Gwinnett County · Ordenanza de zonificación
Gwinnett County Zoning Ordinance
Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.
Sobre este texto
- As published by Municode, current through 2026-04-14
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Parte 6 de 6. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.
5. Underground Detention (except in the R-IF zoning district and mixed-use zoning districts, if authorized by the Director)
6. Or any additional BMP's deemed unacceptable by Planning & Development.
800-60.9 A non-residential subdivision is not required to locate an on-site stormwater management facility on a separate lot. The property owners served by a stormwater management facility that provides runoff reduction, water quality, channel protection, overbank flood protection, extreme flood protection or any combination for more than one property owner or is located off-site shall enter into a maintenance agreement acceptable to the County for the facility's maintenance. However, if desired by the developer, the facility may be located on a separate lot if it is owned and maintained by a mandatory property owners' association.
800-60.10 In a residential subdivision, a private drainage easement at least 20 feet in width in accordance with the UDO section 1000-10.3B shall be required to provide access to all linear stormwater BMPs from a public street. The private drainage easements are to be shown on the subdivision's recorded plat and clearly labeled as a private drainage easement to be maintained by the HOA.
800-60.11 Stormwater management facility access easement requirements for stormwater BMPs shall, at a minimum, meet the requirements outlined in the Gwinnett County Stormwater Management Manual.
800-60.12 Stormwater BMP's must be designed and installed as outlined in the Gwinnett County Stormwater Management Manual.
800-60.13 For every type of stormwater treatment facility, a planned safe flow path must be provided for conveyance of flows of water in excess of those for which the stormwater treatment facility was designed. In many instances, this function can be provided through installation of an emergency spillway. Emergency spillways are usually excavated open channels, either vegetated or paved with reinforced concrete.
800-60.14 Stormwater management facility maintenance requirements are as follows:
A. The detention storage capacity or function of any stormwater management facility whether natural or man-made, shall not be removed or diminished without the express approval of the Department.
B. In a residential subdivision, it shall be the responsibility of the Qualified Property Owner's Association, Homeowners Association, or other private parties to maintain the operational characteristics of any stormwater management facility constructed on their property for stormwater management pursuant to County requirements, to keep the access drive free of obstructions, and to maintain the facility free of obstruction, silt, or debris.
C. In a non-residential subdivision or project served by a stormwater management facility that provides stormwater management for more than one property or by an off-site facility, the property owners shall enter into a maintenance agreement with the County for maintenance of the operational characteristics of the facility pursuant to County requirements, to keep the access drive free of obstructions, and to maintain the facility free of obstruction, silt, or debris.
D. In a non-residential project with an on-site stormwater management facility which serves only that project, the property owner shall be responsible to maintain the operational characteristics of the facility pursuant to County requirements, to keep the access drive free of obstructions, and to maintain the facility free of obstruction, silt or debris as outlined in the Gwinnett County Stormwater Management Manual
E. Where no maintenance agreement has been recorded, it shall be the responsibility of the property owner to maintain the operational characteristics of any facility constructed on their property for stormwater management pursuant to County requirements, to keep the access drive free of obstructions, and to maintain the facility free of obstruction, silt, or debris.
F. Prior to the issuance of a Development Permit, the owner shall submit a detailed schedule of long-term maintenance and inspection activities. This schedule of activities shall be incorporated into a maintenance agreement to be entered into between the County and the owner. The schedule shall describe all maintenance and inspection activities and the parties responsible. The maintenance agreement shall be in a form acceptable to the County and shall be recorded in the deed records of the Clerk of Superior Court of Gwinnett County.
800-60.15 Stormwater management facilities shall be constructed in accordance with plans reviewed and approved by the Department and shall be in place and inspected prior to the initiation of other improvements. If the stormwater management is planned to be handled by a lake a stormwater BMP which shall provide runoff reduction, or any other stormwater management system as determined by Planning and Development, a temporary stormwater management facility shall be provided and shall remain in place until such time as the stormwater management facility has become effective in providing stormwater management. The construction shall be in accordance with the Gwinnett County Stormwater Management Manual.
800-60.16 Upland Area Easements in non-residential subdivisions that are claimed as undisturbed upland areas for the site shall be recorded in an easement acceptable to the County. These areas shall be left in a natural, undisturbed condition except for walking trails.
800-60.17 Prior to or concurrent with the recording of a Final Plat for a subdivision, or issuance of a Certificate of Occupancy for a non-subdivision project, the developer, shall meet the surety requirements of Chapter 900 and provide acceptable surety such as a bond or letter of credit, as determined by Planning & Development, providing for the stormwater management facility(ies) for a period of not less than 18 months. At the end of 18 months, the County may require the surety to be renewed due to anticipated improvements caused by such concerns as future construction activity within the project limits in the drainage basin. The surety for a facility shall be renewed until:
A. The surface water drainage area within the project has undergone final stabilization and all planned site construction activity has been completed.
B. All stormwater runoff in the surface water drainage area within the project is coming from undisturbed or stabilized areas.
C. All stormwater facilities and infrastructure construction has been completed and permanent vegetation is established.
D. If a temporary stormwater management facility is still in use at the end of the site construction, then the surety shall remain in place until the accumulation of acreage of undeveloped lots, lots with no completed permanent structure and no final stabilization, within the surface water drainage area within the project is less than 10 percent of the total area of the common development draining to the facility.
E. Two months prior to surety release, the permanent stormwater management facility shall be installed and cleaned out, as necessary. A new record survey, drawing and certification showing that the volume of the facility is equal to or greater than the volume shown in the record survey, drawing and certification when the facility was approved shall be submitted. Documentation demonstrating the required testing outlined in the Gwinnett County Stormwater Management Manual for the proposed stormwater BMP shall also be provided. As an alternative, a new record survey, drawing and certification showing that the facility complies with this UDO as specified in Section 800-20.7. shall be submitted. If deficiencies are found, the developer shall be required to update the stormwater BMP to comply with the approved development plans.
800-60.18 The methodology used for an underground or rooftop stormwater management facility design shall conform to the Gwinnett County Stormwater Management Manual and the Gwinnett County Storm Sewer Pipe Standards. In the case of rooftop stormwater treatment, permissible structural loads and weatherproofing shall be governed by the Georgia State Building Code as may be amended by the County.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 46), 9-26-2023) Section 800-70. Dams.
800-70.1 New Dams Subject to the Requirements of The Georgia Safe Dams Act and Rules for Dam Safety. Dams proposed to be 25-feet or more in height and proposed to have a maximum storage volume of 100 acre-feet or more and are determined to be a Category I dam as defined by the Georgia Safe Dams Program shall be subject to the requirements of the Georgia Safe Dams Act, the Rules for Dam Safety adopted by the Georgia Department of Natural Resources and the USDA Soil Conservations Service's Technical Release No. 60 "Earth Dam and Reservoirs". The developed shall obtain necessary approvals and permits from the Environmental Protection Division of the Georgia Department of Natural Resources for the project and the dam prior to securing a Development Permit from the Department.
800-70.2 New Dams Subject to Regulation by Gwinnett County. Dams proposed to be nine feet or more in height, but less than 25 feet in height, in combination with an impounding capacity proposed to be 20 acre-feet or more at maximum water storage elevation, but less than 100 acre-feet, or dams determined Category II dams by the Georgia Safe Dams Program shall be subject to the following:
A. If the developer elects not to construct the new dam to the design standards for new dams as contained in the Rules for Dam Safety, then a dam breach analysis for the dam shall be submitted with the construction plans for review and authorization prior to securing a Development Permit from the Department. The professional engineer shall use the computer model such as "DAMBRK" for the dam breach analysis.
B. Should the new dam not meet the design standards for new dams as contained in the Rules for Dam Safety, then only the following uses and structures shall be permitted within the dam breach zone:
1. Agriculture that requires no structures for human habitation within the dam breach zone including forestry, livestock raising, and agricultural and forestry access roads.
2. Fences.
3. Roads, driveways, and parking areas.
4. Utility poles, towers, pipelines, water treatment outfalls and facilities, or similar facilities and structures.
C. If the developer elects to construct the new dam in accordance with the design standards for new dams as contained in the Rules for Dam Safety, then new development shall be permitted within the dam breach zone. However, the dam shall meet the design standards for new dams as contained in the Rules for Dam Safety if development currently exists or is proposed in the dam breach zone.
D. Construction plans for new dams defined herein shall be submitted to Gwinnett County for review for the project and the dam prior to securing a Development Permit from the Department.
E. For any dam that is proposed not to meet the design standards for new dams as contained in the Rules for Dam Safety, the developer shall obtain a dam breach easement, recorded with the Clerk of Superior Court, from any offsite property owner where it is proposed for the dam breach zone to extend off the property where the dam is being constructed. The developer shall also cause a dam breach easement to be recorded upon the property being developed.
Prior to recording of a Final Plat or issuance of a Certificate of Occupancy, as appropriate, an as-built certification from a professional engineer shall be submitted to the Department. The certification shall state that the dam is constructed in accordance with the provisions of these regulations as well as the authorized construction plans. If the project is for the development of a subdivision, the developer shall also establish a legal entity, acceptable to Gwinnett County, such as a mandatory Property Owners Association, at time of recording of the Final Plat, responsible for the maintenance of the dam and its impoundment.
800-70.3 Existing Dams. Existing dams that are located on a project site and will remain after construction is complete, shall comply with the provisions of this Chapter and all referenced chapters and sections as if they were new dams.
800-70.4 Existing Category II Dams. When an existing Category II dam may be reclassified to a Category I dam because of a proposed development downstream of the dam, the following shall be provided by the developer for review by the Georgia Safe Dams Program. The following information shall be provided:
A. Location of the Category II dam and the proposed development.
B. A surveyed cross-section of the stream valley at the location of the proposed development including finished floor elevations.
C. A dam breach analysis must establish the height of the floodwave in the downstream floodplain. A professional engineer shall complete the dam breach analysis in accordance with the Safe Dams Program Quality Assurance Program.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 46), 9-26-2023) Section 800-80. Stormwater Management Practices for Redevelopment Projects.
800-80.1 Stormwater management for redevelopment projects must follow the guidelines set forth in the Gwinnett County Stormwater Management Manual. For redevelopment, the pre-developed conditions may take into account the existing conditions unless the existing development causes a negative impact on downstream property. The standards within this section apply to all redevelopment sites that meet the criteria in section 800-30.2.
800-80.2 The purpose of a stormwater management analysis is to support the redevelopment of the project site using Best Management Practices and diligent engineering. The report must follow the guidelines set forth in the Gwinnett County Stormwater Management Manual and is required for all redevelopment projects. A qualified registered professional in the State of Georgia shall certify the analysis. The analysis shall be in accordance with the criteria specified in Section 800-20.
800-80.3 Water quality treatment of stormwater runoff for the purposes of water quality shall be in accordance with the criteria specified in the Gwinnett County Stormwater Management Manual under the following conditions:
A. Water quality treatment must be met for the entire site when the disturbed area is more than 50 percent of the property.
B. Water quality treatment must be met for the improvements on the site only when the disturbed area is less than 50 percent of the property.
800-80.4 Channel protection and stormwater treatment for a redeveloped project site shall be provided in accordance with the criteria specified in the Gwinnett County Stormwater Management Manual under the following conditions:
A. Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three approaches:
1. Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer.
2. Erosion prevention measures such as energy dissipation and velocity control.
3. 24-hour extended detention storage of the one-year, 24-hour return frequency storm event (channel protection volume).
B. Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-developed conditions which may take into account the existing conditions unless the existing development cause a negative impact on downstream property or the 25-year, 24-hour return frequency storm event.
C. Extreme flood and public safety protection shall be provided by controlling and safely conveying the 100-year, 24-hour return frequency storm event such that flooding is not exacerbated.
D. For receiving water with trout stream designation, the stormwater management plan must address the protection of the trout waters.
800-80.5 Existing stormwater management facilities used for a redevelopment project must have a recorded maintenance agreement and must meet one of the following criteria:
A. Where water quality treatment for a proposed redevelopment is to be provided in an existing detention facility, water quality treatment must be provided for the original project area. A modification to the 25-year detention requirement may be granted for retrofitting the stormwater management facility to meet current water quality regulations. Granting a modification will meet the intent and purpose of these regulations when:
1. The detention requirements of the current regulations are provided in the facility for the 1-year, 2-year, 5-year and 10-year storm. For a retrofitted facility, the volume of the 1-year storm shall be based on the original project area being detained instead of the total area draining to the facility.
2. The water quality requirements of the current regulations are provided for the original project area in the facility.
3. The 25-year ponding limits create a hardship if no modification is granted.
4. The outlet structure meets the requirements of the current regulations.
B. Where water quality is treated in a regional stormwater management facility approved between April 27,1999, and January 1, 2001, all lots within the treated area shall either conform to the original permit requirements and water quality regulations at the time of approval or conform to the current water quality regulations. A volume verification confirming facility maintenance in accordance with the original design shall be certified by an authorized registered professional and submitted to the Department for review and approval.
C. Where stormwater detention is treated in a regional detention facility approved before April 27, 1999, all lots within the treated area shall conform to current water quality and channel protection regulations. A volume verification confirming facility maintenance in accordance with the original design shall be certified by an authorized registered professional and submitted to the Department for review and approval.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 46), 9-26-2023) Section 800-90. Exemptions.
800-90.1 Exemptions from the Gwinnett County Stormwater Management Manual Standards are listed below:
A. Land disturbing activity conducted by local, state, authority, or federal agencies, solely to respond to an emergency need to protect life, limb, or property or conduct emergency repairs;
B. Land disturbing activity that consists solely of cutting a trench for utility work and related pavement replacement;
C. Land disturbing activity conducted by local, state, authority, or federal agencies, whose sole purpose is to implement stormwater management or environmental restoration
D. Repairs to any stormwater management system deemed necessary by the Director;
E. Agricultural practices as described O.C.G.A. 12-7-17(5) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in (A) or (B);
F. Silvicultural land management activities as described O.C.G.A. 12-7-17(6) within areas zoned for these activities with the exception of buildings or permanent structures that exceed the threshold in (A) or (B);
G. Installations or modifications to existing structures solely to implement Americans with Disabilities Act (ADA) requirements, including but not limited to elevator shafts, handicapped access ramps and parking, and enlarged entrances or exits.
800-90.2 Gwinnett County Department of Transportation should reference the Gwinnett County Stormwater Management Manual to determine stormwater management requirements for each project.
A. If such requirements are ascertained to be infeasible to implement in certain site development or transportation projects due to one or more of the factors listed below, a Determination of Infeasibility Report shall be submitted to the Department of Planning and Development for review, along with the associated set of proposed plans. Factors affecting infeasibility include:
1. Additional cost of 10 percent or greater of the total project costs, including right of way acquisition, construction, and utility relocation costs.
2. Project delay of 180 days or greater due to implementation of post-construction controls.
3. Loss of habitat for endangered or threatened species.
4. Significant damage to a cultural resource, such as a historical site, archaeological site, or cemetery.
5. Significant damage to a community resource, such as a park, wildlife refuge, trail, or school.
6. Implementation would result in the displacement of a residence or business.
7. Implementation would result in the violation of a State or Federal law, regulation, or standard.
B. The Determination of Infeasibility Report must be prepared by an authorized registered professional and include the following sections based on the applicable affecting factor(s):
1. Written narrative justifying limitations.
2. Summary of proposed additional costs.
3. Projected number of days for delays.
4. Vicinity map showing site limitations.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 46), 9-26-2023) Chapter 810. Stormwater Conveyance Systems* Section 810-10. General Requirements.
810-10.1 Drainage Improvements Required. Stormwater conveyance systems, which may include but are not limited to culverts, storm drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, and ditches, shall be provided for the protection of public right-of-way and private properties adjoining project sites and/or public rights-of-way. Stormwater conveyance systems that are designed to carry runoff from more than one parcel, existing or proposed, shall meet the requirements of this UDO.
810-10.2 Design Criteria—General. All stormwater conveyance systems design calculations shall be certified by the authorized registered professional (refer to Section 800-20):
A. Methods to calculate stormwater flows shall be in accordance with the Gwinnett County Stormwater Management Manual.
B. All portions of a stormwater conveyance system shall be analyzed using the same methodology.
C. Run-off coefficients used for the Rational Method and runoff Curve Numbers used for the SCS Method shall be consistent with those shown in the Gwinnett County Stormwater Management Manual.
810-10.3 Design Criteria—Conveyance Systems. Conveyance system design is to be in accordance with the methods contained in the Gwinnett County Stormwater Management Manual. The 100-year ponding limits at and upstream of the culvert shall be shown on the Development Plans and on the Final Plat (if applicable).
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 47), 9-26-2023) Section 810-20 Collection System Guidelines.
810-20.1 Outlet Location—Conveyance Systems.
A. Outlet structures (such as headwalls) shall not be located closer to the project site's property line with an adjoining property than the greater of the distance necessary to construct velocity protection or a flow distance equal to six pipe diameters. For non-circular conduits, this distance shall be six times the rise dimension of the conduit.
B. The invert elevation of a piped conveyance system outlet shall be no more than two feet above the elevation of the bottom of the receiving watercourse.
810-20.2 Energy Dissipation. The maximum post-developed flow velocity at the project site's downstream property line with an adjoining tract shall not exceed the maximum pre-developed flow velocity. Calculations shall be required to support this velocity standard.
810-20.3 Concentrated Flows.
A. The discharge of concentrated flows of stormwater into public roadways shall be avoided as practicable. In no case shall such concentrated flows, including flows from swales, ditches, draws, driveways, or piped systems, exceed the allowable peak flow rates in Table 810.1 below
Table 810.1. Maximum Flows into Streets.
Street Classification Allowable Peak Flow Rate For a 2-Year Storm Local 2.0 cfs Minor Collector 1.0 cfs Other 0.5 cfs
B. In residential subdivisions, the drainage area contributing to the peak flow along any property line between lots within 50 feet of the building setback line for either lot shall not exceed 2 acres, unless contained within a piped drainage system or maintained in a natural watercourse. The stormwater conveyance shall be in a drainage easement.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 47), 9-26-2023) Section 810-30. Walls.
810-30.1 When permanent grades are proposed with a resulting slope steeper than one foot vertical for every three feet of horizontal, resulting wall height (measured from top of footing to top of wall) will exceed four feet, or surcharge loading will be applied to the back side of the wall, then an appropriate earth retaining structure shall be designed and permitted. The wall may be constructed of concrete, masonry, segmental block or wire basket units, or other appropriate structural materials. Walls that do not exceed six feet in height may also be constructed of timber.
Retaining Wall design shall be in compliance with the current Georgia State Minimum Standard Building Code and ASCE/SEI 7-16. As applicable, wall design shall also comply with ACI 318-18 (Concrete Wall), TMS 402-16 (Masonry Wall), NCMA Design Manual for Segmental Walls (Modular Wall), and/or ANSI/AWC NDS-2018 (Wood Wall). Walls exceeding six feet in height shall be designed and drawings shall be prepared by a Georgia Registered Professional Engineer.
810-30.2 Walls and wall foundations or supports shall be located in such a fashion as to not encroach upon existing or proposed drainage easements, drainage courses, or floodplains. Walls shall be constructed so that the zone of influence from the wall shall not encroach upon the area of potential excavation to maintain, service or replace a utility facility such as stormwater, sanitary sewer, or water facility. Grading on each side of the wall shall be designed so that the wall will not encumber the natural flow of stormwater surface runoff. Walls and wall supports shall be located at a distance from easements to allow for anticipated future maintenance of the easement while still maintaining the structural integrity of the wall.
810-30.3 Retaining/detention pond walls of any height that are proposed for the purpose of stormwater management must be designed by a Georgia Registered Professional Engineer and must be permitted. Walls shall be designed for hydrostatic loading under full pond conditions and retained backfill soil under dry pond conditions.
The hydrological design must allow for a freeboard dimension and emergency overflow capacity that meets the requirements outlined in the Gwinnett County Stormwater Management Manual. The overflow device should be placed above the projected 100-year flood elevation within the detention area. Detention area and wall calculations are required submittals to Gwinnett County Planning and Development.
810-30.4 Retaining walls constructed in or adjacent to a residential subdivision shall comply with the following:
A. For proposed developments with a residential component, no greater than 50% of a stormwater management facility perimeter may be walled without approval from the Director of Planning & Development.
B. Retaining Walls along the perimeter of a stormwater management facility where the top of wall elevation exceeds the surface elevation and which face a habitable structure and/or a public right-of-way, private access easement or other means of access, shall be screened. The screening shall include native vegetation supplemented as necessary via a preserved landscape strip at least 20-ft in width, a planted landscape strip at least 15-ft in width and the wall may be faced with brick or stone. The strip shall be located a minimum of 10-ft from the face of wall. Vegetation shall be maintained by the property owner on non-residential properties, or a qualified homeowner's association on residential properties or a property owner's association.
C. Retaining walls which face the property line of a residential property or properties shall be located a minimum of 1.5 times the height of the retaining wall from the property line or within the building setbacks of the property/lot. The wall setback area shall be landscaped with native vegetation to screen the wall from the adjacent property.
810-30.5 Any construction that may impact or be within the right-of-way of an existing or proposed water or sanitary sewer easement must be approved by the utility providing service.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 47), 9-26-2023) Chapter 900. Development Conformance, Sureties, and Maintenance* Section 900-10. Development Conformance, Sureties and Maintenance, in General.
900-10.1 Prerequisite to Final Plat, Certificate of Completion, or Certificate of Occupancy. The submittal and acceptance of a Certificate of Development Conformance shall be a prerequisite to the approval of a Final Plat or issuance of a Certificate of Occupancy or Certificate of Completion for any project, or portion thereof, included in a Development Permit, except for single-family and two-family structures. The approval shall reflect the certification by the owner, being the subdivider or developer, that all site work and construction has been accomplished according to the terms of the approved plans and permits, and that all improvements intended for maintenance, supervision and/or dedication to the public are in compliance with appropriate standards, regulations, codes, and ordinances.
Such approval shall be revoked in cases of fraud or whenever unauthorized changes are made to the site without the benefit of required permits.
900-10.2 Submission Requirements. Upon completion of the project as authorized for construction by the development permit, the subdivider/developer, shall file the following items with the Director:
A. A Certificate of Development Conformance in a form as required by the Director, accompanied by an executed Development Performance and Maintenance Agreement and related surety bonds, or other surety forms, as appropriate and acceptable to the Director.
B. Record drawings of all stormwater management facilities.
C. Modifications to the limits of the 100-year floodplain (if any).
D. An "as-built" hydrology study for the project with the actual parameters from the record drawing of the stormwater management facilities.
E. A record drawing of the sanitary sewer facilities shall also be prepared and submitted to the Plan Review Section for review and approval. If the owner is a corporation, the documents shall be executed by the President, or Vice-President, be affixed by a corporate seal, and either the corporate secretary shall attest to the signature and affix the corporate seal, or a Certificate of Corporate Resolution shall also be submitted.
900-10.3 Certificate of Development Conformance Approval Process.
A. Following final inspection and approval of all record drawings, the Director shall require an executed Certificate of Development Conformance from the subdivider/developer.
B. Final approval by the Director shall not be shown on the Certificate of Development Conformance until all requirements of these and other applicable regulations have been met.
C. Once the Department has approved the Certificate of Development Conformance and after all maintenance and performance bonds are released, the Director or designee shall certify by signature on the original of the Certificate of Development Conformance that all of the requirements of this UDO and the conditions of zoning approval have been met, and that all other affected departments have approved the development or Final Plat.
D. For developments with private streets, all required improvements and installations must be completed in accordance to the applicable rules and regulations of Gwinnett County.
900-10.4 Project Closeout and Continuing Maintenance.
A. Development Performance and Maintenance Agreement. Based on the approved Certificate of Development Conformance, the owner shall file a Development Performance and Maintenance Agreement with the Department, along with any required Certificate of Corporate Resolution and performance or maintenance surety, as a prerequisite to the approval of a Final Plat or issuance of a Certificate of Occupancy for any part of a project included in the development permit, except for single-family and two-family residential structures. The Development Performance and Maintenance Agreement shall be in a form as required by the Director, and shall include the following:
1. Maintenance surety shall be filed to warrant to the County that all newly completed street improvements including but not limited to street pavement, curbing, sidewalks, water and sewer lines, appurtenances, stormwater facilities, wall(s), berms, and required landscaping within the right-of-way shall be maintained in compliance with the standards and rules and regulations of Gwinnett County.
Such surety shall:
a. Be conditioned upon the faithful maintenance by the principal, being the subdivider, owner or developer of the public streets and drainage facilities within public streets or easements, in compliance with this UDO and all other applicable rules and regulations within a specified time, not less than 18 months;
b. Be payable to, and for the indemnification of the County;
c. Be an amount equal to 50 percent of the cost of construction of the work required, as calculated based on yearly contract prices or County contracts, where applicable;
d. Be with a surety company entered and licensed to do business in the State of Georgia; and
e. Be in a form acceptable to the Director or to the County Attorney.
2. A Performance surety shall be filed to warrant to the County that all improvements and installations required for the Development Permit or Final Plat approval, but not yet completed, shall:
a. Be conditioned upon the faithful performance by the principal, being the subdivider, owner or developer of all work required to complete all improvements and installation for the development, or approved portion thereof, in compliance with this UDO and all other rules and regulations within a specified time, not to exceed 12 months, unless an extension for additional time is granted;
b. Be payable to, and for the indemnification of, the County;
c. Be in an amount equal to the cost of construction of the work required plus an additional 50 percent of said costs, as calculated based on the yearly contract prices or County contracts, where available;
d. Be with surety by a company entered and licensed to do business in the State of Georgia; and,
e. Be in a form acceptable to the Director or the County Attorney.
B. Continuing Maintenance. The surety principal, being the subdivider, owner, or developer, shall be responsible for maintaining the public streets and drainage facilities within public rights-of-way or easements for the surety period after the date of approval of the Certificate of Development Conformance. Repairs shall be made for any deficiencies identified within the surety period or the bonds shall be called to complete same.
C. Indemnification. Indemnification of the County against any and all liability for damages arising as a result of errors or omissions in the design or construction of the development for a period of ten years. If liability is subsequently assigned or transferred to a successor in title or other person, a copy of such legal instrument shall be filed with the Clerk to Superior Court.
D. Transfer of Land Ownership during the Maintenance and/or Performance Agreement Time Period. No person, firm, partnership, association, corporation, estate, trust, developer, subdivider or any other owner or agent shall transfer title of any property by reference to, exhibition of, or any other use of any map or plat illustrating the subdivision of land of which there are active maintenance or performance bonds without first providing to Gwinnett County, as beneficiary, a newly executed Development Performance and Maintenance Agreement from the new owner or developer. All required performance or maintenance sureties acceptable to Gwinnett County shall accompany the new Agreement as deemed necessary.
900-10.5 Maintenance and Performance Surety.
A. The maintenance surety and the performance surety, required from the subdivider, owner/developer or the contractor employed by the owner/developer, may be in the form of cash deposited with the County, or a surety bond, or letter of credit from a bank or other financial institution in a form acceptable to the Director or County Attorney.
1. The surety bond shall be issued by a surety company authorized by law to do business in the State of Georgia pursuant to a current certificate of authority to transact surety business by the Commissioner of Insurance.
2. The letter of credit shall be an irrevocable letter of credit issued by a bank or savings and loan association, as defined in O.C.G.A Code Section 7-1-4.
3. The cash escrow shall be in the form of cashier's check issued to Gwinnett County by a bank or savings and loan, as defined in O.C.G.A Code Section 7-1-4
B. The performance surety and maintenance surety shall, in all cases, be provided in an amount as required in Section 900-90.4 as applicable. All cost estimates which form the basis of the bond value shall be as prepared by or acceptable to the Department.
C. The Maintenance Bond period shall not be less than 18 months from the date of approval of the Certificate of Development Conformance for the installation of the public streets and drainage facilities improvements within the right-of-way unless an extension for an additional 12 months is requested by the subdivider or developer and granted by the Director. The Performance Bond period of application shall not exceed 12 months unless an extension of an additional 12 calendar months has been requested by the subdivider or developer and granted by the Director.
D. If a period of 18 months elapses from the commencement of the maintenance period for any subdivision and defects, noncompliance, or violations still exist to the extent that the subdivision has not been accepted by the County, the County is authorized to withhold issuance of any and all permits or to refuse inspections to any subdivider/person on the project in dispute or any other project in which the subdivider/person may have a financial interest, or both, who violates or fails to comply with this UDO.
900-10.6 Maintenance Agreement for Water and Sanitary Sewer Installation. An Owner and Developer Agreement required from the subdivider, owner/developer or the contractor employed by the owner/developer, for sanitary sewer installation and water main installation is required by the Department of Water Resources. The Owner and/or developer agree that they or their contractor will maintain the installation for a period of one year from the date of final approval by correcting all defects or deficiencies in material and workmanship. The Owner and/or Developer further agree that the warranty period shall be extended an additional four years when the defects are a direct result of the installation of non-specified materials or the application of non-specified construction practices or methods.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 48), 9-26-2023) Section 900-20. Warranty, Surety and Maintenance for Trees and Landscape Materials.
900-20.1 Upon final installation of new trees, shrubs or other landscape material planted to meet the requirements of this UDO, and following acceptance by the Department in accordance with the procedures set forth herein, the owner shall either provide proof of warranty or post a Maintenance Bond or other acceptable surety, warranting the new trees, shrubs, or landscape material for a period of no less than one year. This section shall not apply to individual residential lot trees or street trees.
900-20.2 Inspection.
A. The Department shall perform an inspection of the plantings and landscape materials required by this UDO prior to expiration of the one-year warranty or maintenance period. The owner shall be notified of any replacements or restoration that must be made to maintain compliance with this UDO.
B. Required landscape material found to be dead or near death shall be replaced prior to release by the Department of the warranty or maintenance surety. In no case shall replacement be delayed greater than 30 days from notification unless a performance bond is posted with the Department.
900-20.3 Performance Surety.
A. Compliance Prior to Certificate of Occupancy or Final Plat Approval. In the event that new trees proposed to be planted to achieve the Tree Density Standard as set forth in the Tree Regulations contained herein, or other trees or landscape material required to be planted as set forth in this Chapter, are not installed upon application for a Certificate of Occupancy or Final Plat approval as appropriate to the project, then a Performance Bond or other acceptable surety shall be posted with the Department in accordance with the performance bonding requirements and provisions of this UDO.
900-20.4 Compliance upon Permit Completion or Expiration. Properties where a permit is issued to conduct land-disturbing activities that do not require the issuance of a Certificate of Occupancy or the approval of a Final Plat, or said activities as authorized are completed or the permit expires, shall comply with the Tree Density Standard of Section 630-30, and as follows:
A. Clearing, Clearing and Grubbing, or Grading Only Permits
1. Replacement trees proposed to be planted to achieve the Tree Density Standard of Section 630-30 which are not planted upon completion or prior to expiration of a clearing, clearing, and grubbing, or grading permit, shall be planted within 30 days of the completion or expiration of said permit unless a performance bond is posted with the Department.
B. Development Permits
1. Replacement trees proposed to be planted to achieve the Tree Density Standard of Section 630-30 which are not planted upon expiration, as opposed to completion, of a development permit shall be planted within 30 days of expiration of said permit unless a performance bond is posted with the Department.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 48), 9-26-2023) Section 900-30. Additional Requirements for Stormwater Facilities.
900-30.1 Prior to or concurrent with the recording of a Final Plat for a subdivision, or issuance of a Certificate of Occupancy for a non-subdivision project, the developer, shall provide acceptable surety such as a bond or letter of credit, as determined by Planning & Development, providing for the stormwater management facility(ies) for a period of not less than 18 months. At the end of 18 months, the County may require the surety to be renewed due to anticipated improvements caused by such concerns as future construction activity within the project limits in the drainage basin. A renewed surety may be required up to a total maximum of 10 years. The surety for a facility shall be renewed during the ten-year period until:
A. The surface water drainage area within the project has undergone final stabilization and all planned site construction activity has been completed.
B. All stormwater runoff in the surface water drainage area within the project is coming from undisturbed or stabilized areas.
C. All stormwater facilities and infrastructure construction have been completed and permanent vegetation is established.
D. If a temporary stormwater management facility is still in use at the end of the site construction, then the surety shall remain in place until the accumulation of acreage of undeveloped lots, lots with no completed permanent structure and no final stabilization, within the surface water drainage area within the project is less than 10 percent of the total area of the common development draining to the facility.
E. Two months prior to surety release, the permanent stormwater management facility shall be installed and cleaned out, as necessary. A new record survey, drawing and certification showing that the volume of the facility is equal to or greater than the volume shown in the record survey, drawing and certification when the facility was approved shall be submitted. Documentation demonstrating the required testing outlined in the Gwinnett County Stormwater Management Manual for the proposed stormwater BMP shall also be provided. As an alternative, a new record survey, drawing and certification showing that the facility complies with this UDO as specified in Section 800-20.7. shall be submitted. If deficiencies are found, the developer shall be required to update the stormwater BMP to comply with the approved development plans.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 48), 9-26-2023) Chapter 1000. As-Builts* Section 1000-10. As-Built Drawings.
1000-10.1 As-built drawings shall show the location, vertical and horizontal alignment, and finished elevations (top and inverts, as appropriate) of the improvements listed below:
A. Drainage system pipes and channels.
B. Bridges or culverts.
C. Stormwater management facilities.
D. Sanitary sewer system. (In accordance with the requirements of the Gwinnett County Department of Water Resources.)
E. Water system. (In accordance with the requirements of the Gwinnett County Department of Water Resources.)
F. Streets. {Street centerlines showing angles of deflection and standard curve data of intersection, radii, length of tangents and arcs, and degree of curvature with basis of curve data. Also indicate pavement width and pavement structure (individual thickness of wearing course, binder course, base, and/or sub-base).}
G. Curb and gutter, sidewalks, multi-purpose trails, bicycle facilities, and recreation improvements on property dedicated to the public.
H. Signage in public rights-of-way and other public dedicated areas.
I. Any other improvements subject to maintenance by the County.
1000-10.2 As-built drawings as required above shall bear the stamp and certification of a Professional Engineer or Registered Land Surveyor.
1000-10.3 An as-built survey is required for sites located within the Chattahoochee River Corridor and subject to the Metropolitan River Protection Act after construction is completed prior to issuance of a Certificate of Occupancy and shall be prepared by a Registered Land Surveyor. The as-built survey shall include the requirements of the House Location Plan in Subsection 320-140.5.C. and in addition shall require the following to be shown on the survey:
A. Land Vulnerability Categories;
B. Impervious surfaces including but not limited to house footprint, garage, driveway, deck(s), patio(s), gazebo, swimming pool, retaining walls, and entry sidewalks;
C. Clearing limits;
D. Calculations for impervious and cleared square feet, including allowances and as-built;
E. Stream buffers and impervious surface setbacks.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 50), 9-26-2023) Section 1000-20. Stormwater As-Built Plan Review Process.
All constructed stormwater infrastructure improvements, including but not limited to new, replaced, or extended conveyance systems, shown on Final Plats shall be as-built and submitted prior to recording for review and approval by the Stormwater, Water and Sewer Plan Review Section of the Department. The design and construction of such system shall comply with the current policy and procedures of the Department and in accordance with the following documents as applicable: Gwinnett County Storm Sewer Pipe Standards and The Gwinnett County Standard Drawings.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 50), 9-26-2023) Section 1000-30. Water and Sewer As-Built Plan Review Process.
All constructed improvements, including but not limited to the extension, replacement, or new installation of any portion of the water distribution system or sanitary sewer system, shall be submitted for review and approval by the Stormwater, Water and Sewer Plan Review Section of the Department. The design and construction of such improvements shall comply with the current policy and procedures of the Gwinnett County Department of Water Resources and in accordance to the following documents as applicable: The Sanitary Sewer Installation Regulations and Specifications, also known as the Sanitary Sewer Standards Manual and the DWRSSS; The Sanitary Sewer Pump Station and Force Main Design and Construction Standards for Developer Installed Systems; The Water Main Design and Sanitary Sewer Design and Construction Standards and Specifications and the Gwinnett County Backflow Prevention Manual.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 50), 9-26-2023) Chapter 1010. Subdivisions Section 1010-10. Subdivision Exemptions.
1010-10.1 General Requirements. For the purpose of the UDO the types of activities contained in this Section shall be considered subdivisions but exempt from the "procedures" and "required public improvements" portions of this Unified Development Ordinance, except as noted. Each such subdivision shall be drawn in accordance with Final Plat standards pursuant to the requirements of this Unified Development Ordinance and shall be submitted in an appropriate format and the appropriate fees to the Department for review and approval. Upon approval, the Director shall authorize the recording of the plat with the Clerk of Superior Court of Gwinnett County and grant the issuance of building permits pursuant to the Codes and Ordinances of Gwinnett County.
1010-10.2 Recombinations. The combination or recombination of all of two or more buildable lots of record, where the total number of lots is not increased and the resultant lots or parcels are in compliance with Title 2 of this Unified Development Ordinance.
1010-10.3 Minor Subdivision.
A. The division of a buildable lot of record into 5 or fewer lots, provided:
1. Each proposed lot complies with all requirements of Title 2 of this Unified Development Ordinance, unless variances are granted as permitted within this UDO, and is limited to single-family detached residential uses.
2. All project related slope and utility easements as well as necessary street right-of-way shall be provided at no cost to the County as determined by the Department based upon the officially adopted Long Range Road Classification Map.
3. Each lot thus created may not be re-subdivided as a minor subdivision.
4. Each proposed lot shall comply with the requirements of the Water and Sewer Plan Review Section of the Department of Planning and Development, as appropriate, whose approval shall be required prior to approval of the Exemption Plat by the Department.
5. Each proposed lot shall comply with the requirements of the Environmental Health Section, as appropriate, whose certification of approval shall be required prior to approval of the Exemption Plat by the Department.
6. Each proposed lot shall comply with the requirements of the Department of Transportation, as appropriate, whose approval shall be required prior to approval of the Exemption Plat by the Department.
7. The Director is authorized to grant a modification from the 5-lot maximum exemption for subdivision with a minimum lot size of 0.5 acre; provided, however, modifications shall not be granted to exceed a total of 7 exempt lots. The Director may impose conditions of approval upon any modification thus granted as may be necessary to ensure the general public welfare.
1010-10.4 Final Plat of Non-Residential Lots. The division of land in any non-residential, commercial, office or industrial subdivision where the purpose of the subdivision is for platting purposes only, where there are no required or proposed improvements, shall comply with the provisions of Section 1010-40 Non-residential Final Plat Specifications for "Platting Only" Purposes, provided that the following provisions are met:
A. Each lot complies with all applicable requirements of Title 2 and Title 3 of the UDO and is limited to commercial, office or industrial use.
B. Each lot abuts an existing street right-of-way.
C. All project related slope and utility easements as well as necessary street right-of-way shall be provided at no cost to the County as determined by the Department based upon the officially adopted Long Range Road Classification Map.
D. Each lot complies with the utility and stormwater requirements of the Department of Water Resources, as appropriate, whose signature of approval shall be required prior to the Final Plat approval by the Department.
E. Each lot complies with the requirements of the Environmental Health Section, as appropriate, whose signature of approval shall be required prior to Final Plat approval of the Department.
F. Each lot complies with the requirements of the Fire Plan Review and Building Plan Review Sections of the Department, as appropriate, whose signature of approval shall be required prior to the Final Plat approval of the Department.
G. All existing buildings and structures shall be shown on the plat and shall meet the dimensional standards of the applicable zoning district, unless a variance or waiver is approved for each non-standard condition.
H. Applicable easement agreements for shared access or facilities between lot owners are recorded and copies provided to the Department.
1010-10.6 Non-residential Project Management. The creation of a lot for recording within an overall nonresidential development, provided:
A. The overall non-residential development is being undertaken as a single multi-phase or multi-use project under the unified control of a single developer, is zoned for such use or development, and an overall Preliminary Plat for the entire project has been approved by the Department.
B. The proposed subdivision is clearly intended to transfer title for financing or building management purposes and not for the sale of the property for future development, to the satisfaction of the Director.
C. The proposed lot has been approved by the Department to be provided permanent vehicular access by private drive. Said access shall be established by easement or acceptable covenant prior to or concurrently with recording of the Final Plat.
D. The proposed lot must encompass a principal structure which has been granted a building permit and which is under construction or has been completed.
E. The Final Plat shall be drawn to include the entirety of the overall development and shall clearly identify those lots to be recorded, those lots previously recorded and the remainder of the development which shall be labeled "not included." All easements, dedications, etc., shall be shown as appropriate or as required.
Each lot shall be consistent with the zoning approved for the overall development and the applicable requirements of Title 2 of this Unified Development Ordinance.
1010-10.7 Amnesty Lots. The designation of a lot as a buildable lot of record if the lot was recorded between June 2, 1970, and the effective date of this Unified Development Ordinance but not reviewed and approved under the provisions of the Subdivision Regulations in effect at that time, provided:
A. The Exemption Plat is limited to one individual lot and no property which adjoins the lot is, or has been, owned by the applicant in whole or in part.
B. The lot meets all requirements of Title 2 of this Unified Development Ordinance, and the applicant demonstrates to the satisfaction of the Director that approval of the lot will not create nonconformity to the requirements of Title 2 of this Unified Development Ordinance on any other portion of the original property from which the lot was subdivided.
C. The lot abuts upon an existing public street.
D. All project related slope and utility easements as well as necessary street right-of-way shall be provided at no cost to the County as determined by the Department based upon the officially adopted Long Range Road Classification Map.
E. The lot shall comply with the requirements of the Water and Sewer Plan Review Section of the Department of Planning and Development, as appropriate, whose approval shall be required prior to approval of the Exemption Plat by the Department.
F. The lot shall comply with the requirements of the Environmental Health Section, as appropriate, whose certification of approval shall be required prior to approval of the Exemption Plat by the Director.
G. A Record Survey certified by a Land Surveyor currently registered in the State of Georgia shall be submitted to and approved by the Department showing the lot.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 51), 9-26-2023) Section 1010-20. Final Plat Approval Process.
The subdivision of lots where there is a development permit issued for construction of new street(s) and related utility, stormwater and infrastructure improvements shall comply with the following provisions for Final Plat approval prior to the recording of such lots.
1010-20.1 When the applicable provisions of the UDO have been complied with, the subdivider may submit to the Department an application for Final Plat approval.
1010-20.2 The Director shall indicate on a review copy of the plat or in a written memorandum all comments related to compliance of the Final Plat with this UDO, conditions of zoning approval, and the regulations of other County departments and State agencies as appropriate. The Director shall have final staff authority to determine the applicability of any and all comments under Title 2 and Title 3 of the UDO or conditions of zoning approval.
1010-20.3 The Director may not approve any Final Plat whereon is shown or by which is otherwise created a lot which would present particularly severe and unusual difficulties for construction of a building, which would clearly require a variance to be reasonably usable, or which is otherwise "unbuildable" due to the presence of floodplain, unusual configuration, lack of Environmental Health Section approval, or for any other justified reason.
1010-20.4 Lots which would appear to be buildable under certain circumstances and would require further study or additional information before a building permit could be issued, but which present problems or unusual difficulties which can reasonably be addressed or overcome by the lot owner, may be included in the Plat with the appropriate notation of the steps necessary to allow issuance of a building permit.
1010-20.5 The subdivider shall be responsible for compliance with all codes, regulations, and zoning requirements and for the satisfaction of all of the comments of the Director.
1010-20.6 Final approval by the Director shall not be shown on the Final Plat until all requirements of these and other applicable regulations have been met, and the Director shall require an executed Certificate of Development Conformance and an executed Development Performance and Maintenance Agreement from the subdivider. The Agreement, when applicable, shall be accompanied by a bond, letter of credit or other acceptable surety providing for the maintenance of all installations and improvements required by this UDO in the subdivision for a period not to exceed 18 months following the date of approval of the Certificate of Development Conformance.
The Director shall further determine that either:
A. All improvements and installation to the subdivision required for approval of the Final Plat under the rules and regulations of Gwinnett County have been completed in accordance with the appropriate specifications; or
B. All of the stormwater drainage and management facilities, water and sewer utilities, private utilities (power, gas, cable, etc.), or proof of payment for private utilities, street base and curbing construction required for approval of the Final Plat have been properly installed and completed and, for those required improvements not yet completed (grassing, required landscaping, sidewalks, entrance monuments, final street topping etc.) a performance bond shall have been filed by the subdivider with the Development Performance and Maintenance Agreement.
C. Payment for materials and installation of streetlights, traffic control, and street name signs shall be made to the Department of Transportation prior to approval of the Final Plat. Payment of the cost of striping major thoroughfares or required signalization if required and not completed by the developer shall also be received by the Department of Transportation prior to approval of the Final Plat.
D. Payment of the required plat review and authorization fees shall be made to the Department of Planning and Development prior to approval of the Final Plat.
1010-20.7 Once the Department has approved the Final Plat and all other affected departments and agencies of government as required have certified compliance, the Director shall certify by signature on the original of the plat that all of the requirements of the UDO and the conditions of zoning approval have been met, and that all other affected departments have approved the plat. The Final Plat shall not be deemed approved until it has been signed by the Director and where use of septic tanks is proposed, by a duly authorized representative of the Environmental Health Section.
1010-20.8 Once the Final Plat has been certified, the Director shall authorize it to be recorded with the Clerk of the Superior Court of Gwinnett County. The subdivider shall provide the Department an electronic copy of the recorded plat.
1010-20.9 Periodically, but no less often than once each month, the Director shall submit a listing of all approved Final Plats to the Board of Commissioners for ratification of acceptance of all dedications.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 51), 9-26-2023) Section 1010-30. Procedures for Revising Final Plats.
1010-30.1 When it becomes necessary or desirable to revise a recorded Final Plat, the subdivider shall prepare a letter to the Director documenting the reason for and extent of the revision and drawing(s) that contain the subject revisions along with a review fee determined by the Board of Commissioners. The revised plat shall contain a new signature block, be dated with the current date, be drawn at an appropriate scale and contain notation(s) indicating the nature, location and number of the revision, the previously recorded subdivision name, date and book and page number of the revision(s). The subdivision name, date and book and page number of the original or previously recorded recording shall be noted on the new plat; and the new plat drawings shall be designated as "Revised Final Plat".
1010-30.2 All revisions shall be recorded on the original Final Plat, and a statement to that effect shall be noted on the Final Plat.
1010-30.3 If necessary, corresponding revisions to construction drawings, as-built drawings, engineering data and reports also shall be prepared, labeled appropriately, submitted, reviewed, and certified by the Director, and filed in the Department along with a review fee determined by the Board of Commissioners.
1010-30.4 The Director shall forward the proposed plat revision, Final Plat and any related documentation to the appropriate departments or agencies that would be involved in checking the accuracy of the revision. After receipt of approval from such other departments or agencies, the Director shall certify the Revised Final Plat and submit it to the Board of Commissioners for ratification.
1010-30.5 The subdivider shall be responsible of re-recording the certified revised plat with the Clerk of the Superior Court and provide a copy of recorded plat to the Department.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 51), 9-26-2023) Section 1010-40. Non-residential Final Plat Specifications for "Platting Only" Purposes.
The subdivision of non-residential lots for the purpose of platting only, where there are no improvements proposed, shall conform to the provisions of Section 1010-40 and all requirements of Georgia Law, including but not limited to O.C.G.A § 15-6-67 and latest amendments regarding recordation of maps and plats specifications.
1010-40.1 Size. The Final Plat shall be clearly and legibly drawn in black ink on good legible reproducible paper or approved print material. The scale of the Plat shall be 100 feet to 1 inch (1"= 100') or larger. Sheet size shall not exceed 24 inches by 36 inches.
1010-40.2 Certified Boundary Survey. The Final Plat shall be based on a certified boundary survey delineating the entirety of the property contained within the Final Plat and tied to a point of reference (tie point) with the same degree of accuracy as the boundary survey itself. The survey shall have an accuracy of no less than 1 in 10,000 feet.
1010-40.3 The Final Plat "for platting only" purposes shall contain the following information:
A. Title or name of the Final Plat, subdivision name, unit number, land district, land lot number and parcel(s) of the parent tract(s) and the proposed tracts.
B. Name, address, email address, and telephone number of owner of record, and the subdivider (if not the owner).
C. Name, address, and telephone number and registration number of the land surveyor and professional firm associated with the Final Plat.
D. Date of plat preparation and date of the field survey, graphic scale, north arrow; notation as to the reference of bearings to magnetic, true north or grid north, and indication whether bearings shown are calculated from angles turned.
E. Location sketch of tract showing major surrounding features.
F. Name of former subdivision, if any or all of the Final Plat has been previously recorded.
G. Case number and date of approval for any applicable rezoning, special use permit, variance, modification, or waiver affecting the property.
H. Location and dimension of any buffer, landscape strip, special setback, no-access easement, etc.
I. Boundary lines of the tract, to be indicated by a heavy line, giving distances to the nearest one-hundredth foot and bearings to the nearest second. Bearing and distance to designated tie point shall be shown. The Plat shall have a closure precision of 1 foot in no less than 10,000 feet.
J. Municipal or County jurisdictional lines approximately tied to the lines of the subdivision by distance and angles when such lines traverse or adjoin the subdivision; land lot lines traversing or adjoining the subdivision shall also be indicated.
K. Locations, widths, and names of all streets and alleys within and immediately adjoining the plat, the location and widths of all internal public crosswalks, and all other public rights-of-way.
L. Street center lines showing angles of deflection and standard curve data including radii, length of arcs and tangents between curves, point of curvature (PC) and point of tangency (PT).
M. Lot lines with dimensions to the nearest one-tenth of a foot and bearings to the nearest second, and radii of rounded corners, as necessary to delimit each lot.
N. Building setback lines along streets with dimensions.
O. When lots are located on a curve or when side lot lines are at angles other than 90 degrees, the lot width measured in accordance with the provisions of Title 2 of the UDO may be required to be shown, if deemed necessary by the Department for clarity.
P. Lots numbered in numerical order and blocks lettered alphabetically.
Q. Location and size of all drainage pipe, the location and size of all stormwater management facilities, and the location, dimensions and purpose of any easements, including construction or slope easements if required.
R. The location and size of all public sanitary sewer lines and manholes and the location, dimensions, and purpose of any easements, including construction or slope easements if required.
S. The location and size of all public water lines and fire hydrants and the location, dimensions, and purpose of any easements, including construction or slope easements if required.
T. Location of any areas to be reserved, donated, or dedicated to public use with notes stating their purpose and limitations. Location of any areas to be reserved by private deed covenant for common use of all property owners or dedicated to a property owner's association.
U. Accurate location, material, and description of monuments and markers (all monuments shall be in place prior to approval of the Final Plat).
V. All information required under the Georgia Metropolitan River Protection Act for recording of plats, if applicable.
W. Extent of the 100-year floodplain and a floodplain chart showing the area within and outside the floodplain for each lot containing any portion of the 100-year floodplain. Origin of the floodplain data shall be indicated.
X. Street address numbers, lot or tract number designations, and parcel identification numbers of the proposed tracts.
Y. All other notes or notations as may be required by the Department.
Z. Certificates and statements specified in Section 1010-40.6.
1010-40.4 Reserved.
1010-40.5 Warranty or Right-of-Way Deeds. If any lands shown on the Final Plat are proposed for dedication to Gwinnett County, including street rights-of-way or easements, a Warranty Deed transferring title to said land in fee simple, in a form acceptable to the Director, shall be submitted with the Final Plat application.
1010-40.6 Certificates. Each Final Plat shall bear the following certificates or statements printed or stamped thereon as follows:
A. Final Registered Land Surveyor's Certificate:
It is hereby certified that this plat is true and correct as to the property lines and all improvements shown thereon and was prepared from an actual survey of the property made by me or under my supervision; that all monuments shown hereon actually exist, and their location, size, type, and material are correctly shown.
The field data upon which this plat is based has a closure precision of 1 foot in feet and an angular error of per angle point and was adjusted using rule. This plat
has been calculated for closure and is found to be accurate within 1 foot in feet and contains a total of acres. The equipment used to obtain the linear and angular measurements herein was .
By:
REGISTERED GEORGIA LAND SURVEYOR
REG NO DATE OF EXPIRATION
B. Owners Acknowledgment and Declaration:
STATE OF GEORGIA, COUNTY OF GWINNETT
The owner of the land shown on this plat and whose name is subscribed hereto, in person or through a duly authorized agent, acknowledges that this plat was made from an actual survey, and dedicates by this Acknowledgement and Declaration to the use of the public forever all streets, sewer collectors, lift stations, drains, easements, and other public facilities and appurtenances thereon shown.
SIGNATURE OF SUBDIVIDER DATE SIGNED
PRINTED OR TYPED NAME OF SUBDIVIDER
SIGNATURE OF OWNER DATE SIGNED
PRINTED OR TYPED NAME OF OWNER
C. Final plat approval:
The Director of the Department of Planning and Development certifies that this plat complies with Title 2 and Title 3 of the Gwinnett County Unified Development Ordinance (UDO) and that it has been approved by all other operational County departments, as appropriate. This plat is approved.
DATED THIS DAY OF , 20 .
DIRECTOR, DEPARTMENT OF PLANNING AND DEVELOPMENT
D. Environmental Health Section Certification (for subdivisions served by septic tanks):
The lots shown hereon have been reviewed by the Environmental Health Section of the Gwinnett County Board of Health and with the exception of lots are approved for development. Each lot is to be reviewed by the Environmental Health Section of the Gwinnett County Board of Health and approved for septic tank installation prior to the issuance of a Building Permit.
DATED THIS DAY OF , 20 .
BY:
TITLE:
ENVIRONMENTAL HEALTH SECTION
E. Public Notice—Drainage:
NOTE: Gwinnett County assumes no responsibility for overflow or erosion of natural or artificial drains beyond the extent of the street right-of-way, or for the extension of culverts beyond the point shown on the approved and recorded subdivision plat. Gwinnett County does not assume responsibility for the maintenance of pipes in drainage easements beyond the County right-of-way.
Stream Buffer Easements are to remain in a natural and undisturbed condition.
NOTE: Structures are not allowed in drainage easements.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 51), 9-26-2023) Section 1010-50. Survey Monuments.
360-50.1 Lot Corner Survey Monuments. All corners shall be marked with an iron rebar or pin, at least one-half inch in diameter and 18 inches long and driven so as to extend no less than 1 inch above the finished grade.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 51), 9-26-2023) Section 1010-60. Assignment of Names and Addresses.
1010-60.1 Subdivision or Development Names.
A. Proposed subdivision or development names must be reviewed and approved prior to the issuance of a Development Permit. Names will be reviewed by the Department upon submittal of the Subdivision Development Plan or Site Development Plan.
B. Proposed names shall not duplicate or too closely approximate, phonetically, the name of any other subdivision or development in Gwinnett County or its municipalities except for extensions of existing subdivisions or developments.
C. Subdivision and development names may be reserved if submitted and approved along with the Concept Plan for the project.
1010-60.2 Street Names.
A. Proposed street names for public or private streets must be reviewed and approved prior to approval of a Development Permit or recording of a Final Plat. Street names may be reserved through approval as shown on an approved Concept Plan or Subdivision Development Plan for the subdivision.
B. Street names shall consist of a root name of the subdivider or developer's choosing and a suffix designation (such as "Street", "Avenue", "Drive", etc.), and shall be followed by a quadrant suffix. Directional prefixes (i.e., "North", "South") and the prefixes "old" or "new" shall not be used.
C. All streets shall bear the proper quadrant suffix appropriate to its location within the County (i.e., NE, NW, SE, and SW), as determined by the Department.
D. A proposed street that is obviously in alignment with another already existing and named street shall bear the name of such existing street, unless this requirement is waived by the Department of Transportation.
E. Except within the same development, no proposed street name shall duplicate (be spelled the same or be phonetically the same) as an existing street name within Gwinnett County regardless of the use of such suffix designations as "Street", Avenue", "Boulevard", "Drive", "Place", "Way", "Court", or however otherwise designated. In the same subdivision, a root name may not occur more than twice.
F. All street root names, and suffix designations are subject to the approval of the Department. Obscene or otherwise unacceptable language, abbreviations, contractions, or initials may not be used.
G. Root names shall consist of no more than 13 characters including spaces. Letters not occurring in the English alphabet, hyphens, and numerals shall not be used.
1010-60.3 Street Address Assignments.
A. A street address number will be assigned prior to issuance of a Building Permit. For any new structure proposed on a property which has not been assigned an address, a street number will be assigned upon confirmation or establishment of the property as a buildable lot of record under the requirements of this UDO. Unless a public or private street is proposed, an overall development located on one buildable lot of record shall be issued a single street address. The property owner shall be responsible for numbering/ lettering individual buildings, suites, and units.
B. Subdivisions. House numbers will be assigned prior to Exemption Plat or Subdivision Development Plan is approved for the property. Block number assignments shall also be designated for abutting major street name signs at this time.
C. For each of the plans listed below projects will be numbered after the developer submits the Site Development Plan or Subdivision Development Plan to the Department of Planning and Development.
1. Commercial/Industrial projects or buildings.
2. Apartment projects.
a. One number shall be assigned to the apartments when the project is located on one parcel.
3. Condominium projects.
a. Individual units shall be numbered consecutively if located along public or private streets.
b. Units in the "stacked-flat" configuration shall use the same numbering approach as applies to an apartment project.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 51), 9-26-2023) Section 1010-70. Final Plat Specifications.
The subdivision of lots where there are proposed streets and related utility, stormwater, and infrastructure improvements in accordance with an approved development permit shall conform to the provisions of Section 1010-70 and all requirements of Georgia Law, including but not limited to O.C.G.A § 15-6-67 and latest amendments regarding recordation of maps and plats specifications.
1010-70.1 Size. The Final Plat shall be clearly and legibly drawn in black ink on good legible reproducible paper or approved print material. The scale of the Final Plat shall be 100 feet to 1 inch (1"=100') or larger. Sheet size shall not exceed 24 inches by 36 inches.
1010-70.2 Certified Boundary Survey. The Final Plat shall be based on a certified boundary survey delineating the entirety of the property contained within the Final Plat and tied to a point of reference (tie point) with the same degree of accuracy as the boundary survey itself. The survey shall have an accuracy of no less than 1 in 10,000 feet.
1010-70.3 Conformity to Subdivision Development Plan. The Final Plat shall substantially conform to the Plan which the subdivider proposes to record at any one time, provided that such portion conforms to the requirements of this UDO, and said portion is not inconsistent with the public health, safety, or welfare. Any substantial deviation from the Subdivision Development Plan shall require revision and reapproval of the Subdivision Development Plan.
1010-70.4 The Final Plat shall contain the following information:
A. Name of the subdivision, unit number, land district, and land lot number.
B. Name, address, email address, and telephone number of owner of record, and the subdivider (if not the owner).
C. Name, address, email address, and telephone number of each professional firm associated with the portion of the subdivision within the Final Plat (engineer, surveyor, landscape architect, etc.).
D. Date of plat drawing, graphic scale, north arrow; notation as to the reference of bearings to magnetic, true north or grid north, and indication whether bearings shown are calculated from angles turned.
E. Location sketch of tract showing major surrounding features.
F. Name of former subdivision, if any or all of the Final Plat has been previously recorded.
G. Case number and date of approval for any applicable rezoning, special use permit, variance, modification, or waiver affecting the property.
H. Location and dimension of any buffer, landscape strip, special setback, no-access easement, etc.
I. Boundary lines of the tract, to be indicated by a heavy line, giving distances to the nearest one-hundredth foot and bearings to the nearest second. Bearing and distance to designated tie point shall be shown. The Plat shall have a closure precision of 1 foot in no less than 10,000 feet.
J. Municipal or County jurisdictional lines approximately tied to the lines of the subdivision by distance and angles when such lines traverse or adjoin the subdivision; land lot lines traversing or adjoining the subdivision shall also be indicated.
K. Locations, widths, and names of all streets and alleys within and immediately adjoining the plat, the location and widths of all internal public crosswalks, and all other public rights-of-way.
L. Street center lines showing angles of deflection and standard curve data including radii, length of arcs and tangents between curves, point of curvature (PC) and point of tangency (PT).
M. Lot lines with dimensions to the nearest one-tenth of a foot and bearings to the nearest second, and radii of rounded corners, as necessary to delimit each lot.
N. Building setback lines along streets with dimensions.
O. When lots are located on a curve or when side lot lines are at angles other than 90 degrees, the lot width measured in accordance with the provisions of Title 2 of this UDO may be required to be shown, if deemed necessary by the Department for clarity.
P. Lots numbered in numerical order and blocks lettered alphabetically.
Q. Location and size of all drainage pipe, the location and size of all stormwater management facilities, and the location, dimensions and purpose of any easements, including construction or slope easements if required.
R. The location and size of all public sanitary sewer lines and manholes and the location, dimensions, and purpose of any easements, including construction or slope easements if required.
S. The location and size of all public water lines and fire hydrants and the location, dimensions, and purpose of any easements, including construction or slope easements if required.
T. Location of any areas to be reserved, donated, or dedicated to public use with notes stating their purpose and limitations. Location of any areas to be reserved by private deed covenant for common use of all property owners or dedicated to a homeowner's association.
U. A statement of private covenants if any shall be recorded on the plat; otherwise, if covenants are separately recorded provide a statement as follows:
This plat is subject to the covenants set forth in the separate document(s) attached hereto dated , which hereby become a part of this plat, and which were recorded and signed by the owner.
V. Accurate location, material, and description of monuments and markers (all monuments shall be in place prior to approval of the Final Plat).
W. Certificates and statements specified in Section 1010-70.7.
X. All information required under the Georgia Metropolitan River Protection Act for recording of plats, if applicable.
Y. Extent of the 100-year floodplain and a floodplain chart showing the area within and outside the floodplain for each lot containing any portion of the 100-year floodplain. Origin of the floodplain data shall be indicated.
Z. Street address numbers and block number designations for street names on abutting streets, where appropriate.
AA. Individual lots shall be designated HLP (House Location Plan), RDP (Residential Drainage Plan) and/or RDS (Residential Drainage Study) if such are required by the Department to be approved prior to issuance of a Building Permit.
BB. All lots shall be labeled with minimum floor elevations, drainage flow arrows and designated as either a slab, basement, or slab/basement.
CC. All other notes or notations as may be required by the Department.
1010-70.5 Warranty Deed. If any lands are shown on the Final Plat for dedication to Gwinnett County including street rights-of-way or easements, a Warranty Deed transferring title to said land in fee simple, in a form acceptable to the Director, shall be submitted with the Final Plat application.
1010-70.6 Property Owner's Association/Homeowner's Association. If any lands are shown on the Final Plat for dedication to a Property Owners Association in order to meet minimum park or open space requirements of the UDO, a copy of the deed of transfer for such dedication and a copy of the instrument of incorporation of the Property Owners Association/Homeowner's Association shall be submitted with the Final Plat application.
1010-70.7 Certificates. Each Final Plat shall bear the following certificates or statements printed or stamped thereon as follows:
A. Final Registered Land Surveyor's Certificate:
It is hereby certified that this plat is true and correct as to the property lines and all improvements shown thereon and was prepared from an actual survey of the property made by me or under my supervision; that all monuments shown hereon actually exist, and their location, size, type, and material are correctly shown.
The field data upon which this plat is based has a closure precision of 1 foot in feet and an angular error of per angle point and was adjusted using rule. This plat
has been calculated for closure and is found to be accurate within 1 foot in feet and contains a total of acres. The equipment used to obtain the linear and angular measurements herein was .
By:
REGISTERED GEORGIA LAND SURVEYOR
REG NO DATE OF EXPIRATION
B. Owners Acknowledgment and Declaration:
STATE OF GEORGIA, COUNTY OF GWINNETT
The owner of the land shown on this plat and whose name is subscribed hereto, in person or through a duly authorized agent, acknowledges that this plat was made from an actual survey, and dedicates by this Acknowledgment and Declaration to the use of the public forever all streets, sewer collectors, lift stations, drains, easements, and other public facilities and appurtenances thereon shown.
SIGNATURE OF SUBDIVIDER DATE SIGNED
PRINTED OR TYPED NAME OF SUBDIVIDER
SIGNATURE OF OWNER DATE SIGNED
PRINTED OR TYPED NAME OF OWNER
C. Final Plat Approval: The Director of the Department of Planning and Development certifies that this plat complies with Title 2 and Title 3 of the Gwinnett County Unified Development Ordinance (UDO) and that it has been approved by all other operational County departments, as appropriate. This plat is approved subject to the provisions and requirements of the Development Performance and Maintenance Agreement executed for this project between the Owner and Gwinnett County. Acceptance of constructed greenways, if shown on the final plat, is hereby expressly excluded from approval and maintenance, and shall not be accepted by the County until said greenway is completed in its entirety and verified that it has been built to standards as set forth in the UDO.
D. Environmental Health Section Certification (for subdivisions served by septic tanks):
The lots shown hereon have been reviewed by the Environmental Health Section of the Gwinnett County Board of Health and with the exception of lots are approved for development. Each lot is to be reviewed by the Environmental Health Section of the Gwinnett County Board of Health and approved for septic tank installation prior to the issuance of a Building Permit.
DATED THIS DAY OF , 20 .
BY:
TITLE:
ENVIRONMENTAL HEALTH SECTION
PRINTED OR TYPED NAME OF OWNER
E. Public Notice - Drainage:
NOTE: Gwinnett County assumes no responsibility for overflow or erosion of natural or artificial drains beyond the extent of the street right-of-way, or for the extension of culverts beyond the point shown on the approved and recorded subdivision plat.
NOTE: Stream Buffer Easements are to remain in a natural and undisturbed condition.
NOTE: Structures are not allowed in drainage easements.
F. Fee-simple layout plan for single-family detached lots less than 7,500 square feet: Every Final Plat for a subdivision proposing single-family detached houses on fee-simple ownership lots less than 7,500 square feet shall contain the following statement:
NOTE: Lot layout plan is required on each lot to be approved by the Department of Planning and Development prior to a Building Permit being issued. This lot layout plan must be drawn to scale on a copy of a certified boundary survey of the lot. It must show all proposed improvements and easements on the lot and must indicate compliance with the requirements of Title 2 of this UDO and conditions of zoning approval. It shall be the builder's responsibility to ensure that the house is staked out on the site to match the approved lot layout plan.
G. House Location Plans (HLP): On any Final Plat containing a lot for which a House Location Plan approval is required prior to issuance of a Building Permit (see Section 330-20), the following statement shall be included:
HLP - HOUSE LOCATION PLAN
A House Location Plan shall be required to be approved by the Department of Planning and Development prior to issuance of a Building Permit on those lots labeled "HLP". A House Location Plan is a scale drawing submitted by the builder at the time of the permit application. It is not required that this plan be prepared by an authorized registered professional. The purpose of this plan is to ensure that the house is properly located on the lot.
H. Residential Drainage Plan (RDP) or Study (RDS): On any Final Plat containing a lot for which a Residential Drainage Plan (RDP) or Residential Drainage Study (RDS is required, the following statements shall be included, as applicable:
A Residential Drainage Plan (RDP) [or Residential Drainage Study (RDS)] must be approved by the Stormwater Plan Review Section of the Department of Planning and Development prior to issuance of a Building Permit on those lots labeled "RDP" or "RDS" respectively.
A Residential Drainage Study (RDS) must be conducted by the builder's design professional and approved by the Building Permits Section prior to issuance of a Certificate of Occupancy on those lots so noted on the Final Plat.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 51), 9-26-2023)
APPENDIX
Appendix Section 1.0 Standard Drawings* NOTE: Many of the drawings in this section cover two pages. Each drawing's end is marked by the Gwinnett County Board of Commissioner's seal as shown below.
These standard drawings illustrate minimum acceptable standards for land development activities authorized under the development regulations of Gwinnett County, Georgia, however, these standards shall not supersede more restrictive prudent design requirements or good engineering practice as applied to specific situations on a case-bycase basis. Unless otherwise specified on these standard drawings or in the development regulations, all construction must meet or exceed the minimum standards established by the Georgia Department of Transportation.
Series 100: Site Grading 200: Storm Water Detention and Erosion Control 300: Streets — Designs 400: Streets — Construction 500: Streets — Utilities 600: Reserved 700: Reserved 800: Landscaping and Tree Protection 900: Miscellaneous Effective January 5, 1988 (Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 52), 9-26-2023) Appendix Section 2.0 Design Guidelines General Design Building Facade Materials and Modulation Plan
• Modulate building façade setbacks with a variety of dimensions and feature elements such as colonnades.
Elevation
• Buildings 3 stories or less shall incorporate cornices that project horizontally a minimum of 1 foot and extending across the entire façade.
• Changes in building material and color shall be incorporated.
• Street level: Articulate façade with large windows and distinctive entrances.
Architectural Design For Multi-Story Buildings The following design guidelines should be considered when designing multi-story buildings:
• Create unique iconic features at building comers such as towers and balconies
• Building facades shall be varied via offsets and recesses to avoid creating a heavy monolithic appearance.
• Ground floors shall be distinguished through façade projections, recesses, and change of materials and color that will differentiate building elevations.
• Ground floors shall incorporate large frequent window articulations.
• Changes in building material, texture, and color shall be incorporated.
Architectural Entry Features The following architectural entry features should be considered when designing commercial buildings:
• Incorporate height variations to distinguish entry features
• Incorporate projections, roof overhangs, canopy structures, and awnings to distinguish entry features
• Changes in building material, texture, and color to distinguish entry features.
• Incorporate unique window and door features to provide entry identity.
• Incorporate offsets and recesses to distinguish entry features.
Height Transitions Transitional Height Plane Internal Height Transitions Multifamily Residential The following architectural and site design guidelines are laid out to ensure well-designed and well-constructed multifamily development that enhances the quality of life in the surrounding community and provides a variety of quality housing options to current and future residents.
Typical Multifamily Building Elevation
• Multifamily buildings encouraged to be designed with a pitched roof (see 3.8 for roof guidelines.)
• Common entrances and breezeway entrances shall incorporate a distinctive architectural entrance structure such as a tower element, arched portal or arbor/trellis.
• Front, sides, and rear facades shall be finished with a minimum of 50 percent brick or stone finish on each elevation.
Typical Site Layout For Multifamily Residential
1. Provide pedestrian connections within and beyond the development.
2. Provide potential future connections to adjacent sites or parallel roads.
3. Organize buildings around park to create more park views and provide more natural security.
4. Buildings should be oriented parallel to both external and internal streets, providing a frontage that helps frame the public realm.
5. Buildings should be used to screen the parking areas from view.
6. Break up parking lots to avoid large areas of asphalt.
Attached Single-Family Residential Typical Attached Single-Family Building Elevation
• Buildings shall be designed with a pitched roof (see 3.8 for roof guidelines)
• Front, sides, and rear facades shall be finished with a minimum of 50 percent* brick or stone finish on each elevation
• Required percentage of brick or stone finish varies by zoning district.
Typical Site Layout For Attached Single-Family Residential
• Building front façade changes in setback are encouraged.
Industrial Building Facades The following design guidelines should be considered when designing industrial buildings:
• Articulate facades to provide a consistent visual effect that is consistent with the character and scale of the area.
• Elevations visible to public view shall reflect the overall design, colors and textures used on the front façade.
• Design multi-building projects to include consistent design elements throughout the project.
• Incorporate clearly defined public and employee entrances.
• Incorporate canopies, porticoes, and peaked roof features.
• Varied parapet elevation height changes.
• Entrance framed by outdoor pedestrian features or enhanced landscaping.
• Incorporate architectural details such as façade articulation that includes changes in color and materials.
• Incorporate integral planters in the outdoor pedestrian areas.
Roof Treatments Flat Roof
• Flat roof buildings shall incorporate articulated parapets or facade projections every 100 feet. Parapets should be a minimum of 1' in height. Vary building and cornice heights along long facades, but avoid drastic changes - generally no more than 20 feet or two stories.
Green Roof
• Flat roofs with live vegetative planting visible from ground views may be substituted for articulated parapets or pitched roofs.
Mansard Roof
• Pitched roofs may have a flat roof well located in the central area of the roof, not to exceed 50 percent of the total roof area. The height of the partial (mansard) roof profile should be equal in ridge height to the design height of a fully pitched roof.
Pitched Roof
• Fully pitched roofs require a minimum slope of 4 feet in every 12 feet. Roof eaves must overhang 1 foot at minimum. Roofing material is limited to seam metal, slate, tile, or architectural shingles. Roof must be articulated every 100 feet.
Incorporate features such as roof eave height changes, towers, spires, cupolas, dormers, and/or gables.
Awning/Canopy Design Awnings
• The scale of the awning, i.e., height, length, depth, and overall bulk shall be compatible with the building storefront or entry.
• Awnings shall not be made of shiny, high gloss, or translucent materials.
• Awnings shall not cover distinctive architectural features of the building façade.
Discouraged: higher awnings that cover signage or architectural features Encouraged: awnings that highlight signage and enhance building Canopies
• Canopies shall be compatible in material, color, and construction to the style of the building.
• Canopy roof and column material and design shall compliment the main building design.
Parking Decks: Architectural Features and Screening Landscape and Plaza Design Multifamily Residential •Vary heights, sizes and types of plant materials around the building foundation area.
• Create focal cluster groups of plants adjacent to the building entry points.
• Incorporate perennials and annuals to add color.
Commercial/Office
• Screen service areas with large evergreens.
• Vary heights, sizes and types of plant materials around the building foundation area.
• Create focal cluster groups of plants adjacent to the building entry points.
• Incorporate perennials and annuals to add color.
Ground-Level Utility Equipment and Dumpster Screening Utility equipment screening
• Utility equipment such as HVAC and other mechanical equipment should be designed and located in a manner to be hidden from public view.
• Screens for exterior equipment should exceed the height of the equipment.
• Screen structures shall utilize building materials that match the exterior materials of the adjacent building.
Utility meter and other building mounted equipment screening
• Utility meters shall screened to best extent possible with evergreen and other plantings.
• Utility meters and associated fixtures shall be painted to match the color of the building.
• Heating and air cooling units, exhaust hoods, fans, vent piping, satellite dishes, antennae, solar panels, and other appurtenances that are ground or roof mounted shall be screened from public view.
Dumpster enclosures
• Dumpster enclosures shall be constructed of materials that match the material and color finishes of the adjacent primary building.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 53), 9-26-2023) Appendix Section 3.0 Design Guidelines Traditional Neighborhood Design Detached Single-Family Residential Detached Garage With Rear Access Detached Garage With Front Access Attached Garage With Front Access Live-Work Units Civic Uses Commercial Uses Commercial Corner—Typical Site Plan The following design guidelines should be considered when designing commercial neighborhood buildings:
• Commercial Uses are small commercial retail and services within residentially-scaled buildings that are located on designated corners within walking distance of adjacent neighborhoods for the convenience of local neighborhood residents.
Elements In Residential Design The following design guidelines should be considered when designing detached residential buildings:
• Articulate facades with porch elements and bay windows.
• Provide unique architectural entrance door surround.
• Incorporate changes in building material, texture, and color.
• Provide design elements such as shutters and roof eave brackets.
• Incorporate roof elements such as dormers and gables.
Local Street Section Plan View Street Section:
Permitted Uses Single Family (Detached) Single Family (Attached) Live/Work Units Neighborhood Commercial Civic Uses
A. Spacing of street trees and street lights may be adjusted to account for driveways, utility poles, fire hydrants and other obstructions and to provide adequate visual clearance for intersections, driveways and traffic control devices.
Block length 600 feet B. Underground utility lines are required. Sewer lots only. Septic lots are not permitted.
Streetscape:
Landscape strip Sidewalk 5 feet 4 feet Alley Interconnected Street Grid Appendix Section 4.0 Design Guidelines Office Residential District* Office-Residential Uses Appendix Section 5.0 Design Guidelines Public Spaces* Pocket Parks and Green Spaces
A. Pocket Park Minimum size: 3,000 square feet Landscaping: mix of undisturbed natural plantings and/or formal plantings Outdoor furnishings: benches, tables, seat walls, planters, play structure, picnic areas/shelter Maximum impervious cover: 25 percent.
B. Green Minimum size: 25,000 square feet Maximum Length to width ratio: 3 to 1 Maximum impervious surface: 20 percent Landscaping: mix of undisturbed natural plantings and/or formal plantings Outdoor furnishings: benches, picnic shelter, gazebo, water feature, play structure, trellis, wayfinding or interpretive signage Squares and Plazas
C. Square Minimum size: 1 acre Maximum Length to width ratio: 2 to 1 Maximum impervious surface: 60 percent Bounded by streets on two or more sides Formal areas of landscaping Outdoor furnishings: benches, gazebo, water feature, play structure Outdoor lighting
D. Plaza Minimum size: 10,000 square feet Facing a public street or connected to public street ROW by pedestrian corridor Maximum impervious surface: 75 percent Formal areas of landscaping Outdoor furnishings: benches, gazebo, water feature, play structure Outdoor lighting Courtyards
E. Courtyard Landscaped outdoor public space partially enclosed on two or three sides by buildings or other structures Minimum area: 1,000 Maximum impervious surface: 75 percent Formal planted areas Outdoor furnishings: benches, gazebo, water feature, seating Outdoor lighting Paths and Trails
F. Multi-Use Path Connects two common areas or connects a common area to a sidewalk or trail along a public right of way Trees planted so that trunk is 3 feet maximum from edge of trail/sidewalk and a maximum of 60 feet on center Outdoor lighting optional
G. Greenway Trail Linear public space following a stream, lake, utility easement, or street with paved or unpaved improvements designed for walking, jogging, or cycling in a natural environment Trees planted so that trunk is 3 feet maximum from edge of trail/sidewalk and a maximum of 60 feet on center Outdoor lighting optional (Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 53), 9-26-2023) Appendix Section 6.0 Buffers, Landscaping, and Tree Protection Landscape Buffers* 15' Landscaped Buffer with 6' High Fence or Wall 25' Landscaped Buffer with 6' High Fence or Wall 50' Landscaped Buffer with 6' High Fence or Wall 50' Landscaped Buffer with 6' High Berm 75' Landscaped Buffer with 6' High Berm Appendix Section 7.0 Buffers, Landscaping, and Tree Protection Landscape Strips* Type 1: 5' Landscape Strip Type 2: 10' Landscape Strip Type 3: 10' Landscape Strip with 4' High Masonry Screening Wall Type 4: 5' Landscape Strip with 6' High Masonry Screening Wall Type 5: 10' Masonry Screening Wall Small Tree Species List Scientific name Common Name Native Evergreen Street Tree Parking Lot Tree Max Ht. (ft.)
Spread (ft.)
Canopy (SF) Acer buergerianum Trident Maple S 25 20 314 Acer griseum Paperbak Maple 25 20 314 Acer palmatum var.
atropurpureum 'Bloodgood' Japanese Maple 'Bloodgood' S 20 20 314 Amelanchier arborea Downy Serviceberry N S 25 20 314 Carpinus caroliniana Ironwood/American Hornbeam N 25 25 491 Cercis canadensis 'Pauline Lily' Pauline Lily Redbud N S 25 25 491 Cercis canadensis 'Texensis' Texas Redbud N S 25 25 491 Cercis canadensis 'The Rising Sun' The Rising Sun Redbud N S 25 25 491 Chionanthus virginicus Fringe Tree N S 25 25 491 Cornus alternifolia Alternate Leaf Dogwood N S 20 20 314 Cornus florida Flowering Dogwood N S 20 20 314 Cornus kousa Chinese/ Kousa Dogwood S 20 20 314 Cotinus obovatus American Smoketree N 20 15 177 Crataegus spathulata Littlehip Hawthorn 20 20 314 Crataegus viridis 'Winter King' Green Hawthorne S 25 25 491 Hamamelis virginiana Witch-hazel N 20 15 177 Ilex x attenuata 'Fosteri' Foster Holly E 25 10 79 Ilex x attenuata 'Savannah' Savannah Holly E 25 10 79 Ilex decidua Deciduous Holly/Possum Haw N 15 10 79 Ilex latifolia Lusterleaf Holly E 25 20 314 Ilex x 'Nellie R. Stevens' Nellie R. Stevens Holly E 30 10 79 Ilex verticillata Winterberry N 15 10 79 Ilex vomitoria Yaupon Holly N E 20 10 79 Magnolia stellata Star Magnolia 20 15 177 Malus angustifolia Narrow-Leaf Crabapple N 25 20 314 Myrica cerifera Wax Myrtle N E 25 20 314 Parrotia persica Persian Parrotia 30 20 314 Prunus 'Accolade' Accolade Flowering Cherry 20 15 177 Quercus georgiana Georgia Oak N S 20 15 177 Rhamnus alaternus Italian Buckthorn E 20 10 79 Rhus glabra or typhina Smooth or Staghorn Sumac N 15 10 79 Scientific name Common Name Native Evergreen Street Tree Parking Lot Tree Max Ht. (ft.)
Spread (ft.)
Canopy (SF) Tilia cordata 'Halka' Summer Sprite Littleleaf Linden P 20 10 79 Zelkova serrata 'JFS-KW1' City Sprite Japanese Zelkova S P 25 20 314 Zelkova serrata 'Schmidtlow' Wireless Japanese Zelkova S P 25 35 962 Medium Tree Species List Scientific name Common Name Native Evergreen Street Tree Parking Lot Tree Max Ht. (ft.)
Spread (ft.)
Canopy (SF) Acer barbatum Southern Sugar Maple N P 40 30 707 Acer leucoderme Chalk Maple N 40 20 314 Acer rubrum, small cultivars Red Maple, dwarf varieties N P 50 35 962 Acer truncatum Shantung or Painted Maple 35 25 491 Betula nigra 'Dura Heat' Dura Heat' River Birch N 40 25 491 Carpinus caroliniana American Hornbeam N 40 20 314 Celtis tenuifolia Georgia Hackberry 35 20 314 Chamaecyparis thyodies Atlantic Whitecedar N E 30 20 314 Cladrastis lutea American Yellowwood N S 50 40 1,256 Fagus sylvatica Purple Beech 50 40 1,256 Frangula caroliniana Carolina Buckthorn N 40 20 314 Gordonia lasianthus Loblolly Bay N E 35 25 875 Halesia carolina/tetraptera Carolina Silverbell N 40 30 707 Ilex latifolia Lusterleaf Holly E 40 20 314 Ilex opaca American Holly N E 30 15 177 Juniperus virginiana Eastern Red Cedar N E P 50 10 79 Magnolia grandiflora 'Little Gem' Little Gem Magnolia E 35 12 113 Magnolia grandiflora 'Samuel Sommer' Samuel Sommer Magnolia E P 40 20 314 Magnolia x soulangiana (Tree Form) Saucer Magnolia S 30 25 491 Nyssa sylvatica 'Red Rage' Red Rage Black Gum N P 50 25 491 Ostrya virginiana Eastern Hophornbeam N S 40 25 491 Scientific name Common Name Native Evergreen Street Tree Parking Lot Tree Max Ht. (ft.)
Spread (ft.)
Canopy (SF) Oxydendron arboreum Sourwood N S 30 20 314 Pinus nigra Austrian Pine E 30 20 314 Platanus x acerifolia London Planetree S P 40 40 1256 Prunus serrulata Japanese Flowering Cherry S 30 20 314 Prunus subhirtella 'Atumnalis' Autumn Cherry S 30 30 707 Prunus x yedoensis Yoshino Flowering Cherry S 50 30 707 Quercus lyrata Overcup Oak N P 45 30 707 Quercus stellata Post Oak 50 40 1256 Sassafras albidum Sassafras N 30 15 177 Styrax japonica Japanese Snowbell 30 15 177 Thuja occidentalis Eastern Arborvitae E 50 10 79 Ulmus parvifolia 'Athena' Athena Chinese Elm S P 30 35 962 Large Tree Species List Scientific name Common Name Native Evergreen Street Tree Parking Lot Tree Max Ht. (ft.)
Spread (ft.)
Canopy (SF) Acer barbatum cultivars Florida Maple N P 60 35 962 Acer saccharum cultivars Sugar Maple 'Legacy' N P 50 35 962 Betula nigra cultivars River Birch 'Dura Heat' or 'Heritage' N 50 40 1,256 Carya cordiformis Bitternut Hickory N P 100 60 2,826 Carya glabra Pignut Hickory N S P 100 60 2,826 Carya ovata Shagbark Hickory N P 80 40 1,256 Carya pallida Sand Hickory N P 90 30 707 Carya tormentosa Mockernut Hickory N S P 100 60 2,826 Cedrus deodara Deodar Cedar E 70 30 707 Celtis laevigata Sugarberry P 70 50 1,963 Celtis occidentalis Hackberry S 50 40 1,256 Celtis sinensis Chinese Hackberry S 60 40 1,256 Cercidiphyllum japonicum Katsura Tree P 70 45 1,590 Cryptomeria japonica Japanese Cryptomeria E 60 20 314 Fagus grandifolia American Beech N 70 40 1,256 Fraxinus pennsylvanica Green Ash N S 60 25 491 Ginkgo biloba (male) Gingko, Maidenhair Tree S P 50 30 707 Scientific name Common Name Native Evergreen Street Tree Parking Lot Tree Max Ht. (ft.)
Spread (ft.)
Canopy (SF) Gleditsia triacanthos inermis Thornless Honeylocust N S P 70 50 1963 Liquidambar styraciflua 'Rotundiloba' Seedless Sweetgum N P 70 45 1,590 Liriodendron tulipifera Tulip Poplar N S P 90 40 1,256 Magnolia acuminata Cucumber Magnolia N 80 40 1,256 Magnolia grandiflora Southern Magnolia N E 80 40 1,256 Magnolia virginiana Sweetbay Magnolia N P 60 30 707 Metasequoia glyptostroboides Dawn Redwood 80 25 491 Nyssa aquatica Swamp Tupelo N 70 40 1,256 Nyssa sylvatica Black Gum N P 80 45 1,590 Pinus echinata Shortleaf Pine N E P 100 25 491 Pinus taeda Loblolly Pine N E P 100 25 491 Pinus virginiana Virginia Pine E P 70 20 314 Platanus occidentalis American Sycamore N S 100 45 1,590 Platanus x acerifolia London Planetree S P 100 80 5,024 Quercus acutissima Sawtooth Oak P 60 50 1,963 Quercus alba White Oak N 80 60 2,826 Quercus bicolor Swamp White Oak S 60 50 1,963 Quercus coccinea Scarlet Oak N P 70 45 1,590 Quercus falcata Southern Red Oak N S P 80 45 1,590 Quercus hemisphaerica 'Darlington' Darlington Oak N P 90 50 1,963 Quercus laurifolia Laurel Oak N P 80 50 1,963 Quercus macrocarpa Bur Oak 80 80 5,024 Quercus muehlenbergii 'Engelm' Chinkapin Oak S P 100 50 1,963 Quercus nigra Water Oak S P 80 40 1,256 Quercus nutallii Nuttal Oak N S P 80 40 1,256 Quercus palustris Pin Oak N S P 70 40 1,256 Quercus phellos Willow Oak N S P 60 35 962 Quercus prinus Chestnut Oak S 70 50 1,963 Quercus robur English Oak S P 60 50 1,963 Quercus rubra Northern Red Oak S P 75 45 1,590 Quercus shumardii Shumard Oak N S P 80 60 2,826 Quercus stellata Post Oak P 50 40 1,256 Quercus velutina Black Oak P 70 45 1,590 Scientific name Common Name Native Evergreen Street Tree Parking Lot Tree Max Ht. (ft.)
Spread (ft.)
Canopy (SF) Taxodium distichum Bald Cypress N S P 70 25 491 Thuja plicata Western Arborvitea E P 70 25 491 Tilia americana Basswood S P 80 45 1,590 Tsuga canadensis Eastern Hemlock N E 60 35 962 Ulmus alata Winged Elm N P 80 40 1,256 Ulmus americana 'Princeton' Princeton American Elm S P 60 30 707 Ulmus parvifolia 'Emer II' P.P. #7552 Allée ® Chinese Elm S P 60 45 1590 Ulmus rubra Slippery Elm N P 80 40 1,256 Ulmus x 'Morton' (Accolade) Accolade Hybrid Elm S P 60 30 707 Ulmus x 'Pioneer' "Pioneer' Elm S P 60 50 1,963 Zelkova serrata Japanese Zelkova S P 70 50 1,963 Shrub List Botanical Name Common Name Native Height (ft.)
(avg.)
Width (ft.)
(avg.)
Moist Wet DroughtTolerant Adaptable Soils Abelia x 'Edward Goucher' Edward Goucher Abelia X 6 5 X X Abelia x grandiflora 'Kaleidoscope' & 'Canyon Creek' Kaleidoscope or Canyon Creek Abelia
X 2 3 X X
Abelia x grandiflora 'Confetti' Confetti Abelia 3—4 3—4 X X Abelia x grandiflora 'Rose Creek' Rose Creek Abelia 2—3 3—4 X X Aesculus parviflora Bottle brush Buckeye X 6—12 12 X Agarista populifolia Doghobble, leucothoe X 8—12 6—8 X X Amelanchier arborea Serviceberry X 10 6 X X X Aucuba japonica Japanese Aucuba 3—10 3—6 X Azalea 'Satsuki' Gumpo Azalea 2 3 X Azalea 'Southern indica' Southern azalea 7—10 6 X Azelea Encore Encore Azaleas 2.5—5 2—5 X X Botanical Name Common Name Native Height (ft.)
(avg.)
Width (ft.)
(avg.)
Moist Wet DroughtTolerant Adaptable Soils Buxus microphylla Boxwood many varieties 3—20 3—20 X Buxus sempervirens English boxwood 5—8 5 X Callicarpa Americana Beautyberry X 3—6 3—5 X Callicarpa americana American Beautyberry X 8 6 Calycanthus floridus Sweetshrub, Carolina allspice X 6—12 6 X X X Camellia Camelia 3—15 4—8 X X Caryopteris × clandonensis 'Worcester Gold' X 6 3 X X Cephalotaxus harringtonii 'Prostrata' Creeping Japanese Plum Yew 3 4 X X Chamaecyparis obtusa 'Nana Gracilis' Hinoki False Cypress 12 5 X Chamaecyparis pisifera filifera 'Golden Charm' False Cypress 6 8 X Chamaecyparis pisifera filifera 'Golden Mop' Threadleaf False Cypress 4 3 X Chamaecyparis pisifera filifera 'Mops' Threadleaf False Cypress 5 5 X Chamaecyparis pisifera filifera 'Sun Gold' Threadleaf False Cypress 8 6 X Clethra alnifolia 'Hummingbird' Summersweet X 3 4 X X Clethra alnifolia 'Ruby Spice' Summersweet X 8 8 X X Clethra alnifolia 'Sixteen Candles' Summersweet X 6 6 X X Cryptomeria japonica 'Elegans Aurea ' Japanese cedar 15 20 X Cryptomeria japonica 'Nana Globus' Japanese cedar 5 5 X Cryptomeria japonica 'Yoshino' Japanese cedar 30 25 X Deutzia gracilis 'nikko' Dwarf Nikko deutzia 2 5 X Distylium 'hybrid' 'Vintage Jade', 'Blue Cascade' and 'Emerald Heights Evergreen witch hazel 2—5 6 X X X Edgeworthia chrysantha Paperbush 6 6 X Botanical Name Common Name Native Height (ft.)
(avg.)
Width (ft.)
(avg.)
Moist Wet DroughtTolerant Adaptable Soils Fothergilla Mountain witch alder X 4—12 4—6 X Fothergilla gardenii X 2 3 X Fothergilla major American WitchAlder X 4 6 X Gardenia jasminoides Common gardenia 4—6 5 X Gardenia jasminoides 'radicans' Creeping dwarf gardenia 3 5 X Hamamelis viginiana Witch Hazel X 10—12 10—12 X X X Hydrangea Hydrangea 3—8 3—6 X Hypericum calycinum 'Hidcote' St. John's Wort 4 3 X X Ilex cornuta 'Carissa Carissa Holly 4 4 X Ilex cornuta 'Dwarf Burford' Dwarf Burford holly 15 6—8 X Ilex crenata 'Helleri' Japanese Helleri holly 4 5 X Ilex crenata 'Sky Pencil' Sky Pencil holly 10 3 X Ilex crenata 'Soft Touch' Soft touch 3 3 Ilex verticillata Winterberry X 8 5 Ilex vomitoria 'Condeaux' Bordeaux Dwarf Yaupon Holly 3 3 X Illicium floridanum, parviflorum Florida Anise X 6 6 X X Illicium henryi Henryi, Star anise 7—15 8 X X Itea virginica Virginia sweetspire X 2—4 4—6 X X X Jasmine nudiflorum Winter jasmine 3—4 3—4 X X Kerria japonica 'Pleniflora' Japanese Kerria, Japanese rose 5—10 6—10 X X X X Leucothoe fontanesiana and axillaris Weeping leucothoe, variegated leucothoe
X 3—6 3—6 X X
Lindera benzoin spicebush X 6—12 6—12 X X X X Loropetalum 'Emerald snow' Emerald Snow Fringe Flower 3—4 3—4 X Loropetalum 'Ruby' Fringe flower 4—6 4—6 X Loropetalum chinense 'Chang Nian Hong' 'Ever Red' Fringe Flower 6 6 X Loropetalum chinense 'Peack' Weeping Purple Pixie Fringe Flower 2 4 X Botanical Name Common Name Native Height (ft.)
(avg.)
Width (ft.)
(avg.)
Moist Wet DroughtTolerant Adaptable Soils Loropetalum chinense 'Rubrum' Crimson fire' 2 3 X Loropetalum chinense 'Shang-hi' compact Purple Diamond Fringe Flower 5 5 X Myrica cerifera Wax Myrtle X 6—12 6—12 X X X X Osmanthus fragrans Fragrant tea olive 10 8 X X Osmanthus heterophyllus 'Goshiki' Goshiki' False Holly 5 4 X Osmanthus x fortunei Fortune's tea olive 20 20 X X Philadelphus coronarius x 'Natchez' Mock Orange 10 6 X X Pieris japonica Japanese pieris 3—12 3—8 X Pinus mugo Mugo Pine 3—5 3—5 X Prunus caroliniana Cherry laurel X 12—20 8—10 X X Rhododendron alabamense Alabama Azalea X 8 6 X Rhododendron canescens Piedmont Azalea X 6 5 X X Rhododendron flammeum
R. speciosum Oconee Azalea X 5 6 Rosa Shrub roses 3—6 3—5 X Spiraea thunbergii Spirea - many cultivars 3—8 3—6 X Thuja (standish x plicata) 'Green Giant' Arborvitae X 30+ 10 X X Thuja occidentalis 'Emerald' Arborvitae 15 4 X X Thuja occidentalis 'Golden Globe' Arborvitae 4 4 X X Thuja occidentalis 'Pyramidalis' Arborvitae 20 6 X X Vaccinium arboreum Sparkleberry X 10 6 X X Vaccinium ashei Blueberry X 8 6 X X Viburnum many varieties 5—10 5—10 X Viburnum prunifolium Blackhaw Viburnum X 12 8 X Viburnum rufidulum Rusty Blackhaw X 8 8 X Weigela florida Weigela 3—20 3—12 X X Prohibited Plant List Georgia Exotic Pest Plant Council (GA-EPPC) Botanical Name Common Name GA-EPPC Threat Category
TREE
Pyrus calleryana Callery (Bradford) Pear 3
SHRUB
Berberis thunbergii Japanese Barberry 3 Celastrus orbiculatus Oriental Bittersweet 1 Alert Elaeagnus pungens Thorny Olive 2 Elaeagnus umbellata Autumn Olive 1 Lantana camara Largeleaf Lantana 3 Ligustrum japonicum Japanese Privet 2 Ligustrum lucidum Glossy Privet 3 Ligustrum sinense Chinese Privet 1 Mahonia bealei Leatherleaf Mahonia 3 Nandina domestica Nandina or Sacred Bamboo 2 Spiraea japonica Japnese Spiraea 2
VINE/GROUNDCOVER
Amelopsis brevipedunculata Porcelain-berry 3 Hedera helix English Ivy 1 Vinca major Big Periwinkle 2 Vinca minor Common Periwinkle 2
GRASSES
Miscanthus sinensis Chinese Silvergrass 2 Eragrostis curvula Weeping Lovegrass 3 Liriope spicata Creeping Lily Turf 3 Category 1—Exotic plant that is a serious problem in Georgia natural areas by extensively invading native plant communities and displacing native species.
Category 1 Alert—Exotic plant that is not yet a serious problem in Georgia natural areas, but that has significant potential to become a serious problem.
Category 2—Exotic plant that is a moderate problem in Georgia natural areas through invading native plant communities and displacing native species, but to a lesser degree than Category 1 species.
Category 3—Exotic plant that is a minor problem in Georgia natural areas, or is not yet known to be a problem in Georgia but is known to be a problem in adjacent states.
(Ord. No. UDOA2023-00002(GCID 2023-0604), Exh. A(§ 54), 9-26-2023)
APPENDIX B
COUNTY CONSTRUCTION CODE*
106.3. Contractor Responsibilities.
107.3.4. Primary design professional.
115.1. Electric vehicle charging systems.
Ordinance Number CC-2014
GWINNETT COUNTY
BOARD OF COMMISSIONERS
LAWRENCEVILLE, GEORGIA
ORDINANCE ENTITLED: Gwinnett County Construction Code READING AND ADOPTION: December 16, 2014
CONSTRUCTION CODES
SECTION 101. GENERAL
101.1. Title.
The regulations shall be known as the "GWINNETT COUNTY CONSTRUCTION CODE," hereinafter referred to as "this code."
101.2. Scope.
This code shall apply to new and existing buildings, structures, electrical systems, fuel gas piping systems, mechanical systems, and plumbing systems as specifically described herein.
101.3. Intent.
The intent of this code is to establish the minimum requirements to safeguard the public health, safety and general welfare through structural strength, means of egress facilities, stability, sanitation, adequate light and ventilation, energy conservation, and safety to life and property from fire and other hazards attributed to the built environment. This code enacts the provisions for each of the Georgia State Minimum Standard Codes referenced in sections 101.4.1 through 101.4.8. Subsequent editions and amendments to these codes as adopted by the State of Georgia shall become a part of this code and subject to enforcement on the date mandated by State Law.
101.4. Referenced codes.
The Georgia State Minimum Standard Codes listed in Sections 101.4.1 through 101.4.8 and referenced elsewhere in this code shall be considered part of the requirements of this code to the prescribed extent of
each such reference. (Note: Chapter 1 of the Georgia State Minimum Standard Code is deleted and replaced with this Construction Code.)
101.4.1. Building (General).
The provisions of the Georgia State Minimum Standard Building Code shall apply to the construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal and demolition of every building or structure or any appurtenances connected or attached
to such buildings or structures except as specified in section 101.4.2.
101.4.2. Building (Detached One- and Two-Family Dwellings and Townhouses).
The provisions of the Georgia State Minimum Standard One and Two Family Dwelling Code shall apply to the construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal and demolition of detached one- and two-family dwellings and townhouses separated by a 2-hour fire-resistance-rated wall assembly not more than three stories above grade plane
in height with a separate means of egress and their accessory structures.
101.4.2.1. Appendices Appendix F of the Georgia State Minimum Standard One- and Two-Family Dwelling Code shall be considered part of the requirements of this code for
new construction including basement foundations.
101.4.3. Electrical.
The provisions of the Georgia State Minimum Standard Electrical Code shall apply to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and appurtenances thereto.
101.4.4. Fuel Gas.
The provisions of the Georgia State Minimum Standard Gas Code shall apply to the installation of fuel gas piping from the point of delivery, fuel gas appliances and related accessories as covered in this code.
These requirements apply to fuel gas piping systems extending from the point of delivery to the inlet connections of appliances and the installation and operation of residential and commercial fuel gas appliances and related accessories.
101.4.5. Mechanical.
The provisions of the Georgia State Minimum Standard Mechanical Code shall apply to the installation, alteration, repair and replacement of mechanical systems, including equipment, appliances, fixtures, fittings and/or appurtenances, including ventilating, heating, cooling, air-conditioning and refrigeration systems, incinerators and other energy-related systems.
101.4.6. Plumbing.
The provisions of the Georgia State Minimum Standard Plumbing Code shall apply to the installation, alteration, repair and replacement of plumbing systems, including equipment, appliances, fixtures, fittings and appurtenances, and where connected to a water or sewage system and all aspects of a medical gas
system, subject to the exceptions, amendments, and modifications contained in this Section.
(Ord. No. GCID 2023-1028, Exh. A, 12-5-2023)
101.4.6.1. Appendices.
Appendix F of the Georgia State Minimum Standard Plumbing Code shall be considered part of the requirements of this Code.
(Ord. No. GCID 2023-1028, Exh. A, 12-5-2023)
101.4.6.2. Local Amendments to Georgia Minimum Standard Plumbing Code.
1. Chapter 2, Section 202 General Definitions shall be amended to add in alphabetical order and revise, as applicable, the following definitions:
KITCHEN FAUCET OR KITCHEN FAUCET REPLACEMENT AERATOR. A kitchen faucet or kitchen faucet replacement aerator that allows a flow of no more than 1.8 gallons of water per minute at a pressure of 60 pounds per square inch and conforms to the applicable requirements in ASME A112.18.1/CSA B125.1.
LAVATORY FAUCET OR LAVATORY FAUCET REPLACEMENT AERATOR. A lavatory faucet or lavatory faucet replacement aerator that allows a flow of no more than 1.2 gallons per minute at a pressure of 60
pounds per square inch and is listed to the WaterSense High Efficiency Lavatory Faucet Specification.
LANDSCAPE IRRIGATION.
Flow sensor. An inline device in a landscape irrigation system that produces a repeatable signal proportional to flow rate.
Lawn or Landscape Irrigation system. An assembly of component parts that is permanently installed for the controlled distribution of water to irrigate landscapes such as ground cover, trees, shrubs, and other plants. Lawn and Landscape Irrigation System refer
to the same system.
Master shut-off valve. An automatic valve such as a gate valve, ball valve, or butterfly valve) installed as part of the landscape irrigation system capable of being automatically closed by the WaterSense controller. When this valve is closed water will not be supplied to the landscape irrigation system.
Pressure regulating device. A device designed to maintain pressure within the landscape irrigation system at the manufacturer's recommended operating pressure and that protects against sudden spikes or drops from the water source.
Rain sensor shut-off. An electric device that detects and measures rainfall amounts and overrides the cycle of a landscape irrigation system so as to turn off such system when a predetermined amount of rain has fallen.
WaterSense irrigation controller. Is a weather-based or soil moisture-based irrigation controller labeled under the U.S. Environmental Protection Agency's WaterSense program, which includes standalone controllers, add-on devices, and plug-in devices that use current weather data as a basis for scheduling irrigation.
WaterSense spray sprinkler bodies. A sprinkler body with integral pressure regulation, generating opti mal water spray and coverage labeled under the U.S.
Environmental Protection Agency's WaterSense program.
SHOWER HEAD. A shower head that allows a flow of no more than the average of 2.0 gallons of water per minute at 80 pounds per square inch of pressure, is listed in the WaterSense Specification for Showerheads, and meets the US Department Definition of Energy definition of showerhead.
2. Chapter 6, Section 604.4 Maximum Flow and Water Consumption shall be amended to read as follows:
604.4 Maximum Flow and Water Consumption Consistent with the general approach taken in Georgia, these Maximum Flow and Water Consumption requirements and related definitions in Section 604.4 of the plumbing code shall apply to all plumbing systems,
including those in one- and two-family dwellings. The maximum water consumption flow rates and quantities for all plumbing fixtures and fixture fittings shall be in accordance with Table 604.4.
Exceptions:
1. Blowout design water closets having a water consumption not greater than 3 ½ gallons (13
L) per flushing cycle.
2. Vegetable sprays.
3. Clinical sinks having a water consumption not greater than 4 ½ gallons (17 L) per flushing cycle.
4. Laundry tray sinks and service sinks.
5. Emergency showers and eye wash stations.
TABLE 604.4
MAXIMUM FLOW RATES AND
CONSUMPTION FOR PLUMBING
FIXTURES AND FIXTURE FITTINGS
PLUMBING FIXTURE OR
FIXTURE FITTING
MAXIMUM FLOW RATE
OR QUANTITYb
Lavatory faucet and replacement aerators, private WaterSense Labeled & 1.2 gpm at 60 psif Lavatory faucet, public (metering)
0.25 gallon per metering cycle Lavatory, public (other than metering) 0.5 gpm at 60 psi Showerheada WaterSense Labeled & 2.0 gpm at 80 psif
PLUMBING FIXTURE OR
FIXTURE FITTING
MAXIMUM FLOW RATE
OR QUANTITYb
Kitchen faucet and replacement aerators 1.8 gpm at 60 psif,g Urinal 0.5 gallon per flushing cyclef Water closet 1.28 gallons per flushing cyclec,d,e,f For SI: 1 gallon = 3.785 L, 1 gallon per minute = 3.785 L/m, 1 pound per square inch = 6.895 kPa.
a. A hand-held shower spray is a shower head. As point of clarification, multiple shower heads may be installed in a single shower enclosure so long as each shower head individually meets the maximum flow rate, the WaterSense requirements, and the US Department of Energy definition of showerhead.
However, multiple shower heads are not recommended for water efficiency purposes.
b. Consumption tolerances shall be determined from referenced standards.
c. For flushometer valves and flushometer tanks, the average flush volume shall not exceed 1.28 gallons.
d. For single flush water closets, including gravity, pressure assisted and electro-hydraulic tank types, the average flush volume shall not exceed 1.28 gallons.
e. For dual flush water closets, the average flush volume of two reduced flushes and one full flush shall not exceed 1.28 gallons.
f. See 2014 GA Amendment to Section 301.1.2 'Waiver from requirements of high efficiency plumbing fixtures'.
g. Kitchen faucets are permitted to temporarily increase the flow above the maximum rate, but not to exceed 2.2 gpm (8.3 L/m) at 60 psi (414 kPa) and
must revert to a maximum flow rate of 1.8 gpm (6.8 L/m) at 60 psi (414 kPa) upon valve closure.
604.4.1 Clothes Washers. Residential clothes washers shall be in accordance with the Energy Star program requirements.
604.4.2 Cooling Tower Water Efficiency.
604.4.2.1 Once-Through Cooling. Once-through cooling using potable water is prohibited.
604.4.2.2 Cooling Towers and Evaporative Coolers.
Cooling towers and evaporative coolers shall be equipped with makeup water and blow down meters, conductivity controllers and overflow alarms.
Cooling towers shall be equipped with efficiency drift eliminators that achieve drift reduction to 0.002 percent of the circulated water volume for counterflow towers and 0.005 percent for crossflow towers.
604.4.2.3 Cooling Tower Makeup Water. Water used for air conditioning, cooling towers shall not be discharged where the hardness of the basin water is less than 1500 mg/L. Exception: Where any of the following conditions of the basin water are present:
total suspended solids exceed 25 ppm, CaCO3 exceeds 600 ppm, chlorides exceed 250 ppm, sulfates exceed 250 ppm, or silica exceeds 150 ppm.
604.4.3 Landscape Irrigation System Efficiency Requirements. The requirements in Section 604.4.3 apply to all new landscape irrigation systems connected to the public water system except those (a) used for agricultural operations as defined in the Official Code of Georgia
Section 1-3-3, (b) used for golf courses, and (c) dependent upon a nonpublic water source. Nothing in this Code or this Section 604.4.3 is intended to require that
landscape irrigation systems must be installed at all premises. The landscape irrigation efficiency requirements in this Section 604.4.3 apply only when someone voluntarily chooses or is otherwise required by some
requirement beyond this Code, to install a landscape irrigation system on premises.
604.4.3.1 Avoiding Water Waste Through Design.
All new landscape irrigation systems shall adhere to the following design standards:
1. Pop-up type sprinkler heads shall pop-up to a height above vegetation level of not less than four (4) inches above the soil level when emitting water.
2. Pop-up spray heads or rotary sprinkler heads must direct flow away from any adjacent surfaces and must not be installed closer than four inches from impervious surfaces.
3. Areas less than ten (10) feet in width in any direction shall be irrigated with subsurface irrigation or by other means that produces no overspray or runoff.
4. Narrow or irregular shaped landscaped areas, less than four (4) feet in any direction across opposing boundaries shall not be irrigated by any irrigation emission device except sub-surface or low flow emitters with flow rates not to exceed 6.3 gallons per hour.
604.4.3.2 Landscape Irrigation System Required Components. All new landscape irrigation systems shall include the following components:
1. A rain sensor shut-off installed in an area that is unobstructed by trees, roof over hangs, or anything else that might block rain from triggering the rain sensor shutoff.
2. A master shut-off valve for each controller installed as close as possible to the point of connection of the water but
downstream of the backflow prevention assembly.
3. Pressure-regulating devices such as valve pressure regulators, sprinkler head pressure regulators, inline pressure regulators, WaterSense spray sprinkler bodies, or other devices shall be installed as
needed to achieve the manufacturer's recommended pressure range at the emission devices for optimal performance.
4. Except for landscape irrigation systems serving a single-family home, all other systems must also include:
(a) a WaterSense irrigation controller;
and
(b) at least one flow sensor, which must be installed at or near the supply point of the landscape irrigation system and shall interface with the control system, that when connected to the WaterSense controller will detect and report high flow conditions to such controller and
automatically shut master valves.
The flow sensor serves to aid in detecting leaks or abnormal flow conditions by suspending irrigation. High flow conditions should be consistent with manufacturers' recommendations and specifications.
3. Chapter 13, Section 1304 Reclaimed Water Systems shall be amended to read as follows:
1304.3.2 Connections to water supply. Reclaimed water provided from a reclaimed wastewater treatment system permitted by the Environmental Protection Di
vision may be used to supply water closets, urinals, trap primers for floor drains and floor sinks, water features and other uses approved by the Authority Having Jurisdiction, in motels, hotels, apartment and condominium buildings, and commercial, industrial, and institutional buildings, where the individual guest or occupant does not have access to plumbing. Also, other systems
that may use a lesser quality of water than potable water such as water chillers, carwashes or an industrial process may be supplied with reclaimed water provided from a reclaimed wastewater treatment facility permitted by the Environmental Protection Division. The use of reclaimed water sourced from any new private reclaimed wastewater treatment system for outdoor irrigation shall be limited to golf courses and agriculture operations as defined in the Official Code of Georgia
Section 1-3-3, and such reclaimed water shall not be approved for use for irrigating any other outdoor landscape such as ground cover, tree, shrubs, or other plants.
These limitations do not apply to reclaimed water sourced from existing private reclaimed water systems or from existing or new, governmentally-owned reclaimed wastewater treatment systems.
4. Appendix E, Section E101.1.2. shall be amended to read as follows:
Because of the variable conditions encountered in hydraulic design, it is impractical to specify definite and detailed rules for sizing of the water piping system.
Accordingly, other sizing or design methods conforming to good engineering practice standards are acceptable alternatives to those presented herein. Without limiting the foregoing, such acceptable design methods
may include for multi-family buildings the Peak Water Demand Calculator from the IAPMO/ANSI 2020 Water Efficiency and Sanitation Standard for the Built Environment, which accounts for the demands of waterconserving plumbing fixtures, fixture fittings, and appliances. If future versions of the Peak Water Demand Calculator including other building types, such as commercial, such updated version shall be an acceptable design method.
(Ord. No. GCID 2023-1028, Exh. A, 12-5-2023)
101.4.7. Energy.
The provisions of the Georgia State Minimum Standard Energy Code shall apply to all matters governing the design and construction of buildings for energy
efficiency.
101.4.8. Existing Building.
The provisions of the Georgia State Minimum Standard Existing Building Code shall serve as a supplement to the Georgia State Minimum Standard Building Code and shall apply to the repair, alteration, change of occupancy, and relocation of existing buildings.
SECTION 102. APPLICABILITY
102.1. General.
Where, in any specific case, different sections of this code specify different materials, methods of construction or other requirements, the most restrictive shall govern. Where there is a conflict between a general
requirement and a specific requirement, the specific requirement shall be applicable.
102.2. Other laws.
The provisions of this code shall not be deemed to nullify any provisions of local, state or federal law.
102.3. Application of references.
References to chapter or section numbers, or to provisions not specifically identified by number, shall be construed to refer to such chapter, section or provision of this code.
102.4. Referenced codes and standards.
The codes and standards referenced in this code shall be considered part of the requirements of this code to the prescribed extent of each such reference.
Where differences occur between provisions of this code and referenced codes and standards, the provisions of this code shall apply.
102.5. Partial invalidity.
In the event that any part or provision of this code is held to be illegal or void, this shall not have the effect of making void or illegal any of the other parts or provisions.
102.6. Change in occupancy.
It shall be unlawful to make a change in the occupancy of a structure which will subject the structure to the special provisions of this code applicable to the new
occupancy without approval. The code official shall certify that such structure meets the intent of the provisions of law governing building construction for the proposed new occupancy and that such change of occupancy does not result in any hazard to the public health, safety or welfare.
102.7. Maintenance.
Electrical, fuel gas piping, mechanical, and plumbing systems, both existing and new, and parts thereof shall be maintained in proper operating condition in
accordance with the original design and in a safe and sanitary condition as applicable. All device or safeguards which are required by this code shall be maintained in compliance with the code edition under which they were installed. The owner or owner's designated
agent shall be responsible for maintenance of each system. To determine compliance with this provision, the building official shall have the authority to require any electrical, fuel gas piping, mechanical, or plumbing system to be reinspected.
SECTION 103. DEPARTMENT OF PLANNING
AND DEVELOPMENT
103.1. Enforcement agency.
This code shall be enforced by the Building Official or the Chief of the Gwinnett County Police Department or their duly authorized representatives, as applicable.
103.2. Building Official.
The Director of Planning and Development, or his designee, shall be known as the Building Official.
SECTION 104. DUTIES AND POWERS OF
BUILDING OFFICIAL
104.1. General.
The building official is hereby authorized and directed to enforce the provisions of this code. The building official shall have the authority to render interpretations of this code and to adopt policies and procedures in order to clarify the application of its provisions.
Such interpretations, policies and procedures shall be in compliance with the intent and purpose of this code.
Such policies and procedures shall not have the effect of waiving requirements specifically provided for in this code.
104.2. Applications and permits.
The building official shall receive applications, review construction documents and issue permits for the erection, and alteration, demolition and moving of
buildings and structures, and for the installation and alteration of electrical, fuel gas piping, mechanical, and plumbing systems, inspect the premises for which such permits have been issued and enforce compliance with the provisions of this code.
104.3. Notices and orders.
The building official shall issue all necessary notices or orders to ensure compliance with this code.
104.4. Inspections.
The building official shall make all of the required inspections, or the building official shall have the authority to accept reports of inspection by approved agencies or individuals. Reports of such inspections by
approved agencies or individuals shall be in writing and be certified by a responsible officer of such approved agency or by the responsible individual. The building official is authorized to engage such expert opinion as deemed necessary to report upon unusual technical issues that arise.
104.5. Identification.
The building official shall carry proper identification when inspecting structures or premises in the performance of duties under this code.
104.6. Right of entry.
Where it is necessary to make an inspection to enforce the provisions of this code, or where the building official has reasonable cause to believe that there exists
in a structure or upon a premises a condition which is contrary to or in violation of this code which makes the structure or premises unsafe, dangerous or hazardous, the building official is authorized to enter the structure or premises at reasonable times to inspect or to perform the duties imposed by this code, provided that if such structure or premises be occupied that credentials be presented to the occupant and entry requested. If such structure or premises is unoccupied, the building official shall first make a reasonable effort to locate the owner or other person having charge or control of the
structure or premises and request entry. If entry is refused, the building official shall have recourse to every remedy provided by law to secure entry.
104.7. Department records.
The building official shall keep official records of applications received, permits and certificates issued, fees collected, reports of inspections, and notices and orders issued. Such records shall be retained in the official records in accordance with the appropriate retention schedule.
104.8. Liability.
This code shall not create any duty or right of recovery against Gwinnett County's officials and employees.
The inspection or permitting of any building or plan by Gwinnett County, under the requirements of this code, is not intended to be construed as a representation or warranty of the physical condition of such building or the adequacy of such plans. Neither Gwinnett County nor any official or employee thereof shall be liable for damages to person or property for any defect or hazardous or illegal condition or inadequacy in such building, system or plans, nor for any failure of any component of such. Neither Gwinnett County nor any of its officials or employees shall have any liability for any act
or failure to act pursuant to the provisions of this code.
SECTION 105. AUTHORIZATION
105.1. Interpretations.
Whenever there are practical difficulties involved in carrying out the provisions of this code, the building official shall have the authority to render interpretations of this code, in order to clarify the application of its provisions, which are consistent with the intent and
purpose of this code and which do not lessen health, accessibility, life and fire safety, or structural requirements.
105.2. Alternative materials, design and methods of construction and equipment.
The provisions of this code are not intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that any such alternative has been authorized. An alternative material, design or method of construction shall be authorized
where the building official finds that the proposed design is satisfactory and complies with the intent of the provisions of this code, and that the material, method
or work offered is, for the purpose intended, at least the equivalent of that prescribed in this code in quality, strength, effectiveness, fire resistance, durability and safety.
105.3. Supporting documentation.
Supporting documentation, where necessary to assist in the approval of materials or assemblies not specifically provided for in this code, shall consist of
valid research reports from approved sources or any supplemental data or evidence as may be required by the building official including tests as may be required.
105.4. Requirements not covered by code.
Any requirements necessary for the strength, stability or proper operation of an existing or proposed building, structure, or electrical, gas, energy conservation, mechanical and plumbing system, or for the public safety, health and general welfare, not specifically covered by this code, including the technical codes,
shall be determined by the building official.
105.5. Required testing.
Whenever there is insufficient evidence of compliance with the provisions of this code, or evidence that a material or method does not conform to the requirements of this code, or in order to substantiate claims for alternative materials or methods, the building official shall have the authority to require tests as evidence of compliance to be made at no expense to the jurisdiction.
105.5.1. Testing methods.
Test methods shall be as specified in this code or by other recognized test standards. In the absence of recognized and accepted test methods, the building official shall authorize the testing procedures.
105.5.2. All tests.
All tests shall be performed by an approved agency.
105.5.3. Test reports.
Reports of such tests shall be retained by the building official for the period required for retention of public records.
105.6. Authorized materials and equipment.
Materials, equipment, appliances and devices authorized by the building official shall be constructed and installed in accordance with such authorization.
105.6.1. Material, equipment and appliance reuse.
Materials, equipment, appliances and devices shall not be reused unless such elements have been reconditioned, tested, and placed in good and proper working condition and authorized.
SECTION 106. PERMITS
106.1. Required.
Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect,
install, enlarge, alter, repair, remove, convert or replace any electrical, fuel gas piping, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be done, shall first make application to the building official and obtain the required permit.
106.2. Misrepresentation of Application.
The building official is hereby authorized to revoke a permit or revoke a previous authorization, issued under the provisions of this code whenever there has been any false statement or false payment of permit fees such as returned check(s) or misrepresentation as to the material fact in the application or plans on which the permit or written release was based.
106.3. Contractor Responsibilities.
106.3.1. Contractor Business License.
Each individual engaged in construction activities for which a building permit is required shall provide proof of a valid business license issued by a jurisdiction within the state of Georgia at the time of permit application except for the owner of a single-family dwelling that serves as his/her primary residence. Each individual engaged in construction activities for which a building permit is required and that is not the permit holder shall provide proof of a valid business license issued by
a jurisdiction within the state of Georgia prior to commencing work.
106.3.2. Contractor State License.
Each permit holder engaged in construction activities which require state licensure as a contractor shall provide proof of a valid contractor license issued by
the state of Georgia at the time of permit application.
A contractor that is not the permit holder shall provide proof of a valid contractor license issued by the state of Georgia prior to commencing work.
106.4. Work exempt from permit.
Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of this jurisdiction. Permits shall not be required for the following:
A. Building:
1. One-story detached accessory structures used as tool and storage sheds, playhouses and similar uses, provided the floor area does not exceed 120 square feet.
2. Fences up to 8 feet in height excluding masonry and concrete construction.
3. Masonry and concrete walls up to 4 feet in height which function as a fence, screen, or barrier with optional integral pilasters up to 6 feet in height.
4. Retaining walls up to 4 feet in height measured from the top of the footing to the top of the wall, unless supporting a surcharge or confining liquids.
5. Water tanks supported directly on grade if the capacity does not exceed 5,000 gallons and the ratio of height to diameter or width does not exceed 2:1.
6. Sidewalks and driveways not more than 30 inches above adjacent grade, and not over any basement or story below and are not part of an accessible route.
7. Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work.
8. Temporary motion picture, television and theater stage sets and scenery.
9. Prefabricated swimming pools accessory to a Group R-3 occupancy that are less than 24 inches deep, do not exceed 5,000 gallons and are installed entirely above ground.
10. Shade cloth structures constructed for nursery or agricultural purposes which are not accessible to the public and do not include service systems such as electrical, fuel gas piping, mechanical, and plumbing systems.
11. Window awnings of Group R-3 and U occupancies supported by an exterior wall that do not project more than 54 inches from the exterior wall and do not require additional support.
12. Nonfixed and movable fixtures, cases, counters and partitions up to 5 feet 9 inches in height.
13. Basketball goals which are stand alone and not part of a basketball court.
14. Private vehicular bridges with no clear span exceeding 2 feet.
B. Electrical:
1. Repairs and maintenance: Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles.
2. Radio and television transmitting stations: The provisions of this code shall not apply to electrical equipment used for radio and television transmissions, but do apply to equipment and wiring for a power supply and the installations of towers and antennas.
3. Temporary testing systems: A permit shall not be required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus.
C. Gas:
1. Portable heating appliances.
2. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe.
D. Mechanical:
1. Portable heating appliances.
2. Portable ventilation appliances and equipment.
3. Portable cooling units.
4. Steam, hot or chilled water piping within any heating or cooling equipment or appliances regulated by this code.
5. Replacement of any minor part that does not alter the approval of equipment or appliance or make such equipment or appliance unsafe.
6. Portable evaporative coolers.
7. Self-contained refrigeration systems that contain 10 pounds or less of refrigerant or that are actuated by motors of 1 horsepower or less.
8. Portable fuel cell appliances that are not connected to a fixed piping system and are not interconnected to a power grid.
E. Plumbing:
1. The stopping of leaks in drains, water, soil, waste or vent pipe, provided, however, that if any concealed trap, drain pipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work shall be
considered as new work and a permit shall be obtained and inspection made as provided in this code.
2. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures and the removal and reinstallation of
water closets, provided such repairs do not involve or require the replacement or rearrangement of valves, pipes or fixtures.
106.4.1. Emergency repairs.
Where equipment replacements and repairs must be performed in an emergency situation, the permit application shall be submitted within the next two (2) working business days to the building official.
106.4.2. Repairs.
Application or notice to the building official is not required for ordinary repairs to structures, replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles. Such repairs shall not include the cutting
away of any wall, partition or portion thereof, the removal or cutting of any structural beam or loadbearing support, or the removal or change of any required means of egress, or rearrangement of parts of
a structure affecting the egress requirements; nor shall ordinary repairs include addition to, alteration of, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, soil, waste, vent or similar piping, electric wiring or mechanical or other
work affecting public health or general safety.
106.4.3. Public service agencies.
A permit shall not be required for the installation, alteration or repair of generation, transmission, distribution, metering or other related equipment that is under the ownership and control of public service agencies by established right.
106.5. Application for permit.
To obtain a permit, the applicant shall first file an application on a form furnished by the Department of Planning and Development for that purpose. Such application shall:
1. Identify and describe the work to be covered by the permit for which application is made.
2. State the full name and address of the applicant.
3. Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed
building or work.
4. Indicate the use and occupancy for which the proposed work is intended.
5. Be accompanied by construction documents and other information as required in Section 107.
6. State the valuation of the proposed work.
7. Be signed by the applicant, or the applicant's authorized agent.
8. Give such other data and information as required by the building official.
106.5.1. Action on permit application and permit issuance.
The building official shall examine or cause to be examined applications for permits and amendments thereto within a reasonable time after filing and within the time period prescribed by law. If the application, construction documents, or other data filed by the applicant do not conform to the requirements of this code and all applicable laws and ordinances, the building official shall reject such application in writing, stating the reasons therefor. If the building official is
satisfied that the proposed work conforms to the requirements of this code and laws and ordinances applicable thereto, the building official shall issue a permit therefor as soon as practicable within the time period
prescribed by law.
106.5.2. Time limitation of permit application.
An application for a permit for any proposed work shall be deemed to have been abandoned 180 days after the date of filing, unless such application has been pursued in good faith or a permit has been issued;
except that the building official is authorized to grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated.
106.6. Validity of permit.
The issuance of a permit or authorization of construction documents shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of this code or of any other applicable ordinance or law. Permits presuming to give authority to violate or cancel the provisions of this code or other applicable ordinances or laws shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data. The building official is also authorized to prevent occupancy or use of a structure where in violation of this code or of any other applicable ordinances or laws.
106.7. Expiration.
Each permit issued by the building official under the provisions of this code shall expire by limitation and shall become null and void under at least one of the following conditions:
1. The work authorized by such permit is not commenced within 180 days from the date of its issuance or renewal, as applicable, with no passed inspection of the work within the stated time frame.
2. The work authorized by such permit is suspended or abandoned at any time for a period of 180 days after the work is commenced with
no passed inspection of the work within the stated time frame. The building official is authorized to grant one extension of time for a period not more than 180 days. The extension
shall be requested by the permit holder in writing prior to expiration and justifiable cause demonstrated.
3. The weather-resistant building envelope including exterior walls, windows, doors, and roofing, as required by the applicable building code and authorized by such permit, is not complete within 360 days after the work is commenced on the pertinent one- or two-family dwelling, townhouse, or multi-family or commercial building no greater than 4 stories in height.
4. Change in permit holder.
106.8. Renewal.
The building official is authorized to grant one renewal for a permit issued under the provisions of this code when the permit is expired. The renewal shall be
requested by the original permit holder in writing within the time frame established by the building official and justifiable cause demonstrated.
106.9. Suspension or revocation.
The building official is authorized to suspend or revoke a permit issued under the provisions of this code wherever the permit is issued in error or on the basis of incorrect, inaccurate or incomplete information, or in violation of any applicable ordinance or regulation or any of the provisions of this code.
106.10. Placement of permit card.
Work authorized by a building permit shall not proceed until the permit card has been properly posted at the construction site. The building permit card shall be displayed in an easily visible location at the entrance to the site, building, structure, or space under construction, until completion of the project and issuance of the certificate of occupancy or certificate of completion as applicable.
SECTION 107. CONSTRUCTION DOCUMENTS
107.1. Submittal documents.
Construction documents including but not limited to statement of special inspections, engineering calculations, technical reports, and other data as applicable shall be submitted in one or more sets with each permit
application. The construction documents shall be prepared by a registered design professional where required by state law and any applicable ordinance.Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional. Construction documents prepared by a registered design professional shall bear a current date of seal by the
registered design professional within 180 days of the date of permit issuance.
Exception: The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that review of construction documents is not necessary to obtain compliance with this code.
107.1.1. Information on construction documents.
Construction documents shall be dimensioned and drawn upon suitable material. Electronic media documents are permitted to be submitted when approved by the building official. Construction documents shall be
of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that the work conforms to the provisions of this code and relevant laws, ordinances, rules and regulations, as determined by the building official.
107.1.2. Occupant Load.
The construction documents shall designate the number of occupants to be accommodated on each floor, and in each room and space, as required by the building
official.
107.1.3. Exterior wall envelope.
Construction documents for all buildings shall describe the exterior wall envelope in sufficient detail to determine compliance with this code. The construction
documents shall provide details of the exterior wall envelope as required, including flashing, intersections with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of drainage, water-resistive membrane and details around openings.
The construction documents shall include manufacturer's installation instructions that provide supporting documentation that the proposed penetration and opening details described in the construction documents maintain the weather resistance of the exterior wall
envelope. The supporting documentation shall fully describe the exterior wall system which was tested, where applicable, as well as the test procedure used.
107.2. Site plan.
The construction documents submitted with the application for permit shall be accompanied by a site plan showing to scale the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades and the proposed
finished grades and, as applicable, flood hazard areas, floodways, and design flood elevations; and it shall be drawn in accordance with an accurate boundary line survey. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot. The building official is authorized to waive or modify the requirement for a site plan when the application for permit is for alteration or repair or when otherwise warranted.
107.3. Examination of documents.
The building official shall examine or cause to be examined the accompanying construction documents and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of this code and other pertinent laws or ordinances.
107.3.1. Authorization of construction documents.
When the building official issues a permit, the construction documents shall be authorized by stamp as "Authorized for Issuance of Building Permit." One set
of construction documents so reviewed shall be retained by the building official. The other set shall be returned to the applicant, shall be kept at the site of
work and shall be open to inspection by the building official or a duly authorized representative. Such authorized construction documents shall not be changed, modified or altered without authorization from the
building official. Work shall be done in accordance with the authorized construction drawings.
107.3.2. Previous authorization.
No changes in the construction documents, construction or designated occupancy of a structure shall be required for which a lawful permit has been heretofore
issued or otherwise lawfully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of this code and
has not been abandoned irrespective of the adoption of subsequent editions and amendments to the Georgia StateMinimum Standard Codes listed in Section 101.4.
107.3.3. Phased authorization.
The building official is authorized to issue a permit for the construction of foundations or any other part of a building or structure before construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements have been filed complying with pertinent
requirements of this code. The holder of such permit for the foundation or other parts of a building or structure shall proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted.
107.3.4. Primary design professional.
107.3.4.1. General.
When it is required that documents be prepared by a registered design professional, the building official shall be authorized to require the owner to engage and desAPPENDIX B—COUNTY CONSTRUCTION CODE 107.3.4.1 ignate on the building permit application a registered
design professional who shall act as the primary design professional. If the circumstances require, the owner shall designate a substitute primary design professional who shall perform the duties required of the original primary design professional. The building official shall be notified in writing by the owner if the primary registered design professional is changed or is unable to continue to perform the duties.
The primary design professional shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building.
107.3.4.2. Deferred submittals.
For the purposes of this section, deferred submittals are defined as those portions of the design that are not submitted at the time of the application and that are to be submitted to the building official within a specified period.
Deferral of any submittal items shall have the prior approval of the building official. The primary registered design professional shall list the deferred submittals on the construction documents for review by the building official.
Documents for deferred submittal items shall be submitted to the primary registered design professional who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and been found
to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the design and submittal documents have been authorized by the building official.
107.3.4.3. Residential construction submittals.
Documents for Residential Group R-3 (one and two family dwellings) buildings which are 7,500 square feet or greater in total floor area, or are more than three (3) stories above grade plane in height shall be prepared by a primary registered design professional.
107.4. Amended construction documents.
Work shall be installed in accordance with the authorized construction documents, and any changes made during construction that are not in compliance with the
authorized construction documents shall be resubmitted for authorization as an amended set of construction documents.
107.5. Retention of construction documents.
One set of authorized construction documents shall be retained by the building official in accordance with the appropriate retention schedule.
SECTION 108. TEMPORARY STRUCTURES
AND USES
108.1. General.
The building official is authorized to issue a permit for temporary structures and temporary uses. Such permits shall be limited as to time of service, but shall not be permitted for more than 180 days. The building official is authorized to grant extensions for demonstrated cause.
108.2. Conformance.
Temporary structures and uses shall conform to the structural strength, fire safety, means of egress, accessibility, light, ventilation and sanitary requirements of this code as necessary to ensure public health, safety
and general welfare.
108.3. Temporary power.
The building official is authorized to give permission to temporarily supply and use power in part of an electric installation before such installation has been
fully completed and the final certificate of completion has been issued. The part covered by the temporary certificate shall comply with the requirements specified for temporary lighting, heat or power in the Georgia State Minimum Standard Electrical Code.
108.4. Termination of approval.
The building official is authorized to terminate such permit for a temporary structure or use and to order the temporary structure or use to be discontinued.
SECTION 109. FEES
109.1. Payment of fees.
A permit shall not be valid until the appropriate fees have been paid, nor shall an amendment to a permit be released until all additional fees, if any, have been paid.
109.2. Schedule of permit fees.
On buildings, structures, electrical, fuel gas piping, mechanical and plumbing systems or alterations requiring a permit, a fee for each permit shall be paid as required, in accordance with the schedule as established by the Gwinnett County Board of Commissioners.
109.3. Building permit valuations.
The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, fuel gas piping, mechanical, plumbing equipment and permanent systems. If, in the
opinion of the building official, the valuation is underestimated on the application, the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
109.4. Work commencing before permit issuance.
Any person who commences any work on a building, structure, electrical, fuel gas piping, mechanical or plumbing system before obtaining the necessary permits shall be subject to a fee established by the Gwinnett County Board of Commissioners that shall be in addition to the required permit fees.
109.5. Related fees.
The payment of the fee for the construction, alteration, removal or demolition for work done in connection to or concurrently with the work authorized by a building permit shall not relieve the applicant or holder
of the permit from the payment of other fees that are established by the Gwinnett County Board of Commissioners.
SECTION 110. INSPECTIONS AND TESTING
110.1. General.
Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved.
Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of this code or of other ordinances of Gwinnett County. Inspections presuming to give authority to violate or cancel the provisions of this code or of
other ordinances of Gwinnett County shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor Gwinnett County shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.
110.2. Preliminary inspection.
Before issuing a permit, the building official is authorized to examine or cause to be examined buildings, structures and sites for which an application has been
filed.
110.3. Required inspections.
The building official, upon notification from the permit holder or permit holder's agent, shall make the inspections set forth in Sections 110.3.1 through 110.3.10 and other such inspections as necessary, and shall either release that portion of the construction or notify the permit holder or the permit holder's agent of violations that are required to be corrected. The permit holder is responsible for scheduling the required inspections.
110.3.1. Footing and foundation inspection.
Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. For concrete foundations, any required forms shall be in place prior to inspection. Materials for the foundation shall be on the
job, except where concrete is ready mixed in accordance with ASTM C 94, the concrete need not be on the job.
110.3.2. Concrete slab and under-floor inspection.
Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories and other ancillary equipment items are in place, but before any concrete is placed or floor sheathing installed, including the subfloor.
110.3.3. Rough Inspection.
Inspection of electrical, fuel gas piping, mechanical, and plumbing systems and components to be concealed shall be made after the roof, framing, fireblocking and bracing are in place and prior to the installation of wall or ceiling membranes.
110.3.4. Framing inspection.
Framing inspections shall be made after the roof deck or sheathing, all framing, fireblocking and bracing are in place and pipes, chimneys and vents to be concealed are complete and the rough electrical, plumbing, heating wires, pipes and ducts are approved.
110.3.5. Lath and gypsum board inspection.
Lath and gypsum board inspections shall be made after lathing and gypsum board, interior and exterior, is in place, but before any plastering is applied or gypsum board joints and fasteners are taped and finished.
Exception: Gypsum board that is not part of a fire-resistance-rated assembly or a shear assembly.
110.3.6. Fire-resistant penetrations.
Protection of joints and penetrations in fire-resistance-rated assemblies shall not be concealed from view until inspected and approved.
110.3.7. Energy efficiency inspections.
Inspections shall be made to determine compliance with the Georgia State Minimum Standard Energy Code and shall include, but not be limited to, inspections for: envelope insulation R and U values, fenestration U value, duct system R value, and HVAC and water-heating equipment efficiency.
110.3.8. Other inspections.
In addition to the inspections specified above, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of this code and other ordinances and laws that are enforced by the Department of Planning and Development.
110.3.9. Special inspections.
Special inspections shall be provided in accordance with the Georgia State Minimum Standard Building Code.
110.3.10. Final inspection.
The final inspection shall be made after all work required by the building permit is completed.
110.4. Inspection agencies.
The building official is authorized to accept reports of authorized inspection agencies, provided such agencies satisfy the requirements as to qualifications and reliability.
110.5. Inspection requests.
It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code.
110.6. Testing.
Electrical, fuel gas piping, mechanical, and plumbing installations shall be tested as required in this code and in accordance with Sections 110.6.1 through 110.6.3.
Tests shall be made by the permit holder and observed by the building official.
110.6.1. New, altered, extended, or repaired installations.
New electrical, fuel gas piping, mechanical, and plumbing systems and parts of existing systems, which have been altered, extended or repaired, shall be tested as prescribed herein to disclose leaks and/or defects except that testing is not required in any case that does not include addition to, replacement, alteration or relocation of any water supply, drainage or vent piping.
110.6.2. Equipment, instruments, material and labor for tests.
Equipment, instruments, material and labor required for testing an electrical, fuel gas piping, mechanical, and plumbing system or part thereof shall be furnished by the permit holder.
110.6.3. Reinspection and testing.
Where any work or installation does not pass any initial test or inspection, the necessary corrections shall be made to comply with this code. The work or installation shall then be resubmitted to the building official for inspection and testing.
110.7. Approval required.
Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official. The building official, upon notification, shall make the requested inspections and shall either indicate the portion of the construction that is satisfactory as completed, or notify the permit holder or his or her agent wherein the same fails
to comply with this code. Any portions that do not comply shall be corrected and such portion shall not be covered or concealed until approved by the building official.
SECTION 111. VIOLATIONS
111.1. Unlawful acts.
It shall be unlawful for any person, firm or corporation to erect, construct, alter, repair, remove, demolish or utilize any structural, electrical, fuel gas piping,
mechanical, or plumbing system, or occupy any building, structure, or equipment regulated by this code or cause same to be done, in conflict with or in violation of
any of the provisions of this code.
111.2. Notice of violation.
The building official shall serve a notice of violation on the owner and/or the person responsible for the erection, installation, alteration, extension, repair, removal or demolition of structural, electrical, fuel gas piping, mechanical or plumbing work or occupancy of
a building or structure in violation of the provisions of this code, or in violation of a detail statement or the authorized construction documents thereunder, or in violation of a permit or certificate issued under the provisions of this code. Such notice shall direct the discontinuance of the illegal action or condition and the abatement of the violation. If the notice of violation is not complied with by the established deadline, the owner and/or the person responsible shall be subject to issuance of a citation by the building official to appear in the Recorder's Court of Gwinnett County to
respond to violations of any of the provisions of this code.
111.3. Stop Work Order.
The building official is authorized to issue a stop work order on the responsible person to immediately cease work on any structural, electrical, fuel gas piping, mechanical or plumbing system that is being done contrary to the provisions of this code or in a dangerous or unsafe manner. The stop work order shall be in writing and shall be given to the owner of the property
or to the owner's agent, or to the person doing the work. The stop work order shall state the conditions under which work is authorized to resume. Where an emergency exists, the building official shall not be required to give a written notice prior to stopping work.
Any person who shall continue any work in or about the structure after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to issuance of a citation by the building official to appear in the Recorder's Court of Gwinnett County to respond to violations of any of the provisions of this code.
111.4. Violation penalties.
Any person who shall violate a provision of this code or who shall fail to comply with any of the requirements thereof or who shall erect, install, alter or repair structural, electrical, fuel gas piping, mechanical or
plumbing work in violation of the authorized construction documents or directive of the building official, or of a permit or certificate issued under the provisions of
this code, shall be guilty of violating a duly adopted ordinance, and subject to punishment upon conviction of any such violation in accordance with section 1.11 of the Gwinnett County Code. Each day that a violation continues after due notice has been served shall be deemed a separate offense.
111.5. Abatement of violation.
When any building structure, or electrical, fuel gas piping, mechanical or plumbing system or installation is maintained in violation of this code, and in violation of a notice issued pursuant to the provisions of this section, the building official shall institute appropriate action to prevent, restrain, correct or abate the violation. The imposition of the penalties herein prescribed shall not preclude the legal officer of Gwinnett County
from instituting appropriate action to prevent unlawful construction, restrain, correct or abate a violation, prevent illegal occupancy of a building, structure or premises, or stop an illegal act, conduct, business or utilization of the installations on or about any premises.
SECTION 112. MEANS OF APPEALS
112.1. Application for appeal.
The owner of a building, structure or service system, or authorized agent, shall have the right to appeal a denial, revocation of a permit, or administrative decision of the building official to the Board of Construction Adjustments and Appeals in accordance with Gwinnett County Code of Ordinances Sections 14-19—14- 34.
SECTION 113. CERTIFICATE OF OCCUPANCY
AND CERTIFICATE OF COMPLETION
113.1. Certificate of Occupancy.
No building or structure shall be used or occupied, and no change in the existing occupancy classification of a building or structure or portion thereof shall be made until the building official has issued a certificate of occupancy therefore as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of this code or of other ordinances of Gwinnett County.
113.2. Certificate of Completion.
A certificate of completion is issued by the building official to document that the construction work applicable to each building, structure, system, or space with no change in use or occupancy is complete and is not
subject to any known violations of the provisions of this code, state or local law. Authorization to occupy a building or habitable structure or connect a building or habitable structure to a permanent utility system is granted only upon issuance of a certificate of occupancy. Issuance of a certificate of completion shall not be construed as an approval of a violation of the
provisions of this code or of other ordinances of Gwinnett County.
113.3. Certificate issued.
After the building official inspects the building or structure and finds no violation of the provisions of this code or other ordinances and laws that are enforced by the Department of Planning and Development, the building official shall issue a certificate of occupancy or certificate of completion as applicable
that contains the following:
1. The building permit number.
2. The address of the structure.
3. Parcel identification number.
4. Lot/block location (residential only).
5. A description of that portion of the structure for which the certificate is issued.
6. The name of the inspector responsible for certificate issuance.
7. The use and occupancy, in accordance with state law.
8. The maximum occupant load (certificate of occupancy only).
9. Any special stipulations and conditions of the building permit.
10. Zoning classification.
113.4. Temporary occupancy.
The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that
such portion or portions shall be occupied safely. The building official shall set a time during which the temporary certificate of occupancy is valid.
113.5. Revocation.
The building official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of this code wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation of any of
the provisions of this code.
SECTION 114. SERVICE UTILITIES
114.1. Connection of service utilities.
No person shall make connections from a utility, source of energy, fuel or power to any building or system that is regulated by this code for which a permit is required, until released by the building official.
114.2. Temporary connection.
The building official shall have the authority to authorize the temporary connection of the building or system to the utility source of energy, fuel or power.
114.3. Authority to order disconnection of utility service.
The building official shall have the authority to order disconnection of utility service to the building, structure or system regulated by this code in case of emergency, where necessary, to eliminate an immediate danger to life or property. Written notice of such order to disconnect service and the causes thereof shall be given within 24 hours to the owner and occupant of such building, structure or premises, provided, however, that in cases of immediate danger to life or property, such disconnection shall be made immediately without such notice. Where energy sources are provided by a public utility, the building official shall immediately notify the serving utility in writing of the
issuance of such order to disconnect. Where possible, the owner and occupant of the building, structure or service system shall be notified of the decision to disconnect utility service prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or system shall be notified in writing, as soon as practical thereafter.
114.4. Connection after order to disconnect utility service.
No person shall make connections from any energy, fuel, power supply or water distribution system or supply energy, fuel or water to any electrical, gas, mechanical or plumbing system regulated by this code that has been disconnected or ordered to be disconnected by the building official, or the use of which has been ordered to be disconnected by the building official
until the building official authorizes the reconnection and use of such electrical, fuel gas piping, mechanical or plumbing system.
SECTION 115. ENVIRONMENTAL
SUSTAINABILITY CONSTRUCTION
115.1. Electric vehicle charging systems.
Commercial buildings, multifamily residential buildings and single-family residential units shall have electrical panels installed with space reserved for the installation of a 2-pole single-phase circuit that can be used for an electric vehicle charging system
(Ord. No. CCA2018-00001 GCID2018-1386, Exh. A, 10-16-2018) Ordinance/ Resolution Number Date Section Section in Code 4(IV) 2-525 5(I) 2-544 5(II) 2-545 6(I) 2-569 6(II) 2-570
6(III) 2-571
6(IV) 2-572 6(V) 2-573 6(VI) 2-574
6(VII) 2-575
6(VIII) 2-576
6(IX) 2-577 6(X) 2-578 7(I) 2-605 7(II) 2-606
7(III) 2-607
7(IV) 2-608 8(I) 2-635 8(II) 2-636 9 2-429 Ord. No. SDC-2010 12-14-2010 106-225—106-232 106-234—106-239 Ord. No. TAV-2010-001 12-14-2010 102-35—102-37
WUO-2010 12-14-2010 106-19—106-25
Ord. No. OTO2011- 00001 2-22-2011 1 18-26 2 18-47 5 18-218 6 18-271 7 18-318 8 18-324 9 18-451 10 18-148 11 18-489 Ord. of 6-28-2011 6-28-2011 1 78-28 2 98-24 Ord. No. MHT-2011- 001 8-16-2011 exh. A 94-160 — 94-165 Ord. No. OTO2011-
00002/WPF-2011
9-27-2011 I 18-89 II 18-90
III 18-91
IV 18-92 — 18-117 Ord. No. TOO2011-2 9-27-2011 attach. 1 78-28
- 98-24 Res. No. WUO 2011- 001 10-4-2011 106-25 Ord. No. SO-2011-1 10-25-2011 attach. 1 78-28 Ord. No. TC-2011-01 10-25-2011 attach. 1 98-24 Ord. No. ABO-2011-01 11-15-2011 attach. A 6-125 Ord. No. EO2011 11-15-2011 att. A 54-23—54-43
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.