Ir al contenido
Georgia Commons
Menú

Stockbridge · Ordenanza de zonificación

Title 12 - UNIFIED DEVELOPMENT CODE / Chapter 16 - INFRASTRUCTURE IMPROVEMENTS

16.11. Streetlight and pedestrian light requirements.

Sobre este texto

  • As published by Municode, retrieved 2026-11-14
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

A. In order to ensure adequate illumination of public rights-of-way and promote safety and security, The American National Standard Practice for Roadway Lighting of the Illumination Engineering Society (RP-8-00), as approved by the American National Standards Institute (1993), as from time to time amended, is hereby adopted as the standard for the installation and operation of lighting in the city.

B. Approval of Lighting Plan.

1. A lighting plan, which may be prepared by the streetlight provider, shall be provided to the director or designee for the erection, construction, or installation of streetlight and/or pedestrian light fixtures or equipment upon which the illumination thereof falls upon public rights-of-way. This shall include security lights of all kinds and nature. The lighting plan shall illustrate the illumination provided by pedestrian lights. The overlap of pedestrian light illumination and streetlight illumination shall be minimized to such an extent that streetlights may not be required at all in areas where pedestrian lights provide the required illumination without streetlights.

2. Lighting plans shall be submitted with the final plat and any additions.

3. Plans shall demonstrate how the proposed lighting meets the standards of this section and include a drawing showing the exact location of streetlights.

4. No lighting shall be installed or operated without approval of the division director or designee.

C. Streetlight and pedestrian light fixtures or equipment shall be erected, constructed, or installed by the applicant in such a manner to ensure that the lateral light distribution which causes a glare does not inhibit the users of the rights-of-way from safely traversing and using the rights-of-way.

D. Streetlight and Pedestrian Light District Requirements for New Development.

1. Streetlights shall be provided in new subdivisions where new streets are required to be dedicated to the city or which allow lot access to existing city streets.

2. The developer of residential subdivisions shall install streetlights and pedestrian lights with underground wiring. It shall be the responsibility of the applicant to coordinate the installation of the streetlights and pedestrian lights with the appropriate utility and the city consistent with the standards contained in this UDC.

3. Each property owner shall be assessed a rate based on the total cost of annual lighting charge within the district divided by the number of properties within the district. Unit cost of lighting fixture charges shall be based on fees provided by electric utility companies of both overhead and underground installation.

4. The rates or charges for lighting service shall constitute assessments on the property so served. Those assessments shall be added to tax bills at the end of each year and shall constitute a lien upon the property. Said lien shall have the same priority as tax assessments and an execution may issue for the purpose of enforcing the lien, including foreclosure and/or judicial sale.

E. Streetlight and Pedestrian Light District Requirements in Existing Residential Development.

1. Individuals owning real property in an existing residential area desiring to install streetlights and/or pedestrian lights may apply with the city to establish a streetlight and pedestrian light district.

2. The application shall be supported by a petition signed by property owners representing more than fifty-one percent (51%) of the property owners in the district which is sought to be established.

3. Upon receipt of a complete streetlight application, the director will contact the utility provider to request a layout, price, and contract, if necessary, for the streetlights. For pedestrian lights, the proposed layout prepared by an engineer licensed in the State of Georgia and the fixture specifications, the unit price, and the contract, if necessary, shall be provided as part of a complete streetlight and pedestrian light district application.

F. Up to three (3) additional streetlights or pedestrian lights may be added to an existing street light district by the director. If four (4) or more additional streetlights or pedestrian lights are required, the request must follow the procedure in subsection 16.11.E.2. above.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:stockbridge/zoning/16.11@2026-11-14-96b23332d5

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Stockbridge Zoning Ordinance, 16.11. Streetlight and pedestrian light requirements | Georgia Commons