Ir al contenido
Georgia Commons
Menú

Mount Zion · Ordenanza de zonificación

Part II - CODE OF ORDINANCES / Chapter 34 - ZONING / Article V - BUFFER REQUIREMENTS

Sec. 34-197. Determination of buffer requirements between residential, commercial and industrial zones.

Sobre este texto

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

When two adjoining properties are dissimilar residential, commercial or industrial zone districts as indicated in Table 34-196.1, the property within the zone district allowing the most intensive uses is required to provide the buffer when acquiring a building permit unless the buffer was pre-existing. When two adjoining vacant parcels are in dissimilar zone districts as indicated in Table 34-196.1, no buffer is required when the parcel zoned for the less intensive use acquires a building permit.

(1) Buffer requirement. The required buffer shall consist of plantings or a fence, wall (not otherwise part of a structure or accessory structure), or berm, which meets the screening standards of section 34-198. If plantings are chosen as the method of screening, the planting area shall have a minimum base width of 12 feet.

(2) Buffer requirement. The required buffer shall consist of a 50-foot setback from the adjoining property line containing not less than a 20-foot base width consisting of plantings, plus a fence, wall (not otherwise part of a structure or accessory structure), berm, or any combination thereof, which meets the screening standards of section 34-198.

(3) Buffer requirement. The required buffer shall consist of a 100-foot setback from the adjoining property line containing not less than a 20-foot base width consisting of plantings, plus a fence, wall (not otherwise part of a structure or accessory structure), berm, or any combination thereof, which meets the screening standards of section 34-198.

(4) Buffer requirement. The required buffer shall consist of either an unvegetated 500-foot setback or 200-foot vegetated setback from the adjoining property line. A 200-foot minimum setback shall consist of 75 feet of vegetated buffer area, measured along the entire portion of the property line abutting said use, and such buffer shall extend an additional 100 feet in each direction along the common property line. The 75-foot vegetated buffer shall meet the screening requirements contained in section 34-198.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Res. of 10-12-2004(3), § 8.1)

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:mount-zion/zoning/34-197@2026-11-11-80acaec994

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.