enforced by the Department.

400-20.5 Agricultural operations as defined in O.C.G.A. § 1-3-3 to include raising, harvesting, or storing of crops;

feeding, breeding, or managing livestock or poultry; producing or storing feed for use in the production of livestock, including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits, or for use in the production of poultry, including, but not limited to, chickens, hens, ratites, and turkeys; producing plants, trees, fowl, or animals;

or the production of aquacultural, horticultural, dairy, livestock, poultry, eggs, and apiarian products.

400-20.6 Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in Subsections 400-30.3.O. and 400-30.3.P of this UDO, no other land disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices.

400-20.7 Any project carried out under the active technical supervision of the Natural Resources Conservation Service of the United States Department of Agriculture. This excludes those land-disturbing activities undertaken by a person who has requested technical advice only rather than active participation from the Natural Resources Conservation Service;

400-20.8 Any project involving 5,000 square feet or less of disturbed area; provided, however, that this exemption shall not apply to any of the following activities:

1. Any land-disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than 1 acre or; Within 200 feet of the bank of any state waters, and for purposes of this paragraph, "state waters" excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year-round; provided, however, that any person responsible for a project which involves 5,000 square feet or less of disturbed area and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located. The provisions of this paragraph shall not apply to those projects specifically exempted by Sections 400-20.1 through 400-20.7 and Sections 400-20.9 through 400-20.10 of this section.

400-20.9 Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the Georgia Department of Transportation, the Georgia Highway Authority, the State Road and Tollway Authority, or the Gwinnett County Department of Transportation; provided, however, that construction or maintenance projects of the Georgia Department of Transportation or the State Road and Tollway Authority which disturb one or more contiguous acres of land shall be subject to the provisions of O.C.G.A. § 12-7-7.1; except where the Georgia Department of Transportation, the Georgia Highway Authority, or the State Road and Tollway Authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;

400-20.10 Any land-disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and,

400-20.11 Any public water system reservoir.

(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 39), 9-26-2023) Section 400-30. Requirements for Erosion and Sedimentation Control Using Best Management Practices.

400-30.1 General Provisions. Excessive soil erosion and resulting sedimentation can take place during land disturbing activities. Therefore, plans for those land-disturbing activities that are not exempted by this Chapter shall contain provisions for the application of soil erosion, sedimentation and pollution control measures and practices.

These provisions shall be incorporated into the Erosion, Sedimentation, and Pollution Control Plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the requirements of Sections 400-30.2 and 400-30.3. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed and continually maintained to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with the requirements of this UDO and the NPDES general permit.

400-30.2 Minimum Requirements/Best Management Practices (BMP's).

A. Best Management Practices as set forth in Sections 400-30.2 and 400-30.3 shall be required for all land disturbing activities. Proper design, installation, and maintenance of Best Management Practices shall constitute a complete defense to any action by the Director of the Environmental Protection Division or to any other allegation of noncompliance with Subsection B of this Section or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to O.C.G.A. § 12-5-30(f), the Georgia Water Quality Control Act. As used in this section, the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the "Manual for Erosion and Sediment Control in Georgia" specified in O.C.G.A. § 12-7-6(b).

B. A discharge of stormwater runoff from disturbed areas where Best Management Practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land disturbance permit issued by Gwinnett County or of any state general permit issued by the Environmental Protection Division of the Georgia Department of Natural Resources pursuant to O.C.G.A. § 12-5-30(f), the Georgia Water Quality Control Act, for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units (NTU's) for waters supporting warm water fisheries or by more than ten nephelometric turbidity units (NTU's) for waters classified as trout waters. The turbidity of the receiving waters shall be measured in accordance with guidelines issued by the Director of the Environmental Protection Division of the Georgia Department of Natural Resources. This paragraph shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than 5 acres.

C. Failure to properly design, install, maintain, or remove Best Management Practices shall constitute a violation of any land disturbance permit issued by Gwinnett County or of any state general permit issued by the Environmental Protection Division of the Georgia Department of Natural Resources pursuant to O.C.G.A. § 12-5-30(f) for each day on which such failure occurs.

D. The Director of the Environmental Protection Division of the Georgia Department of Natural Resources may require, in accordance with regulations adopted by the Georgia Board of Natural Resources, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land-disturbing activities occur.

400-30.3 Additional Minimum Requirements. The rules and regulations, ordinances or resolutions adopted pursuant to O.C.G.A. § 12-7-1 et seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and Best Management Practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation which are consistent with, and no less stringent than the state general permit, and those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, shall be observed by all land disturbers and plan preparers, as well as the following:

A. Stripping of vegetation, regrading, and other development activities shall be conducted in a manner so as to minimize erosion.

B. Cut-fill operations must be kept to a minimum.

C. Development plans must conform to topography and soil type so as to create the lowest practical erosion potential.

D. Whenever feasible, natural vegetation shall be retained, protected, and supplemented.

E. The disturbed areas and the duration of exposure to erosive elements shall be kept to a practicable minimum.

F. Disturbed soil shall be stabilized as quickly as practicable.

G. Temporary vegetation or mulching shall be employed to protect exposed critical areas during development.

The disturbed area shall be stabilized with temporary vegetation or mulch if land-disturbing activity temporarily ceases for more than 14 calendar days.

H. Permanent vegetation and structural erosion control measures shall be installed as soon as practicable. The disturbed area shall be stabilized with permanent vegetation if land-disturbing activity ceases for more than 30 calendar days.

I. To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of this Chapter and O.C.G.A. § 12-7-1 et seq.

J. Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping surface of fills.

K. Cuts and fills may not endanger adjoining property.

L. Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners.

M. Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings shall be kept to a minimum;

N. Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in Section 400-30.2b.

O. Except as provided in Subsection P of this section, there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the Director of the Environmental Protection Division determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the Director of the Environmental Protection Division pursuant to O.C.G.A. § 12-2-8, or where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or along any ephemeral stream. As used in this paragraph, the term "ephemeral stream" means a stream: that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year-round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow. Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to O.C.G.A. § 12-5-440 shall remain in force unless a variance is granted by the Director of the Environmental Protection Division as provided in this paragraph. The following requirements shall apply to any such buffer:

1. No land-disturbing activities shall be conducted within a buffer and it shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed.

2. Once the final stabilization of the construction site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed.

3. Exception: Any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed.

4. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented:

a. Stream crossings for water lines; or,

b. Stream crossings for sewer lines; and,

c. Prior to action by the Director of the Environmental Protection Division, buffer variance requests along state waters with drainage areas greater than 20 acres shall be reviewed for approval or denial by the director using the same buffer variance criteria as adopted by the Board of the Georgia Department of Natural Resources.

P. There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as "trout streams" pursuant to O.C.G.A. § 12-5-20 et seq, except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the Board of Natural Resources providing for notice to the Environmental Protection Division or the County of the location and extent of the piping and prescribed methodology for minimizing the impact of such piping and for measuring the volume of water discharged by the stream. Any such pipe must stop short of the downstream landowner's property, and the landowner must comply with the buffer requirement for any adjacent trout streams. The Director of the Environmental Protection Division may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to any such buffer:

1. No land-disturbing activities shall be conducted within a buffer and it shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed.

2. Once the final stabilization of the construction site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:gwinnett-county/zoning/whole@2026-04-14-862004956d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.