Oglethorpe County · Ordenanza de zonificación
Article XI - Project Design and Construction Standards / 1112 - Deceleration lanes and turn lanes.
Section 1112.03. Commercial/Industrial subdivision entrances.
Sobre este texto
- As posted on the county's website, retrieved 2026-11-23
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a) A deceleration lane shall be installed at all entrance roads into a commercial or industrial subdivision connecting to a minor collector, major collector or arterial street with an ADT equal to or greater than 500 vehicles per day. See Section 1113.05, below.
b) The County Engineer may require a traffic study to determine if the project’s size warrants a center turn lane, longer deceleration lane, an acceleration lane or other improvements. If the traffic study determines that the traffic generated by the project warrants it, the County Engineer will require the additional improvements or other mitigating measures.
Leer este código donde se publica (county website (oglethorpecountyga.gov)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.