Ir al contenido
Georgia Commons
Menú

Sylvester · Ordenanza de zonificación

Appendix B - SUBDIVISION REGULATIONS / Article IV - IMPROVEMENTS REQUIRED, AND DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS

Section 401.5. Streets.

Sobre este texto

  • As published by Municode, current through 2022-12-19
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The improvement of all streets, including existing streets, as well as driveways incorporated into the subdivision, shall conform to the following minimum standards:

1. Major collector streets [shall] have a minimum right-of-way width of not less than 60 feet.

2. Minor collector streets and local streets shall have a paved way width of not less than 20 feet and a minimum right-of-way width of 60 feet and shall be constructed to meet all DOT standards.

3. Paving—Subgrade, subbase, base, prime and pavement.

A. Subgrade construction will be in accordance with Georgia Department of Transportation specifications, Section 209.

B. Subbase and base construction will be in accordance with Georgia Department of Transportation specifications, Sections 300 and 301.

C. Base will be six inches in depth, sand/clay base, class "C" or better.

D. In place material, if certified acceptable by a soils laboratory, may be used for base.

E. Bituminous prime is required and may be applied only after the city or its designee has approved the subgrade and base.

F. Pavement shall be asphaltic concrete, 11 /2 inches of "E" mix placed at 150 pounds per square foot, that meets Georgia Department of Transportation design and specifications or triple surface treatment using liquid asphalt and #5, #7 and #89 stone. The city or its designee may require such inspection and analysis of materials as he deems necessary.

G. All testing shall be the responsibility of the developer, will be done by a certified testing laboratory and will be performed in accordance with Georgia Department of Transportation standard specifications.

H. The following tests will be made and reports submitted to the city or its designee:

(1) Base material analysis.

(2) Base compaction.

(3) Base course depth.

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:sylvester/zoning/401.5@2022-12-19-3e886c5380

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Sylvester Zoning Ordinance, Section 401.5. Streets | Georgia Commons