Ir al contenido
Georgia Commons
Menú

Millen · Ordenanza de zonificación

Appendix A

10-2. Building Permit Required.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A building permit, or a sign permit in case of a sign, issued by the zoning administrator, is required in advance of the initiation of construction, erection, moving, or alteration of any building or structure, including manufactured housing, or sign. No building permit or sign permit shall be issued except in conformity with the provisions of this ordinance; however, a building permit issued before the adoption of this ordinance shall remain valid with the same qualifications as issued under this ordinance.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:millen/zoning/10-2@2026-11-11-03fc28aedd

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Millen Zoning Ordinance, 10-2. Building Permit Required | Georgia Commons