Ir al contenido
Georgia Commons
Menú

Macon-Bibb County · Carta municipal

Part I - RELATED LAWS [OF BIBB COUNTY] / Chapter 2 - ADMINISTRATION / Article V - BOARDS, COMMISSIONS AND AUTHORITIES / Division 8 - MACON WATER AUTHORITY

Sec. 2-501. Definitions.

Sobre este texto

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

As used in this act, the term:

(1) Authority shall mean the Macon Water Authority created by section 2-502.

(2) Cost of the project shall embrace the cost of construction, the cost of all lands, properties, rights, easements, and franchises acquired, the cost of all machinery and equipment, financing charges, interest prior to and during construction, and for one year after completion of construction, the cost of engineering, architectural, fiscal, and legal expenses, and of plans and specifications, and other expenses necessary or incident to determining the feasibility or practicability of the project, administrative expenses, and such other expenses as may be necessary or incident to the financing authorized in this division, the construction of any project, the placing of the same in operation, and the condemnation of property necessary for such construction and operation. Any obligation or expense incurred for any of the foregoing purposes shall be regarded as a part of the cost of the project and may be paid or reimbursed as such out of the proceeds of revenue bonds issued under the provisions of this division for such project.

(3) Project shall mean and include the acquisition and construction of systems, plants, works, instrumentalities, and properties:

a. Used or useful in connection with the obtaining of a water supply and the conservation, treatment, distribution, and sale of water for public and private uses; or

b. Used or useful in connection with the collection, treatment, and disposal of sewage and like waste water;

together with all parts of any such system, plant, work, instrumentality, and property and all appurtenances thereto, including lands, easements, rights in land, water rights, contract rights, franchises, approaches, dams, reservoirs, generating stations, sewage disposal plants, intercepting sewers, trunk, connecting, and other sewers and water mains, filtration works, pumping stations, and equipment.

�Project� shall also include all things used or useful in connection with the performance of any of the contracts with respect to industrial development as authorized in [subsection 2-504(19.1)].

(4) Revenue bonds and bonds shall mean revenue bonds authorized to be issued pursuant to this division.

(5) Self-liquidating shall mean that the revenues and earnings to be derived by the authority therefrom and all properties used, leased, and sold in connection therewith will be sufficient to pay the cost of operating, maintaining, repairing, improving, and extending the project and to pay the principal and interest of the revenue bonds which may be issued for the cost of such project or projects.

Historia

La línea de historia que la fuente imprime al final de la sección.

(1992 Ga. Laws (Act No. 665), page 4991, § 1(4); 1999 Ga. Laws (Act No. 296), page 4991, § 2)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:macon-bibb/charter/2-501@2026-11-14-699832c630

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Macon-Bibb County Charter, Sec. 2-501. Definitions | Georgia Commons