Harlem · Ordenanza de zonificación
Part III - LAND DEVELOPMENT CODE / Chapter 102 - BUILDING REGULATIONS / Article VI - EXTERIOR LIGHTING IN THE MILITARY LIGHTING OVERLAY DISTRICT
Sec. 102-109. Plan submittal requirements.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Site plan applications. The following information shall be submitted with all site plan applications for new commercial, industrial, and multifamily residential development:
(1) The location of all freestanding, building-mounted and canopy outdoor lighting fixtures and all adjacent street lights, where applicable;
(2) Building elevations for all structures on the site plan;
(3) A written description of each illuminating device, fixture, lamp, support and shield.
The description may include, but is not limited to, manufacturer's catalog cuts and drawings including elevations where required, lamp types and wattage output;
(4) A photometric grid overlay indicating the overall light intensity in foot candles at the property lines of the site; and
(5) Any additional information that may be necessary to adequately review the site plan application for compliance with the provisions of this article.
(b) Building permit applications. The following information shall be submitted with all building permit applications for new commercial, industrial, and multifamily residential development:
(1) Verification that all outdoor light fixtures with a bulb producing more than 680 lumens have a full cutoff style fixture directed downward;
(2) Verification that no outdoor lighting fixture, with the exception of motion activated lighting, will create an intensity of light greater than one-half foot candle at a property line that abuts residentially zoned property; and
(3) Any additional information that may be necessary to adequately review the building permit application for compliance with the provisions of this article.
Historia
(Ord. No. 2310, 8-28-2023)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.