Lavonia · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 102 - ZONING / Article XI - MEDICAL CAMPUS DISTRICT

Sec. 102-308. Plan review and approval procedures.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The following procedures must be completed before a building permit will be issued by the city building inspector for any construction project within the MCD.

(1) Pre-application conference. Prior to filing for a building permit with the inspections department, the applicant (developer) must confer with the city building inspector and the zoning administrator regarding the general character of the proposed construction project. The MCD Project Planning Guide outlining suggested building designs, roof lines, construction materials, site design elements, and ordinances affecting the scope of the proposed project will be given to the applicant (developer) at this time. This planning guide will assist in the development of the preliminary project design package.

(2) Preliminary project design package. The preliminary project design package must contain the following items:

a. Plats and topo of the construction area.

b. Site layout drawings including building location, curb cuts, ingress/egress, parking lot dimensions, green space, and stormwater containment.

c. Architectural overview.

(3) Architectural overview. The architectural overview should include conceptual drawings of the proposed building(s), accessory buildings, landscaping buffers, refuse receptacles, signage, and external lighting of the proposed project and shall be included with the submission of the preliminary project design package.

(4) Application conference. The applicant (developer) shall present the completed preliminary project design package for review at the application conference. After review (generally seven to ten days) the city building inspector shall confer with the applicant (developer) as to the cities finding regarding the proposed project.

Additional information may be requested by the city before the project is approved for a final building permit application package.

(5) Building permit application package. If the proposed project is found to be within the permitted uses of this article and in compliance with subsections (1), (2), and (3) of this section, then a written approval for a building permit application package will be issued to the applicant (developer) by the city building inspector. The requirements for a building permit application in the MCD is the same as outlined in sections 102-284 and 102-285, planned development mixed-use for a P-M application. The building inspector and zoning administrator shall outline the required information in that code section that must be included in the application package.

(6) Building permit. A building permit and notice to proceed will be issued to the applicant upon final approval of the building permit application package by the zoning administrator and city building inspector.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 3-7-2011)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:lavonia/zoning/102-308@2026-11-11-90ad2343bb

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Lavonia Zoning Ordinance, Sec. 102-308. Plan review and approval procedures | Georgia Commons