Ir al contenido
Georgia Commons
Menú

Rome · Ordenanza de zonificación

Appendix B - UNIFIED LAND DEVELOPMENT CODE / Article 6 - SUBDIVISION AND PROJECT STANDARDS

6.15.4. Hydrologic and hydraulic analysis.

Sobre este texto

  • As published by Municode, current through 2026-01-26
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

a. Analyses and design shall be performed in accordance with the publication entitled #Manual for Erosion and Sediment Control in Georgia# published by the Soil and Water Conservation Commission, and the most recent edition of the #Georgia Stormwater Management Manual.#

b. In order to obtain a Development Permit, a hydrology report shall be prepared that includes appropriate calculations for the 2-year, 10-year, 25-year, and 100-year design frequency storms. The report shall show detailed calculations indicating the formula used, along with co-efficient of run-off, the time of concentration, the rainfall intensity, the discharge velocity, and the source of all data used.

c. The hydrology report shall include a map outlining the areas and showing the acreage of all on-site and off-site drainage basins contributing flow through the

project for both the pre- and post- development conditions.

d. Runoff peak rate of discharge for drainage areas up to 50 acres in size may be calculated using the Rational Method.

Flows from drainage areas larger than 50 acres in size shall be calculated using the SCS Method.

e. Rainfall intensities used in hydrologic analyses shall not be less than those shown by applicable rainfall curves published within the most recent edition of the #Georgia Stormwater Management Manual.#

f. Runoff coefficients used for pre- and postdevelopment activity conditions for the Rational Method shall be consistent with

local conditions. For the SCS method, the runoff curve numbers found in the most recent edition of the #Georgia Stormwater Management Manual.#

g. Hydraulic capacity for open channel flow, pipes, and ditches shall be determined using the Manning Equation.

h. The controlled release of stormwater runoff shall be required for all developments or construction in order to prevent any increase in excess of 10 percent of 1

cubic foot per second of the predevelopment rate of runoff for a ten-year frequency storm. Where controlled release

is required, such releases shall prevent any increase in the predevelopment rate of runoff of less frequent storms up to and including the 100-year storm event.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:rome/zoning/6.15.4@2026-01-26-17e4ce3738

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Rome Zoning Ordinance, 6.15.4. Hydrologic and hydraulic analysis | Georgia Commons