Sec. 38-303. Stormwater management area design.
Sobre este texto
- As published by Municode, current through 2026-06-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Overall detention/retention area design shall typically conform to the following:
(1) Emergency spillways designed to pass the 100-year storm post-developed peak flow.
Emergency spillways are to be placed in undisturbed soils wherever possible.
(2) Any retention basin shall have the ability to percolate a volume of one inch of runoff/acre of watershed within seven days.
a. All retention basins shall be designed to store the post developed runoff volume for the two-, five-, ten-, 25-, 50-, and 100-year storm events.
b. When the pre developed and post developed runoff volumes are collected and concentrated into a closed or channeled storm conveyance system and where that volume is directed to a retention facility then the capacity for that entire pre and post developed runoff storage volume shall be created within the retention facility.
(c) All proposed retention ponds, whether manmade or natural stormwater storage ponds, shall have the pre developed seasonal high water table elevation established based upon a detailed site soil investigation survey.
(1) A detailed site investigation survey shall be performed prior to plan design to determine what soils are present in the immediate confines of the proposed retention pond. The survey shall consist of either: two excavation pits located at opposite ends of the retention site or four three-inch diameter auger bores located at each corner of the retention site. The test pit and the bores shall extend vertically at least two feet below the bottom elevation of the proposed retention pond and shall be within the confines of the lowest proposed bottom contour.
(d) At the conclusion of the soil investigation: if the soils at the bottom of all of the test pits or bores have the ability to percolate a volume of stormwater equal to or greater than one inch of runoff per acre of watershed within a seven-day period then the retention pond shall be allowed with the required storage capacity constructed in a typical vertical configuration starting with excavation at the existing natural grade and going vertically downward to the proposed elevation for the retention pond bottom. If however any of the test pits or bores in the soils survey determines that the soils will not percolate at a volume equal to or greater than one inch of runoff per acre of watershed within a seven-day period then the storage required for retention shall be created by excavating horizontally over an area of sufficient size to store the required volume above the minimum or most restrictive elevation related to the depth of the seasonal high water table for the soil series contained in the top five feet of natural ground.
(1) To determine the soil series within the top five feet of the natural grade at least four samples (to be spaced at least 75 feet but not more than 100 feet apart) per acre shall be taken. The results of the soil samples shall be determined and the most restrictive soils series shall be used for determining the minimum depth to the seasonal high water table.
(e) The Soils Series Interpretation table located in Appendix B of the Georgia Stormwater Management Manual shall be used for determining the elevation of the seasonal high water table.
(1) The volume and area for calculating the required retention capacity shall be based upon the depth to the seasonal high water table that shall be the most restrictive (minimum depth) listed in the table measured vertically from the natural ground to the top of the seasonal high water table. Upon the finding of the minimum depth to the seasonal high water table for the most restrictive soil series (after determining the soil series sample results) the storage capacity for retention purposes shall be created above the seasonal high water table.
(f) The design engineer shall certify that a soils scientist or professional engineer specializing in soil surveys classified the soils. If the pond is proposed to be built in a typical vertical configuration then the design engineer shall provide certification that based upon the determinations made by the soils scientist or professional engineer specializing in soil surveys that the soils have the ability to percolate a volume equal to or greater than one inch of runoff per acre of watershed within a seven-day period.
(g) The results of the soils series testing, the percolation test, the locations of the soil sample, and the engineers certification letter shall be submitted to the Development Services Department at the same time the site plan and application for a Land Disturbance Permit is submitted.
(h) Side slopes (into basin) steeper than 6:1 shall require a limited access control device such as a fence around the perimeter.
(i) Side slopes (into basin) shall not be steeper than 4:1 in any case.
(j) Dike requirements.
(1) Dike side slopes (outside pond) not steeper than 3:1.
(2) Dike top width:
Water ponding depth (ft) Dike top width (ft) 0 to 2 3 2 to 4 5 4 to 12 12 12 to 24 20
(3) Dike is to be made from soil which has a permeability of .2 inches per hour or less or has a clay core with permeability of .06 inches per hour.
(4) Dike shall be subject to compaction tests. One per 2,000 square feet six-inch loose lift placement, 95 percent standard proctor.
(k) A ten-foot-wide service drive shall be required around management area if possible.
Drive shall not be part of side slopes.
(l) Minimum one-foot freeboard above flow depth in spillway to top of dike is required.
(m) Anti-seep collar for all pipes through dike shall be required when dike is higher than four feet.
(n) Riser and stand pipes shall have a trash rack per the design in the current edition of the Georgia Storm Water Manual, Volume 2.
(o) Discharge pipes shall meet the same requirements as for storm pipes.
Historia
(Res. No. LD05-A049, 9-23-2005; Ord. of 4-11-2006)