Sec. 4-308. Completion of development.
Sobre este texto
- As published by Municode, current through 2022-10-28
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Upon completion of the project, the applicant or other responsible party may be required to submit a final hydrological study and shall submit all as-built plans of the project that may be required by the zoning administrator in electronic format. All plans must be in the Georgia Coordinate System West Zone NAD 83. If the project is within 1,000 feet of a geodetic monument the plans must use the monument as a control/tie point. In addition, the applicant shall submit electronic (DWG/DXF and PDF) file copies of information as specified by the zoning administrator which unless otherwise specified shall be limited to water lines, sanitary sewer lines, road centerlines and lot lines for parcels. Building permits may be withheld pending receipt of the electronic files.
(b) Upon application and for a fee, the zoning administrator may provide a certificate of project compliance.
(c) Once a development project is complete and the site has been stabilized in the opinion of the zoning administrator, the land disturbance bond (if required) shall be released by the zoning administrator.
Historia
(Ord. of 5-17-2021(1))