Bryan County · Código de ordenanzas
Bryan County Code of Ordinances
Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.
Sobre este texto
- As published by Municode, current through 2026-01-13
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Parte 5 de 9. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.
Failure to comply with the provisions of this chapter or with any of its requirements, including conditions and safeguards established in connection with grants of variance or special exceptions, shall constitute a violation. Any person who violates this chapter or fails to comply with any of its requirements shall, upon conviction thereof, be fined not more than $500.00 or imprisoned for not more than 15 days, or both, and, in addition, shall pay all costs and expenses involved in the case. Each day such violation continues shall be considered a separate offense. Nothing herein contained shall prevent the county from taking such other lawful actions as are necessary to prevent or remedy any violation.
(Code 1996, § 6-502(H); Ord. of 1-6-2009) Sec. 105-3. Statutory authorization.
Article IX, section II of the Constitution of the state and O.C.G.A. § 36-1-20(a) have delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, the board of commissioners of the county does ordain as provided in this chapter
(Code 1996, § 6-501(A); Ord. of 1-6-2009) Sec. 105-4. Finding of fact.
(a) The flood hazard areas of unincorporated Bryan County are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare.
(b) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable to floods, which are inadequately elevated, floodproofed, or otherwise unprotected from flood damages, and by the cumulative effect of obstructions in floodplains causing increases in flood height and velocities.
(Code 1996, § 6-501(B); Ord. of 1-6-2009) Sec. 105-5. Statement of purpose.
It is the purpose of this chapter to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to:
(1) Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;
(2) Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which increase flood heights, velocities, or erosion;
(3) Control filling, grading, dredging and other development which may increase erosion or flood damage;
(4) Prevent or regulate the construction of flood barriers which will unnaturally divert floodwaters or which may increase flood hazards to other lands; and
(5) Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters.
(Code 1996, § 6-501(C); Ord. of 1-6-2009) Sec. 105-6. Objectives.
The objectives of this chapter are to:
(1) Protect human life and health;
(2) Minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains;
(3) Help maintain a stable tax base by providing for the sound use and development of floodprone areas in such a manner as to minimize future flood blight areas;
(4) Minimize expenditure of public money for costly flood control projects;
(5) Minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
(6) Minimize prolonged business interruptions; and
(7) Ensure that potential home buyers are notified that property is in a flood area.
(Code 1996, § 6-501(D); Ord. of 1-6-2009) Sec. 105-7. Territorial applicably.
This chapter shall apply to all areas of special flood hazard within the jurisdiction of the county board of commissioners.
(Code 1996, § 6-502(A); Ord. of 1-6-2009) Sec. 105-8. Compliance.
No structure or land shall hereafter be located, extended, converted or altered without full compliance with the terms of this chapter and other applicable regulations.
(Code 1996, § 6-502(D); Ord. of 1-6-2009) Sec. 105-9. Basis for area of special flood hazard.
(a) The areas of special flood hazard identified by the Federal Emergency Management Agency (FEMA) in its flood insurance study (FIS), dated March 2, 2009, with accompanying maps and other supporting data and any revision thereto, are adopted by reference and declared a part of this chapter.
For those land areas acquired by a municipality through annexation, the current effective FIS, supporting data and any revision thereto, for the county, dated March 2, 2009, are hereby adopted by reference.
(b) Areas of special flood hazard may also include those areas known to have flooded historically or defined through standard engineering analysis by governmental agencies or private parties but not yet incorporated in a FIS.
(c) The repository for public inspection of the flood insurance study (FIS), accompanying maps and other supporting data is located in the county community development department offices in Richmond Hill and Pembroke.
(Code 1996, § 6-502(B); Ord. of 1-6-2009; Ord. No. 05-2024, § 2, 3-12-2024) Sec. 105-10. Establishment of development permit.
A development permit shall be required in conformance with the provisions of this chapter prior to the commencement of any development activities.
(Code 1996, § 6-502(C); Ord. of 1-6-2009) Sec. 105-11. Abrogation and greater restrictions.
This chapter is not intended to repeal, abrogate, or impair any existing ordinances, easements, covenants, or deed restrictions. However, where this chapter and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
(Code 1996, § 6-502(E); Ord. of 1-6-2009) Sec. 105-12. Interpretation.
In the interpretation and application of this chapter, all provisions shall be:
(1) Considered as minimum requirements;
(2) Liberally construed in favor of the governing body; and
(3) Deemed neither to limit nor repeal any other powers granted under state statutes.
(Code 1996, § 6-502(F); Ord. of 1-6-2009) Sec. 105-13. Warning and disclaimer of liability.
The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur;
flood heights may be increased by manmade or natural causes. This chapter does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of the county or by any officer or employee thereof for any flood damages that result from reliance on this chapter or any administrative decision lawfully made thereunder.
(Code 1996, § 6-502(G); Ord. of 1-6-2009) Secs. 105-14—105-44. Reserved.
ARTICLE II. ADMINISTRATION AND ENFORCEMENT
Sec. 105-45. Designation of ordinance administrator.
The county engineer is hereby appointed to administer and implement the provisions of this chapter.
(Code 1996, § 6-503(A); Ord. of 1-6-2009) Sec. 105-46. Permit procedures.
Application for a development permit shall be made to the county engineer on forms furnished by the community prior to any development activities, and may include, but not be limited to, the following:
plans in duplicate drawn to scale showing the elevations of the area in question and the nature, location, dimensions of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities. Specifically, the following information is required:
(1) Application stage.
a. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;
b. Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed;
c. Design certification from a registered professional engineer or architect that any proposed nonresidential floodproofed structure will meet the floodproofing criteria of sections 105-71(2) and 105-73(2);
d. Design certification from a registered professional engineer or architect that any new construction or substantial improvement placed in a coastal high hazard area will meet the criteria of section 105-75(5); and
e. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development.
(2) Construction stage.
a. For all new construction and substantial improvements, the permit holder shall provide to the administrator an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed where a structure is subject to the provisions applicable to coastal high hazard areas, after placement of the lowest horizontal structural members. Any regulatory floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When floodproofing is utilized for nonresidential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same.
b. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk.
c. The county engineer shall review the above-referenced certification data submitted.
Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby shall be cause to issue a stop-work order for the project.
(Code 1996, § 6-503(B); Ord. of 1-6-2009) Sec. 105-47. Duties and responsibilities of the administrator.
Duties of the county engineer shall include, but not be limited to:
(1) Review all development permits to ensure that the permit requirements of this chapter have been satisfied.
(2) Review proposed development to ensure that all necessary permits have been received from governmental agencies from which approval is required by federal or state law, including section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 USC 1344; and require that copies of such permits be provided and maintained on file.
(3) Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding.
(4) When base flood elevation data or floodway data have not been provided in accordance with this chapter, obtain, review, and reasonably utilize any base flood elevation and floodway data available from a federal, state or other source in order to administer the provisions of article III of this chapter.
(5) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the regulatory floor, including basement, of all new or substantially improved structures in accordance with section 105-46(2).
(6) Review and record the actual elevation, in relation to mean sea level to which the new or substantially improved structures have been floodproofed, in accordance with sections 105- 46(2) and 105-73(2).
(7) When floodproofing is utilized for a structure, obtain certification of design criteria from a registered professional engineer or architect in accordance with sections 105-46(1)c and 105- 71(2) or 105-73(2).
(8) Obtain design certification from a registered professional engineer or architect that any new construction or substantial improvement placed in a coastal high hazard area will meet the criteria of section 105-75(5).
(9) Make substantial damage determinations following a flood event or any other event that causes damage to structures in flood hazard areas.
(10) Notify adjacent communities and the state department of natural resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA).
(11) For any altered or relocated watercourse, submit engineering data/analysis within six months to FEMA to ensure accuracy of community flood maps through the letter of map revision process.
Ensure flood-carrying capacity of any altered or relocated watercourse is maintained.
(12) Make the necessary interpretation where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions). Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this subsection.
(13) Maintain all records pertaining to the provisions of this chapter in the office of the county engineer which shall be open for public inspection.
(Code 1996, § 6-503(C); Ord. of 1-6-2009) Sec. 105-48. Appeals and variances.
(a) The flood prevention review board as established by the county board of commissioners shall hear and decide requests for appeals or variance from the requirements of this chapter.
(b) The board shall hear and decide appeals when it is alleged an error in any requirement, decision, or determination is made by the county engineer in the enforcement or administration of this chapter.
(c) Any person aggrieved by the decision of the flood prevention review board may appeal such decision to the county superior court as provided by state law.
(d) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure.
(e) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this section are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety.
(f) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.
(g) In reviewing such requests, the flood prevention review board shall consider all technical evaluations, relevant factors, and all standards specified in this and other sections of this chapter.
(h) Conditions for variances.
(1) A variance shall be issued only when there is:
a. A finding of good and sufficient cause;
b. A determination that failure to grant the variance would result in exceptional hardship;
and
c. Determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.
(2) The provisions of this chapter are minimum standards for flood loss reduction; therefore any deviation from the standards must be weighed carefully. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief; and, in the instance of a historic structure, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building.
(3) Any applicant to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor, and stating that the cost of flood insurance will be commensurate with the increased risk to life and property resulting from the reduced lowest floor elevation.
(4) The county engineer shall maintain the records of all appeal actions and report any variances to the Federal Emergency Agency Management upon request.
(i) Upon consideration of the factors listed above and the purposes of this chapter, the flood prevention review board may attach such conditions to the granting of variances as it deems necessary to further the purposes of this chapter.
(Code 1996, § 6-505; Ord. of 1-6-2009) Secs. 105-49—105-69. Reserved.
ARTICLE III. FLOOD HAZARD REDUCTION
Sec. 105-70. General standards.
In all areas of special flood hazard, the following provisions are required:
(1) New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure.
(2) New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage.
(3) New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage.
(4) Elevated buildings. All new construction or substantial improvements of existing structures that include any fully-enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater. (Not applicable in coastal high hazard areas.)
a. Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:
1. Provide a minimum of two openings, on opposite walls, having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;
2. The bottom of all openings shall be no higher than one foot above grade; and
3. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both directions;
b. So as not to violate the lowest floor criteria of this article, the unfinished or flood resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and
c. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.
(5) All heating and air conditioning equipment and components (including ductwork), electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding.
(6) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement.
Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces.
(7) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system.
(8) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters.
(9) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding.
(10) Any alteration, repair, reconstruction, or improvement to a structure, which is not compliant with the provisions of this article, shall be undertaken only if the nonconformity is not furthered, extended or replaced.
(Code 1996, § 6-504(A); Ord. of 1-6-2009; Ord. of 10-3-2011; Ord. No. 05-2024, § 2, 3-12-2024) Sec. 105-71. Specific standards.
In all areas of special flood hazard designated as A1-30, AE, AH, or A (with engineered or estimated BFE), the following provisions are required:
(1) New construction and/or substantial improvements.
a. Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with the standards of section 105-70(4).
b. All heating and air conditioning equipment and components (including ductwork), electrical, ventilation, plumbing and other service facilities shall be elevated at or above one foot above the base flood elevation.
(2) Nonresidential construction. New construction and/or the substantial improvement of any structure located in A1-30, AE, or AH zones, may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one foot above the base flood elevation, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and in section 105-47(6).
(3) Pre-existing homes. The owner or his designated agent shall be responsible for notification to all potential buyers of homes which exist in a potential hazardous flood zone.
(4) Standards for manufactured homes and recreational vehicles where base flood elevation data are available.
a. All manufactured homes placed and/or substantially improved:
1. On individual lots or parcels;
2. In new and/or substantially improved manufactured home parks or subdivisions;
3. In expansions to existing manufactured home parks or subdivisions; or
4. On a site in an existing manufactured home park or subdivision where a manufactured home has incurred substantial damage as the result of a flood;
must have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation.
b. Manufactured homes placed and/or substantially improved in an either existing manufactured home park or subdivision may be elevated so that:
1. The lowest floor of the manufactured home is elevated no lower than one foot above the level of the base flood elevation; and
2. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.
c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement.
d. All recreational vehicles placed on sites must either:
1. Be on the site for fewer than 180 consecutive days;
2. Be fully licensed and ready for highway use (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or
3. Meet all the requirements for new construction, including the anchoring and elevation requirements.
(5) Floodway. Located within areas of special flood hazard established in section 105-9 are areas designated as floodways. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:
a. Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted, however, provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase in flood levels or floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.
b. Only if subsection (5)(a) of this section is satisfied, then any new construction or substantial improvement shall comply with all other applicable flood hazard reduction provisions of this article.
(Code 1996, § 6-504(B); Ord. of 1-6-2009; Ord. No. 05-2024, § 2, 3-12-2024) Sec. 105-72. Building standards for streams without established base flood elevations and/or floodways (A-zones).
Located within the areas of special flood hazard established in section 105-9, where streams exist but no base flood data have been provided (A-zones), or where base flood data have been provided but a floodway has not be delineated, the following provisions apply:
(1) When base flood elevation data or floodway data have not been provided in accordance with section 105-9, then the county engineer shall obtain, review, and reasonably utilize any scientific or historic base flood elevation and floodway data available from a federal, state, or other source, in order to administer the provisions of this article. Only if data are not available from these sources, then the provisions in subsections (2) and (3) of this section shall apply.
(2) No encroachments, including structures or fill material, shall be located within an area equal to the width of the stream or 25 feet, whichever is greater, measured from the top of the stream bank, unless certification by a registered professional engineer is provided demonstrating that such encroachment shall not result in more than one foot increase in flood levels during the occurrence of the base flood discharge.
(3) In special flood hazard areas without base flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. (Note: Require the lowest floor to be elevated one foot above the estimated base flood elevation in A-zone areas where a limited detail study has been completed.) Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with the standards of section 105-70(4). All heating and air conditioning equipment and components (including ductwork), electrical, ventilation, plumbing, and other service facilities shall be elevated no less than three feet above the highest adjacent grade at the building site.
The county engineer shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.
(Code 1996, § 6-504(C); Ord. of 1-6-2009) Sec. 105-73. Standards for areas of special flood hazard (zones AE) with established base flood elevations without designated floodways.
Located within the areas of special flood hazard established in section 105-9, where streams with base flood elevations are provided but no floodways have been designated (zones AE), the following provisions apply:
(1) No encroachments, including fill material, new structures or substantial improvements shall be located within areas of special flood hazard, unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with all other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. The engineering certification should be supported by technical data that conforms to standard hydraulic engineering principles.
(2) New construction or substantial improvements of buildings shall be elevated or floodproofed to elevations established in accordance with section 105-71.
(Code 1996, § 6-504(D); Ord. of 1-6-2009) Sec. 105-74. Standards for areas of shallow flooding (AO zones).
Areas of special flood hazard established in section 105-9 may include designated "AO" shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. The following provisions apply:
(1) All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated to the flood depth number specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with the standards of section 105-70(4). The county engineer shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.
(2) New construction or the substantial improvement of a nonresidential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to the specified FIRM flood level plus one foot, above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and as required in section 105-46(1)c and d.
(3) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.
(Code 1996, § 6-504(E); Ord. of 1-6-2009) Sec. 105-75. Coastal high hazard areas (V-zones) and Coastal A Zones (LiMWA).
Located within the areas of special flood hazard established in section 105-9 are areas designated as coastal high hazard areas (V-zones) and Coastal A zones or Limits of Moderate Wave Action (LiMWA).
These areas have special flood hazards associated with wave action and storm surge, therefore, the following provisions shall apply:
(1) All new construction and substantial improvements of existing structures shall be located landward of the reach of mean high tide;
(2) All new construction and substantial improvements of existing structures shall be elevated on piles, columns, or shear walls parallel to the flow of water so that the bottom of the lowest supporting horizontal structural members (excluding pilings or columns) is located no lower than one foot above the base flood elevation level. All space below the lowest supporting member shall remain free of obstruction or constructed with non-supporting breakaway walls.
Open wood lattice work or decorative screening may be permitted for aesthetic purposes only and must be designed to wash away in the event of abnormal wave action and in accordance with subsection (6) of this section;
(3) All new construction and substantial improvements of existing structures shall be securely anchored on pilings, columns, or shear walls;
(4) All pile and column foundations and the structures attached thereto shall be anchored to resist flotation, collapse, and lateral movement due to the combined effects of wind and water loads acting simultaneously on all building components, both non-structural and structural. Water loading values shall equal or exceed those of the base flood. Wind loading values shall be in accordance with the International Building Code as adopted and amended by the county;
(5) A registered professional engineer or architect shall certify that the design, specifications and plans for construction are in compliance with the provisions contained in subsections (2) through (4) of this section;
(6) All space below the lowest horizontal supporting member must remain free of obstruction.
Open wood lattice work or decorative screening may be permitted for aesthetic purposes only and must be designed to wash away in the event of abnormal wave action without causing structural damage to the supporting foundation or elevated portion of the structure. The following design specifications are allowed:
a. Material shall consist of open wood lattice or mesh screening only; and
b. If aesthetic open wood lattice work or screening is utilized, any enclosed space shall not be used for human habitation, but shall be designed to be used only for parking of vehicles, building access, or limited storage of maintenance equipment used in connection with the premises;
(7) Prior to construction, plans for any structures having open wood lattice work or decorative screening must be submitted to the county engineer for approval;
(8) Any alteration, repair, reconstruction or improvement to any structure shall not enclose the space below the lowest floor except with open wood lattice work or decorative screening, as provided in this section;
(9) There shall be no fill used as structural support. Non-compacted fill may be used around the perimeter of a building for landscaping/aesthetic purposes, provided the fill will wash out from storm surge (thereby rendering the building free of obstruction) prior to generating excessive loading forces, ramping effects, or wave deflection. The county engineer shall approve design plans for landscaping/aesthetic fill only after the applicant has provided an analysis by an engineer, architect, and/or soil scientist, which demonstrates that the following factors have been fully considered:
a. Particle composition of fill material does not have a tendency for excessive natural compaction;
b. Volume and distribution of fill will not cause wave deflection to adjacent properties; and
c. Slope of fill will not cause wave run-up or ramping;
(10) There shall be no alteration of sand dunes or mangrove stands, which would increase potential flood damage; and
(11) The placement of manufactured homes (mobile homes) shall be prohibited, except in an existing manufactured home park or subdivision. A replacement manufactured home may be placed on a lot in an existing manufactured home park or subdivision, provided the anchoring standards of subsection (4) of this section are met.
(Code 1996, § 6-504(F); Ord. of 1-6-2009; Ord. No. 05-2024, § 2, 3-12-2024) Sec. 105-76. Standards for subdivisions and/or development proposals.
(a) All subdivision and/or development proposals shall be consistent with the need to minimize flood damage and shall be reasonably safe from flooding.
(b) All subdivision and/or development proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage.
(c) All subdivision and/or development proposals shall have adequate drainage provided to reduce exposure to flood hazards.
(d) For subdivision and/or developments greater than 50 lots or five acres, whichever is less, base flood elevation data shall be provided for subdivision and all other proposed development, including manufactured home parks and subdivisions. Any changes or revisions to the flood data adopted herein and shown on the FIRM shall be submitted to FEMA for review as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. Upon completion of the project, the developer is responsible for submitting the as-built data to FEMA in order to obtain the final LOMR.
(Code 1996, § 6-504(G); Ord. of 1-6-2009; Ord. No. 05-2024, § 2, 3-12-2024) Sec. 105-77. Standard for critical facilities.
(a) Critical facilities shall not be located in the 100-year floodplain or in the 500-year floodplain.
(b) All ingress and egress from any critical facility must be protected to the 500-year flood elevation.
(Code 1996, § 6-504(H); Ord. of 1-6-2009; Ord. of 10-13-2011) Chapter 106
RESERVED
Chapter 107
MANUFACTURED HOMES*
ARTICLE I. IN GENERAL
Secs. 107-1—107-18. Reserved.
ARTICLE II. MANUFACTURED HOME STANDARDS*
Sec. 107-19. Definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Applicant means any person seeking to install a pre-owned manufactured home in the unincorporated area of the county.
Building inspector means the person appointed, employed, or otherwise designated as the director of planning, permits and inspections, the county building official or any of his assistants.
Certificate of occupancy means a document issued by the building inspector certifying that a pre-owned manufactured home is in compliance with applicable requirements set forth by this article, and indicating it to be in a condition suitable for residential occupancy.
Guarantee of condition bond means a surety bond to guarantee that the affidavit and photographs required by section 107-21(1)a and b reasonably portray or represent the existing condition of the pre-owned manufactured home proposed for relocation. In lieu of the bond, a cash deposit may be deposited with the county.
Install means to construct a foundation system and to place or erect a manufactured home on such foundation system. The term "install" includes, without limitation, supporting, blocking, leveling, securing, or anchoring such manufactured home and connecting multiple or expandable sections of such manufactured home.
Jurisdiction means the unincorporated areas of the county.
Manufactured home means a structure, transportable in one or more sections, which, in the traveling mode, is eight body feet or more in width or 40 body feet or more in length or, when erected on site, is 320 or more square feet and which is built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities and includes the plumbing, heating, air conditioning, and electrical systems contained therein; except that such term shall include any structure which meets all the requirements of this definition except the size requirements and with respect to which the manufacturer voluntarily files a certification required by the secretary of housing and urban development and complies with the standards established under the National Manufactured Housing Construction and Safety Standards Act of 1974, 42 USC 5401 et seq.
Pre-owned manufactured home means any manufactured home that has been previously used as a residential dwelling and has been titled.
(Code 1996, § 11-401; Ord. of 8-2-2005; Ord. of 10-5-2010) Sec. 107-20. Conditions.
All pre-owned manufactured homes located in the jurisdiction shall bear a label certifying there were constructed in compliance with the National Manufactured Housing Construction and Safety Standards Act of 1974, 42 USC 5401 et seq. (the HUD code), and shall be installed in accordance with applicable state standards.
Code 1996, § 11-402; Ord. of 8-2-2005; Ord. of 10-5-2010) Sec. 107-21. Permitting, inspection, certificate of occupancy and fees.
A permit shall be required to locate a pre-owned manufactured home in the jurisdiction.
(1) Permit. To obtain a permit, applicants shall provide to the building inspector:
a. An affidavit signed by the applicant that the pre-owned manufactured home meets health and safety standards required by law;
b. Photographs of the interior and exterior of the pre-owned manufactured home providing evidence that the home meets the minimum health and safety standards of section 107-22;
c. A $150.00 refundable guarantee of condition bond or $150.00 refundable cash deposit;
and
d. The permit and inspection fee required by subsection (4) of this section.
(2) Inspection. Upon receipt of a permit, applicants may relocate the manufactured home on a residential site for the purposes of inspection. The applicant shall arrange for an inspection to be held once the installation of the manufactured home is complete.
(3) Certificate of occupancy. A certificate of occupancy shall be issued to the applicant at such time that the building inspector certifies that the requirements of this article have been met.
(4) Fee. A permit and inspection fee as established by the board shall be charged to the applicant to cover the cost to the county to process the permit application and inspect the pre-owned manufactured home. Such fee shall cover the initial inspection and one follow-up inspection.
The applicant shall be charged a fee as established by the board for each additional follow-up inspection that may be necessary.
(5) Alternative inspection. At the request of the applicant, the building inspector may, at his discretion, inspect a pre-owned manufactured home prior to its being relocated if the home is then located at another site within the county.
Code 1996, § 11-403; Ord. of 8-2-2005; Ord. of 10-5-2010) Sec. 107-22. Minimum health and safety standards.
All pre-owned manufactured homes shall comply with the following before being issued a certificate of occupancy by the building inspector:
(1) HUD code. Every pre-owned manufactured home located in the jurisdiction shall be in compliance with the Federal Manufactured Housing Construction and Safety Standards Act, 42 USC 5401-5445 (the HUD code) and shall not have been altered in such a way that the home no longer meets the HUD code.
(2) Installation. Manufactured homes shall be installed by a competent licensed professional installer and shall be installed according to the manufacturer's installation instructions. Manufactured homes shall comply with the International Building Code.
(3) Interior condition. Every floor, interior wall, and ceiling of a pre-owned manufactured home shall be in sound condition. The floor system shall be in sound condition and free of warping, holes, water damage, or deterioration.
(4) Exterior condition. The exterior of all pre-owned manufactured homes shall be free of loose or rotting boards or timbers and any other conditions that might admit rain or moisture to the interior portions of the walls or to occupied spaces. The exterior siding shall be free of rot and rust. Roofs shall be structurally sound and have no obvious defects that might admit rain or cause moisture to collect on the interior portion of the home.
(5) Skirting. Manufactured homes being erected for occupancy shall be fitted with approved commercial skirting. Approved commercial skirting includes any skirting material which is manufactured for that purpose, and any masonry.
(6) Wind speeds. All manufactured homes must be designed to withstand wind speeds of 100 miles an hour (Wind Zone II) in accordance with HUD regulations 24 CFR 3280 and 3282. Wind Zone I homes are not permitted in any area of the county. Existing and registered manufactured homes that are designed to withstand wind speeds of 100 miles an hour may be moved within the county.
(7) Sanitary facilities. Every plumbing fixture, water, and waste pipe of a pre-owned manufactured home shall be in a sanitary working condition when properly connected, and shall be free from leaks and obstructions. Each home shall contain a kitchen sink. Each bathroom shall contain a lavatory and water closet. At least one bathroom shall contain a tub and/or shower facilities.
Each of these fixtures shall be checked upon being connected to ensure they are in good working condition.
(8) Heating systems. Heating shall be safe and in working condition. Un-vented heaters shall be prohibited.
(9) Electrical systems. Electrical systems (switches, receptacles, fixtures, etc.) shall be properly installed and wired and shall be in working condition. Distribution panels shall be in compliance with the approved listing, complete with required breakers, with all unused openings covered with solid covers approved and listed for that purpose. The home shall be subject to an electrical continuity test to ensure that all metallic parts are properly bonded. Each pre-owned manufactured home shall contain a water heater in safe and working order.
(10) Hot water supply. Each home shall contain a water heater in safe and working condition.
(11) Egress windows.Each bedroom of a manufactured home shall have at least one operable window of sufficient size to allow egress if necessary.
(12) Ventilation. The kitchen in the home shall have at least one operating window or other ventilation device.
(13) Smoke detectors. Each pre-owned manufactured home shall contain one operable batterypowered smoke detector in each bedroom and in the kitchen, which must be installed in accordance with the manufacturer's recommendations.
Code 1996, § 11-404; Ord. of 8-2-2005; Ord. of 10-5-2010) Sec. 107-23. Conversion of structure.
No DCA-regulated manufactured home may be converted from residential to commercial or other nonresidential uses.
Code 1996, § 11-405; Ord. of 8-2-2005; Ord. of 10-5-2010) Sec. 107-24. Enforcement.
(a) Permanent connection to utilities shall not be approved until the building inspector has issued a certificate of occupancy.
(b) Owners of pre-owned manufactured homes that are not in compliance upon a third inspection shall have their permit revoked and shall be required to remove the home from the jurisdiction at their own expense.
(c) The guarantee of condition bond or cash deposit will be forfeited after 90 days from the date of inspection, unless all conditions and standards are met prior to the end of the 90 days or an extension has been issued in writing by the building inspector.
Code 1996, § 11-406; Ord. of 8-2-2005; Ord. of 10-5-2010) Chapter 108
RESERVED
Chapter 109
RESERVED*
Chapter 110
RESERVED
Chapter 111
SOIL EROSION AND SEDIMENTATION CONTROL*
Sec. 111-1. Title.
This chapter will be known as the "Bryan County Soil Erosion and Sedimentation Control Ordinance."
(Code 1996, § 6-401; Ord. of 10-13-2009) Sec. 111-2. Definitions.
The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Best management practices (BMPs) includes sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the "Manual for Erosion and Sediment Control in Georgia" published by the commission as of January 1 of the year in which the land disturbing activity was permitted.
Board means the board of natural resources.
Buffer means the area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.
Certified personnel means a person who has successfully completed the appropriate certification course approved by the state soil and water conservation commission.
Coastal marshlands shall have the same meaning as in O.C.G.A. 12-5-282.
Commission means the Georgia Soil and Water Conservation Commission (GSWCC).
CPESC means certified professional in erosion and sediment control with current certification by EnviroCert, Inc., which is also referred to as CPESC or CPESC, Inc.
Cut means a portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to the excavated surface. Also known as excavation.
Department means the state department of natural resources (DNR).
Design professional means a professional licensed by the State of Georgia in the field of: engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a certified professional in erosion and sediment control (CPESC) with a current certification by EnviroCert, Inc.
Design professionals shall practice in a manner that complies with applicable Georgia law governing professional licensure.
Director means the director of the environmental protection division or an authorized representative.
District means the coastal soil and water conservation district.
Division means the environmental protection division (EPD) of the department of natural resources.
Drainage structure means a device composed of a virtually non-erodable material such as concrete, steel, plastic or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control, or flood control purposes.
Erosion means the process by which land surface is worn away by the action of wind, water, ice or gravity.
Erosion, sedimentation and pollution control plan means a plan required by the Erosion and Sedimentation Act of 1975 (O.C.G.A. § 12-7-1 et seq.), that includes, as a minimum, protections at least as stringent as the Georgia General Permit, best management practices, and requirements in section 111-4(c).
Fill means a portion of land surface to which soil or other solid material has been added; the depth above the original ground surface of an excavation.
Final stabilization means all soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or landscaped according to the Plan (uniformly covered with landscaping materials in planned landscape areas), or equivalent permanent stabilization measures as defined in the Manual (excluding a crop of annual vegetation and seeding of target crop perennials appropriate for the region). Final stabilization applies to each phase of construction.
Finished grade means the final elevation and contour of the ground after cutting or filling and conforming to the proposed design.
Grading means altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition.
Ground elevation means the original elevation of the ground surface prior to cutting or filling.
Land disturbing activity means any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land, but not including agricultural practices as described in section 111-3(5).
Larger common plan of development or sale means a contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purposes of this definition, the term "plan" means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor markings, indicating that construction activities may occur on a specific plot.
Local issuing authority means the governing authority of any county or municipality, which is certified pursuant to O.C.G.A. § 12-7-8(a).
Metropolitan River Protection Act (MRPA) means a state law referenced as O.C.G.A. § 12-5-440 et seq., which addresses environmental and developmental matters in certain metropolitan river corridors and their drainage basins.
Natural ground surface means the ground surface in its original state before any grading, excavating or filling.
Nephelometric turbidity units (NTU) means numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed or suspended particles are present.
NOI means a notice of intent form provided by EPD for coverage under the state general permit.
NOT means a notice of termination form provided by EPD to terminate coverage under the state general permit.
Operator means the party or parties that have:
(1) Operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications; or
(2) Day-to-day operational control of those activities that are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.
Outfall means the location where stormwater is a discernible, confined and discrete conveyance, leaves a facility or site or, if there is a receiving water on site, becomes a point source discharging into that receiving water.
Permit means the authorization necessary to conduct a land disturbing activity under the provisions of this chapter.
Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of the State of Georgia, any interstate body or any other legal entity.
Phase or phased means subparts or segments of construction projects where the subpart or segment is constructed and stabilized prior to completing construction activities on the entire construction site.
Project means the entire proposed development project regardless of the size of the area of land to be disturbed.
Properly designed means designed in accordance with the design requirements and specifications contained in the "Manual for Erosion and Sediment Control in Georgia" ("manual") published by the state soil and water conservation commission as of January 1 of the year in which the land disturbing activity was permitted and amendments to the manual as approved by the commission up until the date of NOI submittal.
Roadway drainage structure means a device such as a bridge, culvert, or ditch, composed of a virtually non-erodable material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled roadway consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.
Sediment means solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by wind, water, ice, or gravity as a product of erosion.
Sedimentation means the process by which eroded material is transported and deposited by the action of water, wind, ice or gravity.
Soil and water conservation district approved plan means an erosion, sedimentation and pollution control plan approved in writing by the coastal soil and water conservation district.
Stabilization means the process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity.
State general permit means the National Pollution Discharge Elimination System (NPDES) general permit or permits for stormwater runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state's authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 USC 1251 et seq., and O.C.G.A. § 12-5-30(f).
State waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of the state which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.
Structural erosion, sedimentation and pollution control practices means practices for the stabilization of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures, and sediment traps, etc. Such practices can be found in the publication "Manual for Erosion and Sediment Control in Georgia."
Trout streams means all streams or portions of streams within the watershed as designated by the Wildlife Resources Division of the Georgia Department of Natural Resources under the provisions of the Georgia Water Quality Control Act, O.C.G.A. 12-5-20, in the rules and regulations for Water Quality Control, Chapter 391-3-6 at www.epd.georgia.gov. Streams designated as primary trout waters are defined as water supporting a self-sustaining population of rainbow, brown or brook trout. Streams designated as secondary trout waters are those in which there is no evidence of natural trout reproduction, but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.
Vegetative erosion and sedimentation control measures means measures for the stabilization of erodible or sediment-producing areas by covering the soil with:
(1) Permanent seeding, sprigging or planting, producing long-term vegetative coverage;
(2) Temporary seeding, producing short-term vegetative cover; or
(3) Sodding, covering areas with a turf of perennial sod-forming grass.
Such measures can be found in the publication "Manual for Erosion and Sediment Control in Georgia."
Watercourse means any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater.
Wetlands means those areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.
(Code 1996, § 6-402; Ord. of 10-13-2009; Ord. No. 2019-07, § 1, 12-10-2019) Sec. 111-3. Exemptions.
This chapter shall apply to any land disturbing activity undertaken by any person on any land except for the following:
(1) Surface mining, as the same is defined in O.C.G.A. § 12-4-72, "The Georgia Surface Mining Act of 1968";
(2) Granite quarrying and land clearing for such quarrying;
(3) Such minor land disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences, and other related activities which result in minor soil erosion;
(4) The construction of single-family residences, when such construction disturbs less than one acre and is not part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this subsection; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A. § 12-7-6(b) and this subsection. For single-family residence construction covered by the provisions of this subsection, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to the Georgia Water Quality Control Act (O.C.G.A. § 12-5-20 et seq.). In any such buffer zone, no land disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the director may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The minimum requirements of O.C.G.A. § 12-7-6(b) and the buffer zones provided by this subsection shall be enforced by the local issuing authority;
(5) Agricultural operations as defined in O.C.G.A. § 1-3-3, "definitions," to include the establishment, cultivation, or harvesting of products of the field or orchard; the preparation and planting of pasture land; farm ponds; dairy operations; livestock and poultry management practices; and the construction of farm buildings;
(6) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause or result in land disturbing or other activities otherwise prohibited in a buffer, as established in section 111-4(c)(15) and (16), no other land disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices;
(7) Any project carried out under the technical supervision of the natural resources conservation service (NRCS) of the United States Department of Agriculture;
(8) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land disturbing activity within a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre or within 200 feet of the bank of any state waters, and for purposes of this subsection, the term "state waters" excludes channels and drainage ways which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them yearround; provided, however, that any person responsible for a project which involves less than one acre, which involves land disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing contained herein shall prevent the local issuing authority from regulating any such project which is not specifically exempted by subsections (1), (2), (3), (4), (5), (6), (7), (9) or (10) of this section;
(9) Construction or maintenance projects, or both, undertaken or financed in whole or in part, or both, by the department of transportation, the state highway authority, or the state road and tollway authority; or any road construction or maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the department of transportation or state road and tollway authority which disturb one or more contiguous acres of land shall be subject to provisions of O.C.G.A. § 12-7-7.1; except where the department of transportation, the state highway authority, or the state road and tollway authority is secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;
(10) Any land disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and
(11) Any public water system reservoir.
(Code 1996, § 6-403; Ord. of 10-13-2009) Sec. 111-4. Minimum requirements for erosion, sedimentation and pollution control using best management practices.
(a) General provisions. Excessive soil erosion and resulting sedimentation can take place during land disturbing activities if requirements of this chapter and the NPDES general permit are not met.
Therefore, plans for those land disturbing activities which are not exempted by this chapter shall contain provisions for application of soil erosion, sedimentation and pollution control measures and practices.
The provisions shall be incorporated into the erosion, sedimentation and pollution control plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the minimum requirements of subsections (b) and (c) of this section. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land disturbing activity in accordance with requirements of this chapter and the NPDES general permit.
(b) Minimum requirements/BMPs.
(1) Best management practices as set forth in subsections (b) and (c) of this section shall be required for all land disturbing activities. Proper design, installation, and maintenance of best management practices shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with subsection (b)(2) of this section or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to O.C.G.A.
§ 12-5-30(f). As used in this subsection, the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the "Manual for Erosion and Sediment Control in Georgia" specified in O.C.G.A. § 12-7-6(b).
(2) A discharge of stormwater runoff from disturbed areas where best management practices have not been properly designed, installed, and maintained shall constitute a separate violation of any land disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f) for each day on which such discharge results in the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters shall be measured in accordance with guidelines to be issued by the director. This subsection shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.
(3) Failure to properly design, install, or maintain best management practices shall constitute a violation of any land disturbing permit issued by a local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f) for each day on which such failure occurs.
(4) The director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities occur.
(5) The LIA may set more stringent buffer requirements than stated in (c)(15), (16) and (17), in light of O.C.G.A. § 12-7-6 (c).
(c) Other requirements. Land disturbing activities shall comply with the state general permit; and best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than, those practices contained in the "Manual for Erosion and Sediment Control in Georgia" published by the state soil and water conservation commission as of January 1 of the year which the land disturbing activity was permitted, as well as the following:
(1) Stripping of vegetation, regrading and other development activities shall be conducted in a manner so as to minimize erosion;
(2) Cut-fill operations must be kept to a minimum;
(3) Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential;
(4) Whenever feasible, natural vegetation shall be retained, protected and supplemented;
(5) The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum;
(6) Disturbed soil shall be stabilized as quickly as practicable;
(7) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;
(8) Permanent vegetation and structural erosion control practices shall be installed as soon as practicable;
(9) To the extent necessary, sediment in runoff water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this subsection, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of the Erosion and Sedimentation Act of 1975 (O.C.G.A.
§ 12-7-1 et seq.);
(10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills;
(11) Cuts and fills may not endanger adjoining property;
(12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other property owners;
(13) Grading equipment must cross flowing streams by means of bridges or culverts except when such methods are not feasible, provided, in any case, that such crossings are kept to a minimum;
(14) Land disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in subsection (b)(2) of this section;
(15) Except as provided in paragraph (16) and (17) of this subsection, there is established a 25 foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the Director determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the Director pursuant to O.C.G.A. § 12-2-8, where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the project plans and specifications, and are implemented; or where bulkheads and sea walls are installed to prevent shoreline erosion on Lake Oconee and Lake Sinclair; or along any ephemeral stream. As used in this provision, the term 'ephemeral stream' means a stream: that under normal circumstances has water flowing only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round; for which ground water is not a source of water; and for which runoff from precipitation is the primary source of water flow, Unless exempted as along an ephemeral stream, the buffers of at least 25 feet established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the "Georgia Water Quality Control Act", shall remain in force unless a variance is granted by the director as provided in this paragraph. The following requirements shall apply to any such buffer:
a. No land disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
b. The buffer shall not apply to the following land disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented:
1. Stream crossings for water lines; or
2. Stream crossings for sewer lines;
(16) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as trout streams pursuant to the Georgia Water Quality Control Act (O.C.G.A.
§ 12-5-20 et seq.), except where a roadway drainage structure must be constructed; provided, however, that small springs and streams classified as trout streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be piped, at the discretion of the landowner, pursuant to the terms of a rule providing for general variance promulgated by the board, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director may grant a variance from such buffer to allow land disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to such buffer:
a. No land disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; and
b. The buffer shall not apply to the following land disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented:
1. Stream crossings for water lines; or
2. Stream crossings for sewer lines; and
(17) a. There is established a 25-foot buffer along coastal marshlands, as measured horizontally from the coastal marshland-upland interface, as determined in accordance with the Coastal Marshlands Protection Act of 1970 (O.C.G.A. § 12-5-280 et seq.) and the rules and regulations promulgated thereunder, except:
1. Where the state director determines to allow a variance that is at least as protective of natural resources and the environment;
2. Where otherwise allowed by the state director pursuant to O.C.G.A. § 12-2-8;
3. Where an alteration within the buffer area has been authorized pursuant to O.C.G.A.
§ 12-5-286;
4. For maintenance of any currently serviceable structure, landscaping, or hardscaping, including bridges, roads, parking lots, golf courses, golf cart paths, retaining walls, bulkheads, and patios; provided, however, that if such maintenance requires any land disturbing activity, adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented;
5. Where a drainage structure or roadway drainage structure is constructed or maintained; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented;
6. On the landward side of any currently serviceable shoreline stabilization structure;
or
7. For the maintenance of any manmade stormwater detention basin, golf course pond or impoundment that is located entirely within the property of a single individual, partnership, or corporation; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented. For the purposes of this paragraph maintenance shall be defined as actions necessary or appropriate for retaining or restoring a currently serviceable improvement to the specified operable condition to achieve its maximum useful life. Maintenance includes emergency reconstruction of recently damaged parts of a currently serviceable structure so long as it occurs within a reasonable period of time after damage occurs. Maintenance does not include any modification that changes the character, scope or size of the original design and serviceable shall be defined as usable in its current state or with minor maintenance but not so degraded as to essentially require reconstruction.
b. No land-disturbing activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed, state of vegetation until all land-disturbing activities on the construction site are completed. Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat; provided, however, that any person constructing a single-family residence, when such residence is constructed by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat.
c. The buffer requirements of this subsection (17) shall not apply to crossings for utility lines that cause a width of disturbance of not more than 50 feet within the buffer; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented. The buffer shall not apply to:
1. Any land disturbing activity conducted pursuant to and in compliance with a valid and effective land disturbing permit issued subsequent to April 22, 2014, and prior to December 31, 2015; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented; or
2. Any lot for which the preliminary plat has been approved prior to December 31, 2015, if roadways, bridges, or water and sewer lines have been extended to such lot prior to December 31, 2015, and if the requirement to maintain a 25-foot buffer would consume at least 18 percent of the high ground of the platted lot otherwise available for development; provided, however, that adequate erosion control measures are incorporated into the project plans and specifications and such measures are fully implemented.
(d) Activities where the area within the buffer is not more than 500 square feet or that have a "Minor Buffer Impact" as defined in 391-3-7-.01(r), provided that the total area of buffer impacts is less than 5,000 square feet are deemed to have an approved buffer variance by rule. Bank stabilization structures are not eligible for coverage under the variance by rule and notification shall be made to the division at least 14 days prior to the commencement of land disturbing activities.
(e) Nothing contained in O.C.G.A. 12-7-1, et. seq., shall prevent any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements in section 111-4(b) and (c) of this section.
(f) The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this ordinance or the terms of the permit.
(Code 1996, § 6-404; Ord. of 10-13-2009; Ord. No. 2019-07, § 1, 12-10-2019) Sec. 111-5. Application/permit process.
(a) General. The property owner, developer and designated planners and engineers shall design and review before submittal the general development plans. The local issuing authority shall review the tract to be developed and the areas surrounding it. They shall consult the zoning ordinance, stormwater management ordinance, subdivision ordinance, flood damage prevention ordinance, this chapter, and any other ordinances, rules, regulations or permits, which regulate the development of land within the jurisdictional boundaries of the local issuing authority. However, the owner and/or operator are the only parties who may obtain a permit.
(b) Application requirements.
(1) No person shall conduct any land disturbing activity within the jurisdictional boundaries of the county without first obtaining a permit from the department of planning and zoning to perform such activity and providing a copy of notice of intent submitted to EPD if applicable.
(2) The application for a permit shall be submitted to the department of planning and zoning and must include the applicant's erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans shall include, as a minimum, the data specified in subsection (c) of this section. Erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the land disturbing activity proposed will be carried out in such a manner that the provisions of section 111-4(b) and (c) will be met. Applications for a permit will not be accepted unless accompanied by three copies of the applicant's erosion, sedimentation and pollution control plans. All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan in accordance with EPD Rule 391-3-7-.10.
(3) In addition to the local permitting fees, fees will also be assessed pursuant to O.C.G.A.
§ 12-5-23(a)(5), provided that such fees shall not exceed $80.00 per acre of land disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7-8(a), half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A. § 12-7-17(9) or (10) shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.
(4) Immediately upon receipt of an application and plan for a permit, the local issuing authority shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion, sedimentation and pollution control plan. The district shall approve or disapprove a plan within 35 days of receipt. Failure of the District to act within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the local issuing authority. No permit will be issued unless the plan has been approved by the District, and any variances required by Section 111-4(c)(15)(16) and (17) have been obtained, all fees have been paid, and bonding, if required as per section 111-5 (b)(6), have been obtained. Such review will not be required if the local issuing authority and the district have entered into an agreement which allows the local issuing authority to conduct such review and approval of the plan without referring the application and plan to the district. The local issuing authority with plan review authority shall approve or disapprove a revised plan submittal within 35 days of receipt. Failure of the local issuing authority with plan review authority to act within 35 days shall be considered an approval of the revised plan submittal.
(5) If a permit applicant has had two or more violations of previous permits, this section, or the Erosion and Sedimentation Act (O.C.G.A. § 12-7-1 et seq.), as amended, within three years prior to the date of filing the application under consideration, the local issuing authority may deny the permit application.
(6) The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00 per acre or fraction thereof of the proposed land disturbing activity, prior to issuing the permit. If the applicant does not comply with this section or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land disturbing activity and bring it into compliance. These provisions shall not apply unless there is in effect an ordinance or statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.
(c) Plan requirements.
(1) Plans must be prepared to meet the minimum requirements as contained in section 111-4(b) and (c), or through the use of more stringent, alternate design criteria which conform to sound conservation and engineering practices. The "Manual for Erosion and Sedimentation Control in Georgia" is hereby incorporated by reference into this chapter. The plan for the land disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land disturbing activity shall meet the education and training certification requirements, dependent on his level of involvement with the process, as developed by the commission and in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.
(2) Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the land disturbing activity was permitted.
(d) Permits.
(1) Permits shall be issued or denied as soon as practicable but in any event not later than 45 days after receipt by the local issuing authority of a completed application, providing variances and bonding are obtained, where necessary, and all applicable fees have been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken.
(2) No permit shall be issued by the Local Issuing authority unless the erosion, sedimentation and pollution control plan has been approved by the district and the local issuing authority has affirmatively determined that the plan is in compliance with this ordinance, any variances required by section 111-4(c)(15)(16) and (17) are obtained, bonding requirements, if necessary, as per section 111-5(b)(6) are met and all ordinances and rules and regulations in effect within the jurisdictional boundaries of the local issuing authority are met. If the permit is denied, the reason for denial shall be furnished to the applicant.
(3) Any land disturbing activities by a local issuing authority shall be subject to the same requirements of this chapter, and any other ordinances relating to land development, as are applied to private persons, and the division shall enforce such requirements upon the local issuing authority.
(4) If the tract is to be developed in phases, then a separate permit shall be required for each phase.
(5) The permit may be suspended, revoked, or modified by the local issuing authority, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this chapter. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit.
(6) The LIA may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A. § 12-7-7(f)(1).
(Code 1996, § 6-405; Ord. of 10-13-2009; Ord. No. 2019-07, § 1, 12-10-2019) Sec. 111-6. Inspection and enforcement.
(a) The department of planning and zoning will periodically inspect the sites of land disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. Also, the local issuing authority shall regulate primary, secondary and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land disturbing activities.
Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land disturbing activities. If, through inspection, it is deemed that a person engaged in land disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this chapter, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures must be completed. If the person engaged in the land disturbing activity fails to comply within the time specified, he shall be deemed in violation of this chapter.
(b) The local issuing authority must amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975 (O.C.G.A. § 12-7-1 et seq.).
(c) The department of engineering and inspections/planning and zoning shall have the power to conduct such investigations as it may reasonably deem necessary to carry out duties as prescribed in this chapter, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land disturbing.
(d) No person shall refuse entry or access to any authorized representative or agent of the local issuing authority, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.
(e) The districts or the commission, or both, shall semi-annually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a).
The district or the commission, or both, may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the county's or municipality's erosion, sedimentation and pollution control program. The districts or the commission shall notify the division and request investigation by the division if any deficient or ineffective local program is found.
(f) The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). Such review may include, but shall not be limited to, review of the administration and enforcement of a governing authority's ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A. § 12-7-8(a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. § 12-7-7(e), the division shall notify the governing authority of the county or municipality in writing. The governing authority of any county or municipality so notified shall have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority. If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division shall revoke the certification of the county or municipality as a local issuing authority.
(Code 1996, § 6-406; Ord. of 10-13-2009) Sec. 111-7. Penalties and inspections.
(a) Failure to obtain a permit for land disturbing activity. If any person commences any land disturbing activity requiring a land disturbing permit as prescribed in this chapter without first obtaining said permit, the person shall be subject to revocation of his business license, work permit or other authorization for the conduct of a business and associated work activities within the jurisdictional boundaries of the local issuing authority.
(b) Stop-work orders.
(1) For the first and second violations of the provisions of this chapter, the director or the local issuing authority shall issue a written warning to the violator. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or the local issuing authority shall issue a stop-work order requiring that land disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land disturbing activities are conducted without obtaining the necessary permit, the director or the local issuing authority shall issue an immediate stop-work in lieu of a warning;
(2) For a third and each subsequent violation, the director or the local issuing authority shall issue an immediate stop-work order;
(3) All stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred; and
(4) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by the local issuing authority or by the director or his designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop-work order shall be issued by the local issuing authority or by the director or his designee. All such stop-work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. Such stop-work orders shall apply to all land disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.
(c) Administrative penalties: Any issuance of a stop work order may be accompanied by administrative fines of up to $1,000.00 per day per violation until such time as all issues of non-compliance that constitute a violation are brought into compliance and a site inspection has been conducted by the department of engineering. Any administrative fine assessed under this paragraph may be appealed in accordance with section 111-9(a). In lieu of a $1,000.00 per day administrative fine, a magistrate court citation may be issued with fines up to $2,500.00 per day as outlined in subsection (e) below.
(d) Bond forfeiture. If, through inspection, it is determined that a person engaged in land disturbing activities has failed to comply with the approved plan, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land disturbing activity fails to comply within the time specified, he shall be deemed in violation of this chapter and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of section 111-5(b)(6). The issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land disturbing activity and bring it into compliance.
(e) Monetary penalties. Any person who violates any provisions of this chapter, or any permit condition or limitation established pursuant to this chapter, or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provided in this chapter shall be liable for a civil penalty not to exceed $2,500.00 per day. For the purpose of enforcing the provisions of this chapter, notwithstanding any provisions in any city Charter to the contrary, municipal courts shall be authorized to impose a penalty not to exceed $2,500.00 for each violation. Notwithstanding any limitation of law as to penalties which can be assessed for violations of county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this chapter under county ordinances approved under this chapter shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or failure or refusal to comply continues shall be a separate violation.
(Code 1996, § 6-407; Ord. of 10-13-2009; Ord. No. 09-2023, § 1, 6-13-2023) Sec. 111-8. Education and certification.
(a) Persons involved in land development design, review, permitting, construction, monitoring, or inspection of any land disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A.
§ 12-7-20.
(b) For each site on which land disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirement developed by the commission present on site whenever land disturbing activities are conducted on that site. A project site shall herein be defined as any land disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.
(c) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this chapter.
(d) If a state general permittee who has operational control of land disturbing activities for a site has met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A. § 12-7-1(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said subsection.
(Code 1996, § 6-408; Ord. of 10-13-2009) Sec. 111-9. Administrative appeal judicial review.
(a) The suspension, revocation, modification, or grant with condition of a permit by the local issuing authority upon finding that the project is not in compliance with the approved erosion and sediment control plan; or that the project is in violation of permit conditions; or that the project is in violation of any portion of this article; or that a stop work order is warranted; or that an administrative fine is assessed; shall entitle the person submitting the plan or holding the permit to a hearing before the Bryan County Board of Appeals within 30 days after receipt by the local issuing authority of written notice of appeal. Any such written notice of appeal must be tendered to the Bryan County Community Development Director within 30 days of the challenged action or determination.
(b) Judicial review. Any person aggrieved by a decision or order of the local issuing authority, after exhausting his administrative remedies, shall have the right to appeal de novo to the superior court of the county.
(Code 1996, § 6-409; Ord. of 10-13-2009; Ord. No. 09-2023, § 3, 6-13-2023) Sec. 111-10. Liability.
(a) Neither the approval of a plan under the provisions of this chapter, nor the compliance with provisions of this chapter shall relieve any person from the responsibility for damage to any person or property otherwise imposed by law nor impose any liability upon the local issuing authority or district for damage to any person or property.
(b) The fact that a land disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this chapter or the terms of the permit.
(c) No provision of this chapter shall permit any persons to violate the Georgia Erosion and Sedimentation Act of 1975 (O.C.G.A. § 12-7-1 et seq.), the Georgia Water Quality Control Act (O.C.G.A. § 12-5-20 et seq.) or the rules and regulations promulgated and approved thereunder or pollute any waters of the state as defined thereby.
(Code 1996, § 6-410; Ord. of 10-13-2009) Chapter 112
RESERVED
Chapter 113
TELECOMMUNICATIONS ANTENNAS
ARTICLE I. IN GENERAL
Sec. 113-1. Definitions.
The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Alternative tower structures means clock towers, bell towers, church steeples, light/power poles, electric transmission towers, manmade trees (without accessory buildings/structures), and similar natural or manmade alternative-design mounting structures that camouflage or conceal the presence of antennas and towers.
Antenna means any exterior apparatus designed for wireless telecommunications, radio, or television communications through the sending and/or receiving of electromagnetic radiation.
Co-location means the placement of the antennas of two or more service providers upon a single tower or alternative tower structure.
Department means the county department of planning and zoning.
Erected includes the words "constructed," "located" or "relocated."
FAA means the Federal Aviation Administration.
FCC means the Federal Communications Commission.
Geographic antenna placement area means the general vicinity within which the placement of an antenna is necessary to meet the engineering requirements of an applicant's cellular network or other broadcasting need.
Governing authority means the board of commissioners of the county or other governmental entity controlling affected real property.
Guy tower means a tower that is supported, in whole or in part, by guy wires and ground anchors.
Height, when referring to a tower or other structure, means the distance measured from ground level to the highest point on the tower structure of appurtenance.
Lattice tower means a tower that has open-framed supports on three or four sides and is constructed without guy wires or ground anchors.
Map or zoning map means the zoning map of the county.
Monopole tower means a telecommunications tower constructed of a single pole, without guy wires or ground anchors.
Parcel includes the word "plot" or "lot."
Pre-existing towers and antennas means structures as set forth in section 113-26.
Scenic views are those geographic areas containing visually significant or unique natural features, as identified in the county comprehensive plan.
Tower means any structure that is designed and constructed primarily for the purpose of supporting one or more antennas, including self-supporting lattice towers, guy towers, or monopole towers. The term "tower" includes radio and television transmission towers, microwave towers, common-carrier towers, cellular telecommunication towers, manmade trees (with accessory buildings/structures) and other similar structures.
Used or occupied include the words "intended, arranged or designed to be used or occupied."
Visual quality is the appropriate design, arrangement, and location of tower structures in relation to the built or natural environment to avoid abrupt or severe differences.
(Code 1996, ch. 25, § 201; Ord. of 1-9-2001) Sec. 113-2. Purpose.
This chapter is designed and intended to balance the interests of the residents of the county, telecommunications providers, and telecommunications customers in the siting of telecommunications facilities with the county so as to protect the health, safety and integrity of residential neighborhoods and foster, through appropriate zoning and land use controls, a competitive environment for telecommunications carriers that does not unreasonably discriminate among providers of functionally equivalent services and shall not prohibit or have the effect of prohibiting the provision of personal wireless services, and so as to promote the county as a proactive county in the availability of wireless telecommunication service. To that end, this chapter shall:
(1) Provide for the appropriate location and development of telecommunications facilities to serve the residents and businesses of the county;
(2) Protect the county's built and natural environment by promoting compatible design standards for telecommunications facilities;
(3) Minimize adverse visual impacts of telecommunications facilities through careful design, siting, landscape, screening and innovative camouflaging techniques;
(4) Avoid potential damage to adjacent properties from tower or antennae failure through engineering and careful siting of telecommunications tower structures and antennae;
(5) Maximize use of any new and existing telecommunications towers so as to minimize the need to construct new towers and minimize the total number of towers throughout the county;
(6) Maximize and encourage use of alternative telecommunication tower structures as a primary option rather than construction of additional single use towers; and
(7) Encourage and promote the location of new telecommunications facilities in areas which are not likely to adversely impact property values, aesthetics or the health or safety of the populace.
(Code 1996, ch. 25, § 101; Ord. of 1-9-2001) Secs. 113-3—113-22. Reserved.
ARTICLE II. REQUIREMENTS
Sec. 113-23. District height limitations.
Except as set forth in section 113-24 the requirements of this chapter shall govern the location of telecommunications and wireless commercial towers that exceed, and antennas that are installed at a height in excess of, 50 feet.
(Code 1996, ch. 25, § 301; Ord. of 1-9-2001) Sec. 113-24. Governmental exemption.
The provisions of this chapter shall not apply to governmental facilities and structures. Private facilities and structures proposed for placement on governmentally-owned property shall not be exempt.
(Code 1996, ch. 25, § 302; Ord. of 1-9-2001) Sec. 113-25. Amateur radio, receive-only antennas.
This chapter shall not govern any tower, or the installation of any antenna, that is 70 feet or less in height and is owned and operated by a federally-licensed amateur radio station operator from the operator's residence, or is used exclusively as a receive-only antenna.
(Code 1996, ch. 25, § 303; Ord. of 1-9-2001) Sec. 113-26. Pre-existing towers and antennas.
(a) Any tower or antenna for which a permit has been properly issued prior to the effective date of the ordinance from which this chapter is derived shall not be required to meet the provisions of this chapter, other than the requirements of the Federal Government and Buildings Codes and Safety Standards. Any such towers or antennas shall be referred to in this chapter as "pre-existing towers" or "pre-existing antennas."
(b) If an additional antenna is co-located upon a pre-existing tower after adoption of the ordinance from which this chapter is derived, then fencing and landscaping requirements of sections 113-34 and 113-35 shall be met as part of permitting processing. If any non-economic hardships exist in meeting the requirements of sections 113-34 and 113-35, the request to waive the requirement must be submitted in writing and shall be approved or disapproved by the director of planning and zoning.
(Code 1996, ch. 25, § 304; Ord. of 1-9-2001) Sec. 113-27. Pre-existing antenna on existing structures.
Any antenna located on any existing structure (i.e., existing towers, water tanks, buildings, utility poles, street lights, etc.) is exempted from this chapter. Any monopole tower and antenna 100 feet or less in height, located in an electrical substation is exempted from this chapter.
(Code 1996, ch. 25, § 305; Ord. of 1-9-2001) Sec. 113-28. Principal or accessory use.
A tower and/or antenna is considered a principal use if located on any lot or parcel of land as the sole or primary structure, and is considered an accessory use if it is located on a lot or parcel shared with a different existing primary use or existing structure. An existing use or structure on the same lot or parcel shall not preclude the installation of an antenna or tower. For purposes of determining whether the installation of a tower or antenna complies with zoning district requirements, including, but not limited to, setback, buffer and other requirements, the dimensions of the entire lot or parcel shall control, even though the antenna or tower may be located on a leased area within such lot or parcel. Towers that are constructed, and antennas that are installed, in accordance with the provisions of this chapter shall not be deemed to constitute the expansion of a nonconforming use or structure.
(Code 1996, ch. 25, § 401; Ord. of 1-9-2001) Sec. 113-29. Inventory of existing sites.
(a) To facilitate the co-location of antennas, each applicant seeking to locate a new tower, alternative tower structure or antenna, or modify any such existing structure, shall provide to the department an inventory of its existing towers or alternative tower structures and inventory of facilities. Applicants seeking to erect an amateur radio tower or antenna shall be exempt from this provision.
(b) The inventory shall include all such structures that are within the jurisdiction of the governing authority; within a municipality located in the county; or within one-quarter mile of the boundary line of the county and shall include specific information about the location (latitude and longitude coordinates), height, design, tower type and general suitability for antenna co-location of each tower, and other pertinent information as may be required by the department. The department may share such information with other applicants or organizations seeking to locate towers or antennas within the jurisdiction of the governing authority; provided, however, that the department is not, by sharing such information, in any way representing or warranting that such sites are available or suitable.
(Code 1996, ch. 25, § 402; Ord. of 1-9-2001) Sec. 113-30. Co-location—Design requirements.
The board of commissioners of the county encourage co-location of antennas and especially building new towers with design capable of holding multiple co-locations. In addition to all applicable building and safety codes, all towers, except amateur radio towers, shall be designed to accommodate the co-location of cellular telecommunication antennas according to the following:
(1) For towers up to 150 feet in height, the structure and fenced compound shall be designed to accommodate at least two providers.
(2) For towers greater than 150 feet in height, the structure and fenced compound shall be designed to accommodate at least four or more providers.
(Code 1996, ch. 25, § 403; Ord. of 1-9-2001) Sec. 113-31. Same—Availability of suitable existing structures.
No new tower, except amateur radio towers, shall be permitted unless the applicant demonstrates to the satisfaction of the department and the board of commissioners that no existing tower or existing alternative tower structure can accommodate the applicant's proposed antenna. All evidence submitted shall be signed and sealed by appropriate licensed professionals or qualified industry experts. Evidence submitted to demonstrate that no existing tower or structure can accommodate the proposed antenna shall consist of one or more of the following:
(1) That no existing towers or suitable alternative tower structures are located within the geographic antenna placement area required to meet the applicant's engineering requirements.
(2) That existing towers or structures are not of sufficient height to meet the applicant's engineering requirements.
(3) That existing towers or structures do not have sufficient structural strength to support the applicant's antenna and related equipment.
(4) That the applicant's proposed antenna(s) would cause electromagnetic interference with the antenna(s) on the existing towers or structures, or the antenna on the existing towers or structures would cause interference with the applicant's proposed antenna.
(5) That the cost or contractual provisions required by the tower owner to share an existing tower or structure or to adapt an existing tower or structure for sharing are unreasonable. Costs exceeding new tower development are presumed to be unreasonable.
(6) That the applicant adequately demonstrates that there are other limiting factors that render existing towers and structures unsuitable.
(Code 1996, ch. 25, § 404; Ord. of 1-9-2001) Sec. 113-32. Aesthetics.
The guidelines set forth in this section shall rule the design and construction of all towers, and the installation of all antennas, governed by this chapter.
(1) Towers and/or antennas shall either maintain a galvanized steel or concrete finish or, subject to any applicable standards of the FAA, be painted a neutral color, or painted and/or textured to match the existing structure so as to reduce visual obtrusiveness. If federal or state regulations require, telecommunication facilities shall maintain a galvanized steel finish or other required finish.
(2) At all tower sites, the design of all buildings and related structures shall use materials, colors, textures, screening, and landscaping that will blend the tower facilities to the natural setting and building environment.
(3) For antennas installed on a structure other than a tower, the antenna and supporting electrical and mechanical ground equipment shall be of a neutral color so as to make the antenna and related equipment visually unobtrusive.
(4) Towers shall not be artificially lighted, unless required by the FAA or other applicable authority.
If lighting is required, the governing body shall review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding area and views.
The lighting shall be dimmed or changed to red lights from sunset to sunrise.
(5) No signage or other identifying markings of a commercial nature shall be permitted upon any tower or alternative tower structure within the county. No signs other than those required by the FCC or other governing authority with jurisdiction over the tower site are permitted.
(Code 1996, ch. 25, § 405; Ord. of 1-9-2001) Sec. 113-33. Setbacks and separations.
(a) No tower shall be located any closer than the height of the tower to any property line.
(b) Guy towers and lattice towers shall not be located any closer than 500 feet or three times the height of the tower, whichever is greater, to any habitable residential structure. Provided, further, that no anchor point of a guy wire shall be located closer than 25 feet to any property line.
(c) The setback requirements herein shall not apply to any building related to the operation or maintenance of the tower; provided, however, that all other setbacks contained in the zoning ordinance of the county shall apply to buildings related to the operation or maintenance of the tower.
(Code 1996, ch. 25, § 406; Ord. of 1-9-2001; Ord. of 11-13-2001) Sec. 113-34. Security fencing/anti-climbing devices.
(a) All towers and supporting equipment shall be enclosed by fencing not less than six feet in height and shall also be equipped with appropriate anti-climbing devices. Fencing shall be of chain link, wood or other approved alternative. This requirement may be waived by the planning director if it is deemed that this would produce negative visual clutter or obstruct a view corridor.
(b) All fences shall be maintained all the time.
(c) For guy towers, each guy anchor shall also be enclosed by security fencing not less than six feet in height with fence line set back at least ten feet from the guy anchor.
(d) Amateur radio towers and antennas, or receive-only antennas, shall not be subject to the provisions of this section unless required by the board of commissioners through the conditional use permit.
(Code 1996, ch. 25, § 407; Ord. of 1-9-2001) Sec. 113-35. Landscaping.
(a) Where adequate vegetation is not present, tower facilities shall be landscaped with a landscaped strip of plant materials which effectively screens the view of the tower compound. Landscaped strips shall be a minimum of ten feet in width and located outside of the fenced perimeter of the compound.
(b) The landscaped buffer area shall consist of materials of the evergreen variety sufficient to provide screening that will minimize the visual impact. Said evergreen plantings shall be of a variety capable of growing to a height of at least ten feet within ten years of planting.
(c) All required landscaping shall be properly maintained to ensure good health and vitality.
(d) The use of existing vegetation shall be preserved to the maximum extent practicable.
(e) Camouflaged towers designed to look like trees shall be exempt from the requirements of this section.
(f) The applicant may submit for approval alternative landscaping plans that meet the purpose of this section to limit the visual impact of towers. In locations where the visual impact of the tower would be minimal, the landscaping requirements may be reduced or waived by the director of planning and zoning.
(g) Amateur radio towers and antennas, or receive-only antennas, shall not be subject to the provisions of this section unless required by the board of commissioners through conditional use permit.
(Code 1996, ch. 25, § 408; Ord. of 1-9-2001) Sec. 113-36. Federal and state requirements.
All towers must meet or exceed current standards and regulations of the FAA, the FCC and any other agency of the federal or state government with the authority to regulate towers and antennas. If such standards and regulations are changed, the owners of the towers and antennas governed by this chapter shall bring such towers and antennas into compliance with such revised standards and regulations within six months of the effective date of such standards and regulations unless a more or less stringent compliance schedule is mandated by the controlling federal or state agency.
(Code 1996, ch. 25, § 409; Ord. of 1-9-2001) Sec. 113-37. Building code and safety standards.
To ensure the structural integrity of towers, the owner, permittee or subsequent lessee of a tower or alternative tower structure shall ensure that it is maintained in compliance with standards contained in applicable local building codes and the applicable standards for towers that are published by the Electronic Industries Association, as amended from time to time. If, upon inspections, the department concludes that a tower fails to comply with all applicable codes and standards, or constitutes a danger to persons or property, then upon receipt of written notice by the owner, permittee or lessee of the tower, said party shall have 15 days to bring the tower in compliance with such standards. If the owner, permittee, or lessee fails to bring the tower into compliance within 15 days, the governing authority may remove the tower at the owner's, permittee's, or lessee's expense. Prior to the removal of any tower, the department may consider detailed plans submitted by the owner, permittee or subsequent lessee for repair of substandard towers, and may grant a reasonable extension of the above-referenced compliance period.
(Code 1996, ch. 25, § 410; Ord. of 1-9-2001) Sec. 113-38. Change of ownership notification.
Upon the transfer of ownership of any tower, alternate tower structure, or lot upon which such a structure has been erected, the tower permittee shall notify the department of planning and zoning of the transaction in writing within 30 days.
(Code 1996, ch. 25, § 411; Ord. of 1-9-2001) Sec. 113-39. Advertising.
There shall be no advertising permitted on the tower or tower site. The tower shall not contain any signs for the purposes of advertising. Nameplates for the purposes of self-identification shall not be considered advertising.
(Code 1996, ch. 25, § 412; Ord. of 1-9-2001) Sec. 113-40. Local government co-location requirements.
All new towers and existing towers, if applicable, shall consider co-location, installation of communication facilities or any such related facilities for local government use, emergency use purposes, and be approved by the board of commissioners.
(Code 1996, ch. 25, § 413; Ord. of 1-9-2001) Secs. 113-41—113-68. Reserved.
ARTICLE III. PERMITTED USES
Sec. 113-69. General.
The uses listed in this article are deemed to be permitted uses and shall not require administrative review or approval of a conditional use permit. However, all such uses shall comply with requirements of this chapter and all other applicable codes and ordinances.
(Code 1996, ch. 25, § 501; Ord. of 1-9-2001) Sec. 113-70. Co-location of antennas required.
Applicants for the erection of a tower or placement of an antenna shall be required to co-locate upon an existing tower or alternative tower structure. An exception to co-locate shall only be made if the applicant adequately demonstrates that an existing tower suitable for co-location does not exist in the geographic antenna placement area utilizing the tower inventory maintained by the department, and that no suitable alternative tower structure is available as set forth in section 113-30.
(Code 1996, ch. 25, § 502; Ord. of 1-9-2001) Sec. 113-71. Permitted uses.
If it is adequately demonstrated that antenna co-location, as required in section 113-69, is not possible for a given geographic antenna placement area, the following uses are permitted: Constructing a new tower, including the placement of additional buildings or other supporting equipment used in connection with said tower or antenna, in the following zoning districts is permitted:
(1) In I-1 (general industrial district), and I-L (light industrial district) zoning districts, telecommunications facilities shall be allowed as use by right. Telecommunication towers are permitted as use by right up to a height of 180 feet following design review and approval by the director.
Telecommunications towers greater than 180 feet in height shall require a conditional use permit. An additional 30 feet may be allowed by right for towers which provide proof of three or more companies/providers locating on the same tower.
(2) In B-1 (neighborhood commercial district), B-2 (general commercial district), and C-I (interchange commercial district), antennas shall be allowed as a use by right on existing structures.
Monopole towers up to a height of 70 feet shall be permitted. New towers and antennas greater than 70 feet in height shall be allowed if permitted by a conditional use permit approved by the board of commissioners following design review by the director.
(3) In A-5 (agricultural district), telecommunication towers are permitted as a use by right up to height of 180 feet, provided meeting setback of distance of equal to the height of the tower from all habitable buildings or structures, public rights-of-way, and property lines of any adjacent property. Setback regulations for monopole tower, guy tower and lattice tower set in section 113-33 shall apply.
(4) Except as set forth in this section or listed elsewhere, telecommunication facilities shall not be permitted in AR-2.5 (agricultural residential district), AR-1.5 (agricultural residential district), AR-1 (agricultural residential district), R-30 (residential district), R-1 (single family residential district), R-3 (multi-family residential district), R-4 (manufactured housing park), BN (neighborhood business district), WP (waste management district), WB-1, WB-2, WB-3 (waterfront business and commercial district), PUD (planned unit development) and DM-1 (dunes and marshland districts) nor within 1,500 feet of a river corridor as defined in O.C.G.A. § 12-2-8 or as so delineated under the county comprehensive land use plan, whichever distance is greater.
Telecommunication facilities shall be allowed only if the applicant provides evidence that such placement is a technological necessity in order to for the applicant to be in compliance with federal law; upon such evidence, such use shall be allowed if approved with the conditional use permit by the board of commissioners following design review by the director.
(5) Telecommunications facilities outside the guidelines listed above may only be built upon approval of a conditional use permit except for variances to the zoning ordinance setbacks for a specific zoning district which shall be presented to the zoning board of appeals unless the request is part of a conditional use permit which is presented to the board of commissioners.
(Code 1996, ch. 25, § 503; Ord. of 1-9-2001) Sec. 113-72. Preferred location sites.
(a) Publicly used structures. Publicly used structures are preferred locations throughout the county, and due to their institutional or infrastructure uses are generally similar in appearance to or readily adaptable for telecommunication facilities. Therefore, telecommunications facilities should be less noticeable when placed on publicly used structures than when placed on commercial or residential structures. Publicly used structures include police or fire stations, libraries, community centers, civic centers, courthouses, utility structures, water towers, elevated roadways, bridges, flag poles, schools, hospitals, clock or bell towers, light poles and churches.
(b) Co-location sites. Any existing site on which a legal wireless telecommunications facilities is currently located shall be a preferred location site regardless of the underlying zoning designation of the site; however, that location which meets this criteria shall be subject to the design and siting components of this chapter and co-location sites shall not become an "antenna farm" or otherwise deemed by the director of the governing authority to be visually obtrusive.
(c) Industrial and commercial structures. Wholly industrial and commercial structures such as warehouses, factories, retail outlets, supermarkets, banks, garages, or service stations shall be preferred location sites particularly where existing visual obstructions or clutter on the roof or along a roof line can and will be removed as part of the installation of the telecommunication system.
(d) Mixed-use buildings in planned unit development districts. Mixed-use buildings (housing above commercial or other nonresidential space) are also preferred location sites.
(Code 1996, ch. 25, § 504; Ord. of 1-9-2001) Sec. 113-73. Public notice/appeal.
(a) At least ten days prior to the issuance of a building permit for the construction of a tower as a permitted use, the department shall cause a sign to be posted on the property and the publication of a public notice in a newspaper of general circulation within the territorial boundaries of the county. Said public notice shall state the nature of the application, street location of the proposal and height of the proposed structure.
(b) If during the public notice period an objection to the building permit application is raised, the validity of the application and all pertinent documentation shall be determined by the zoning board of appeals. The objection shall be placed on the first available agenda of regularly scheduled meeting following the expiration of the ten-day appeal period. The zoning board of appeals shall dispense with the objection by either:
(1) A determination that the application is valid and meets all applicable criteria of this article, which shall result in the issuance of building permit.
(2) A determination that the application is in error. Applications found to be in error must, as a result, be processed through the conditional use permit process set forth in article V of this chapter.
(Code 1996, ch. 25, § 505; Ord. of 1-9-2001) Sec. 113-74. Appeal of administrative determination.
If a building permit application for a tower as a permitted use is determined by the department of planning and zoning to not meet all applicable criteria of this chapter, the building permit applicant may appeal the determination to the zoning board of appeals. The zoning board of appeals shall dispense with the objection by either:
(1) A determination that the application is valid and meets all applicable criteria of this chapter, which shall result in the issuance of a building permit.
(2) A determination that the application does not satisfy all applicable criteria of this chapter.
Applications which do not satisfy all applicable criteria must, as a result, be processed through the conditional use permit process set forth in article V of this chapter.
(Code 1996, ch. 25, § 506; Ord. of 1-9-2001) Secs. 113-75—113-91. Reserved.
ARTICLE IV. ADMINISTRATIVE APPROVALS
Sec. 113-92. General application requirements for all building and conditional use permits.
Application for a building permit or conditional use permit for any telecommunication facility shall be made to the director. An application will not be considered until it is complete. The following information shall be submitted when applying for any building permit, conditional use permit or other permit or variance included in this chapter:
(1) Basic information:
a. Site plan to scale specifying the location of telecommunications facilities, transmission building and/or other accessory uses, access, parking, fences, landscaped area, and adjacent land uses.
b. Landscape plan to scale indicating size, spacing and type of plantings required in section 113-34.
c. An impact statement fully describing the effects that the proposed telecommunications facility will have on the environment and surrounding area, including the impacts on adjacent residential structures and districts, impacts on structures and sites of historic significance and impacts on streetscapes and significant view corridors. The impact statement shall include a description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personnel needs, equipment needs and traffic noise or safety impacts of such maintenance. A plan showing visual impact on neighboring properties and beyond covering area at least five times of the height of the proposed facility.
d. Report from professional structural engineer licensed in the state, documenting the following:
1. Telecommunication facility height and design, including technical, engineering, economic, and other pertinent factors governing selection of the proposed site;
2. Total anticipated capacity of the telecommunications facility, including number and types of antennas which can be accommodated;
3. Evidence of structural integrity of the tower structure (i.e., engineer's statement that structure is built to meet or exceed International Building Code);
4. Structural failure characteristics of the telecommunications tower(s) over 70 feet and demonstration that site and setbacks are of adequate size to contain debris; and
5. Setbacks for telecommunication tower(s) 70 feet and less shall not be closer to a residential structure than the height of the tower or closer to a residential property line than 40 feet, whichever is greater.
e. A definition of the area of service to be served by the antenna or tower and whether such antenna or tower is needed for coverage or capacity.
f. The identity of community liaison officer to resolve issues of concern to neighbors and residents relating to the construction and operation of the facility. Include name, address, telephone number, facsimile number and electronic mail address, if applicable.
g. The existing towers, tall structures, and related facilities located within the geographic service area should be identified on a map along with written justification as to the need for a new tower in place of an existing structure.
(2) A map indicating all existing towers, antennas, and related facilities sites located within the county and within a quarter mile of the county boundaries.
(3) The applicant must provide any other information which may be requested by the director, planning commission, board of commissioners, and/or zoning board of appeals to fully evaluate and review the application and the potential impact of a proposed telecommunications facility.
(4) The department shall respond to each application within 45 days of its receipt by either approving or denying the application. A 45-day extension of this review may be exercised by the department if such additional time is deemed necessary to adequately assess the request. If the department fails to respond to the applicant within a maximum of 90 days, the application shall be deemed to be approved.
(5) As part of any administrative approval, the department may administratively reduce setback requirements by up to ten percent to compensate for irregular shaped lots or parcels.
(6) If a request for administrative approval is denied, the applicant may appeal the decision to the zoning board of appeals. In such an instance, the zoning board of appeals may authorize such variances from the terms of this chapter as will not be contrary to the public interest where, owing to special conditions, a literal enforcement of the chapter will, in an individual case, result in unnecessary hardship, so that the spirit of the chapter shall be observed, public safety and welfare secured, and substantial justice is done. Such variances may be granted in such individual cases of unnecessary hardship upon a finding by the zoning board of appeals that the denial of the variance presents a significant detriment to the telecommunications service provider making application, and that the denial of the variance is insubstantially related to the public welfare.
(Code 1996, ch. 25, § 601; Ord. of 1-9-2001) Sec. 113-93. Co-location of antennas required.
Applicants for the erection of an antenna, except amateur radio operators, shall be required to co-locate upon an existing tower structure. An exception to co-location shall only be made if the applicant adequately demonstrates that an existing tower suitable for co-location does not exist in the geographic antenna placement area utilizing the tower inventory maintained by the department, and that no suitable alternative tower structure is available as set forth in section 113-30.
(Code 1996, ch. 25, § 602; Ord. of 1-9-2001) Sec. 113-94. Uses allowed by administrative approval.
The following uses may be approved by the department after conducting an administrative review:
(1) Installation of an antenna on any alternative tower structure, and further including the placement of additional buildings or other supporting equipment used in connection with said antenna, so long as such addition does not add more than 20 feet to the height of the existing structure.
(2) Installation of an antenna on an existing tower of any height, including a pre-existing tower, and further including the placement of additional buildings or other supporting equipment used in connection with said antenna, so long as the addition of said antenna adds no more than 20 feet.
(3) Installation of a tower, where the property cannot meet the setback requirements within its own property lines. The applicant/property owner may provide a bona fide proof of approval/no objection from the adjacent or beyond property owner(s), to meet setback requirements. The request may be combined with section 113-92(5).
(Code 1996, ch. 25, § 603; Ord. of 1-9-2001) Secs. 113-95—113-116. Reserved.
ARTICLE V. CONDITIONAL USE PERMIT
Sec. 113-117. General.
(a) If the proposed location, height, setback, or other aspect of a tower or antenna cannot comply with the minimum requirements established in article III or IV of this chapter, then a conditional use permit shall be required for the construction of a tower or the placement of an antenna in any zoning district.
(b) The following provisions shall also govern the issuance of conditional use permit for telecommunication and personal wireless service towers and antennas:
(1) In granting a conditional use permit, the board of commissioners may impose conditions to the extent that it concludes such conditions are necessary to minimize adverse effects from the proposed tower on adjoining or nearby properties.
(2) All information of an engineering nature that the applicant submits, whether civil, mechanical, or electrical, shall be certified by a licensed professional engineer or qualified industry expert.
However, amateur radio antennas shall meet the requirements of the county construction code.
(Code 1996, ch. 25, § 701; Ord. of 1-9-2001) Sec. 113-118. Applications; contents; fee.
All applications for conditional use permits shall be submitted to the department of planning and zoning. Each application shall contain as a part thereof detailed plans and specification as set forth in article IV of this chapter. An application for conditional use permit shall not be accepted for processing without the information required in this article. An application fee shall be charged by the department in an amount stated in the schedule of fees and charges.
(Code 1996, ch. 25, § 702; Ord. of 1-9-2001) Sec. 113-119. Co-location of antennas required.
Applicants for the erection of a tower or antenna, except amateur radio operators, shall be required to co-locate upon an existing tower structure. An exception to co-location shall only be made if the applicant adequately demonstrates that an existing tower suitable for co-location does not exist in the geographic antenna placement area utilizing the tower inventory maintained by the department, and that no suitable alternative tower structure is available as set forth in section 113-30.
(Code 1996, ch. 25, § 703; Ord. of 1-9-2001) Sec. 113-120. Public hearing.
Before taking action upon the conditional use permit, the board of commissioners shall hold a public hearing on the matter. At least 15 days prior to the date of the public hearing, the board of commissioners shall cause the following notice requirements to be instituted by the department of planning and zoning:
(1) A sign shall be erected, in a conspicuous location, on or adjacent to the property under consideration. The sign shall state the time, place, location and purpose of the public hearing.
(2) A letter shall be sent by regular mail to all property owners of records of abutting parcels, and all residentially-zoned parcels lying in whole or in part within a distance of two times the height of the proposed tower as measured from its base, giving notice of the public hearing. Owners of records shall be as indicated by the county tax commissioners records. The letter shall state the same information as required for the sign.
(Code 1996, ch. 25, § 704; Ord. of 1-9-2001) Sec. 113-121. Consideration in approval or denial of a conditional use permit.
Any denial of a request to place, construct or modify a telecommunications facility shall be in writing and supported by substantial evidence contained in a written record. The governing body shall consider the following factors in acting upon a conditional use permit application under the provisions of this chapter:
(1) The height and setbacks of the proposed tower;
(2) The proximity of the tower to residential structures and residential district boundaries;
(3) The nature of uses on adjacent and nearby properties;
(4) The surrounding topography;
(5) The surrounding tree coverage and foliage;
(6) The design of the tower, with particular references to design characteristics that have the effect of reducing or eliminating visual obtrusiveness;
(7) The proposed ingress and egress;
(8) The availability of suitable existing tower or other structures for antenna co-location; and
(9) The impact of the proposed tower upon scenic views and visual quality of the surrounding area.
(Code 1996, ch. 25, § 705; Ord. of 1-9-2001) Secs. 113-122—113-140. Reserved.
ARTICLE VI. REMOVAL OF ABANDONED TOWERS AND ANTENNAS
Sec. 113-141. Removal of antennae and towers.
(a) Any telecommunications facility that is not operated for a continuous period of 12 months shall be considered abandoned, whether or not the owner or operator intends to make use of it or any part of it. The owner of a telecommunications facility and the owner of the property where the facility is located shall be under a duty to remove the abandoned telecommunications facility. If such antenna and/or tower is not removed within 60 days of receipt of notice from the county notifying the owner(s) of such abandonment, the county may remove such tower and/or antenna and place a lien upon the property for the costs of removal or seek costs incurred through court action. The county may pursue all legal remedies available to it to ensure that abandoned telecommunications facilities are removed. Delay by the county in taking action shall not in any way waive the county's right to take action. The county may seek to have the telecommunications facility removed regardless of the owner's or operator's intent to operate the tower or antenna and regardless of any permits, federal, state, or otherwise, which may have been granted.
(b) If the owner of an abandoned tower or antenna wishes to use such abandoned tower or antenna, the owner first must apply for and receive all applicable permits and meet all the conditions of this chapter as if such tower or antenna were a new tower or antenna.
(c) Prior to commencement of construction of any telecommunications facilities, the owner shall post a surety bond in an amount of not less than the estimate cost of removal of tower and associated structures; which may be utilized by the county for cost of removal of the tower if abandoned, which bond shall be cumulative to any other remedy at law or as otherwise set forth in this chapter.
(Code 1996, ch. 25, § 801; Ord. of 1-9-2001) Sec. 113-142. Application and permit fees.
The following fees will be required of any applicant submitting an application:
(1) Administrative approval of new tower construction. An application for construction of a new tower up to a height of 210 feet in I-1 and I-L zoning districts, otherwise eligible for administrative approval, shall be as established by the board.
(2) Administrative approval of antenna location on tower or alternative tower structure. An application for location of an antenna on an existing tower or alternative tower structure (so long as the addition of said antenna adds no more than 20 feet to the height of the existing tower or structure), otherwise eligible for administrative approval, shall be as established by the board.
(3) Conditional use permit for construction of new tower. An application for construction of a new tower (including the placement of additional buildings or other supporting equipment used in connection with said tower or antenna) not eligible for administrative approval shall be as established by the board.
(4) Conditional use permit for location of antenna on tower or alternative tower structure. An application for location of an antenna on an existing tower or alternative tower structure, not eligible for administrative approval, shall be as established by the board.
(5) Building permit fee. In addition to the application fees set forth herein, the applicable construction and utility inspection permit fees in effect at the time of the application for the permit shall apply. The foregoing permit fees shall be in addition to any and all other costs and expenses required by this section to be borne by the applicant.
(Code 1996, ch. 25, § 803; Ord. of 1-9-2001) Chapter 114 Appendices Appendix A: Table of Amendments to UDO Text.
Appendix B: Table of Amendments to Zoning Map.
Appendix C: Reserved.
Appendix D: Development Application Requirements.
Appendix E: Road Classification Plan.
Appendix F: Consolidated Table Of Authorized Land Uses.
ARTICLE I. CODE ADMINISTRATION
This article sets forth general provisions, describing the UDO's purposes, organization, applicability and administration.
Sec. 114-100. Title.
This chapter shall be known and may be cited as the "Unified Development Ordinance of Bryan County, Georgia" ("UDO").
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-101. Purpose.
The purposes of this UDO are to:
(a) Promote and protect the health, safety, prosperity, and welfare of the citizens of Bryan County ("county");
(b) Achieve the goals and objectives of the county's comprehensive plan through effective zoning and subdivision regulation;
(c) Maintain the county's appearance;
(d) Conserve and protect the natural, scenic, environmental and historic resources of the county;
(e) Provide adequate light, water, and air;
(f) Avoid both undue concentration of population and urban sprawl;
(g) Facilitate the adequate provision of transportation, water, sewerage, schools, parks and other public requirements;
(h) Protect property against blight and depreciation;
(i) Encourage the most appropriate use of land and structures throughout the county;
(j) Support the fiscal health of the county;
(k) Maintain the economic viability of the forestry and agricultural resources of the county;
(l) Promote site and building designs and development that foster safe, healthy, and sustainable neighborhoods;
(m) Ensure that residential and commercial lots within the county will be of such design, area, and width as will prevent health and sanitation problems;
(n) Prevent and reduce traffic congestion and traffic hazards within the county;
(o) Provide buffers to ensure compatibility between uses, protect property values, and maintain the rural character and scenic beauty of the county;
(p) Ensure that drainage systems for development within the county are constructed to avoid adverse impacts on the natural drainage systems for surrounding properties;
(q) Reduce maintenance problems with roads, drainage and other subdivision and non-residential development improvements within the county;
(r) Ensure the timely completion of improvements within subdivisions in the county;
(s) Ensure that the taxpayers of the county are not burdened with costs of completing subdivision improvements or correcting improperly constructed subdivision improvements, by having sufficient financial guarantees;
(t) Prevent development in areas of the county unsuitable for residential or commercial uses because of soils, wetlands, special flood hazard areas, or drainage characteristics;
(u) Ensure that all newly created lots within the county will be accessible to firefighting equipment and other emergency and service vehicles;
(v) Promote private investment in sustainable residential, mixed-use and non-residential development; and
(w) Foster a mix of housing types that provide housing options for county residents.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-102. Authority.
This UDO is adopted pursuant to the authority granted by the Constitution and statutes of the State of Georgia in accordance with applicable laws, statutes, ordinances and regulations of the State of Georgia to exercise authorized powers for zoning and subdivision regulations.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-103. Jurisdiction.
This UDO shall apply to all land and structures within the unincorporated areas of the county. For properties being proposed for annexation into a municipality, the county shall retain jurisdiction until such time all applicable provisions of O.C.G.A § 36-36-1 et seq. are satisfied.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-104. UDO organization.
The provisions of this UDO are organized into the following articles and appendices:
(a) Article I: Code Administration establishes general provisions for the application, interpretation and administration of the UDO.
(b) Article II: General Development Procedures establishes the general procedures for development applications, notice, reviews, actions and appeals.
(c) Article III: Development Procedures Requiring Public Hearings establishes the specific procedures for development applications, reviews, and actions for applications associated with approvals requiring public hearings.
(d) Article IV: Development Procedures Requiring Administrative Review establishes the specific procedures for development applications, reviews, and actions for applications that are approved by county staff.
(e) Article V: Zoning Districts and Uses establishes the zoning districts, the zoning map and district specific rules for the use of land within a district.
(f) Article VI: Site Development Standards establishes the rules for the design and improvement of lots and development sites, including standards for building location, building dimensions, lot and block design, parking and loading, landscaping, tree preservation, buffering, open space, recreational facilities, and signs.
(g) Article VII: Supplemental Conditions for Specific Uses establishes standards for specific uses that are supplemental to use standards established in article V or VI for specific zoning districts.
(h) Article VIII: Development Patterns and Design establishes site and building design standards and guidelines for a variety of development patterns.
(i) Article IX: Environmental Management references the county's floodplain management provisions that are included in chapter 105 of the County Code of Ordinances, references provisions of chapter 111 of the County Ordinances for stormwater management, and establishes additional standards for stormwater management, erosion control, and grading.
(j) Article X: Roads and Pedestrian Ways establishes standards for the design and improvement of roads, sidewalks, trails and other facilities.
(k) Article XI: Utilities establishes standards for water and sewer system improvements, in addition to requirements for electric, telecommunications and other utilities within county.
(l) Article XII: Non-Conforming Situations establishes rules for the continuation, modification, expansion, and termination of lots, uses and structures that do not conform to UDO standards.
(m) Article XIII: Interpretation and Definitions establishes specific rules for interpretation of language and definitions for terms used within the UDO.
(n) Appendices: Attached to and made part of this UDO are appendices listing amendments to the UDO text and zoning map, engineering design standards and development application requirements.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-105. UDO interpretation.
The regulations expressed in this document shall be considered as the minimum provisions for the protection of the health, safety, economy, good order, appearance, convenience and welfare of the general public. This UDO is intended to be administered with the flexibility to respond to unique circumstances of individual properties in ways that best achieve its purposes.
(a) This UDO establishes many, but not all, of the standards and procedures for development.
Other portions of the County Code shall apply to development, whether specifically referenced or not, including, but not limited to, flood hazard regulations, building codes, fire codes, utility, road and drainage design and engineering design standards.
(b) The issuance of any development approval pursuant to this UDO shall not relieve the recipient from the responsibility to comply with all other County, State or federal laws, ordinances, rules or regulations.
(c) References to other regulations or provisions of the UDO are for the convenience of the reader.
The lack of a cross-reference does not exempt a property, building, structure, or use from other regulations.
(d) The UDO contains numerous graphics, pictures, illustrations, and drawings to assist the reader in understanding and applying the UDO. However, to the extent that there is any inconsistency between the text of the UDO and any such graphic, picture, illustration, or drawing, the text controls unless otherwise provided in the specific section.
(e) Unless otherwise specified, when any requirement of this UDO results in a fraction, such as to the number of dwelling units or any other measurement, that fraction will be disregarded and the nearest lower number shall apply.
(f) Additional rules for interpreting language and the provisions are included in article XIII of this
UDO.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-106. UDO applicability.
(a) Generally. This UDO applies as follows:
(1) Use and occupancy. The UDO applies to the development, use, occupancy or sale of land or buildings as provided herein. For purposes of this section, the "use" or "occupancy" of a building or land relates to anything and everything that is done to, on or in a building or land.
(2) Building permits required. No building permits shall be issued until the community development director certifies that the proposed construction complies with this UDO.
(3) Certificate of occupancy. No lot, or structure or part thereof hereafter erected, moved or altered in its use, shall be occupied or used until the building official has, pursuant to the Code of Bryan County, Georgia ("County Code"), issued a certificate of occupancy. Such occupancy or use must also conform with the provisions of this UDO.
(4) Agricultural exemption. Agricultural land uses in the county are exempt from the UDO's land use regulations when the property is used for bona fide farm purposes and those uses are an integral part of the agricultural use. If bona fide agricultural uses occupy a portion of the property, then the agricultural uses on that portion of the property are exempt from the land use regulations. If the primary use is for non-agricultural purposes, then the property is not exempt.
If the property is subdivided so that all or portions of the property are no longer a bona fide farm, then such portions are not exempt. For purposes of this section, a bona fide farm use shall be established by the following evidence:
a. A farm sales tax exemption issued by the State Department of Revenue;
b. A copy of the property tax listing showing that the property is eligible for an agricultural property tax exemption;
c. A copy of the farm owner's or operator's Schedule F from the owner's or operator's most recent federal income tax return;
d. A forest management plan, if applicable; or
e. A Farm Identification Number issued by the United States Department of Agriculture Farm Service Agency.
(5) State and federal law. This UDO does not apply to activities that are exempted by State or Federal law.
(b) Limits on development and use of land. Except as herein specifically provided, no building shall be erected, converted, enlarged, reconstructed, moved or structurally altered, nor shall any building or land be used, except subject to the following limitations:
(1) No use may be established unless the use is permitted in the zoning district in which the use is located, pursuant to article V of this UDO.
(2) No more than one principal building may be located on one lot in a RR or R-15 district, unless otherwise authorized.
(3) No camper, shipping container, storage container, bus, tractor trailer, or other structure not specifically designed as a permanent residence may be used as a principal or accessory residential structure in an A, RR, or R district.
(4) No structure or land shall be occupied or used without first obtaining a certificate of occupancy or zoning verification.
(5) All uses shall comply with all applicable building, life safety, fire and health codes adopted by the county and all applicable regulations adopted by the county, state or federal governments.
(6) No development of property, e.g., clearing, grading, construction of infrastructure, shall be allowed until the necessary local, State, and federal permits and/or approvals are obtained.
(c) Subdivision of land. No land shall be subdivided, and no subdivision plat shall be filed for recording, recorded or modified except in conformance with this UDO. After the effective date of the UDO, unless a subdivision is approved in accordance with the provisions of this UDO:
(1) The county shall not accept the dedication of any subdivision improvements within such subdivision;
(2) The county shall not issue any building permits within such subdivision; and
(3) The clerk shall not record any plat of such subdivision or any plat of a lot within such subdivision.
(d) Transfer of land; permits. No parcel of land in a subdivision created after the adoption date of this UDO shall be transferred or sold; nor shall a building permit or certificate of occupancy be issued for any use or structure thereon, until a plat has been recorded with the clerk of court - real estate office in accordance with the provisions of this UDO.
(e) Pending actions. The adoption of this UDO will not affect any action, suit, or proceeding which may be pending at the effective date of this UDO.
(f) Government property. Property owned by Bryan County, the State of Georgia or the United States of America and used or held for governmental purposes, is not subject to this UDO.
(g) Minimum requirements. The requirements of this UDO are the minimum requirements for the promotion of the public health, safety and general welfare. The board of commissioners may impose additional requirements to ensure that proposed development will:
(1) Express and reflect the unique sense of place and the desirable qualities of county through innovative and sustainable design and architectural standards for development;
(2) Promote the use of the best available technology at a reasonable cost, using local, state and federal grants, loans, tax credits and deductions, for installation of energy and resource conservation measures, including green and sustainable building and neighborhood requirements for all public and private buildings, structures and land uses;
(3) Ensure that building projects are planned, designed, constructed, and managed to minimize adverse environmental impacts; to effectively manage stormwater; to conserve natural resources; to promote sustainable development; and to enhance the quality of life in the county;
(4) Reflect the transportation network of the region and provide within each development a framework of transportation alternatives and inter-connectivity, including automobiles, pedestrian, and bicycle systems to maximize access and mobility throughout the region; and
(5) Place high regard for the protection of individual property rights in appropriate balance with the community's need to implement the goals, objectives, policies and strategies of the comprehensive plan.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-107. Development under prior regulations.
Development under prior regulations shall be allowed, provided a valid development approval has not expired. All new applications shall comply with the provisions of this UDO. Legal non-conforming situations may continue in conformance with article XII of this UDO.
(a) Uses. Uses that were legally established under prior regulations may continue to operate subject to provisions for non-conforming uses in this UDO. Any use authorized by a conditional use permit approved prior to adoption of this UDO may be established if that use is established within six months of the adoption of this UDO or the community development director has determined that a vested right has been established pursuant to article IV, division 2.
(b) Structures. Existing structures established under prior regulations may continue to be used subject to applicable provisions for non-conforming structures in this UDO. Any structure authorized by a building permit or site plan approval prior to the adoption of this UDO may be constructed provided that a certificate of occupancy has been granted not more than 12 months after the adoption of this UDO or the community development director has determined that a vested right has been established pursuant to article IV, division 2.
(c) Site plans. Development pursuant to a site plan approved under prior regulations shall be allowed, provided that the community development director has determined that a vested right has been established pursuant to article IV, division 2.
(d) Subdivisions. Any subdivision that has received preliminary plat approval prior to adoption of this UDO may receive final plat approval under the regulations in effect at the time of the preliminary plat approval provided that said preliminary plat approval has not expired prior to submittal of the final plat and that the final plat is submitted within 18 months of adoption of this UDO. Pending subdivisions that do not meet the above criteria may be processed under existing regulations pursuant to the following conditions:
(1) A pending subdivision is a proposed subdivision that:
a. Is a continuation of the development of a contiguous tract by the applicant. As used herein, the term "continuation of the development of a contiguous tract" means that, prior to the effective date of this UDO, the applicant recorded a subdivision plat or plats that were approved by the planning and zoning (P&Z) commission, or the board of commissioners, that are contiguous to the proposed subdivision, and share the same access roads as constructed in connection with the previously developed subdivision or subdivisions;
b. Prior to the effective date of this UDO, was either owned by the applicant or subject to a written option to purchase in favor of the applicant; and
c. Prior to the effective date of this UDO, the applicant had taken specific actions exhibiting the applicant's intent to complete the proposed subdivision as a continuation of a prior development. Evidence of such intent may include, but is not limited to, the inclusion of the proposed subdivision on a plat, development plan, or master plan of a development; the obtaining for the proposed subdivision of an on-site soils survey or jurisdictional wetlands delineation; or the inclusion of the proposed subdivision in a master drainage plan of a development or a traffic impact analysis or traffic design analysis.
(2) A subdivision designated as a pending subdivision under this section may be exempted from the provisions of this UDO relating to:
a. Open space and recreational facilities, where open space and recreational facilities have been provided for a development under the subdivision regulations in effect prior to the effective date of this UDO ("prior regulations");
b. Pedestrian ways, provided that pedestrian ways in the pending subdivision are a continuation of pedestrian ways provided in a development under the prior regulations;
c. Drainage system, provided that the drainage system in the pending subdivision is a continuation of the drainage system provided for in a development under the prior regulations; or
d. The design specifications (e.g., road, water, sewer, or drainage system improvement construction requirements) of subdivision improvements for a limited area in the pending subdivision, provided such area is used to provide a safe, orderly and aesthetically acceptable transition between the design of subdivision improvements constructed under the prior regulations and the design of subdivision improvements in the pending subdivision.
(3) Termination of designation as pending subdivision. The designation of a subdivision as a pending subdivision shall terminate unless a sketch plat of the pending subdivision is approved by the board of commissioners within 18 months of adoption of this UDO.
Upon such termination, the pending subdivision shall no longer be exempt from any of the provisions of this UDO.
(e) Conditions of prior approvals. Any conditions attached to a prior development approval or provisional or conditional rezoning shall remain in effect unless modified by action of the applicable approval body.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-108. Relationship of UDO to other documents and actions.
(a) Conflicts with other regulations. Where a regulation contained within the UDO imposes higher or more stringent standards than those required under another statute, ordinance or regulation, the regulation adopted under the UDO controls. If the other statute, ordinance, or regulation imposes higher or more stringent standards, that statute, ordinance, or regulation controls.
(b) Consistency with comprehensive plan required. The board of commissioners intends this UDO to implement the county's comprehensive plan and all other area or corridor plans. Any amendments to the UDO or local development approvals, including zoning map amendments shall be consistent with the comprehensive plan in effect at the time of the amendment or local development approval.
(c) Issuance of policies, rules and regulations for public improvements. The county may promulgate reasonable policies, rules, and regulations regarding the design and installation of improvements required pursuant to this UDO.
(d) Minimum standard may exceed state standards. Any rule and regulation established shall meet the minimum county and State standards, but nothing in this section shall prevent the county from requiring compliance with higher or more stringent requirements than the State regulations.
(e) Relationship to private agreements. This UDO is not intended to abrogate, annul, or otherwise interfere with any easement, covenant or other private agreement or legal relationship; provided, however, that where the regulations of this UDO are more restrictive or impose higher standards or requirements than such easement, covenant or other private agreement, the regulations of this UDO shall govern.
(f) Relationship to other codes. The procedures and standards of the UDO are intended to facilitate and ensure compliance with other technical standards adopted by the County, including, but not limited to building codes, fire codes, and property maintenance codes.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-109. Code administration responsibilities and organization.
This section provides a list of responsibilities assigned to each entity/staff position in carrying out the provisions of this UDO. These duties and responsibilities are specific to this UDO and are not applicable to other sections of the county Code.
(a) Board of commissioners.
(1) Responsibilities. The county board of commissioners shall decide on applications for:
a. Comprehensive plan text and map amendments;
b. UDO text and map amendments;
c. Preliminary development plans for planned developments;
d. Conditional use permits;
e. Sketch plats for major subdivisions;
f. Development agreements;
g. Acceptance of improvements and right-of-way;
h. Abandonment of right-of-way;
i. Other actions assigned by this UDO; and
j. Any actions required pursuant to State law to be approved by the board of commissioners.
(2) Membership and other rules. See chapter 2 of the Bryan County Code.
(b) Planning and zoning commission ("P&Z Commission").
(1) Responsibilities.
a. The P&Z commission shall make the final decisions on applications for appeals to staff decisions on modifications to the design standards authorized in article VIII.
b. The P&Z commission shall recommend action on applications for:
1. Comprehensive plan text and map amendments;
2. UDO text and map amendments;
3. Preliminary development plans for planned developments;
4. Conditional use permits; and
5. Sketch plats for major subdivisions.
c. Conduct other actions assigned by this UDO or requested by the board of commissioners.
(2) Membership. The P&Z commission shall consist of seven members who shall be residents of unincorporated Bryan County, appointed by the board of commissioners.
(3) Terms of office. The terms of the members shall be for four years. Any vacancy in membership shall be filled for the unexpired term by the board of commissioners.
(4) Compensation. The board of commissioners may authorize a monthly stipend to offset members' expenses for attending meetings and performing their duties.
(5) Attendance. P&Z commission members are required to attend regularly scheduled meetings. A member is allowed to miss two meetings a quarter, not to exceed four meetings in a calendar year, without providing evidence of just cause. If the P&Z commission member has not provided evidence of just cause for failing to meet the attendance requirements, the board of commissioners may remove the member.
(6) Removal. P&Z commission members are subject to the ethics code of Bryan County, chapter 2, article III, division 2. In addition to the disciplinary action identified in the ethics code, the board of commissioners may remove a P&Z commission member upon a finding that the member violated the ethics code.
(7) Officers; meetings; quorum; minutes; procedures, generally.
a. The P&Z commission shall elect the chairman and vice-chairman from its members.
The term of the chairman and vice-chairman shall be one year, with eligibility for re-election. The P&Z commission shall appoint a secretary, who may be an officer or employee of the county. The Commission shall make its own rules of procedure and determine its time of meetings. All meetings of the P&Z commission at which official action is taken shall be open to the public and all records of the P&Z commission shall be public records.
b. Four commissioners shall be considered a quorum.
c. The P&Z commission shall keep minutes of its proceedings, showing the vote of each member upon each question, or if absent or failing to vote, indicating such fact, and shall keep records of its official actions, all of which shall be immediately filed in the office of the community development department and shall be a public record.
d. The P&Z commission may request assistance with services as it may deem necessary for its work. Upon determining the request is reasonable and related to the duties and responsibilities of the P&Z commission, the board of commissioners may
contract with the State planning agency and planners and other consultants for such services as the P&Z commission may require.
(8) Decisions. Unless otherwise provided by this UDO, P&Z commission recommendations or decisions for approval shall require an affirmative vote of the majority of the quorum.
(9) Records. The community development director shall be responsible for maintaining records of all actions by the P&Z commission.
(10) Assistance by board of commissioners. The board of commissioners shall provide for such administrative and clerical assistance and office space as is required by the P&Z to carry out its functions under this UDO.
(c) Board of adjustment.
(1) Responsibilities. The board of adjustment shall hear and decide upon:
a. Appeals in accordance with article III, division 6 of this UDO, where it is alleged that there is error in any requirement, decision or determination made by the community development director for any decision for which the director has final decision authority.
b. Applications for variances in accordance with article III, division 5 of this UDO.
(2) Membership. The board of adjustment shall consist of five members who shall be residents of unincorporated Bryan County and be appointed by the board of commissioners. In the absence of a formally appointed board of adjustment, the P&Z commission shall serve as the board of adjustment.
(3) Attendance. Board of adjustment members are required to attend regularly scheduled meetings. A member is allowed to miss two meetings a quarter, but not more than four in one calendar year, without providing evidence of just cause. If the board of adjustment member has not provided evidence of just cause for failing to meet the attendance requirements, the board of commissioners may remove the member.
(4) Removal. Board of adjustment members are subject to the ethics code of Bryan County, chapter 2, article III, division 2. In addition to the disciplinary action identified in the ethics code, the board of commissioners may remove a board of adjustment member upon a finding that the member violated the ethics code.
(5) Terms of office. The term of office for each member shall be four years; however, so that no terms shall expire upon the same date, the terms of the original members shall be as follows: two appointees shall serve for four years, two appointees shall serve for three years, and one appointee shall serve for two years. Thereafter, each appointee shall be appointed to serve for four years. Members may be re-appointed to successive terms.
(6) Compensation. The board of commissioners may authorize a monthly stipend to offset members' expenses for attending meetings and performing their duties.
(7) Officers; meetings; quorum; minutes; procedures, generally.
a. The board of adjustment shall elect one of its members as chairman and one of its members as vice-chairman, who shall serve for one year or until reelected or a successor is elected. The board of adjustment shall appoint a secretary who may be a member or an employee of the county. The board of adjustment shall have
authority to adopt rules of procedure. Meetings of the board of adjustment shall be held once per month within the county, with the place, time and date of the meeting specified per the meeting calendar adopted annually by the board of adjustment.
Meetings shall not be required if there are no agenda items in a given month.
b. The board of adjustment shall keep minutes of its proceedings, showing the vote of each member upon each question, or if absent or failing to vote, indicating such fact, and shall keep records of its official actions, all of which shall be immediately filed in the office of the community development department and shall be a public record.
The full text of the resolution shall be sent to the applicant/appellant. If, because of absence or abstention, there is a tie vote on a resolution, the effect shall be an affirmation of the decision appealed from or the denial of the requested variance.
(8) Decisions. Board of adjustment decisions shall require an affirmative vote of the majority of a quorum of the commission. Three voting board members shall be considered a quorum. For appeals of administrative decisions, 80 percent of the members voting must affirmatively vote to overturn the administrative decision. Failure to meet the 80 percent threshold shall result in an affirmation of the administrative decision.
(9) Records. The community development director shall be responsible for maintaining records of all actions by the board of adjustment.
(10) Assistance by board of commissioners. The board of commissioners shall provide for such administrative and clerical assistance and office space as is required by the board of adjustment to carry out its functions under this UDO.
(d) Building and construction board of appeals.
(1) Responsibilities.
a. The building and construction board of appeals shall function as the construction board of adjustment as provided in section 103-103 of the county Code.
b. The building and construction board of appeals shall hear and decide upon appeals in accordance with the procedures of article III, division 6 of this UDO, where it is alleged that there is error in any requirement, decision or determination made by:
1. The building official for any decision under this UDO or chapter 103 of the county Code for which the building official has final decision authority; or
2. The engineering director for any decision under this UDO or the Engineering Design Manual for which the engineering director has final decision authority.
c. The building and construction board of appeals shall also serve as the flood prevention review board and shall hear and decide requests for appeals or variances brought pursuant to chapter 105 "Flood Damage Prevention" of the county ordinances.
d. The building and construction board of appeals shall also serve as the board of appeals, for administrative appeals/relief pursuant to chapter 111 "Soil Erosion and Sedimentation Control" of the county Code.
(2) Membership. The building and construction board of appeals shall consist of five members residing or operating a business within Bryan County and appointed by the board of commissioners. The board membership shall consist of one civil engineer, three members representing the following trades: electrical, plumbing, mechanical, and one member who is a general contractor. A person with expertise in structural engineering or architecture may be appointed in lieu of a general contractor. If the board of commissioners does not or is unable to appoint members to this board, the board of commissioners shall serve as the building and construction board of appeals.
(3) Removal. Building and construction board of appeals members are subject to the ethics Code of Bryan County, chapter 2, article III, division 2. In addition to the disciplinary action identified in the ethics code, the board of commissioners may remove a member of the building and construction board of appeals upon a finding that the member violated the ethics code.
(4) Term of office. The term of office for each member shall be three years; however, so that no terms shall expire upon the same date, the terms of the original members shall be as follows: two appointees shall serve for two years, two appointees shall serve for three years, and one appointee shall serve for one year. Thereafter, each appointee shall be appointed to serve for three years. Members may be re-appointed to successive terms.
(5) Compensation. The board of commissioners may authorize a stipend to offset members' expenses for attending meetings and performing their duties.
(6) Officers; meetings; minutes; procedures, generally.
a. The building and construction board of appeals shall elect one of its members as chairman and one member as vice-chairman, who shall serve for one year or until reelected or a successor is elected. The board shall appoint a secretary who may be a member or an employee of the county. The board shall have authority to adopt rules of procedure. Meetings of the board shall be held not more than 45 days after submittal of an appeal or variance application. Meetings shall be held in the location (north or south end of the county) where the majority of the properties subject to appeal or variance applications are located.
b. The building and construction board of appeals shall keep minutes of its proceedings, showing the vote of each member upon each question, or if absent or failing to vote, indicating such fact, and shall keep records of its official actions, all of which shall be immediately filed in the office of the community development department and shall be a public record. The decision of the board shall be by resolution adopted by a majority of members, which resolution shall contain a statement of the grounds of its decision or action. The full text of the resolution shall be sent to the appellant or applicant. If, because of absence or abstention, there is a tie vote on a resolution, the effect shall be an affirmation of the decision appealed from or the denial of the requested variance.
(7) Decisions. Unless otherwise provided by this UDO, board decisions shall require an affirmative vote of the majority of a quorum of the commission. Three board members shall be considered a quorum.
(8) Records. The community development director shall be responsible for maintaining records of all actions by the board.
(9) Assistance by board of commissioners. The board of commissioners shall provide for such administrative and clerical assistance and office space as is required by the building and construction board of appeals to carry out its functions under this UDO.
(e) County administrator responsibilities. The county administrator shall be responsible for recommending action on development agreements to the board of commissioners and any other duties identified in this UDO or assigned by the board of commissioners, in addition to appointing the community development director, engineering director, and building official, or the individuals responsible for those roles as established in this UDO.
(f) Community development director. The community development director shall be responsible for interpreting the provisions of this UDO in addition to:
(1) Supporting the efforts of the board of commissioners and other boards, commissions, and county departments in the enforcement of this UDO;
(2) Coordinating meetings of the development review committee;
(3) Reviewing and recommending action to the planning and zoning commission on comprehensive plan text and map amendments, UDO text and map amendments, conceptual and preliminary development plans for planned developments, conditional use permits, and sketch plats;
(4) Forwarding recommendations of the P&Z commission to the board of commissioners;
(5) Acting on applications for final development plans for planned developments;
(6) Acting on applications for final plats;
(7) Acting on applications for zoning verification letters, site plans, minor subdivisions, temporary use permits, special events permits, administrative relief, and home occupation permits;
(8) Forwarding information and providing analysis of applications for variances and appeals to the board of adjustment;
(9) Preparing forms and administering the development application review and approval processes;
(10) Maintaining records of actions on development applications taken by the community development director pursuant to this UDO;
(11) Maintaining a copy of this UDO and the zoning map;
(12) Establishing such rules of procedure as are necessary and proper for the administration of this UDO;
(13) Rendering interpretations of the provisions of this UDO and the zoning district boundaries indicated on the zoning map;
(14) Conducting planning studies and performing other tasks requested by the P&Z commission, board of commissioners or county administrator; and
(15) Performing any and all other tasks required to implement this UDO.
(g) Engineering director. The engineering director shall be responsible for:
(1) Providing requested support to the community development director and development review committee;
(2) Interpreting the UDO regarding requirements for public improvements;
(3) Preparing and updating the Engineering Design Manual and Construction Details;
(4) Reviewing and acting on applications for construction plan approval;
(5) Inspecting public improvements required by this UDO;
(6) Reviewing and recommending action to the board of commissioners on abandonments of rights-of-way and easement;
(7) Reviewing and recommending actions pursuant to traffic impact analyses;
(8) Recommending action on acceptance of public improvements and rights-of-way to the board of commissioners;
(9) Acting on requests for administrative relief as authorized by the UDO;
(10) Acting on land disturbance permits and right-of-way encroachment permits;
(11) Reviewing and providing recommendations to the building and construction board of appeals for appeal and variance applications;
(12) Maintaining records of actions for which the engineering director has responsibility pursuant to this UDO;
(13) Performing other tasks as requested by the board of commissioners or county administrator; and
(14) Performing any and all other tasks required to implement this UDO.
(h) Building official. The building official shall be responsible for:
(1) Providing requested support to the community development director and development review committee;
(2) Acting on applications for building permits, certificates of use and occupancy and sign permits;
(3) Maintaining records of actions on development applications taken by the building official pursuant to this UDO; and
(4) Reviewing and providing recommendations to the building and construction board of appeals for appeal and variance applications; and
(5) Performing other tasks as requested by the board of commissioners or county administrator or as required to implement this UDO.
(i) Development review committee.
(1) Purpose. The development review committee (DRC) is intended to secure comments, coordinate responses, and resolve conflicts from input provided by various County departments and other agencies having responsibility for reviewing or providing services to proposed development.
(2) Membership. The community development director shall serve as the chair and coordinator for all DRC meetings. Other participants, who shall participate as needed in the review of specific applications shall include the engineering director, fire chief, public health director, and public works director. At the discretion of the community development director, representatives from other County public service agencies may be asked to comment on development or participate in DRC meetings.
(3) Responsibilities. The DRC shall be responsible for reviewing applications as requested by the community development director; evaluating compliance with the requirements of UDO and other technical requirements; recommending site and building design modifications to ensure greater compliance with adopted standards; and identifying public improvement implications for the following types of actions pursuant to the procedures in this UDO:
a. Comprehensive plan map and text amendments;
b. Zoning map amendments;
c. UDO text amendments;
d. Planned development applications;
e. Conditional use permit applications;
f. Site plan applications;
g. Variance applications;
h. Subdivision applications;
i. Temporary use and special events permits as requested by the community development director; and
j. Other development approvals pursuant to this UDO as requested by the community development director.
(Ord. No. 06-2020, § 3, 12-8-2020; Ord. No. 05-2026, § 2, 1-13-2026) Sec. 114-110. Enforcement and penalties.
(a) Complaints regarding violations. Whenever a violation of this UDO occurs, or is alleged to have occurred, a complaint stating fully the causes and basis thereof may be submitted by any person or county agency with the community development director. The community development director shall record such complaint, investigate, and take such action thereon as provided by this UDO.
(b) Penalties for violation.
(1) Any person violating any provision of this UDO shall, upon conviction, be deemed guilty of a misdemeanor and shall be subject to such penalties as are provided by law for other misdemeanors.
(2) Any person or entity that violates any provision of this UDO or fails to comply with the requirements thereof shall, upon conviction, be fined not more than $1,000.00 or imprisoned in the county jail for not more than six months, or both, and in addition pay the costs of such action. Each day such a violation continues shall be considered a separate offense. The owner or tenant of the premises or part thereof, and any architect, builder, attorney, contractor, agent or other person who commits, participates in, assists in, or maintains any such violation may each be found guilty of a separate offense and suffer the penalties herein provided.
(3) If any structure is or is proposed to be erected, constructed, reconstructed, altered, converted or maintained in violation of this UDO, the board of commissioners, community development director, engineering director or the county administrator may institute an action in the magistrate court of county for a temporary or permanent injunction, mandamus or other appropriate action as provided for under State or federal law to:
a. Prevent such unlawful erection, placement, construction, reconstruction, alteration, conversion, maintenance, or use;
b. Correct or abate such violation; and
c. Prevent the occupancy or use of such structure or lot.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-111. Severability.
If any section, subsection, sentence, clause, phrase or portion of this UDO is declared invalid or unconstitutional by any court of competent jurisdiction, or if the provisions of any part of this UDO as applied to any particular situation or set of circumstances shall be declared invalid or unconstitutional, such invalidity shall not be construed to affect portions of this UDO not so held to be invalid. It is hereby declared that this UDO would have been adopted had such invalid portion not been included herein.
(Ord. No. 06-2020, § 3, 12-8-2020) Secs. 114-112—114-199. Reserved.
ARTICLE II. GENERAL DEVELOPMENT PROCEDURES
This article establishes all development procedures and the minimum criteria for development approvals.
Sec. 114-200. Purpose.
The purpose of this article is to establish procedures for filing and processing applications for development approval. The format is designed to allow users to determine the steps involved to obtain development approval.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-201. Procedural requirements.
No development is permitted unless all applicable approvals are issued in accordance with this UDO.
Development approvals are required for all development, unless otherwise exempted, to ensure compliance with adopted codes, standards, and laws, and to ensure consistency with the comprehensive plan.
This article describes procedural elements common to all applications. The specific procedures followed in reviewing various applications for development approval differ. Subsequent articles address the specific procedures and requirements for particular applications. Generally, the procedures for all applications have five common elements:
(a) Submittal of a complete application, including required fee payments and appropriate information and studies;
(b) Review of the submittal by appropriate staff, agencies, and boards;
(c) A decision to approve, approve with conditions, or deny, together with the description of the actions authorized and the time period for exercising rights;
(d) Options to amend or appeal the decision; and
(e) Documenting the decision.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-202. Approvals required.
Except as specifically exempted by State law, the use of property may not be substantially changed, substantial clearing, grading or excavation may not be commenced, land may not be subdivided, and buildings or other substantial structures may not be constructed, erected, moved, occupied or substantially altered except in accordance with and pursuant to this UDO. Required development approval types, responsibilities for action and references to applicable UDO sections are listed in Exhibit 202. An "(H)" indicates that a public hearing is required prior to action by the applicable hearing body.
(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-203. Authority to condition development approvals.
(a) County staff, the P&Z commission, board of adjustment, building and construction board of appeals, and the board of commissioners may impose conditions as are reasonably necessary to assure compliance with applicable general or specific standards identified in this UDO after review of the application and other pertinent documents and any evidence made part of the public record.
(b) Any conditions recommended by the community development director, development review committee, or P&Z commission may be modified subsequently by the board of commissioners.
Exhibit 202: UDO Procedures and Responsibilities Development Application Recommendation Final Decision Appeal UDO Section Comprehensive Plan Text and Map Amendment Community Development Director/P&Z Commission (H) Board of Commissioners (H) Superior Court of County article III, division 1 UDO Text and Map Amendment Community Development Director/P&Z Commission (H) Board of Commissioners (H) Superior Court of County article III, division 2 Planned Development Preliminary Development Plan Community Development Director/P&Z Commission (H) Board of Commissioners (H) Superior Court of County section 114-325 Final Development Plan Community Development Director Community Development Director Board of Commissioners section 114-326 Conditional Use Permit Community Development Director/P&Z Commission (H) Board of Commissioners (H) Superior Court of County article III, division 4 Variance Community Development Director Board of Adjustment
(H) or Building and Construction Board of Appeals based on the type of variance Superior Court of County article III, division 5 Development Application Recommendation Final Decision Appeal UDO Section Appeals to Staff Decisions Community Development Director or Engineering Director Board of Adjustment
(H) or Building and Construction Board of Appeals based on type of appeal Superior Court of County article III, division 6 Vested Rights Determination Community Development Director Community Development Director Board of Adjustment article IV, division 2 Major Subdivision Sketch Plat Community Development Director/P&Z Commission (H) Board of Commissioners (H) Superior Court of County section 114-365 Construction plans Engineering Director Engineering Director Building and Construction Board of Appeals section 114-366
Development Agreement (optional) County Administrator Board of Commissioners (H) Superior Court of County article III, division 9 Final Plat Community Development Director Community Development Director Board of Adjustment section 114-367 Acceptance of Improvements and ROW Engineering Director Board of Commissioners section 114-368 Abandonment of Right-of-way or Easement Engineering Director Board of Commissioners (H) Superior Court of County article III, division 7 Zoning Certification Community Development Director Community Development Director Board of Adjustment section 114-418 Site Development Plan Community Development Director Board of Adjustment (3) section 114-419 Subdivisions, Minor Community Development Director Board of Adjustment article IV, division 1 Tree Removal Permit Community Development Director Board of Adjustment section 114-421 Temporary Use or Special Events Permit Community Development Director (1) Board of Adjustment (2) section 114-424 Administrative Relief Community Development Director or Engineering Director Board of Adjustment section 114-417
Building Permits Building Official Building and Construction Board of Appeals section 114-431
Certificates of Use and Occupancy Building Official Building and Construction Board of Appeals section 114-431 Land Disturbance Permit Engineering Director Engineering Director Building and Construction Board of Appeals section 114-426
Floodplain Development Permit Engineering Director Engineering Director Building and Construction Board of Appeals section 114-427
Sign Permits Community Development Director Board of Adjustment or Building and Construction Board of Appeals based on type of appeal section 114-422 Road Encroachment Permit Engineering Director Engineering Director Building and Construction Board of Appeals section 114-429
Traffic Impact Assessment Engineering Director Building and Construction Board of Appeals section 114-428 Landscape Plan Community Development Director Board of Adjustment section 114-420 Home Occupation Permit Community Development Director Board of Adjustment section 114-423 Development Application Recommendation Final Decision Appeal UDO Section Table Notes:
(1) If the community development director determines the proposed use has a potentially detrimental impact to the public, the application must be reviewed by the board of commissioners.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.