Oglethorpe County · Ordenanza de zonificación
Article XI - Project Design and Construction Standards / 1116 - Location of utilities and street cuts.
Section 1116.02. Pavement cuts.
Sobre este texto
- As posted on the county's website, retrieved 2026-11-23
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
a) If utility services are installed after the streets have been paved (i.e., under existing streets), such utility services shall be installed by boring under the street. Note that this applies only to services and not the distribution system in the development.
b) When it is necessary for a subdivider or any utility company to break existing base or pavement for the installation of services, or any other purpose, the subdivider or utility company shall be financially responsible for the repair of the pavement. The pavement shall be repaired with a patch in accordance with standards developed by the County Engineer, and in accordance with all other specifications required herein for construction ofstreets.
c) No existing County road can be open cut unless unusual circumstances warrant it. All utility construction plans within County right‐of‐way shall be reviewed and approved by the County Engineer.
d) If a pavement cut is approved, all trenches shall be backfilled and compacted the same day the trench is opened. Trenches under the paving shall be returned to 95 percent compaction. The backfill in all such ditches will be thoroughly compacted in 6‐inch lifts, the subgrade shall be brought to the lines, grades, and typical roadway section required by County specifications. See also Section 1120 regarding excavating and trenching requirements.
Leer este código donde se publica (county website (oglethorpecountyga.gov)) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.