Ir al contenido
Georgia Commons
Menú

Stockbridge · Ordenanza de zonificación

Title 12 - UNIFIED DEVELOPMENT CODE / Chapter 15 - ENVIRONMENTAL PROTECTION / 15.9 - Floodplain management/flood damage prevention.

15.9.22. Building standards for areas of shallow flooding (AO zones).

Sobre este texto

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Areas of special flood hazard may include designated "AO" shallow flooding areas. These areas have base flood depths of one (1) to three (3) feet above ground, with no clearly defined channel. In these areas, the following provisions apply:

A. All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated to no lower than one (1) foot above the flood depth number in feet specified on the flood insurance rate map ("FIRM"), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three (3) feet above the highest adjacent grade. Flood openings sufficient to facilitate automatic equalization of hydrostatic flood forces shall be provided for floodprone enclosures in accordance with subsection 15.9.18.E;

B. New construction and substantial improvement of a nonresidential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to the specified FIRM flood level plus one (1) foot above the highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice, and shall provide such certification to the official designated by the Henry County Board of Commissioners and/or his designee using the FEMA floodproofing certificate along with the design and operation/maintenance plan; and

C. Drainage paths shall be provided to guide floodwater around and away from any proposed structure.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:stockbridge/zoning/15.9.22@2026-11-14-2a1ca32612

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Stockbridge Zoning Ordinance, 15.9.22. Building standards for areas of shallow flooding (AO zones) | Georgia Commons