Ir al contenido
Georgia Commons
Menú

Kennesaw · Ordenanza de zonificación

Appendix A - UNIFIED DEVELOPMENT CODE

6.02.36. Sub-Grade Preparation

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. Sub-grade preparation on all non-local streets shall be in accordance with GDOT specifications and these regulations. Sub-grade preparation for local streets shall meet and pass proof roll testing.

B. If any section of the sub-grade is composed of topsoil, organic, or other unsuitable or unstable material, such material shall be removed and replaced with suitable material and then thoroughly compacted as specified for fill, or stabilized with stone or a geo-textile or geo-grid.

C. Fill shall be placed in uniform, horizontal layers not more than eight inches thick (loose measurement). Moisture content shall be adjusted as necessary to compact material to 95 percent of maximum dry density except for the top twelve inches, which shall be compacted to 100 percent of maximum dry density.

D. After the earthwork has been completed, all storm drainage, water, and sanitary sewer utilities have been installed within the right-of-way as appropriate, and the back-fill in all such ditches thoroughly compacted, the sub-grade shall be brought to the lines, grades, and typical roadway section shown on the plans.

E. Utility trenches cut in the sub-grade shall be back-filled as specified herein.

Compaction tests at the rate of one per 150 feet of trench shall be provided to verify compaction.

F. The sub-grade must pass proof roll testing regardless of compaction test prior to placement of the base material. With the approval of the Kennesaw Public Works and Community Development Department, a geo-textile or grid may be used to stabilize a sub-grade that does not pass proof-rolling.

G. Provisions shall be made to drain low points in the road construction when the final paving is delayed. A break in the berm section is required when the curbing has not been constructed. After installation, drainage under the curb is required.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. No. 2018-21, § l(Exh. B), 10-15-18)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:kennesaw/zoning/6.02.36@2026-11-11-9fd4cd78ea

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Kennesaw Zoning Ordinance, 6.02.36. Sub-Grade Preparation | Georgia Commons