9.4.7. Installation of Utilities

Sobre este texto

  • As published by Municode, current through 2026-05-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Underground utilities, including sewer services, all water lines and any cable

conduits under the pavement, shall be placed in the ground before the base material is in place.

B. All trenches shall be thoroughly compacted in six-inch layers with mechanical

compacting equipment.

C. All fire hydrants, utility poles, streetlights, transformer boxes and pedestals shall be set at a distance not less than six feet from the back of the curb.

D. The subgrade shall be scarified to a minimum depth of six inches and compacted to at least 98 percent maximum dry density immediately prior to the

placing of the base material.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:hall-county/zoning/9.4.7@2026-05-28-7d1e22b4d7

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Hall County Zoning Ordinance, 9.4.7. Installation of Utilities | Georgia Commons