Ir al contenido
Georgia Commons
Menú

Woodbury · Ordenanza de zonificación

Appendix B - SUBDIVISION AND LAND DEVELOPMENT / Chapter 3 - UTILITIES AND DRAINAGE / Article 3-2 - DRAINAGE AND STORMWATER REQUIREMENTS

Sec. 3-203. System maintenance.

Sobre este texto

  • As published by Municode, current through 2022-10-28
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) It shall be the responsibility of the developer to maintain all drainage and stormwater management facilities required by approved preliminary plats or development plans during construction and for a two-year maintenance period following approval of a final subdivision plat or issuance of a certificate of development project completion, as applicable. The developer shall be responsible for removing temporary structures or facilities at the completion of the construction.

(b) The owner of the property shall be responsible for maintaining the drainage and permanent stormwater management facilities identified by the stormwater management plan to remain after construction is complete, following the two-year maintenance period, until or unless maintenance responsibilities are assigned to a homeowner's or property owner's association.

(c) Should an owner or developer, or other responsible party such as a homeowner's association, fail to maintain drainage or stormwater management facilities in a state of service intended by the stormwater management plan, then the zoning administrator shall notify the responsible party in writing of the deficiencies and specific minimum maintenance requirements to remedy such deficiencies.

(d) If the responsible party fails to perform the required maintenance work within a reasonable period of time (30 days maximum), then the owner shall be in violation of this ordinance.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 5-17-2021(1))

Leer este código donde se publica (Municode) La fuente es el código de la ciudad tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:woodbury/zoning/3-203@2022-10-28-8b2b9856e5

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Woodbury Zoning Ordinance, Sec. 3-203. System maintenance | Georgia Commons