Valdosta · Ordenanza de zonificación
Appendix B - SUBDIVISION REGULATIONS / 4 - MINIMUM DESIGN STANDARDS—CONVENTIONAL SUBDIVISIONS
Sec. 4-3. Easements.
Sobre este texto
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
4-3.1. Utility: Unless underground utilities are provided, utility easements for overhead services shall be located at the rear or side of and adjacent to the lot lines and shall be a minimum width of 20 feet. Where possible, water lines shall be located outside the curbline on the west and south sides of streets; sewer and gas lines shall be on the east and north sides.
Wherever public utility easements are planned adjacent to the subdivision tract boundary or phase they shall be platted within said subdivision or phase thereof.
Water and sewer lines outside of street rights-of-way shall follow side and rear property lines where possible and a minimum easement width of 20 feet shall be provided unless it is determined by the city engineer that a greater width is necessary for maintenance or construction.
4-3.2. Drainage: Drainage easements shall be provided as required by the city engineer after review of the construction plans. Drainage easements outside of street rights-of-way shall follow side and rear property lines where possible and shall have a minimum easement width of 20 feet unless it is determined by the city engineer that a greater width is necessary for maintenance and construction.
Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.