Hawkinsville · Ordenanza de zonificación
Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article V - LAND DEVELOPMENT ACTIVITIES / Division 3 - FLOOD DAMAGE PREVENTION
Sec. 5.3.7. Provisions for flood hazard reduction.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a. General standards. In all areas of special flood hazard the following provisions are required:
(1) New construction and substantial improvements shall be anchored to prevent flotation, collapse or lateral movement of the structure;
(2) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement. Methods of anchoring may include, but are not limited to, use of over-thetop or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces;
(3) New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage;
(4) New construction or substantial improvements shall be constructed by methods and practices that minimize flood damage;
(5) Electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities shall be designed and located so as to prevent water from entering or accumulating within the components during conditions of flooding.
(6) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system;
(7) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters;
(8) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding;
(9) Any alteration, repair, reconstruction or improvement to a building which is in compliance with the provisions of this division shall meet the requirements of new construction as contained in this division;
(10) Any alteration, repair, reconstruction or improvement to a building which is not in compliance with the provisions of this division shall be undertaken only if such non-conformity is not furthered, extended, or replaced.
b. Specific standards. In all areas of special flood hazard where base flood elevation data have been provided, the following provisions are required.
(1) Residential construction. New construction or substantial improvement of any residential building (or manufactured home) shall have the lowest floor, including basement, elevated no lower than ten (10) feet above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movement of floodwaters shall be provided in accordance with standards of paragraph (3), below.
(2) Nonresidential construction. New construction or substantial improvement of any commercial, industrial, or nonresidential building or manufactured home shall have the lowest floor, including basement, elevated no lower than ten (10) feet above the level of the base flood elevation. Buildings located in all A zones may be floodproofed in lieu of being elevated provided that all areas of the building belt v the required elevation are watertight with walls substantially impermeable to the passage of water, and use structural components having the capability of resisting hydro-static and hydrodynamics loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the standards of this section are satisfied. Such certification shall be provided to the official as set forth in subsection 5.3.6.b(9).
(3) Elevated buildings. New construction or substantial improvements of elevated buildings that include fully enclosed areas formed by foundation and other exterior walls below the base flood elevation shall be designed to preclude finished living space and designed to allow for the entry and exit of floodwaters to automatically equalize hydrostatic flood forces on exterior walls.
(a) Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:
1. Provide a minimum of two (2) openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;
2. The bottom of all openings shall be no higher than one foot above grade; and
3. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwaters in both directions.
(b) Access to the enclosed area shall be the minimum necessary to allow for parking vehicles (garage door) or limited storage of maintenance equipment used in connection with the premises (standard exterior door) or entry to the living area (stairway or elevator); and
(c) The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.
c. Standards for streams without established base flood elevation and/or floodways.
Located within the areas of special flood hazard where streams exist but where no base flood data has been provided or where base flood data has been provided without floodways, the following provisions apply:
(1) No encroachments, including fill material or structures, shall be located within areas of special flood hazard, unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development will not increase the water surface elevation of the base flood more than one foot at any point within the community. The engineering certification shall be supported by technical data that conforms to standard hydraulic engineering principles.
(2) New construction or substantial improvements of buildings shall be elevated or floodproofed to elevations established in this division.
d. Standards for subdivision proposals.
(1) All subdivision proposals shall be consistent with the need to minimize flood damage.
(2) All subdivision proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage.
(3) All subdivision proposals shall have adequate drainage provided to reduce exposure to flood hazards.
(4) Base flood elevation data shall be provided for subdivision proposals and other proposed development (including manufactured home parks and subdivisions) which is greater than the lesser of fifty (50) lots or five (5) acres.
Historia
(Ord. of 5-10-96)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.