Sylvester · Ordenanza de zonificación
Appendix B - SUBDIVISION REGULATIONS / Article IV - IMPROVEMENTS REQUIRED, AND DESIGN AND CONSTRUCTION STANDARDS FOR ALL SUBDIVISIONS / 402 - Design standards.
Section 402.6. Utilities.
Sobre este texto
- As published by Municode, current through 2022-12-19
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
1. Any underground utilities shall be installed with the surface having the same compaction as that of the paved way and marked on the plat to indicate the location.
2. The facilities for underground utilities, such as sewer, water and gas, including sewer and water laterals to each lot line when laid in streets, shall be in place prior to final surfacing of streets. All facilities for utilities shall, where possible, be placed in easements provided for that purpose in the subdivision, if public utilities are available.
3. Streetlights are required along subdivision streets and shall be installed according to city department standards.
4. All public utility services are required to be underground in all proposed subdivisions, excluding minor subdivisions.
5. All underground utilities will be installed according to city department standards.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.