Barrow County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 70 - ROADS / Article IV - SPEED CONTROL DEVICES PROGRAM
Sec. 70-81. Petition process.
Sobre este texto
- As published by Municode, retrieved 2026-11-23
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
To have speed control devices considered for installation on county-maintained neighborhood roads, a petition must be submitted to the transportation division of the public works department.
(a) Contact transportation division for petition paperwork.
(b) For subdivisions not built out or complete, a minimum of 60 percent of the total units must be occupied before a petition may be considered.
(c) All property owners in the subdivision should be contacted and given the opportunity to sign the petition, indicating their "yes" or "no" concerning the installation of speed control devices.
(d) Only the signature of the legal owner of the property will be proper for the purposes of the petition.
(e) All property owners must sign individually, including the owners of undeveloped lots.
(f) If a property is jointly owned by a married couple, both signatures are required (e.g.
a "Mr. & Mrs." signature is not acceptable).
(g) Multiple owners must all indicate a "yes" on the petition in order for a "yes" vote to count for that lot.
(h) Renting tenants are not an acceptable substitute for the legal property owner.
(i) Each lot counts as one vote, regardless of the number of owners signing.
(j) At least 80 percent of the property owners must be in favor of speed control devices for petitions to be considered.
(k) The completed petition must be submitted to the Transportation Division of the Public Works Department, where it will be checked against tax records and land lot maps to insure that it meets all requirements.
(l) For petitions that do meet the requirements, the Transportation Division will conduct a preliminary field inspection to consider the road geometry. If the street, grade, and other fixed factors do not meet the necessary requirements for consideration of speed control devices, the initial request will fail and no further action will be taken. If the street, grade, and other fixed factors qualify for the Speed Control Devices Program, a traffic engineering study will be conducted to determine whether the subject street meets the criteria for the installation of speed control devices.
(m) In the case of a petition that fails to meet the requirements set forth herein, property owners must wait one year from the date of the initial request before requesting another study of the same street(s).
Historia
(Ord. of 2-8-2022, § 1(Exh. A))
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.