Sylvester · Ordenanza de zonificación
Appendix A - ZONING / Article XXII - SOLAR PANEL USAGE
Section 22.04. Decommissioning.
Sobre este texto
- As published by Municode, current through 2022-12-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) The owner of a solar electrical system is required to notify the City of Sylvester immediately upon cessation or the discontinuation of the operation. The solar electrical system shall be perceived to be discontinued or abandoned if no electricity is generated by such system for a period of 12 continuous months.
(b) The solar electrical system owner shall then have 12 months in which to dismantle and remove the system including all solar related equipment or apparatuses related thereto included but not limited to buildings, cabling, electrical components, roads, foundations and other facilities from the property. If the owner fails to dismantle and/or remove the solar electrical system within the established time frames, the municipality may complete the decommissioning at the owner's expense.
Historia
(Ord. No. 2015-07, § 2, 8-17-2015)
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.