Ir al contenido
Georgia Commons
Menú

Hawkinsville · Ordenanza de zonificación

Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article V - LAND DEVELOPMENT ACTIVITIES / Division 4 - INSTALLATION OF STORM DRAINAGE FACILITIES

Division 4. INSTALLATION OF STORM DRAINAGE FACILITIES

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

[Sec. 5.4.1. Generally.]

Construction of the stormwater system shall be initiated as part of the grading of the site.

Stormwater detention facilities shall be constructed prior to the installation of any other site improvements, and may be utilized under proper design as sedimentation basins during development. Installation of all other storm drainage pipes, culverts, headwalls, and ditches, shall be coordinated with the construction of streets and other site improvements, as appropriate.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 5-10-96)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:hawkinsville/zoning/appendix-a-article-v-division-4-division-4@2026-11-11-341e793d16

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Hawkinsville Zoning Ordinance, Division 4 (Appendix A, Article V). INSTALLATION OF STORM DRAINAGE FACILITIES | Georgia Commons