Ir al contenido
Georgia Commons
Menú

Barrow County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 22 - BUILDINGS AND BUILDING REGULATIONS / Article II - CONSTRUCTION CODES / Division 3 - PERMITS

Sec. 22-96. Permit conditions.

Sobre este texto

  • As published by Municode, retrieved 2026-11-23
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Permit intent. A permit issued under this article shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter or set aside any of the provisions of the technical codes, nor shall issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans or construction or violations of this article. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six months after its issuance or if the work authorized by such permit is suspended or abandoned for a period of six months after the time the worked is commenced.

One or more extensions of time, for periods of not more than 90 days each, may be allowed for the permit. The extension shall be requested in writing and justifiable cause demonstrated.

Extensions shall be in writing by the building official.

(b) Supervision of work by qualified professional. Whenever a permit is issued in reliance upon an affidavit or whenever the work to be covered by a permit involves installation under conditions which, in the opinion of the building official are hazardous or complex, the building official shall require that competent professionals shall supervise such work. In addition, they shall be responsible for conformity with the permit, provide copies of inspection reports as inspections are performed and upon completion make and file with the building official a written affidavit that the work has been done in conformity with the reviewed plans and with the structural provisions of the technical codes. If such architect or engineer is not available, the owner shall employ in his stead a competent person or agency whose qualifications are reviewed by the building official.

(c) Endorsement of plans; copy of plans to be kept at work site. When the building official issues a permit, he shall endorse, in writing or by stamp, the plans "Reviewed for Code Compliance". One set of drawings so reviewed shall be retained by the building official and another set shall be returned to the applicant. The permitted drawings shall be kept at the site of work and shall be open to inspection by the building official or his authorized representative.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 11-25-1997(2), att. A, § 3.6)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:barrow-county/code/22-96@2026-11-23-bed1eb1d5c

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Barrow County Code of Ordinances, Sec. 22-96. Permit conditions | Georgia Commons