Bryan County · Código de ordenanzas

Bryan County Code of Ordinances

Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.

Sobre este texto

  • As published by Municode, current through 2026-01-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Parte 6 de 9. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.

(2) The board of adjustment hears the appeal unless the community development director has determined the board of commissioners must review the application. If the board of commissioners makes the final determination, appeals are filed in the Superior Court.

(3) If the decision is related to design standards identified in article VIII, appeals of these decisions are heard by the planning and zoning commission.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-204. Fees.

(a) Fees. No application shall be reviewed or considered complete in accordance with section 114-213, except for building permit applications, unless the applicant has paid the applicable fee adopted by the board of commissioners or the board of commissioners has waived the fee.

(b) Professional service fees.

(1) When the engineering director or community development director requires a third-party review of a development application, including but not limited to construction plans or traffic impact analyses, the engineering director shall select a third-party reviewer from the county's approved vendor list. Based on the county-approved hourly rates, the engineering director shall provide the applicant a written estimate for the third-party review. The applicant shall provide funds, in the form of cashier's check or money order, to the county in an amount consistent with the written estimate. The funds shall be deposited into an escrow account, and the county shall bill against the account for the third-party review. The county will not commence a development application review until the funds have been received.

(2) The county shall provide a monthly statement to the applicant showing the amount billed to date. If the escrow account is depleted prior to the development application being approved, the engineering director shall notify the applicant and provide an additional estimate for completing the applicable review. No further reviews will be performed until applicant submits additional funds in the form of a cashier's check or money order. Upon approval of the development application, the county shall refund to the applicant any remaining funds in the escrow account within 30 days of approval.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-205. Burden of persuasion regarding approval.

(a) The applicant has the burden of producing sufficient substantial, competent and material evidence for the hearing body to conclude that the requirements of the applicable ordinance(s) have been met.

(b) Regarding appeals, the decision of the administrative official, e.g., community development director, engineering director, shall be presumed correct. The appellant shall have the burden of persuasion, and the hearing body shall not overturn the administrative decision unless the appellant presents clear and convincing evidence that the administrative official has erred in implementing this UDO. The hearing body shall not substitute its opinion for the administrative official's decision.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-206. Pre-application conference.

Before any application is filed with the community development director, the applicant is encouraged to attend a pre-application meeting with the community development director. The purpose of the pre-application meeting is to discuss, in general, the procedures and substantive requirements for the application.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-207. Application requirements.

(a) Submittal requirements. Appendix D of this UDO lists the detailed submittal requirements for each application listed in this UDO. The lists include approvals from State agencies, when required and such approvals shall be secured prior to submittal of an application to the county unless otherwise approved by the community development or engineering director. Requests for any development approval required by this UDO shall be made on applications provided by county staff or using the county's online application process. If the county has an online application process, applicants shall be required to submit applications digitally, including accompanying drawings and documents.

(b) Owners authorization required. Applications for development approvals will be accepted only from the owners or lessees of property, persons who have contracted to purchase property contingent upon their ability to acquire the necessary permits under this UDO, or the agents of such persons. The community development director shall require evidence of the applicant's authority to submit the application when there is a reasonable basis for questioning this authority.

(c) Traffic impact assessments. If required by section 114-428, a traffic impact analysis or traffic design study shall be submitted in conjunction with an application for preliminary development plan, sketch plat, zoning map amendment, conditional use permit or site plan approval. The community development director or engineering director may permit an applicant to submit a traffic impact analysis prior to the submittal of a development application.

(d) Intent to serve. Intent to serve letters for the development are required from all utility providers, including but not limited to water, sewer, electric, cable, internet, telephone, and gas with applications for preliminary development plan, zoning map amendment, site plan, sketch plat, construction plans, final plat, and conditional use permit approval.

(e) Utility study. Utility studies (water, sewer, and stormwater) demonstrating the general layout of on-site and off-site utility improvements, stormwater management systems, and identifying existing capacity and projected demands may be required by the engineering director in conjunction with an application for preliminary development plan, sketch plat, zoning map amendment, conditional use permit or site plan approval.

(f) Developments of regional impact compliance. Applicants shall be required to demonstrate compliance with rules and regulations applicable to developments of regional impact in Bryan County.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-208. Official filing date.

The time for processing applications for development approval shall commence on the date that the community development director or engineering director certifies that a completed application has been filed. Modification of any application by the applicant following its filing and prior to action shall restart specified review times.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-209. Application processing.

Following the determination that an application is complete, the community development director or engineering director shall review the application, forward the application for review to applicable advisory bodies, prepare all required reports, and schedule the matter for public hearing and/or decision within the time and in the manner required by this UDO.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-210. Computation of time.

Unless otherwise specifically provided, time shall be computed by excluding the first and including the last day and "days" shall mean calendar days. If the last day is a Saturday, Sunday or county holiday, that day shall be excluded. When the period of time prescribed is less than seven days intermediate Saturdays, Sundays and holidays shall be excluded. Unless otherwise specifically provided, whenever a person has the right or is required to do some act within a prescribed period after the service of a notice and the notice is served by mail, three days shall be added to the prescribed period.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-211. Concurrent review.

For multi-step applications (e.g., planned developments and subdivisions) and for developments requiring multiple approvals, the applicant may request concurrent review of multiple applications. The hearing body shall review such applications concurrently but take independent actions on each application. Approval of one application does not guarantee approval of others that are reviewed concurrently.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-212. Phased development.

An applicant may submit plans that show multiple phases provided that:

(a) The requirements of this UDO will be satisfied with respect to each phase.

(b) A phasing plan shall be approved by the board of commissioners that designates a date or event by which substantial work on each phase will begin and be completed.

(c) If a development that is to be built in phases includes improvements that benefit the entire development, then the applicant shall submit a proposed schedule for completion of such improvements. The schedule shall relate completion of such improvements to completion of one or more phases.

(d) Once a schedule has been approved and made part of the approval by the board of commissioners, no land may be used, buildings occupied or subdivision lots sold except in accordance with the approved schedule unless otherwise provided in this UDO.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-213. Completeness review.

(a) Applications to be complete.

(1) No application is complete unless all of the information required herein is included and all filing fees have been paid.

(2) Additional information may be required to decide whether or not the development, if completed as proposed, will comply with all of the requirements of this UDO. Failure to provide additional required information may result in application denial. The presumption established by this UDO is that all required application information is necessary.

(3) Review for completeness of application forms is solely for the purpose of determining whether preliminary information required for submission with the application is sufficient to allow further processing, and shall not constitute a decision as to whether application complies with the provisions of the UDO.

(4) The community development director may agree to process an application without all required information at the risk to the applicant that the hearing body may later require the information prior to acting on the application.

(b) Time limits for completeness determination.

(1) Not later than five business days after the community development director has received an application, the community development director shall determine whether the application is complete and either notify the applicant at the DRC meeting or via written correspondence of required materials needed to correct the deficiencies.

(2) If the application requires review by any other local or special district, or regional, State, or federal agency or entity, the applicant shall provide a listing of outside agency approvals required for the project before the application is deemed complete.

(3) If the application, together with the submitted materials, is determined not to be complete:

a. The community development or engineering director shall specify in writing the information required.

b. The applicant may resubmit the application with the information required by the community development director or may appeal that decision in writing to the board of adjustment.

c. The applicant may resubmit the application with the information required by the engineering director or may appeal that decision in writing to the building and construction board of appeals.

d. If appealed, the board of adjustment or building and construction board of appeals shall render a final written determination on the appeal not later than the next available meeting after receipt of the applicant's written appeal.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-214. Continuance.

(a) Nothing in this section precludes an applicant and county staff from mutually agreeing to a continuance or extension of any time limit provided by this section.

(b) If the community development director receives the written request for a continuance prior to the public hearing being noticed, the applicant's request for a continuance will be automatically granted. An applicant is not entitled to more than two automatic continuances.

(c) If the community development director receives the written request for a continuance after the public hearing is noticed, the applicant is not entitled to an automatic continuance. The hearing body will consider the request for a continuance and shall only grant such request upon a demonstration by the applicant of good cause for a continuance.

(d) If an applicant receives a continuance, the applicant shall reimburse the county for all advertising costs associated with rescheduling the public hearing for the application. The reimbursement fee must be paid prior to the county posting the advertisement.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-215. Minor amendments and major amendments.

(a) The community development director may allow minor amendments to an application without re-submittal of the entire application.

(b) Minor amendments to an application include adjustments to achieve greater compliance with the UDO, technical codes or other applicable rules and regulations.

(c) Major amendments include, but are not limited to, the following:

(1) Increases in land area, the number of lots, dwelling units, floor area, height, built-upon area, or any additional land-use disturbance;

(2) Introduction of different land uses than those requested in the original application;

(3) Requests of variances other than those included in the original application;

(4) Reductions in buffer or transition areas, landscaping, or required setbacks, or any change in the design characteristics or materials used in construction of the structures;

(5) Requests to reduce or eliminate conditions attached to a final development approval unless a new notice is provided; or

(6) Changing the method of providing water and sewer service.

(d) The community development director may postpone the consideration of the application by the public hearing body if the community development director determines additional time is needed to fully evaluate the proposed amendments, minor or major. If the applicant does not agree to the postponement, the community development director or engineering director may recommend denial of the application.

(e) If the proposed amendment is determined to be a major amendment, as identified in paragraph (c) and the public noticing has already been posted/advertised, the community development director shall re-notice the application and consideration of the application shall be delayed for a month if the applicant agrees to the postponement.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-216. Withdrawal of applications.

(a) A filed application may be withdrawn by the applicant at any time prior to the provision of notice of the public hearing for the application. After that time, the applicant may file a request to withdraw the application with the community development director. The community development director shall notify the hearing body of the withdrawal at the scheduled meeting.

(b) When an applicant withdraws an application, the applicant shall not re-submit the application for six months following such withdrawal; provided, however, if the withdrawal is made at the county's request, the application may be re-filed within 30 days.

(c) For the purposes of this section, "withdrawal" is defined as the retraction of a filed application, either for amendment and re-submission or for permanent revocation. Should the hearing body defer consideration of an application to its next meeting, either at the request of the applicant or upon its own initiative, such deferral of consideration shall not constitute "withdrawal" and shall not trigger the limitations on resubmission set forth in paragraph (b) of this section.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-217. Approvals.

(a) Effect on successors and assigns. Development approvals are transferable if the use of land or structures or any portion thereof subject to the approval continues to comply with all the terms and requirements of that approval.

(b) Amendments to development approvals.

(1) The community development director may authorize minor amendments to development approvals as defined in subsequent sections of this UDO upon finding that the amendment has no discernible impact on neighboring properties, the general public or those intended to occupy or use the proposed development.

(2) All other requests for changes in approved plans will be processed as a modification to the original application, and new conditions may be imposed only on the specific site or area requested to be modified. The applicant retains the right to withdraw the request for an amendment and may then proceed in accordance with the previously issued permit.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-218. Notice.

(a) Generally.

(1) Notwithstanding anything contained herein, notice of all public hearings required under this article shall be in accordance with O.C.G.A. § 36-66-1 [et seq.], known as the "Zoning Procedures Law" and other applicable State laws.

(2) The notice requirements for each type of application are established in Exhibit 221 and as prescribed in the individual subsections of this article and/or the State statute. For any inconsistency between the provisions of this article and State statute, the State statute governs.

(3) Any defective notification of a required county procedure, not otherwise required by State or federal law, shall not invalidate the proceedings if the defect is determined to be harmless by the hearing body.

(4) The community development director shall make every reasonable effort to comply with the notice provisions set forth in this chapter and shall document such notice.

(b) Content.

(1) Posted notices shall indicate the following information:

a. The development approval requested;

b. Date, time, place and purpose of hearing; and

c. Contact information for persons seeking additional information about the application.

(2) Published and mailed notice shall include:

a. A description of the property subject to the application that includes the street address, if available, and the real property tax assessment roll parcel number. If the application is for a rezoning, the notice must include the current zoning of the property and the requested zoning district;

b. A brief description of the proposed development, including, current and revised zoning classification (if any);

c. Date, time, place, and purpose of hearing; and

d. Notice that the complete application can be reviewed at the office of the community development director.

(c) Format and timing.

(1) Published notice. Notice shall be published in a paper of general circulation in the county for the first time not fewer than 15 days nor more than 45 days before the date set for the public hearing.

(2) Mailed notice. The county may, but is not required to, mail notices to the owners of all properties involved in the application request as well as neighboring property owners. The community development director shall be responsible for creating a notification policy, including the notification boundary.

(3) Posted notice. At least one sign shall be posted at least 15 days prior to the hearing in a conspicuous place visible from each street along the frontage of the subject property. Signs shall be in a form approved by the community development director with words clearly describing the requested development approval (e.g., rezoning, subdivision, variance) and the community development department phone number clearly legible from the street.

Exhibit 221: Notice Requirements Development Application Publication Mail Posting Comprehensive Plan Amendment ' UDO Text Amendment ' UDO Map Amendment ' ' ' Planned Development District Preliminary PD Plan ' ' ' Planned Development District Final PD Plan Major Subdivision Sketch Plat ' ' ' Major Subdivision Final Plat Development Agreement ' ' ' Conditional Use Permit ' ' ' Variances ' ' ' Appeals ' Vested Rights Determination Development Approval Revocation ' ' ' Abandonment of Roads, Alleys or Easements ' ' ' (Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-219. Hearings.

Public hearings shall be scheduled and conducted in accordance with the procedures in this section as may be modified by the more specific procedures established in subsequent sections of this UDO.

(a) Calling a hearing. Whenever required by this UDO or State law, public hearings shall be called by either the community development director, the chair of the planning and zoning commission or board of adjustments, or the board of commissioners in the manner set forth in this UDO. However, if a conflict exists between provisions of this UDO and the State law all public hearings shall be called in the manner set forth in State law.

(b) Hearing timing/location. When hearings are required by both the P&Z and board of commissioners, at least 14 days shall be required between the hearings. The intent of this provision is to ensure that there is adequate time to accurately convey P&Z commission recommendations to the board of commissioners and to ensure that at least one hearing is conducted in the portion of the County where the proposed development is located.

(c) Hearing body. As used in this article, the term "hearing body" shall mean either the board of commissioners, P&Z commission, board of adjustment, or building and construction board of appeals.

(d) Written comments. Written comments on the subject of the hearing may be submitted by any agency, citizen or property owner at any time prior to the adjournment of the hearing.

(e) Oral comment sign-in required. Persons desiring to present their views orally at the hearing, must first signup on a form to be provided by the hearing body prior to the commencement of the hearing.

(f) Reading of requested action. The hearing body chair will cause to be read the requested action under consideration and any analysis or recommendations from staff or other hearing bodies prior to receiving public input.

(g) Applicant and representative comments. Comments from the applicant and the applicant's agent or attorney shall be heard before public comments.

(h) Public comments. The hearing body chair shall call each person who has signed up to speak on the proposed decision or matter in the order in which the persons have signed up to speak. Each person shall have only one opportunity to speak unless called back to by the chair for questions or clarifications. Prior to speaking, the speakers will identify their names, current addresses, and clients, if the speaker is representing the applicant or an organization. Notwithstanding anything contained in this article to the contrary, a minimum time period of no less than ten minutes per side shall be allowed for rezoning applications presentation of data, evidence, and opinion by proponents and opponents of each hearing matter.

(i) Content of comments. Each speaker shall speak only to the merits of the requested action under consideration and shall address remarks solely to the hearing body. The merits of the proposed decision or matter shall include evidence or opinions regarding devaluation, fair market value, nuisance, environmental concerns, traffic, noise, aesthetics and in general, the health, safety, welfare and benefit of the county as it is affected by the requested action. Speakers shall refrain from comment on unrelated issues, unrelated tracts of land or matters not the subject of the hearing. Each speaker shall refrain from personal attacks on any other speaker or person and from discussion of facts or opinions irrelevant to the proposed decision or matter under consideration. The hearing body chair may limit or refuse a speaker the right to continue, if the speaker, after first being cautioned, continues to violate this subsection.

(j) Maintaining decorum. Nothing contained herein shall be construed as prohibiting the hearing body from taking reasonable steps it deems necessary to ensure that hearings are conducted in a decorous and safe manner, or to assure that the public hearing on each requested action or matter is conducted in a fair and orderly manner.

(k) Response to P&Z commission recommendations. In response to P&Z commission recommendation, the applicant may provide supplemental information prior to the board of commissioners public hearing. Supplemental information shall be submitted a minimum of ten business days before the scheduled hearing in front of the board of commissioners. If the supplemental information is not submitted within this timeframe, board of commissioners may postpone the hearing. If the supplemental information significantly changes the information presented at the P&Z commission meeting, the board of commissioners may require the P&Z commission rehear the matter and provide a new recommendation.

(l) Discussion. After the public hearing is closed, the hearing body shall proceed to open the matter for discussion.

(m) Transcripts. Any person desiring a transcript of the hearing must arrange for a court reporter at their own expense.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-220. Action by hearing body.

After a hearing body has held the required public hearing, the hearing body shall either reject the requested action or approve the action with or without conditions or modifications. In the case of the P&Z commission, their action shall be to recommend rejection or approval with or without conditions unless they are serving as an appellate body. The hearing body may also table or defer the decision upon determining there is a legitimate reason to delay a decision. If the hearing body chooses to defer or table the decision, the county may, but is not required, to hold another public hearing.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-221. Preclusion of subsequent actions during the pendency of litigation.

No board of commissioners, board of adjustment, or planning and zoning commission action shall be taken on any property which is the subject of any litigation or appeal arising from a prior land-use or land-development decision pending in any state or federal court, wherein the county, its boards or commissions, or its officials or agents, are parties.

(Ord. No. 4-2025, § 1, 1-14-2025) Secs. 114-222—114-299. Reserved.

ARTICLE III. DEVELOPMENT PROCEDURES REQUIRING PUBLIC HEARINGS

This article describes the development procedures that involve one or more public hearings.

DIVISION 1. COMPREHENSIVE PLAN AMENDMENTS

Sec. 114-300. Applicability.

This division applies to any amendment to the text or maps of the comprehensive plan or to the preparation or amendment of an area or corridor plan that is adopted as part of the comprehensive plan.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-301. Comprehensive plan amendment process overview.

The approval process and typical timing for comprehensive plan amendments are summarized in Exhibit 301a and 301b. Actual timing may vary based on the date of submittal and scheduled hearing dates.

Exhibit 301a: Approval Process Summary Plan Amendment Process Application, Review and Notice P&Z Commission Public Hearing Board of Commissioners Public Hearing/Action Exhibit 301b: Typical Timing Plan Amendment Timing Completeness Review 5 business days (from Application Submittal deadline) P&Z Commission Public Hearing 45 days (from Completeness Certification) Board of Commissioners Public Hearing 30 days (from P&Z Commission Recommendation) (Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-302. Initiation.

(a) The P&Z commission, the board of commissioners, or county administrator may initiate a request for an amendment to the future land use map or text of the comprehensive plan. A property owner may only initiate a comprehensive plan amendment if the request is in conjunction with a rezoning application.

(b) A property owner application for a future land-use map amendment must be accompanied by an application for a zoning district map amendment, and the applications may be processed concurrently.

(c) By resolution, the board of commissioners may establish a schedule prescribing when and how frequently comprehensive plan amendments will be considered.

(d) Before any application is made, the applicant shall schedule a pre-application conference with the community development director to discuss the procedures and requirements for a comprehensive plan amendment request pursuant to these regulations.

(e) The application shall be filed with the community development director, describe the proposed amendment and include a complete application in accordance with Appendix D of this UDO unless the application is being filed by a county board, commission or the county administrator on behalf of the county.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-303. Review.

The community development director shall review the comprehensive plan amendment application and shall determine if the application is complete pursuant to the provisions of section 114-213. Upon finding that the application is complete, the community development director shall consult with the development review committee (DRC) and prepare a report making findings and recommendations on the application and authorize notice to be provided in accordance with section 114-218. If the community development director determines the requested comprehensive plan amendment will require a review and approval by the department of community affairs, the community development director shall initiate the required amendment process pursuant to State law. All time limits identified in this UDO for review by the county shall be tolled until the department of community affairs has completed their review.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-304. Criteria.

In determining whether the proposed amendment should be approved, the P&Z commission and board of commissioners shall consider if the change is needed to address:

(a) Appropriateness: Amending the comprehensive plan is the appropriate mechanism to address the matter presented and the proposed amendment does not raise policy or land use issues that would be more appropriately addressed in another manner, e.g., during the county's five or ten-year update, through the implementation schedule of the CIP, etc.

(b) Original errors or omissions: Whether there was error or omission in the adoption of the comprehensive plan, or in the supporting premises and findings.

(c) Subsequent events: Whether events subsequent to the comprehensive plan adoption have invalidated portions of the plan, changed the character of the county, or demonstrated new information.

(d) Need for amendment: The need for processing the amendment prior to a routine comprehensive plan update.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-305. P&Z commission action.

The P&Z commission shall hold a public hearing and should render its recommendation in accordance with the procedures set forth in this article.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-306. Board of commissioners action.

Upon receiving the P&Z commission recommendation, the board of commissioners shall hear the application. Following the hearing, the board may approve, conditionally approve or deny the application. If the application is denied, the board of commissioners shall advise the applicant of the reason for denial.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-307. Effect of approval.

The approval of an amendment to the comprehensive plan does not authorize the use, occupancy, or development of property until the applicant receives necessary development approvals, such as zoning changes, subdivision, or site plan approval.

(Ord. No. 06-2020, § 3, 12-8-2020)

DIVISION 2. CODE TEXT/MAP AMENDMENTS (REZONINGS)

Sec. 114-308. Applicability.

(a) The provisions of this section apply to any application to:

(1) Revise the text of the UDO (text amendment); or

(2) Reclassify a lot, tract, parcel, or land area from one zoning district to another (map amendment).

(b) Amendments to appendices. The following amendments to the appendices of this UDO may be made by resolution of the board of commissioners at any regular or special meeting:

(1) Road classification plan. The engineering director and/or GIS coordinator shall maintain a list of all approved public roads and private roads. The engineering director shall update the list whenever the commissioners and/or staff: a) formally accept public right-of-way into the county's public road system; b) approve an abandonment of public right-of-way; c) accept an existing private right-of-way pursuant to chapter 24 "Special Districts" article III "Special County Road Pavement Tax Districts"; and d) approve a subdivision plat establishing a private right-of-way.

(2) Submittal requirements. Modify the submittal requirements in Appendix D.

(c) No hearings required. No public hearings are required prior to the board of commissioners adopting resolutions permitted under paragraph (b) of this section.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-309. Approval process overview.

The approval process and typical timing for UDO amendments are summarized in Exhibits 309a and 309b. Actual timing may vary based on the date of submittal and scheduled hearing dates.

Exhibit 309a: Approval Process Summary UDO Amendment Process Application, Review and Notice P&Z Commission Public Hearing Board of Commissioners Public Hearing Exhibit 309b: Timing UDO Amendment Timing Completeness Review 5 business days (from Application Submittal deadline) P&Z Commission Public Hearing 45 days (from Completeness Certification) Board of Commissioners Public Hearing 30 days (from P&Z Commission Recommendation) (Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-310. Initiation.

(a) Zoning map amendments. The P&Z commission, the board of commissioners, the county administrator, or a property owner, may initiate a request for an amendment to the Official Zoning Map (rezoning).

(1) If such a request is initiated by a property owner, a pre-application conference with the community development director is strongly encouraged prior to submittal of a zoning map amendment application to the community development director.

(2) When such a request is made by the board of commissioners, P&Z commission or county administrator, the community development director shall cause an appropriate ordinance to be drafted, required notice to be provided, and set a date for a public hearing.

(3) When any other person requests such an amendment, the application shall be filed with the community development director, describe the proposed amendment and include a complete application in accordance with Appendix D of this UDO.

(b) UDO text amendments. An UDO text amendment may be initiated by the board of commissioners, P&Z commission, county administrator, or community development director. The community development director shall prepare the appropriate ordinance, publish such notice as required, and schedule the public hearing.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-311. Completeness review.

The community development director shall review the application and shall determine if the application is complete pursuant to the provisions of section 114-213. Upon finding that the application is complete, the community development director shall consult with the DRC, prepare a report making findings and recommendations on the application, and authorize notice to be provided in accordance with section 114-218 and the following section 114-312.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-312. Notice.

For text or zoning map amendments, the community development director shall provide notice as identified in section 114-218. Notice shall not be required in the case of a comprehensive revision and re-adoption of the entire zoning map unless the revision involves the rezoning of parcels of land to less intense uses or 'down zoning', in which case notification to owners of those parcels shall also be made by first class mail.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-313. Criteria for zoning map amendments.

In its review of an application for a zoning map amendment, staff and hearing bodies shall consider the following criteria. No single factor is controlling except for paragraph (a). If the request is not consistent with the comprehensive plan, the application shall be denied unless the applicant submits an application for comprehensive plan amendment and such request is approved. For all other criteria, each criterion must be weighed in relation to the other criteria. The hearing body shall not consider any representations made by the applicant that, if the change is granted, the rezoned property will be used for only one of the possible uses permitted in the requested classification. Rather, the hearing body shall consider whether the entire range of permitted uses in the requested classification is more appropriate than the range of uses in the existing classification.

(a) Consistency. Whether the proposed amendment is consistent with the adopted comprehensive plan and helps carry out the purposes of this UDO;

(b) Compatibility with neighboring lands. Whether the proposed reclassification is compatible with or would negatively impact the overall character or land use pattern on an abutting property or neighborhood near the subject property;

(c) Adequacy of public facilities and services. Whether public facilities and services, including, but not limited to, roads, parks and recreational facilities, police and fire protection, schools, stormwater drainage systems, water supplies, wastewater treatment, and solid waste services, are adequate to serve projected demands from development allowed by the amendment;

(d) Adverse impacts. Whether the proposed reclassification will adversely affect known archaeological, historical, cultural or environmental resources; negatively impact water or air quality;

negatively impact ground water recharge areas or drainage patterns; or increase soil erosion or flooding;

(e) Suitability as presently zoned. Whether the property is suitable for authorized uses as presently zoned;

(f) Net benefits. Whether the relative gain to the public exceeds the hardships imposed upon applicant by the existing zoning restrictions;

(g) Development plans. Whether the applicant has plans for development of the property. Applications for multifamily or non-residential zoning classifications carry a rebuttable presumption that such rezoning shall adversely affect the zoning scheme unless a concept plan is submitted with the application;

(h) Market demand. Whether there is projected demand for the property as currently zoned, which may be determined by the length of time the property has failed to produce income or be used productively as zoned, or whether there are substantial reasons why the lot cannot be used in accordance with the existing zoning classification; and

(i) Health, safety, and welfare. Whether the proposed map amendment bears a substantial relationship to the public health, safety or general welfare.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-314. P&Z commission action on map and text amendments.

The P&Z commission shall hold a public hearing on a proposed map or text amendment and shall render its recommendation in accordance with the procedures set forth in this chapter after considering the criteria in section 114-313. In making its recommendation on a map amendment, the P&Z commission may recommend approval, approval with conditions, or denial. In making a recommendation on a text amendment, the P&Z commission may recommend approval as presented, recommend modifications to the text, or recommend denial. If the P&Z commission recommends denial of the text amendment, the Commission shall provide reasons for the recommendation.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-315. Board of commissioners action on map amendments.

(a) The board of commissioners shall conduct a public hearing on the application after receiving the P&Z commission's recommendation. The board of commissioners is not bound by any recommendations of the P&Z commission. If the P&Z commission has not made a recommendation in accordance with the procedures set forth in this chapter, the board of commissioners may proceed with the required readings and render a decision on the amendment.

(b) The board of commissioners is not required to take final action on a proposed amendment within any specific period of time, but it should proceed as expeditiously as practicable on applications for amendments.

(c) At the conclusion of the public hearing, the board of commissioners may proceed to vote on the proposed amendment, refer it to a committee for further study or take any other action consistent with its usual rules of procedure.

(d) After considering the criteria in section 114-313, the board of commissioners may approve, approve with conditions, or deny the application. If the application is denied, the board of commissioners shall advise the applicant of the reason for denial. The board of commissioners shall not regard as controlling any advantages or disadvantages to the individual requesting the change but shall consider the impact of the proposed change on the public at large.

(e) If conditions are attached to the approval, the conditions should relate to the relationship of the proposed use to surrounding property, proposed support facilities such as parking areas and driveways, pedestrian and vehicular circulations systems, screening and buffer areas, the timing of development, street and right-of-way improvements, water and sewer improvements, storm water drainage, the provisions of open space and other matters that the board of commissioners finds appropriate or that the applicant may propose. Such conditions to approval of the application may include dedication to the County of any rights-of-way or easements for streets, water, sewer or other public utilities necessary to serve the proposed development.

(f) Any conditions attached to the approval are binding on the property. The conditions will be part of the zoning map amendment ordinance and a violation of the conditions, unless amended or removed, shall be considered a violation of the county ordinances and subject to all the remedies provided for under State law and this UDO. If an applicant seeks to amend a condition, the same process as the zoning map amendment must be followed.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-316. Board of commissioners action on text amendments.

After deliberating the merits of a proposed UDO text amendment and considering the public health, safety, and welfare, the board of commissioners may approve, approve with amendments or reject a proposed text amendment.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-317. Effect of approval.

Approval of a map amendment entitles the property owner to use the property in accordance with the standards of the applicable zoning district. The approval of an amendment to the UDO text or zoning map does not authorize the use, occupancy, or development of property until the applicant receives necessary development approvals, such as subdivision, site plan and building permit approval.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-318. Recording procedures.

When the amendment involves changes to the existing zoning district boundaries, the form of the amending ordinance shall contain a narrative description of the land to be reclassified or reference to an accompanying plat of such land showing the new zoning classifications and indicating the boundaries.

The community development director shall refer to the attested ordinance as a record of the current zoning status until such time as the zoning map can be changed.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-319. Effect of denial of application.

A application for the amendment to the zoning map that has been denied in whole or in part, or approved to a classification other than the classification originally requested, shall not be resubmitted within one year of the date of the board of commissioners action on the original application. However, nothing in this division shall preclude the seeking of a different classification.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-320. Reserved.

DIVISION 3. PLANNED DEVELOPMENT

Sec. 114-321. Purpose.

The purpose of this division is to establish procedures and review criteria for the establishment of planned development districts (PD) that comply with the purposes and standards established in article V, division 7. No building permits shall be issued prior to final development plan approval for the applicable portion of a PD district, except for single-family detached dwelling units on a single parcel.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-322. Approval process overview.

The general approval process for the creation of a PD district involves a zoning map amendment which typically occurs in coordination with the subdivision of land. The approval process is two-phased with the applicant required to obtain conceptual plan approval and then obtain final development approval. The process summarized in Exhibit 322 identifies the steps involved in a typical PD district creation. Actual process may vary based on the complexity of the proposed development.

Exhibit 322: PD District Approval Process Summary Planned Development Process Pre-application Conference Preliminary Development Plan Final Development Plan (Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-323. Initiation.

(a) Pre-application conference required. Before any application is made, the applicant shall schedule a pre-application conference with the community development director to discuss the procedures and requirements for a PD district request pursuant to these regulations.

(b) Ownership and division of land. No tract of land may be considered for a PD district unless such tract is under single or unified ownership or control. If listed in several ownerships, the application for the creation of a PD district shall be accompanied by each landowner's written consent. The holder of a written option to purchase or a developer under contract shall be considered an owner for purposes of this section provided the landowner's written consent is included with the application.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-324. Reserved.

Sec. 114-325. Preliminary development plan.

(a) Purpose. The purposes of the preliminary development plan are to demonstrate that:

(1) The proposed land use mix and intensity are consistent with the comprehensive plan;

(2) Proposed system of streets, trails and greenways are consistent with county plans and this UDO, as well as the mobility needs of the county and the proposed development;

(3) The proposed development is consistent with the ability to provide and maintain public facilities and services on which the development, area and county depend;

(4) The proposed development is well integrated with the protection of natural features, including watersheds, wetlands, woodlands and other natural features;

(5) The proposed amenities and project design will be superior to that which could be developed through conventional zoning.

(6) The proposed development patterns and products are compatible with the character and vitality of the neighborhood and community; and

(7) The proposed phasing plan for the development will ensure that each proposed phase of the PD will be developed in a manner that ensures its users will be fully served by proposed public and private facilities, services and amenities.

(b) Applicability. A preliminary development plan shall be required to show all contiguous land holdings and the development patterns for the portions of the PD district that are proposed to be developed. Preliminary development plan submittal is not required if the property has a valid PUD approval and has received a sketch plat or site plan approval prior to the adoption of this UDO. For phased PUD projects commenced before the adoption of this UDO, the applicant shall not be required to submit a preliminary development plan as long as each subsequent sketch plat or site plan is submitted within two years of the previously approved sketch plat or site plan.

(c) Preliminary development plan process overview. The approval process and typical timing for preliminary development plan approval are summarized in Exhibits 325a and 325b. Actual timing may vary based on the date of submittal and scheduled hearing dates.

Exhibit 325a: Preliminary Development Plan Approval Process Summary Preliminary Development Plan Process Application, Review and Notice P&Z Commission Public Hearing Board of Commissioners Public Hearing Exhibit 325b: Timing Preliminary Development Plan Timing Completeness Review 5 business days (from application submittal) P&Z Commission Public Hearing 45 days (from completeness certification) Board of Commissioners Public Hearing 30 days (from P&Z Commission recommendation)

(d) Initiation. The preliminary development plan application shall be filed with the community development director. The preliminary development plan application shall comply with the requirements established in Appendix D. The application may include renderings illustrating the proposed development patterns and architectural character of development. If the applicant does not include development standards and/or design details, the development standards and design standards applicable to the closest zoning district, based on proposed use, shall apply.

(e) Completeness. The community development director shall review the application and shall determine if the application is complete pursuant to the provisions of section 114-213. Upon finding that the application is complete and consulting with the DRC, the community development director shall prepare a report making findings and recommendations on the application and authorize notice to be provided in accordance with section 114-218.

(f) Criteria for approval.

(1) The application demonstrates that it will achieve the purposes of the PD district and this section;

(2) The proposed PD district is consistent with the comprehensive plan;

(3) The mix and intensity of uses is compatible with existing and proposed adjacent land uses;

(4) The proposed land uses are meeting a market demand;

(5) The PD furthers the county's goal of providing a diverse use of land and balances residential and commercial development;

(6) Whether the proposed PD will adversely affect

a. Known archeological, historical, cultural resources, such as cemeteries and historic buildings;

b. Environmental resources;

c. Water or air quality;

d. Groundwater recharge areas, or drainage patterns; or

e. Soil erosion or flooding;

(7) The preliminary development plan conforms to all applicable provisions of this UDO;

(8) The proposed development is in an area of the county that is appropriate;

(9) Existing or proposed roads, utilities and other public facilities and services will be adequate to accommodate demands from existing and proposed development;

(10) Private amenities will be sufficient to meet the demands from all proposed phases of development within the PD district;

(11) The proposed development patterns and design are superior to development that could occur under conventional zoning; and

(12) The phasing plan ensures that all development will be fully served by the required infrastructure as each phase is developed.

(g) P&Z commission action. The P&Z commission shall conduct a public hearing and recommend approval, conditional approval or denial of the preliminary development plan based on the criteria established in paragraph (f) of this section.

(h) Board of commissioners action. The board of commissioners shall conduct a public hearing and approve, conditionally approve or deny the preliminary development plan based on the criteria established in paragraph (f) of this section. The board of commissioners is not bound by the recommendation made by the P&Z commission.

(i) Conditions. If the board of commissioners chooses to place conditions on the approval, such conditions shall be consistent with the parameters established in paragraph (f) of this section.

(j) Effect of approval.

(1) The PD zoning is granted at the time of preliminary development plan approval.

(2) Approval of a preliminary development plan shall constitute approval of:

a. Land uses, densities and development patterns;

b. The general arrangement of roads, drainage, utilities, parks and open space, and pedestrian and bicycle trails;

c. The locations and types of amenities to be provided; and

d. The phasing of development and the improvements identified in this paragraph.

(3) No clearing, grading, or construction shall be authorized until the final development plan has been approved and other applicable development approvals have been secured.

(4) While the zoning will be retained, resubmittal of a preliminary development plan will be required unless a final development plan is approved within 24 months. For multiphase PDs, the preliminary development plan shall expire if 24 months elapse between the first final development plan approval and each successive phase or as otherwise provided in the approved phasing plan

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-326. Final development plan.

(a) Purpose. The purpose of the final development plan is to demonstrate that the proposed PD is consistent with the preliminary development plan approval, the purposes and standards of the PD district and other applicable requirements of this UDO.

(b) Applicability. Final development plan approval shall be required before a sketch plat is approved for the subject property. Final development plan approval is not required if the property has a valid PUD approval under the prior zoning ordinance that included a conceptual site plan and design guidelines.

(c) Final development plan process overview. No hearing is required for final development plan approval unless the applicant chooses to appeal the community development director's decision to the board of commissioners, or the applicant proposes a major design modification from the approved preliminary development plan. (See Exhibit 326).

Exhibit 326: Final Development Plan Review Process and Typical Timing Review Process Typical Timing Completeness Review 5 business days (from application submittal) DRC Review 5 days (from completeness certification) Community Development 5 days

(d) Initiation. The final development plan application shall be filed with the community development director. It is the applicant's responsibility to comply with timeframes and submittal deadlines established in this UDO.

(e) Review and action by community development director. The community development director shall review the application and shall determine if the application is complete pursuant to the provisions of section 114-213. Upon finding that the application is complete, the director shall provide the final development plan to the DRC for its review.

(1) Following input from the DRC, the community development director shall determine if the final development plan complies with the conditions of preliminary development plan approval, and, upon making such determination, shall approve such plan, and:

a. Transmit notice to the P&Z commission and board of commissioners of the approval of the final development plan together with a copy of the final development plan; and,

b. Notify the applicant of the approval for the area included within the final development plan.

(2) If the community development director determines that the final development plan submittal does not comply with the preliminary development plan approval or the criteria in paragraph (f) of this section, the community development director shall provide written notice of the denial of the final development plan submittal. If denied, the applicant may:

a. Revise and resubmit such final development plan;

b. Appeal the decision of the community development director to the board of commissioners; or

c. If the final development plan constitutes a major change from the preliminary development plan, submit a new preliminary development plan application pursuant to section 114-325.

(3) If the applicant does not receive approval of the final development plan within the required 24-month approval period, the preliminary development plan shall be void, and the applicant must submit a new preliminary development plan. The 24-month period is tolled if a final development plan is in the process of being reviewed.

(f) Criteria for final development plan approval.

(1) The application demonstrates that it will achieve the purposes of the PD district and this section;

(2) The final development plan application complies with all conditions of the preliminary development plan approval and conforms to all applicable provisions of this UDO.

(g) Effect of approval. Approval of a final development plan authorizes the applicant to proceed with sketch plat submittal.

(h) Minor amendments to a PD approval. The community development director may authorize the following minor amendments to a preliminary or final development plan:

(1) Deviations arising from limited technical considerations which could not reasonably be anticipated during the approval process.

(2) Amendments required to bring the application into compliance with adopted technical codes.

(3) Any other change which has no material effect on the character of the approved preliminary or final development plan, as determined by the community development director, such as:

a. Driveway relocations;

b. Facility design modifications for design, recreational or other amenities;

c. Changes to the boundaries of open spaces and amenity areas that do not reduce the area reserved for buffers, open space, or amenities or the depth of open space, amenities or buffers that adjoin internal lots of record or external boundaries of the PD;

d. Realignments of internal streets and trails prior to final plat approval as long as the realignment does not reduce the gross area of common areas or open spaces, reduce residential lot sizes, eliminate required buffers or create street alignments that fail to conform with county standards;

e. Adjustment of lot boundaries for unrecorded lots that do not adjoin internal lots of record or external lots, provided that the lot boundary adjustments do not reduce average lot sizes or increase the number of lots; and

f. Expansions of buffers, open spaces and landscape areas.

(i) Major amendments to a PD approval. Major amendments to the preliminary development plan shall be resubmitted for preliminary development plan review and approval in accordance with section 114-325. Major amendments include:

(1) Changes in allowable uses or the mix of uses;

(2) Increases in the density or intensity of development;

(3) Designation of additional land uses unless the community development director finds that the new use is substantially similar to a specifically authorized use in its intensity, character, and impacts;

(4) Change in the location of permitted use(s) from the location shown on the approved preliminary development plan;

(5) An increase or decrease in project area other than surveyor base data corrections;

(6) Decrease in open space;

(7) Change in dimensional standards set forth in the development conditions that result in a decrease in minimum standards (e.g., reduction in minimum setbacks or reductions in street widths) or increase in maximum standards (i.e. an increase in building height and/or gross density or intensity of land uses);

(8) Change to proposed amount or design buffering, landscaping, land uses or lot sizes along the perimeter of the PD other than those specifically allowed as minor amendments in paragraph

(h) of this section;

(9) Addition or reduction of driveways or access points, especially those which negatively affect connectivity or street safety; or

(10) Other design modifications to the approved preliminary development plan that the community development director determines to be major.

(Ord. No. 06-2020, § 3, 12-8-2020)

DIVISION 4. CONDITIONAL USE PERMITS

Sec. 114-327. Purpose.

This division establishes a process and standards to approve certain uses that, because of unique characteristics or potential impacts on adjacent land uses, are not permitted in zoning districts as a matter of right. These uses may be permitted through the issuance of a conditional use permit (CUP) after ensuring that the use complies with the CUP approval criteria. No inherent right exists to receive a CUP. Such authorization must be approved under a specific set of circumstances and conditions. Each application and situation is unique and may be subject to specific requirements to mitigate the impacts of the proposed use.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-328. Applicability.

The provisions of this division apply to any application for approval of a CUP. Only those uses that are authorized as conditional uses in the applicable zoning district, as set forth in article V shall be authorized by the board of commissioners.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-329. CUP process overview.

The approval process and typical timing for a CUP approval are summarized in Exhibits 330a and 330b. Actual timing may vary based on the date of submittal and scheduled hearing dates.

Exhibit 330a: CUP Approval Process Summary CUP Process Application, Review and Notice P&Z Commission Public Hearing Board of Commissioners Public Hearing Exhibit 330b: Timing CUP Timing Completeness Review 5 business days (from application submittal deadline) P&Z Commission Public Hearing 45 days (from completeness certification) Board of Commissioners Public Hearing 30 days (from P&Z Commission recommendation) (Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-330. Initiation.

The CUP application shall be filed with the community development director in compliance with the requirements of Appendix D.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-331. Completeness.

(a) The community development director shall review the application and shall determine if the application is complete pursuant to the provisions of section 114-213.

(b) Upon finding that the application is complete and considering DRC comments, the community development director shall prepare a report making findings and recommendations on the application and authorize notice to be provided in accordance with section 114-218.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-332. Criteria.

A conditional use is permitted only if the applicant demonstrates that the proposed use and its operation:

(a) Comply with all regulations of the applicable zoning district and any applicable supplemental use regulations unless specifically modified through the approval process;

(b) Conform to the character of the neighborhood in which it is located and not injure the use and enjoyment of property in the immediate vicinity for the purposes already permitted;

(c) Are served by adequate public facilities as set forth herein;

(d) Do not impede the orderly development and improvement of surrounding property for uses permitted within the zoning district;

(e) Are not detrimental to or endanger the public health, safety, comfort or general welfare; and

(f) Promote the public health and welfare sufficiently to outweigh individual interests that are adversely affected by the establishment of the proposed use.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-333. Conditions.

(a) In approving any CUP, the P&Z commission may recommend, and the board of commissioners may impose such reasonable standards, conditions, or requirements, in addition to or superseding any standard specified in the UDO, as it may deem necessary to protect the public health, safety and welfare.

Such additional standards may include, but need not be limited to:

(1) Adequate and reasonable mitigation of potentially adverse effects on adjacent properties. In making such a determination, consideration shall be given to:

a. The location, type, orientation, design and height of buildings or structures;

b. The type and extent of landscaping and screening on the site; and

c. Whether the proposed use is consistent with any policy of the comprehensive plan that encourages mixed uses and/or densities;

(2) Providing adequate public facilities or services;

(3) Dedication of easements or land in fee title;

(4) Funding for extraordinary costs associated with the development through direct contribution or agreement to establish an acceptable funding mechanism;

(5) Creation of restrictive covenants;

(6) Standards pertaining to traffic, circulation, noise, lighting, hours of operation, protection of environmentally sensitive areas, and similar characteristics;

(7) Adequate measures to provide ingress and egress designed to minimize traffic hazards and to minimize traffic congestion on the public roads;

(8) Provision of sustainable features, solar or other renewable energy source, rain water capture, storage and treatment or other sustainability requirement;

(9) Provision of performance guarantee acceptable in form, content, and amount to the county attorney to ensure continued compliance with all conditions and requirements as may be specified; or

(10) Other conditions that the hearing body finds are necessary to achieve the purposes of this section and UDO.

(b) The board of commissioners may not attach conditions that provide regulatory relief from specific requirements set forth in this UDO.

(c) All additional conditions or requirements authorized by this section are enforceable in the same manner and to the same extent as any other applicable requirement of this UDO.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-334. P&Z commission Action.

The P&Z commission shall conduct a public hearing on the application and recommend approval, conditional approval or denial of the application based on the criteria in section 114-332.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-335. Board of commissioners action.

The board of commissioners shall conduct a public hearing and approve, conditionally approve, or deny the conditional use permit based on the criteria established in section 114-332.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-336. Effect of approval.

(a) Once a CUP is granted, such use may not be enlarged, extended, increased in intensity, or relocated unless the request is reviewed and approved following the same process as the initial application unless the initial approval specifically established alternative procedures for consideration of future expansion or enlargement.

(b) The provisions of this UDO relative to expansion of non-conforming uses, do not supersede this requirement unless the conditionally permitted use for which the development approval was initially granted is no longer a use permitted as of right or as a conditional use in the zoning district in which it is located.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-337. CUP amendments.

(a) An amendment or modification is a request for any enlargement, expansion, increase in intensity, relocation, or modification of any condition of a previously approved and currently valid CUP.

(b) Amendments to an approved CUP approval may be considered minor or major amendments. The community development director shall review a request for a modification and shall determine whether the request for amending an approved CUP is minor or major. In addition to a CUP application, a developer requesting approval of modifications shall also submit a written request, and plans or drawings as necessary, identifying and detailing the requested changes. Approval or denial of a request and any changes shall be provided to the applicant in writing.

(1) Minor amendments from a CUP issued by the board of commissioners may be granted by the community development director. For purposes of this section, minor modifications or changes are those that have no substantial impact on neighboring properties, the general public or those intended to occupy or use the proposed development. Such permission may be obtained without a public hearing or payment of any additional fee; however, a formal application for the requested modification to the CUP and/or applicable revised site plans, studies, or sketch plats, shall be filed with the community development director.

(2) Major amendments are any proposed amendment other than those defined above as minor CUP amendments and shall be approved in the same manner and under the same procedures as the original approval. During the process for a major amendment, new conditions may be imposed only on the specific site or area requested to be modified. The applicant, however, retains the right to reject such additional conditions by withdrawing the request for an amendment and proceeding in accordance with the previously issued permit. Major amendments shall include, but are not limited to the following:

a. Designation of additional land uses;

b. Change in the location of use(s) from what is shown on the approved site plan or sketch plat, to another location on the same parcel;

c. An increase or decrease in project area other than surveyor technical corrections. For a decrease in project area, the amendment will only be considered major if the decrease results in an increase in density or intensity as calculated by total square footage or total number of units within the project area;

d. Change in dimensional standards set forth in the development conditions created in the CUP approval that result in a decrease in minimum standards (e.g., reduction in minimum setbacks or reductions in street widths) or increase in maximum standards (e.g. an increase in building height and/or gross density or intensity of land uses);

e. Change to proposed treatment of buffering, landscaping, land uses or lot sizes along the perimeter of the development;

f. Addition or reduction of driveways or access points, especially those which negatively affect connectivity or street safety; or

g. Other modifications to the approved CUP that the community development director determines to be major.

(c) Amendments shall have no detrimental impact on any adjacent property caused by significant change in the appearance or use of the property or any other contributing factor.

(d) An amendment shall only be approved if the proposal conforms to the UDO and is in keeping with the spirit and intent of any adopted comprehensive plan and nothing in the currently valid conditional use permit precludes or otherwise limits such amendment.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-338. Revocation of conditional use permits.

(a) Any conditional use permit granted under the authority of this article is subject to revocation for any or all of the following reasons:

(1) Non-compliance with any conditions or requirements imposed by the UDO or by the board of commissioners at the time of approval of the CUP.

(2) Violation of any provisions of the UDO pertaining to the use of the land, construction or uses of buildings or structures, or activities conducted on the premises by the applicant or agents of the applicant; or

(3) Violation of any other applicable UDO provisions or any State or federal law or regulation by the applicant or agents of the applicant, provided that such violations relate to the conduct or activity authorized by the CUP or the qualifications of the applicant or its agents to engage in such conduct or activity.

(b) The board of commissioners may revoke the CUP after providing notice to the property owner/applicant, conducting a public hearing, and finding one of the above-stated reasons has occurred.

(Ord. No. 06-2020, § 3, 12-8-2020)

DIVISION 5. VARIANCES

Sec. 114-339. Purpose.

The board of adjustment shall have the power to vary the provisions of this UDO when the applicant demonstrates that the standards impose a substantial and unique hardship on the use of a property.

Variances are intended to be used for quantifiable and not qualitative standards. The following may not be varied:

(a) Permitted uses, i.e., allowing a use not permitted in a zoning district;

(b) Minimum lot size (total square footage/acreage);

(c) Maximum density;

(d) Maximum number of parcels that may be served by a private easement;

(e) Maximum number of parcels that may be created as a minor subdivision;

(f) Minimum time between further subdivision of parcels within a minor subdivision; and

(g) Development standards established for a PD unless the request is for an individual lot.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-340. Application.

The variance application shall be filed with the community development director and shall comply with the requirements established in Appendix D. The application shall state fully the special conditions applying to the building, structure or land for which such variance is sought and how the application satisfies the criteria established herein.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-341. Review.

The community development director shall review the application and shall determine if the application is complete pursuant to the provisions of Section 114-213. Upon finding that the application is complete, the community development director shall cause notice to be provided in accordance with section 114-218, and prepare a report making findings and recommendations on the application based on the criteria in section 114-342.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-342. Review criteria.

A variance may be granted by the board of adjustment if it finds that all the following conditions have been shown.

(a) Unnecessary hardship would result from the strict application of this UDO. It shall not be necessary to demonstrate that, in the absence of the variance, no reasonable use can be made of the property.

(b) The hardship results from conditions that are peculiar to the property, such as location, size, or topography. Hardships resulting from personal circumstances, as well as hardships resulting from conditions that are common to the neighborhood or the general public, may not be the basis for granting a variance.

(c) The hardship did not result from actions taken by the applicant or the property owner. The act of purchasing property with knowledge that circumstances exist that may justify the granting of a variance shall not be regarded as a self-created hardship.

(d) The requested variance is consistent with the spirit, purpose, and intent of this UDO, such that public safety is secured, and substantial justice is achieved.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-343. Board of adjustment hearing.

(a) The board of adjustment shall conduct a public hearing and approve, conditionally approve or deny of the application based on the criteria established in section 114-342.

(b) Before granting a variance, the board of adjustment must affirm by a simple majority that each of the required findings set forth as criteria section 114-342 is true. In so far as practicable, a motion to make an affirmative finding on each of the requirements shall include a statement of the specific reasons or findings of fact supporting each criterion.

(c) In granting variances, the board of adjustment may impose such reasonable conditions as will ensure that the use of the property to which the variance applies will be as compatible as practicable with the surrounding properties.

(d) If a variance request is denied, an applicant may not submit the same or similar variance request for the subject parcel within a year of the date of denial.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-344. Effect of approval.

(a) Except when the board of adjustment specifies that the variance shall be issued for an indefinite duration or for a specified duration, the variance shall expire one year after the approval unless the applicant establishes the building, structure or other condition for which the variance was sought. The applicant may request a one-time extension of up to one year to establish the building, structure, or other condition. The community development director shall have the authority to approve or deny the request upon finding a reasonable reason for the delay. The applicant may appeal a denial by the community development director to the board of adjustment pursuant to article III, division 6.

(b) The nature of the variance and any conditions attached to it shall be entered on the face of the development permit or the development permit may simply note the issuance of the variance and refer to the written record of the variance for further information. All such conditions are enforceable in the same manner as any other applicable requirement of this chapter.

(Ord. No. 06-2020, § 3, 12-8-2020)

DIVISION 6. APPEALS TO STAFF DECISIONS

Sec. 114-345. Purpose.

The board of adjustment shall have the power to decide appeals to any decision on a development application or interpretation/application of the UDO made by the community development director except for appeals to the community development director's modifications of the provisions of article VIII that are authorized by section 114-800, which shall follow the procedures established in section 114-354. Any person aggrieved of such a decision may appeal the decision to the board of adjustment and in the manner provided in this section. Decisions on construction plans made by the engineering director, and decisions of the building official on building or construction standards related to a sign permit shall be appealed to the building and construction board of appeals.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-346. Initiation.

The appeals application shall be filed with the community development director and shall state fully the decision being appealed, including applicable code section, and the reasons that the applicant believes the decision was made in error. The application to appeal shall be filed within 30 days of receiving notice of the development decision being appealed. In calculating the 30 days, if the decision is emailed, notice shall be presumed to be the date of the email. If the decision is mailed via U.S. mail, receipt of notice shall be presumed to be three days from the date of the letter/decision. If the appeal is not timely filed, the decision shall be final.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-347. Stay of proceeding.

An appeal stays all actions by the community development director seeking enforcement of or compliance with the order or decision appealed from, unless the community development director certifies to the board of adjustment that a stay would cause imminent peril to life or property. If enforcement is not stayed, then the board of adjustment shall meet and hear the appeal within 30 days or the next regularly scheduled meeting, whichever is later, after such request is filed.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-348. Board of adjustment hearing.

The board of adjustment shall conduct a quasi-judicial hearing. The official who made the decision shall be present at the hearing as a witness. If the appellant raises issues/matters not identified in the appeal notice, the board of adjustment shall determine if the issue has been waived due to failing to timely appeal or if the matter is reasonably related to the issue raised in the initial appeal. If the appellant presents additional facts or evidence at the public hearing not included in the appeal application, the community development department will be entitled to a continuance.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-349. Board of adjustment considerations.

In evaluating an appeal, the board of adjustment shall determine whether the decision being appealed:

(a) Was made based on correct interpretation of the applicable regulations; or

(b) Reflected a reasonable interpretation/application of the UDO. The board may not reverse the decision based on its opinion of the outcome; its decision must be based on whether the decision was based on a reasonable interpretation of the UDO.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-350. Board of Adjustment Action.

The board of adjustment may reverse or affirm, wholly or partly, or may modify the decision appealed from and shall make any order, requirement, decision, or determination needed to effect the board of adjustment's decision. The board shall have all the powers of the official who made the decision. The board's decision shall not exceed the scope of the specific issue(s) presented in the appeal application.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-351. Findings required.

A motion to reverse, affirm or modify the order, requirement, decision or determination appealed from shall include, in so far as practicable, a statement of the specific reasons or findings of facts that support the motion.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-352. Failure to act.

If a motion to reverse or modify is not made or fails to receive a majority vote necessary to overturn the action being appealed, then the decision appealed from is upheld.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-353. Burden of proof in appeals.

When an appeal is taken to the board of adjustment in accordance with this division, the community development director shall have the initial burden of presenting to the board sufficient evidence and argument to justify the decision appealed from. The burden of presenting evidence and argument to the contrary then shifts to the appellant, who also shall have the burden of persuasion.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-354. Appeals heard by the planning and zoning commission.

(a) Purpose and applicability. Appeals to the community development director's decisions on modifications to the design standards authorized by article VIII shall be heard by the P&Z commission.

(b) Initiation. The appeals application shall be filed with the community development director and shall state fully the decision being appealed, including applicable code section, and the reasons that the applicant believes the decision was made in error. The application to appeal shall be filed within 30 days of receiving notice of the development decision being appealed. In calculating the 30 days, if the decision is emailed, notice shall be presumed to be the date of the email. If the decision is mailed via U.S. mail, receipt of notice shall be presumed to be three days from the date of the letter/decision. If the appeal is not timely filed, the decision shall be final. No notice is required for the hearing other than the posting of the agenda pursuant to this UDO.

(c) P&Z commission hearing and action. The commission shall hear the application and, after considering testimony and other evidence provided at the hearing, may reverse or affirm, wholly or partly, or may modify the decision appealed from and shall make any order, requirement, decision, or determination needed to effect the decision. The commission shall base its decision on whether the decision being appealed would better achieve the purposes and objectives of this UDO than the modification proposed by the applicant. The commission's decision shall not exceed the scope of the specific issue(s) presented in the appeal application.

(d) Burden of proof in appeals. When an appeal is taken to the P&Z commission in accordance with this division, the community development director shall have the initial burden of presenting to the P&Z commission sufficient evidence and argument to justify the decision appealed from. The burden of presenting evidence and argument to the contrary then shifts to the appellant, who shall have the burden of persuasion.

(e) Effect of decision. The community development director shall abide by the decision of the P&Z commission in decisions affecting any site plan or building permit application that is subject to the requested modification.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-355. Appeals heard by the building and construction board of appeals.

(a) Purpose and applicability. This section establishes the procedures for hearings and action under the authority of the building and construction board of appeals, which include:

(1) Appeals where it is alleged that there is error in any requirement, decision or determination made by:

a. The building official for any decision under this UDO or chapter 103 of the County Code for which the building official has final decision authority; or

b. The engineering director for any decision under this UDO, the Engineering Design Manual, for which the engineering director has final decision authority.

(2) Appeals or variances brought pursuant to chapter 105 "Flood Damage Prevention" of the County Code.

(3) Appeals brought pursuant to chapter 111 "Soil Erosion and Sedimentation Control."

(b) Initiation. The application shall be filed with the community development director and shall state fully the decision being appealed or the flood damage prevention provision for which a variance is being sought, including applicable code section, and the reasons that the applicant believes the decision was made in error or a variance is justified. An application to appeal shall be filed within 30 days of receiving notice of the development decision being appealed. In calculating the 30 days, if the decision is emailed, notice shall be presumed to be the date of the email. If the decision is mailed via U.S. mail, receipt of notice shall be presumed to be three days from the date of the letter/decision. If the appeal is not timely filed, the decision shall be final. No notice is required for the hearing other than the posting of the agenda pursuant to this UDO.

(c) Building and construction board of appeals hearing and action. The building and construction board of appeals shall hear the application. After considering testimony and other evidence provided at the hearing:

(1) May reverse or affirm, wholly or partly, or may modify the decision appealed from and shall make any order, requirement, decision, or determination needed to effect the decision; or

(2) May grant, grant with conditions, or deny the requested variance.

(d) Basis for decision. In evaluating an appeal, the building and construction board of appeals shall determine whether the decision being appealed:

(1) Was made based on correct application of the applicable regulations, i.e., was the decision clearly wrong; or

(2) Reflected a reasonable interpretation/application of the UDO, chapter 105 or chapter 111. The Board may not reverse the decision based on its opinion of the outcome; its decision must be based on whether the decision was based on a reasonable interpretation of the UDO, chapter 105 or chapter 111.

(e) Burden of proof in appeals. When an appeal is taken in accordance with this section, the community development director or engineering director shall have the initial burden of presenting to the board sufficient evidence and argument to justify the decision appealed from. The burden of presenting evidence and argument to the contrary then shifts to the appellant, who also shall have the burden of persuasion.

(f) Effect of decision. The building official or engineering director shall abide by the decision of the building and construction board of appeals.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-356. Reserved.

DIVISION 7. ABANDONMENT OF RIGHT-OF-WAY OR EASEMENT

Sec. 114-357. Purpose and applicability.

This division identifies the process for approving the abandonment of right-of-way or easement, in whole or in part, when such property no longer serves a public purpose.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-358. Initiation.

The process may be initiated by the board of commissioners or the owner of property abutting the right-of-way or easement or the entity owning the rights to the right-of-way or easement. If abandonment is not initiated by the county, the requestor must submit an application to the engineering director.

The engineering director shall seek input from applicable county department heads, staff, and other interested parties and prepare a report with their recommendation to the board of commissioners. In preparing their recommendation, the engineering director may request additional information from the requestor such as a title report, boundary survey, or new subdivision plat. Costs to prepare such documents shall be borne by the requestor. The board of commissioners, upon receipt of the recommendation, shall either adopt a resolution declaring its intent to abandon right-of-way or easement and call for a public hearing or deny the request for abandonment.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-359. Notice.

The engineering director shall cause the notice to be published once a week for two successive weeks prior to the hearing. Notice shall be mailed to all the owners of property adjoining the road or alley or to all entities having an interest in an easement at least 30 days prior to the hearing. The cost of notice shall be borne by the applicant for the abandonment.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-360. Decision.

At the hearing, any person may be heard on the question of whether or not the abandonment would be detrimental to the public interest, or the property rights of any individual. If the board of commissioners determines after the hearing that abandoning the right-of-way or easement is not contrary to the public interest, and that no individual owning property in the vicinity of the right-of-way or easement or in the subdivision in which it is located would thereby be deprived of reasonable means of ingress and egress to their property, the commission may adopt an order abandoning the right-of-way or easement.

A certified copy of the order shall be filed in the office of the clerk of the court - real estate division.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-361. Ownership.

(a) Except as provided in paragraph (c) of this section, upon the abandoning of the right-of-way in accordance with this section, all right, title, and interest in the right-of-way shall be conclusively presumed to be vested in those persons owning lots or parcels of land adjacent to the right-of-way, and the title of such adjoining landowners, for the width of the abutting land owned by them, shall extend to the centerline of the right-of-way.

(b) The provisions of this subsection regarding division of right-of-way abandonment may be altered as to a particular right-of-way abandonment by the assent of all property owners taking title to an abandoned right-of-way by the filing of a plat which shows the right-of-way abandonment and the portion of the right-of-way to be taken by each such owner. The plat shall be signed by each property owner who, under this section, has an ownership right in the abandoned right-of-way.

(c) The County may reserve its right, title, and interest in any utility improvement or easement within a right-of-way abandoned pursuant to this section. Such reservation shall be stated in the order of abandonment. Such reservation also extends to utility improvements or easements owned by private utilities which at the time of the right-of-way abandonment have a utility agreement or franchise with the county. To retain such easements, the board of commissioners shall, after the public hearing, approve a "declaration of retention of utility easements" specifically describing such easements.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-362. Recording procedures.

Upon approval of the abandonment of the right-of-way or easement, the engineering director shall cause to be recorded all required documents with the clerk of court - real estate division and shall update all county records that such right-of-way or easement is no longer part of the county inventory.

(Ord. No. 06-2020, § 3, 12-8-2020)

DIVISION 8. MAJOR SUBDIVISIONS

Sec. 114-363. Generally.

(a) Subdivision required. No person may subdivide land except in accordance with the provisions of this division or the minor subdivision process in article IV, division 1. In particular, no person may subdivide land unless and until a final plat of the subdivision has been approved in accordance with the provisions of this UDO and recorded with the clerk of court - real estate division.

(b) Exemptions. A major subdivision plat is not required for any of the following:

(1) The public acquisition by purchase of strips of land for the widening or opening of roads or for public transportation corridors; or

(2) If a court orders the partition of land by dividing the same among the owners, provided that the county is made a party defendant to said action and gives its consent.

(c) Required improvements. Except as otherwise provided by the subdivision regulations, a developer shall provide, install and pay for improvements including but not limited to road name signs, traffic control devices, water and sewer improvements, stormwater management, roadway, recreational and pedestrian facilities, off tract improvements, if necessary, utilities to serve their subdivision, site grading and any other improvements deemed necessary during the review process. All utilities shall be underground including electrical, cable, and gas lines. Utilities shall be located, where possible, in accordance with the applicable roadway cross-section detail in the Engineering Design Manual.

(d) Process overview. The applicant for major subdivision shall follow the procedures established in this division, which are summarized in Exhibit 363.

Exhibit 363: Major Subdivision Approval Process Summary Major Subdivision Process Sketch plat Construction Plans Final Plat Acceptance of Improvements (Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-364. Reserved.

Sec. 114-365. Sketch plat.

(a) Purpose.

(1) The sketch plat serves as a guide to future density, intensity, land uses, pedestrian and bicycle ways, trails, parks and open space, as well as lot, road and drainage patterns. It is intended to ensure that a landowner investigates the broad effects that subdivision of property will have on the site itself as well as on adjacent properties and public infrastructure systems.

(2) Approval of a sketch plat shall constitute acceptance of the land-use mix, development intensity, general road patterns, conceptual drainage patterns, lot patterns, parks and open space lands, and the general layout of pedestrian and bicycle trails, provided that these factors may be modified in conjunction with subsequent approvals if additional information reveals development constraints that are not evident during sketch plat review.

(3) The sketch plat, together with the attendant items required herein, is to provide a basis for the construction of the subdivision and its improvements as well as a draft of the final plat of the subdivision. To achieve this, the applicant should consult with the community development director, engineering director and other agencies concerned with the subdivision and the improvements.

(b) Applicability. Sketch plat approval is required prior to approval of construction plans, including clearing and grading permit and a final plat for any major subdivision. The provisions of this section do not apply to any major subdivision that has received approval of preliminary plat prior to the date of adoption of this UDO for which a final plat is recorded within 24 months of adoption of this UDO.

(c) Initiation.

(1) Process overview. The approval process and typical timing of sketch plat approval are summarized in Exhibits 365a and 365b. Actual timing may vary based on the date of submittal and scheduled hearing dates.

Exhibit 365a: Sketch Plat Approval Process Summary Sketch plat Process Application, Review and Notice P&Z Commission Public Hearing Board of Commissioners Public Hearing Exhibit 365b: Timing Sketch plat Timing Completeness Review 5 business days (from application submittal deadline) P&Z Commission Public Hearing 45 days (from completeness certification) Board of Commissioners Public Hearing 30 days (from P&Z Commission decision)

(2) Application. The applicant shall file a completed sketch plat application with the community development director and shall comply with the requirements established in Appendix D.

(3) Completeness review. The community development director shall review the application and shall determine if the application is complete pursuant to section 114-213.

(4) Notice. Following the community development director's determination that the application is complete, the notice shall be provided pursuant to section 114-218.

(d) Review. Upon finding that the application is complete, the community development director shall forward copies of the sketch plat to the DRC and other reviewing entities, who shall evaluate the application. The community development director shall then prepare a report making findings and recommendations on the application's compliance with the criteria established in the following paragraph.

(e) Review criteria. Each of the following criteria must be satisfied prior to sketch plat approval.

(1) The application is consistent with the comprehensive plan, as well as any other adopted plans for roads, alleys, trails, parks, playgrounds, and public utility facilities;

(2) The proposed subdivision complies with applicable county, State and federal regulations;

(3) Traffic impacts from the proposed development will be mitigated;

(4) The proposed subdivision will not have detrimental impacts on the safety or viability of permitted uses on adjacent properties;

(5) The proposed public facilities are adequate to serve the normal and emergency demands of the proposed development, and to provide for the efficient and timely extension to serve future development;

(6) That the subdivision design provides adequate amenities and connectivity to roads, sidewalks and trails;

(7) That the sketch plat demonstrates a layout that minimizes clearing and grading and protects existing trees; and

(8) The sketch plat addressed the need for and provides the general location of stormwater management facilities for the proposed development, as well as identifying discharge point(s) from the tract.

(f) P&Z commission hearing, deliberation, and action. The P&Z commission shall conduct a public hearing on the application. Following the hearing, the commission shall deliberate the application's compliance with the criteria established in paragraph (e) of this section and shall recommend that the board of commissioners approve, conditionally approve or disapprove the sketch plat application.

(g) Board of commissioners deliberation and action. The board of commissioners may approve, approve with conditions or disapprove the application pursuant to the criteria established in paragraph

(e) of this section.

(h) Effect of board of commissioners action.

(1) Approval constitutes the finding that the plat complies with the county's subdivision and zoning regulations.

(2) The sketch plat governs the preparation of construction plans and the final subdivision plat, which must be submitted for approval and recordation upon fulfillment of the requirements of this UDO.

(3) The sketch plat shall be valid for two years. If the construction plan approval is not obtained within this two-year period, the sketch plat shall be void. If construction plans and final plat are submitted and approved according to the time frames this division, the sketch plat will remain valid. The board of commissioners may approve a phasing plan extending the effective period of the sketch plat approval for up to five years where it is the intent of the landowners to proceed to final plats covering only a portion of the site at any one time. The phasing plan must be submitted with the sketch plat.

(4) If construction is not completed in the timeframes identified in paragraph (h)(3) of this section, the community development director or engineering director may require the applicant obtain a new sketch plat approval.

(5) Approval of the sketch plat by the board of commissioners shall not be deemed final approval of the overall subdivision.

(i) Amendments to sketch plat. Amendments to a sketch plat shall be approved in the following manners:

(1) Minor amendments. Minor amendments may be approved by the community development director without filing a new sketch plat. Minor amendments include the following:

a. Changes in the internal alignment of roads that do not affect external properties or connectivity;

b. Changes in internal lot boundaries that do not abut external property lines provided that all lots comply with minimum area and dimensional requirements;

c. Changes in setbacks along internal property lines provided the changes comply with minimum setback requirements;

d. Changes in the routing of trails and pedestrian ways;

e. Changes to the location or boundaries of open spaces that do not reduce the total area or function of the open spaces;

f. Adjustments in easements, utilities or drainage improvements identified as necessary during the preparation of construction plans; or

g. Changes in the orientation of buildings on internal parcels.

(2) Major amendments. Plat amendments not categorized as minor amendments require the filing of an application for an amended sketch plat for review, deliberation and approval following the same process identified in this section. Major plat amendments shall include any of the following:

a. Changes in permitted uses;

b. Increased intensity of use as measured by the number of dwelling units or square feet of nonresidential building area;

c. Increased trip generation;

d. Increased demand for public utilities;

e. Decreased public or private open space area;

f. Changes that conflict with the tree protection requirements of this UDO; or

g. Any other proposed amendment that the community development director determines is a major amendment.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-366. Construction plans.

(a) Purpose of construction plans. Construction plans ensure that public and private improvements associated with developments are consistent with the county's design standards and that improvements are documented in a way that facilitates the long-term management and enhancement of public infrastructure and ensures that improvements will be durable. Approved construction plans allow for the issuance of a road construction permit or site development permit. Any improvements in the county ROW following final plat approval shall require the submission of a road encroachment permit.

(b) Applicability. Prior to review of a final plat or site plan for a non-residential development, the applicant shall have prepared, by a professional engineer registered in the State of Georgia, construction plans consisting of complete construction drawings and specifications of all rights-of-way, easements, roads, traffic control devices, streetlights, sanitary sewers, stormwater facilities, water system facilities, sidewalks, trails and other improvements required by federal, State, and local law. Landscape and tree protection plans shall be prepared by a registered landscape architect. The applicant may obtain a land disturbance permit per section 114-426 prior to obtaining construction plan approval or the applicant may submit the clearing and grading (land disturbance permit) with the construction plans. If a project requires sketch plat approval, a clearing and grading permit (land disturbance permit) may not be issued until the sketch plat or site plan have been approved.

(c) Application for construction plan approval.

(1) Submittals. Complete construction plan applications shall be submitted to the engineering director for review and approval. The application shall comply with the requirements established in Appendix D. In addition to review fees established pursuant to the fee schedule adopted by the board of commissioners, the engineering director may require payment deposit into an escrow account to cover the costs of plan review by the county's engineering consultant(s) in accordance with section 114-204 of this UDO.

(2) Stormwater management standards. In addition to the requirements in Appendices C and D, the applicant must provide or address the following for stormwater management:

a. A certificate from applicant's engineer stating that the development of the subdivision will not increase, decrease or change the quality or quantity of surface or subsurface water reaching adjacent property shall be required. If such certificate cannot be delivered to the county, then an easement from or other agreement with the affected adjacent property owner shall be required.

b. Each subdivision shall incorporate stormwater management facilities sufficient to maintain pre-development peak discharge rates across adjacent property lines.

c. No subdivision shall be undertaken unless the applicant can establish to the engineering director that the flood potential within the subdivision, on adjacent or surrounding lands or wetlands will not be increased by the development of such subdivision. If such potential is in question, the engineering director shall make the final determination.

d. Inter-basin transfer of water between river basins is prohibited.

(3) Completeness review. The engineering director shall review the application and shall determine if the application is complete pursuant to section 114-213.

(4) Public hearing. A public hearing is not required for construction plan approval.

(d) Engineering director review and action.

(1) Review. The applicant shall submit the construction plans to all applicable local, State and Federal reviewing agencies and public utility companies that will service the subdivision or development. The applicant shall incorporate comments from those agencies into the plans and submit to the engineering director before final approval.

(2) Action. The engineering director shall approve, conditionally approve, or disapprove the construction plan application within 45 calendar days of a determination of completeness. If the application is denied, the applicant shall resubmit revised construction plans demonstrating the reasons for denial have been addressed. The engineering director shall have 14 calendar days to review the revised plans in order to determine whether or not all comments have been satisfactorily addressed. If not, revised plans will be required to be resubmitted until such time that all comments have been addressed. Should subsequent plan revisions significantly modify the original plans and/or require additional supporting documentation then the engineering director may require additional review time.

(3) Deviations from approved sketch plat. Subject to the approval of the community development director, the construction plans may result in minor amendments as defined in section 114- 365(i). Any amendment to a sketch plat that is not considered a minor amendment shall require resubmittal and review of the sketch plat pursuant to section 114-365. To assist in the review for compliance with the sketch plat, a draft final plat shall be submitted with the construction plans.

(4) Deviation from Engineering Design Manual. The applicant's engineer may make a written request and the engineering director may authorize design waivers from the specific requirements of the Engineering Design Manual upon finding that the deviation will result in a design that is equivalent to or better than the specified standard when considering the function, durability, maintenance, repair, and replacement costs associated with the specified improvement. The written request shall reference the specific section from which relief is being sought as well as alternatives being proposed. The request shall include all documentation and data needed to support the request. The engineering director shall have five business days to respond to the request.

(e) Effect of approval.

(1) Construction plan approval grants the right to initiate construction, grading, filling, major clearing and other development activities specifically referenced in the approved construction plans. No grading; removal of trees or other vegetation other than the minimum required to complete necessary survey work; land filling; construction of improvements; or other material change, except for purposes of aiding in preparation of final engineering drawings or plans, shall commence on the subject property until the applicant has:

a. Obtained a separate land disturbance permit per the requirements of section 114-426; or

b. Received approval of the construction plans and all necessary permits from the engineering director; and

c. Obtained necessary approvals and permits from other affected agencies; and

d. A preconstruction meeting with all interested parties and the engineering director has been held and the county has issued a notice to proceed.

(2) The applicant shall complete improvements and secure final inspections and acceptance of improvements within 24 months. Prior to expiration of construction plan approval, the applicant may apply to the engineering director for an extension of up to 12 months. The engineering director may approve the extension of the approval or require modification of the plans to meet any changes to requirements of the Engineering Design Manual or other applicable requirements.

(3) If the construction plans expire, the applicant must submit a new construction plan application and receive approval.

(f) Appeals to engineering director action. If an applicant believes that the engineering director has erred in any finding or condition of approval or disapproval, the applicant may appeal the decision to the building and construction board of appeals in writing, specifying the reasons for the appeal and providing technical justification supporting the appeal. The appeal must be filed within 30 days of the engineering director's decision. The building and construction board of appeals shall review the appeal pursuant to section 114-355.

(g) Resubmittal and amendments. The engineering director may approve minor amendments to approved construction plans without the applicant having to submit complete revised plan sets and the county conducting a complete review process. The applicant must submit the proposed minor amendment to the engineering director for review and approval. All minor plan revisions shall be reflected in the record drawings. If the engineering director determines the amendment is a major change, the applicant must submit a revised plan set for formal review and approval.

(h) Construction of improvements. All improvements required pursuant to these regulations shall be constructed in accordance with the applicable requirements herein and, where applicable, the requirements and authorization of the appropriate federal and State agency, utility company or local franchisee.

(i) Notification of changes. Developer's engineer shall promptly furnish the engineering director with pertinent information concerning changes made during the progress of the work. No changes which are deemed major by the engineering director shall be performed without the prior approval of the engineering director. Any revisions deemed as minor shall be incorporated into the record drawings at the close of the project.

(j) Inspection of improvements.

(1) Inspection required. All improvements required by these regulations shall be inspected by the engineering director, except for improvements made under the jurisdiction of other public agencies, in which case engineers or inspectors of such agency will make the necessary inspections. Where inspections are made by other agencies, the applicant shall provide the County with written reports of each final inspection and acceptance.

(2) Inspection schedule. It shall be the responsibility of the applicant to request the required inspection a minimum of 48 hours prior thereto. Inspections shall follow the schedule, sequence, and standards identified in Appendix C, which may be amended from time-to-time.

(3) Compliance with standards. The applicant or the bonded construction contractor shall bear full and final responsibility for the installation and construction of all required improvements according to the provisions of these regulations and the standards and specifications of other public agencies.

(4) Engineer of record's responsibility. The applicant's engineer will review all phases of the work in progress and will be responsible for ascertaining whether or not the work is performed in accordance with applicant's plans and specifications and the county's requirements and to provide detailed reports and photographs of the inspected work.

(5) County's right to require testing/removal/reinstallation. The engineering director has the right to require removal and reinstallation of work performed if upon inspection the engineering director determines the improvements are not in accordance with county standards and/or the approved construction plans. All such improvements shall be removed and redone to the satisfaction of the engineering department. Should any work be covered without prior approval by the county and/or it is determined through testing that covered work requires examination, the developer may be required to uncover all such improvements and independent third-party testing may be required.

(k) Record drawings required. Prior to final inspection of the required improvements, the applicant shall submit to the engineering director record drawings for each of the required improvements that have been completed. The drawings shall be submitted in digital format (CAD) and certified by the applicant's engineer indicating the date when the record drawing survey was made. Records drawings shall be prepared in accordance with the record drawing standards in Appendix C.

(l) Completion of improvements. Required improvements shall be completed prior to recording the final plat or certificate of occupancy for projects requiring site plan approval, to the satisfaction of the engineering director. The required improvements shall be those specified in the approved sketch plat and construction plans. A letter from the engineer of record certifying completion of all improvements in substantial conformance with all approved documents shall be provided.

(m) Acceptance of improvements.

(1) Final approval of the installation and construction of improvements by the engineering director shall be required prior to the recording of the final plat or certificate of occupancy for projects requiring site plan approval.

(2) The County shall not have any responsibility with respect to any road, or other improvement, notwithstanding the use of the same by the public, unless the road or other improvements shall have been accepted by the recording of the final plat and dedication documents.

(3) County approval of the constructed improvements shall not relieve the applicant of responsibility for construction failures. The developer shall repair any failure or deficiencies that occur during the maintenance guarantee period.

(n) Site cleanup required. The applicant shall be responsible for removal of all equipment, material, and general construction debris from the subdivision and from any lot, road, public way or property therein or adjacent thereto. Dumping of such debris into sewers, onto adjacent property or onto other land in the county is prohibited.

(o) Performance and maintenance guarantees.

(1) Performance guarantee required. Prior to final plat approval or as otherwise approved in a development agreement, a performance guarantee shall be submitted in the form provided in paragraph (o)(3) of this section for the final two inch asphalt surface course required to be installed in accordance with the approved construction plans.

(2) Amount of performance guarantee. The amount of the guarantee shall be 125 percent of the total cost of construction as approved by the engineering director, and it shall remain in effect until such time that final asphalt surface course has been installed and accepted by the county.

(3) Type of security. The security shall be in the form of a performance bond, an irrevocable letter of credit, or cashier's check.

(4) Timing of pavement completion. The developer shall request installation of the final asphalt surface course in accordance with section 306(10) of the Engineering Design Manual. For multiple phase developments the installation shall occur after completion of at least 75 percent of all lots that may be accessed by construction vehicles in subsequent phases. The performance guarantee shall be for three years or until the surface course has been installed.

(5) Release of performance guarantee. All performance guarantees provided shall remain in effect until such time that the improvements have been satisfactorily completed and accepted by the county and a maintenance guarantee has been submitted in accordance with paragraph (o)(6) of this section. The applicant shall request a final inspection from the engineering director, or duly authorized representative, following the installation of the final asphalt surface course. If the engineering director or duly authorized representative, determines the required improvements do not meet minimum county requirements/standards, the applicant shall be required to take the necessary corrective action to meet the required standards. The performance bond shall be extended, as needed, until the engineering director authorizes the release.

(6) Maintenance guarantee. Prior to final plat approval or as otherwise approved in a development agreement or the release of any asphalt performance guarantee, a maintenance guarantee shall be submitted in the form of a maintenance bond, irrevocable letter of credit, or cashier's check for all improvements constructed in the county right-of-way or dedicated to the county. The amount of the guarantee shall be 15 percent of the total cost of construction as approved by the engineering director, and the guarantee provided shall remain in effect for a minimum of three years from the date of final acceptance of all applicable improvements by the County with the exception of the final asphalt surface course, which shall remain in effect for a minimum of one year from the date of final acceptance or to the end of the maintenance period established for all other improvements in conjunction with final plat approval, whichever is greater.

a. If the applicant has entered into a development agreement for the completion of required improvements, an appropriate percentage of the performance guarantee may be retained by the county in lieu of a maintenance guarantee.

b. Damage to curbs and sidewalks shall be repaired by the property owner at no cost to the county prior to issuance of a certificate of occupancy for any lot abutting affected improvements.

(7) Release of maintenance guarantee. Prior to the engineering director releasing/closing the maintenance guarantee, the applicant shall submit a request for final inspection no less than 30 days but no more than 60 days in advance of the maintenance guarantee expiring. If the engineering director or duly authorized representative, determines the required improvements do not meet minimum County requirements/standards, the applicant shall be required to take the necessary corrective action to meet the required standards. The engineering director may require an updated engineer's cost estimate and an updated/amended maintenance guarantee. Release of the maintenance guarantee is contingent upon all required inspections as identified in Appendix C.

(Ord. No. 06-2020, § 3, 12-8-2020; Ord. No. 15-2021, § 2, 7-13-2021) Sec. 114-367. Final plat.

(a) Purpose. To establish a process and standards to create and document the rights and responsibilities associated with the subdivision of land.

(b) Applicability. No final subdivision plat shall be recorded until a final plat has been approved as provided in this section or the provisions of article IV, division 1 of this UDO.

(c) Application. The final plat application shall be filed with the community development director in compliance with Appendix D. The approval process and typical timing for final plat approval are summarized in Exhibits 367a and 367b. Actual timing may vary based on the date of submittal.

(d) Timing. Final plats must be submitted within five years of the date of approval of the sketch plat.

If the project is phased, final plats must be submitted in the timeframe identified in the phasing plan or within five years of the sketch plat approval, whichever is later. If the final plat is not submitted within the time period prescribed, the approved sketch plat shall be null and void. The applicant will be required to resubmit the application for sketch plat and be subject to all fees related to the application. The sketch plat shall comply with all regulations in place at the time it is resubmitted.

Exhibit 367a: Final Plat Approval Process Summary Final Plat Process Application and Review Community Development Director Action Exhibit 367b: Timing of Final Plat Process Final Plat Timing Completeness Review 5 business days (from application submittal) Community Development Director and DRC Review/Action 15 days (from completeness certification)

(e) Community development director review and action.

(1) The community development director shall review the application and shall determine if the application is complete pursuant to section 114-213.

(2) Upon finding that the application is complete the community development director shall determine whether the final plat complies with the approved sketch plat and other applicable rules and regulations. The applicant may submit a final plat for only that portion of the approved sketch plat, if such portion conforms to all requirements of this UDO.

(3) The final plat shall conform to O.C.G.A. §15-6-67, as amended, known as "The Georgia Plat Act," any additional requirements as prescribed in this chapter, the "Required Items and Certifications" in Appendix D, and other applicable rules and regulations.

(4) All required public improvements shall be completed and approved by the engineering director prior to the application.

(5) Any subdivision improvements dedicated to the county:

a. Must be clearly noted on the final plat with the following statement: "The undersigned fee simple owner of all the real estate depicted on this plat, and identified as owned by the undersigned, does hereby dedicate and transfer to the Bryan County board of commissioners all roads, rights-of-way and necessarily attendant drainage facilities and easements for the roads, and drainage and utility facilities and easements all identified in favor of the county on this plat";

b. Must be covered by a fully executed warranty which is secured as required under section 114-366(o)(6); and

c. Dedication documents, in a form approved by the county, must be submitted and approved by the board of commissioners by resolution. The board of commissioners may approve the dedication documents via the consent agenda.

(6) Any private subdivision improvements:

a. Must meet UDO requirements for the applicable infrastructure improvements; and

b. Must be covered by a fully executed maintenance agreement that has been approved by the engineering director.

(7) Prior to approval of the final plat of a subdivision which includes a recreation tract pursuant to article VI, division 7:

a. The community development director must approve a plan submitted by the applicant for the continued maintenance of the recreation tract and facilities; and

b. Prior to the construction of 30 percent of the lots or multi-family dwelling units in any phase of a subdivision, the approved improvements must be completed and installed on the recreation tract for that phase.

(8) Within 15 days of the certification of a complete application submittal, the community development director shall approve the final plat if:

a. The application complies with this UDO and applicable State and federal rules and regulations, and

b. The application is consistent with the conditions of prior planned development, sketch plat, zoning, or conditional use permit approvals.

(f) Other reviews. In addition to the community development director's review of the final plat application, the community development director shall obtain the review of the final plat from the following individuals and departments:

(1) The engineering director and/or health department shall review the water supply and sewerage disposal system and determine that the water supply and sewerage disposal facilities have been constructed and completed in accordance with the approved construction plans;

(2) The engineering director shall determine the compliance of the final plat with the approved construction plans and with this UDO and other applicable laws and shall, upon request by the community development director, review and inspect the construction or installation of any subdivision improvements, including tree protection improvements subject to the tree protection requirements of this UDO; and

(3) If deemed necessary by the community development director, review and comment from consultants or other professionals retained by the county;

(g) Board of commissioners action.If the applicant proposed a development agreement, then the final plat shall require review and approval by the board of commissioners.

(h) Effect of approval. Approval of the final plat allows the applicant to record the final plat and officially subdivide the subject parcel.

(i) Recording. Following approval of the final plat, the community development director shall secure necessary signatures to execute the plat. The action of the county shall be noted on all copies of the final plat to be retained as required for records or further action of the department or other affected agencies of the county or state. Within six months of approval of the final plat, the applicant shall record it with the clerk of court - real estate division. Failure to record the final plat within the time frame noted shall cause the final plat approval to be void.

(j) Amendments. Amendments to a final plat shall be approved in the same manner as the original plat, except as otherwise provided for amending plats herein.

(k) Plat approval is not acceptance of dedication offer. Approval of a plat does not constitute acceptance by the county of the offer of dedication of any roads, sidewalks, parks or other public facilities shown on a plat.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-368. Acceptance of dedications.

(a) Purpose. The provisions of this division ensure that subdivision improvements are constructed and maintained in accordance with county standards prior to the county's acceptance of maintenance responsibilities.

(b) Environmental site assessment. Before the engineering director shall recommend acceptance of proposed dedications, the applicant shall have submitted a Phase I Environmental Site Assessment prepared according to the standards established by ASTM International and accepted by the engineering director with the sketch plat.

(c) Protection against defects. Prior to board of commissioners acceptance of dedications, the engineer of record retained by the applicant shall certify to the county that all facilities and improvements to be dedicated to the county have been constructed in accordance with the requirements of this

UDO.

(d) Developer's certification of non-litigation. Prior to the board of commissioners acceptance of dedications, the developer shall certify that there are no pending or threatened actions of law that involve the subdivision improvements, including any liens from contractors, sub-contractors, suppliers or material and equipment, and all providers of labor or services associated with the subdivision improvements have been paid in full. If any such actions of law or liens remain unresolved, the county will not accept the subdivision improvements for maintenance until releases or waivers are provided.

(e) Maintenance of improvements and facilities. The applicant shall be responsible for maintaining all improvements or facilities required by this UDO. For facilities and improvements dedicated to the county, the applicant shall be required to maintain such improvements for a period of three years and if the applicant fails to maintain such improvements, the county may perform the necessary repairs and reimburse its costs from the maintenance guarantee provided for in section 114-366(o).

(f) Acceptance. When the engineering director finds that a subdivision's improvements comply with the requirements of this section and a maintenance guarantee is in effect in accordance with section 114-366(o)(6), the engineering director shall recommend that the board of commissioners accept responsibility for any or all dedications associated with a subdivision by resolution. The matter shall be scheduled for the next available board of commissioners meeting, and the board of commissioners may accept the offer of dedication by resolution. The applicant shall provide the dedication documents, in a form acceptable to the county.

(Ord. No. 06-2020, § 3, 12-8-2020)

DIVISION 9. DEVELOPMENT AGREEMENTS

Sec. 114-369. Purpose.

This division promotes and facilitates orderly and planned growth and development through the provision of certainty in the development approval process by the county and through corresponding assurances by developers. The development agreement is intended to:

(a) Implement the capital improvements program and the conditions of development approval;

(b) Eliminate uncertainty in the development approval process;

(c) Assure applicants that, upon approval of their project, they may proceed in accordance with the policies, rules, and regulations identified in the development agreement;

(d) Achieve the county's goals and objectives through assurances that public facilities will be provided concurrent with development; and

(e) Provide a mechanism to allow regulatory flexibility for specific development proposals that achieve the county's goals and objectives.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-370. Applicability.

This division applies to any development agreement entered into between an applicant and the county to:

(a) Enforce a condition of development approval;

(b) Recognize the existence of vested rights;

(c) Facilitate the reasonable phasing of large-scale developments requiring significant infrastructure investment;

(d) Provide for the provision of infrastructure, design amenities, or other conditions; and/or

(e) Resolve potential legal disputes.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-371. Criteria for entering into development agreements.

The board of commissioners may approve a development agreement pursuant to this division only if it finds that:

(a) The development to which the development agreement pertains is consistent with the comprehensive plan and capital improvements program, this chapter and other applicable requirements;

(b) The development subject to the agreement advances the county's adopted goals, objectives and policies, in accordance with the criteria established herein; and

(c) The applicant agrees to make contributions of capital improvements for community facilities for one or more types of public improvements, that advance provision of facilities needed to serve the projected demands from the proposed development after considering demands from already approved development.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-372. Initiation.

An application for a development agreement may be made to the community development director.

Application may be made by any person having a legal or equitable interest in the subject real property in accordance with State Law. If made by the holder of an equitable interest, the application shall be accompanied by a verified title report and by a notarized statement of consent to proceed with the proposed development agreement executed by the holder of the legal interest.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-373. Mandatory provisions.

The development agreement shall include, at a minimum, provisions pertaining to the following:

(a) The land that is the subject of the agreement;

(b) The duration of the agreement;

(c) The permitted land use or uses and density/intensity for the proposed development and any conditions attached thereto;

(d) Proposed infrastructure improvements and the timing of their installation;

(e) Provisions for the dedication of land for public use, whether by easement, right-of-way or fee simple conveyance; and

(f) Any other provisions required by state law.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-374. Optional provisions.

If agreed to by the applicant and approved by the board of commissioners, the development agreement may include, without limitation, provisions pertaining to the following:

(a) The phasing of the proposed development project in coordination with the provision of public facilities, including, but not limited to, roads, water, sewer, drainage, parks, libraries, and other county facilities, required to accommodate the impacts of the proposed development project on such facilities at the county;

(b) The identification of public facilities to be dedicated, constructed, or financed by the developer pursuant to the development agreement and the designation of such facilities as project improvements, system improvements, or subsystem improvements;

(c) The determination of the development project's proportionate share of the total system and subsystem improvement costs required to be dedicated, constructed, or financed by the developer of the development project;

(d) The county's share of the costs of system and subsystem improvements to be dedicated, constructed, or financed pursuant to the development agreement;

(e) Reimbursements, as applicable, to the owner of the subject property for the amount of any contributions for system or subsystem improvements in excess of the proportionate share of the benefit derived from such facility by the subject property; and

(f) The rules, regulations, ordinances, laws, plans, and official policies of the county governing development applicable to the subject property.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-375. Review.

The proposed development agreement shall be submitted to the community development director.

The county administrator shall be responsible for reviewing and negotiating the terms and conditions of the development agreement. The county administrator, or designee, shall receive input from applicable departments and other local, state, and federal agencies. The development agreement shall not be placed on a board of commissioners agenda and scheduled for a public hearing until the county administrator and county attorney have reviewed and approved the final draft of the development agreement.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-376. Board of commissioners public hearing and action.

The county administrator shall schedule the development agreement for a public hearing and approval by the board of commissioners. The board of commissioners may:

(a) Approve the development agreement as recommended by the county administrator;

(b) Approve the development agreement with modifications; or

(c) Reject the development agreement in whole or in part and take such further action as it deems to be in the public interest. Any such action shall be taken by the affirmative vote of at least a majority of the voting members of the board of commissioners.

(d) If the board of commissioners denies the development agreement, the county clerk shall give notice within ten days of such action to the applicant at the address shown on the application and to the community development director.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-377. Execution of development agreement.

If approved by the board of commissioners, the development agreement shall become effective upon execution by the county administrator and any other parties to the development agreement.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-378. Recordation of agreement.

Within ten days following execution of a development agreement, the clerk or court shall record with the real estate division a fully executed copy of the development agreement. The agreement shall be binding upon, and the benefits of the agreement shall inure to the parties and all successors in interest to, the parties of the development agreement.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-379. Existing and subsequently adopted rules, regulations, ordinances, and policies.

(a) Unless otherwise provided by the development agreement, rules, regulations, ordinances, general or specific plans, and official policies of the county governing permitted uses, development, density and intensity of use, permitted uses of the land, growth management, public facilities, environmental considerations, and governing design, improvement and construction standards and specifications applicable to the subject property shall be those in force and effect at the time of commencement of the term of the development agreement.

(b) The adoption of a development agreement, however, shall not prevent the county, in subsequent actions applicable to the property or to the county general, from applying such newer, modified rules, regulations, ordinances, laws and official policies that do not conflict with those applicable to the property at the time of the development agreement and that do not prevent the development of the land as set forth in the development agreement. The existence of the development agreement shall not prevent the county from denying or conditionally approving any subsequent development not expressly addressed in said agreement based upon such existing or new rules, regulations, and policies.

(c) Unless otherwise addressed in the development agreement, application, processing and inspection fees, utility fees, impact fees, and improvement standards that are revised during the term of a development agreement shall apply to the property, provided that:

(1) Such fees, standards, and specifications generally apply to public works within the county; and

(2) Their application to the subject property is prospective only as to applications for building and other development approvals not yet accepted for processing.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-380. Subsequently adopted state and federal laws.

If state or federal laws or regulations are enacted following approval of a development agreement that prevent or preclude compliance with one or more provisions of the development agreement, the provisions of the agreement shall be modified or suspended, as may be necessary to comply with such state or federal laws or regulations.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-381. Periodic review, termination, or modification.

An adopted development agreement shall be reviewed at least once a year, at which time the owner or owners of the property subject to the development agreement shall be required to demonstrate good faith compliance with the terms of the development agreement. If, as a result of such review, the board of commissioners finds and determines, on the basis of substantial evidence, that the applicant has not complied in good faith with the conditions of the development agreement, the board of commissioners may unilaterally terminate or modify the agreement. Such action shall be taken by the board of commissioners at a regular or special meeting, provided that the developer is notified at least ten days in advance of such meeting.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-382. Amendment or cancellation of agreement.

A development agreement may be amended or canceled, in whole or in part, by mutual consent of the parties to the agreement or their successors in interest. The procedure for amendment or cancellation shall be the same as that for adoption.

(Ord. No. 06-2020, § 3, 12-8-2020) Secs. 114-383—114-399. Reserved.

ARTICLE IV. DEVELOPMENT PROCEDURES REQUIRING ADMINISTRATIVE REVIEW

This article establishes procedures for development approvals that may be approved by county staff without a public hearing.

DIVISION 1. MINOR PLATS

Sec. 114-400. Purpose.

The minor plat process enables staff approval of applications that have minimal impact on public facilities, do not require the construction or extension of the county roadway network or utility infrastructure, and are consistent with county zoning, subdivision, and public improvement requirements.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-401. Applicability.

Minor plats include each of the following:

(a) Minor subdivisions enable the subdivision of land to create a limited number of new parcels.

The new parcels may be accessed from a new or existing private road or an existing public road.

If the subdivision requires the construction of a new public road, extension of an existing public road, or extension of public utilities greater than 200 feet in length, the subdivision will be considered a major subdivision.

(1) Minor subdivision served by private/public road enables the creation of a maximum of six buildable lots or parcels from a single parcel when:

a. Access to each parcel will be from a new private road, built to county standards;

b. Access to each parcel will be from an existing private road. If the private road is not built to county standards, the road must be brought up to current standards; or

c. Access to each parcel will be from an existing county road that is constructed to current county road improvement standards.

(2) Large lot minor subdivision served by private/public road enables the creation of a maximum of ten buildable lots from a single parcel when:

a. The average lot size is at least five acres; and

b. Access to each lot will be from a new private road, built to County Rock Road Standards (see Engineering Design Manual, Section 304); or

c. Access to each lot will be from an existing private road. If the private road is not built to County Rock Road Standards, the road must be brought up to current standards;

or

d. Access to each parcel will be from an existing county road that is constructed to current county road improvement standards.

(3) Minor subdivision served by private easement enables the creation of up to three lots or parcels from a single parcel when one lot will have access to a public or private road built to county standards and a maximum of two additional lots will be accessed from an easement.

(b) Conveyance plats enable the division of land into up to six parcels of ten acres or more from a single parcel, which are not intended to be developed for any purpose requiring a building permit without subsequent subdivision approval.

(c) Lot line adjustments enable changes to existing lot or parcel boundaries that do not create any additional lots or alter the overall density of the affected lots.

(d) Plat corrections enable corrections to errors or omissions on a recorded plat that does not materially change the boundaries of any of the parcels shown on the plat.

(e) Dedication plats - enable the conveyance of rights-of-way or easements.

(f) Combination plats - enable the combination of two or more existing lots of record into one lot.

(Ord. No. 06-2020, § 3, 12-8-2020; Ord. No. 18-2022, § 3, 12-13-2022) Sec. 114-402. Limitation of subsequent minor subdivisions.

The minor subdivision process may be used to create no more than the maximum number of lots allowed for the applicable minor subdivision type [see section 114-401(a)] for any parcel that is included within the boundaries of a minor subdivision or is a remaining portion of a parcel that was previously subdivided using the minor subdivision process.

(Ord. No. 06-2020, § 3, 12-8-2020; Ord. No. 18-2022, § 3, 12-13-2022) Sec. 114-403. Application.

The formal approval process for each type of minor plat begins with the submittal of a complete application to the community development director in accordance with Appendix D. For minor subdivisions, applicants are encouraged to discuss the proposed subdivision prior to formal application.

For subdivisions involving the creation of a private road, the applicant shall provide a proposed maintenance and access agreement, which will include the rights and obligations, including financial, for owning, using, and maintaining the private road. For subdivisions using existing private roads for access to one or more lots, the applicant shall provide a title report verifying the private road may be used for access.

(Ord. No. 06-2020, § 3, 12-8-2020; Ord. No. 18-2022, § 3, 12-13-2022) Sec. 114-404. Review.

(a) The community development director shall review the application for completeness in accordance with section 114-213.

(b) Upon finding the application complete, the community development director shall review the proposed minor plat and any other documents deemed necessary to determine the compliance of the proposed minor plat with this UDO and other applicable laws. The review of the following individuals must also be obtained for minor subdivisions when required by the community development director:

(1) The health department shall review the proposed water supply and sewerage disposal system and determine compliance with this UDO and other applicable rules and regulations.

(2) The engineering director shall review the proposed minor subdivision and determine the conformity of proposed road alignment with existing roads, the road classification plan and proposed public roads.

(3) The engineering director shall review the proposed water, sewer, and stormwater management improvements for compliance with applicable requirements.

(4) If deemed necessary by the community development director, review and comment from any local, state, or federal agencies, and consultants or other professionals retained by the county may be obtained.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-405. Public hearing and notice.

Notice and a public hearing are not required for minor plats.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-406. Approval criteria.

(a) Approval criteria for minor subdivisions served by private/public road. Before approving this type of subdivision, the community development director shall find that the proposed subdivision complies with each the following provisions:

(1) All lots created by this process shall comply with the minimum area and dimensional standards of this UDO. Area included within the right- of-way shall be excluded for purposes of calculating minimum lot area. However, the right-of-way area may be included for purposes of calculating the maximum density allowed in the zoning district;

(2) Each lot shall be independently accessible from an abutting public or private road constructed in compliance with currently applicable Bryan County standards;

(3) No public road shall be created through the minor subdivision process, but the plat may include the dedication of public right-of-way for the widening of existing public roads abutting lots in the proposed minor subdivision;

(4) Private roads serving four or more parcels shall be placed in a private road right-of-way of at least 40 feet in width, unless the engineering director finds that greater width is needed due to topography, drainage, or private road alignment. The road shall be designed and constructed to comply with the Rock Road Standards (see Engineering Design Manual, Section 304);

(5) There is adequate turnaround area for emergency vehicles, as approved by the emergency services director or designee and as required by the engineering director per the engineering department standard details;

(6) There is adequate turnaround area for buses as approved by the Bryan County Board of Education;

(7) Off-site utility improvements are limited to water and/or sewer line extensions of not more than 200 feet from the nearest property line of the subdivision;

(8) Off-site stormwater improvements are limited to abutting rights-of-way or easements, which may be used only with the owner's consent;

(9) The applicant shall submit a Private Road Ownership and Maintenance Agreement that shall be recorded with the final plat that assigns ownership of and responsibilities for maintenance of private roads and drainage systems. Responsibility for maintenance of the private roads shall be clearly stated on the minor subdivision plat. The applicant shall also reference the recorded Private Road Ownership and Maintenance Agreement in the deeds for all lots in the minor subdivision.

(10) Private roads shall be named. The applicant shall install private road name signs in accordance with the Engineering Design Manual, Section 310: Traffic Control Plan and/or MUTCD. Such signs shall contain the road name and the designation "private."

(b) Approval criteria for large lot minor subdivisions served by private/public road. Before approving this type of subdivision, the community development director shall find that the proposed subdivision complies with each the following provisions:

(1) All lots created by this process comply with the minimum area and dimensional standards and maximum density for the zoning district in which the lots are located. In addition, the average lot size for all lots in the large lot minor subdivision shall be at least five acres. The right-of-way area shall be excluded for purposes of calculating minimum and average lot area. However, the right-of-way area may be included for purposes of calculating the maximum density allowed in the zoning district;

(2) Each lot shall be independently accessible from an abutting public road that is constructed to current county road improvement standards or from a new or existing private road built to County Rock Road Standards (see Engineering Design Manual, Section 304);

(3) New private roads shall be placed in a private road right-of-way of at least 40 feet in width, unless the engineering director finds that greater width is needed due to topography, drainage, or private road alignment; and

(4) The subdivision complies with section 114-406(a)(3) and (a)(5) through (a)(10), above.

(c) Approval criteria for minor subdivisions served by private easement. Before approving a minor subdivision served by private easement, the community development director shall find that the proposed subdivision complies with each the following provisions:

(1) All lots created by this process shall comply with the minimum area and dimensional standards of this UDO. Area included within the easement shall be excluded for purposes of calculating minimum lot area.

(2) An easement with a minimum width of 30 feet shall be provided for lots created by this process and not having direct access from an existing road. The engineering director may require an increased width if they find that greater width is needed due to topography, drainage, or private road alignment. The road shall be designed and constructed to comply with the Private County Dirt Road Standard in the Engineering Design Manual. The plat shall include a note addressing maintenance of the easement.

(3) At least one lot shall be independently accessible from an abutting public road.

(4) No public road shall be created through this process, but the plat may include the dedication of public right-of-way for the widening of existing public roads abutting lots included in the minor subdivision.

(5) Off-site utility improvements are limited to water and/or sewer line extensions of not more than 200 feet from the nearest property line of the subdivision.

(6) Off-site stormwater improvements are limited to abutting rights-of-way or easements, which may be used only with the owner's consent.

(d) Approval criteria for lot line adjustments. Before approving a lot line adjustment, the community development director shall find that:

(1) All resulting lots shall comply with minimum area and dimensional standards of this UDO; or

(2) Where one or more of the existing lots is non-conforming, the proposed lot line adjustment improves overall compliance of the affected lots.

(e) Approval criteria for plat corrections. Before approving a plat correction, the community development director shall find that the amendments are limited to changes required to correct a surveying or scrivener's error or omission, and do not change the density, eliminate restrictions, or substantively change the rights and responsibilities of the owners of the affected lots.

(f) Approval criteria for dedication plats. Before approving a dedication plat, the community development director shall find that subdivision is created solely to document the conveyance of right-of-way or an easement for a public or private road, drainage improvement, utility improvement or other public purpose.

(g) Approval criteria for combination plats. Before approving a combination plat, the community development director shall find that the lots to be combined are existing lots of record.

(h) Approval criteria for conveyance plats. Before approving a conveyance plat, the community development director shall find that:

(1) All parcels resulting from the conveyance plat process shall be ten acres or larger in net area, excluding water bodies, protected wetlands, and land with elevations below the mean high tide, provided that any parcel that is placed in a conservation easement shall be ten acres or larger in gross area.

(2) The conveyance plat shall include the following statement: "No building permits will be issued for a building on any lot in this subdivision."

(Ord. No. 06-2020, § 3, 12-8-2020; Ord. No. 18-2022, § 3, 12-13-2022) Sec. 114-407. Community development director action on minor plats.

The community development director shall approve or disapprove the application within 30 days of finding the application complete and shall notify the applicant of the action in writing. If the plat complies with the requirements of these regulations, the community development director and engineering director shall sign the proposed final plat which can then be recorded in the real estate division of the clerk of court. If the community development director finds that the proposed minor plat does not comply with this UDO and other applicable laws, then such plat shall be disapproved, and reasons noted for such disapproval in the records. The community development director may not approve the minor plat until the engineering director and public health director have signed the minor plat if their review is determined to be required.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-408. Appeals.

Decisions of the community development director made pursuant to this division are appealable to the board of adjustment. Appeals shall follow the procedures identified in article III, division 6.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-409. Variances.

Variances are not permitted for the maximum number of parcels that may be created pursuant to the minor subdivision process. Additionally, variances are not permitted for the development standards identified section 114-406(a)(4), section 114-406(b)(3), and section 114-406(c)(2).

(Ord. No. 06-2020, § 3, 12-8-2020; Ord. No. 18-2022, § 3, 12-13-2022) Sec. 114-410. Effect of approval.

After approval, the applicant may proceed with installation of the private road or easement and any other required public improvements provided they receive the necessary approvals, including but not limited to approved construction plans, encroachment permits, Army Corps of Engineers' permit, and EPD and public health approvals. No building permits shall be granted until required improvements are completed and approved in compliance with section 114-411, and the plat is recorded in compliance with section 114-412.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-411. Inspection.

The engineering director shall inspect all required improvements to determine compliance with applicable requirements and provide written approval of the improvements or a written explanation of any deficiencies precluding approval.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-412. Recording.

Applicant shall record the minor plat within six months of the community development director's approval. Failure to record shall result in expiration and require resubmittal. If the minor plat approval included approval of road construction plans, the applicant shall record the final plat within three months of completion of the road construction.

(Ord. No. 06-2020, § 3, 12-8-2020)

DIVISION 2. VESTED RIGHTS DETERMINATION

Sec. 114-413. Applicability.

(a) This division applies to any application for development approval in which the applicant claims an exemption from any provision of this chapter based on common law, statutory vested rights or estoppel.

(b) Any applicant may apply for a vested rights determination, provided that the requirements of this division are satisfied. An application for a vested rights determination may be approved subject to compliance with a consent agreement.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-414. Vested rights determination process.

(a) Initiation. An application shall be made to the community development director requesting a determination of vested rights.

(b) Application. The application shall include all information needed to support the applicant's claim of vested rights. Information should include but is not limited to applicable statutes or ordinances, board of commissioners, P&Z commission, or other duly appointed county board meeting minutes, correspondence, permits, applications, and official land use maps.

(c) Review and approval. After receiving an application for a vested rights determination, the community development director shall review the application and determine if the application is complete. If deemed incomplete, the applicant shall provide additional information for consideration of the application within ten days. Within 30 days of receiving a complete application, the community development director shall determine whether there is sufficient evidence to establish vested rights. If so, the director shall issue a consent agreement, in compliance with section 114-415, to the applicant recognizing vested rights for the project. The consent agreement shall set forth all terms and conditions required for the continuance of the vested rights being recognized.

(d) Vested rights criteria. The applicant for vested rights must show compliance with the following criteria for the specific project to acquire such rights:

(1) In reliance upon lawfully issued development approval, the applicant makes a substantial financial commitment or assumes substantial financial obligations within the purview of the activities authorized by said development approval;

(2) The applicant has proceeded in good faith, has relied upon the issuance of the development approval, and such development approval has not lapsed or been revoked; and

(3) The applicant has established any other factor that may establish estoppel under state or federal law.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-415. Consent agreement.

A consent agreement shall be executed by the community development director and the applicant upon determining vested rights pursuant to section 114-414(c). The agreement shall include the following terms and conditions:

(a) A legal description of the subject property and the names of the legal and equitable owners;

(b) The duration of the consent agreement and the conditions that will result in revocation;

(c) The uses permitted on the property, including population densities and/or building intensities and height, setbacks, floor area ratio, setbacks, and other bulk regulation requirements;

(d) A description of the public facilities that will service the proposed development, including who shall provide such facilities; the date that any new facilities, if needed, will be constructed; and a schedule to assure that public facilities are available concurrent with the impacts of the development;

(e) A description of any reservation or dedication of land for public purposes;

(f) A description of all development approvals or other local, state, or federal approvals needed for the proposed development;

(g) A finding that the proposed development is consistent with the comprehensive plan and the relevant provisions of this UDO;

(h) A description of any conditions, terms, restrictions, or other requirements determined to be necessary for the preservation and protection of the public health, safety, or welfare;

(i) A statement indicating that the omission of a limitation or restriction shall not relieve the applicant of the necessity of complying with all applicable local, state, and federal laws;

(j) A phasing plan indicating the anticipated commencement and completion date of all phases of the proposed development;

(k) Provisions for remedies in the event of default;

(l) A statement that the county attorney shall review progress pursuant to the consent agreement at least once every 12 months to determine if there has been demonstrated good faith compliance with the terms of the consent agreement; and

(m) Any other provisions as required by state law.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-416. Failure to comply with consent agreement.

If the board of commissioners finds, on the basis of substantial competent evidence, that there has been a failure to comply with the terms of the consent agreement, the consent agreement may be revoked or modified by the board of commissioners after a public hearing, which has been noticed by publication and for which notice has been expressly provided to the applicant.

(Ord. No. 06-2020, § 3, 12-8-2020)

DIVISION 3. OTHER COMMUNITY DEVELOPMENT DIRECTOR ACTIONS

Sec. 114-417. Administrative relief.

(a) Purpose. Administrative relief provides for expeditious review of minor deviations from the provisions of this chapter under specified circumstances. The administrative relief process does not involve a public hearing unless a decision is appealed by the applicant to the board of adjustment.

(b) Initiation. A property owner may initiate an application. The applicant shall file a completed application with the community development director in conformance with section 114-213.

(c) Types of administrative relief. Administrative relief may be granted for any of the following situations:

(1) Building setback reduction: The side and rear building setbacks shall not be less than 90 percent of the minimum setback requirement. Front building setbacks shall not be less than 80 percent of the minimum setback requirement. All setbacks shall be required to meet minimum requirements of the Fire Code.

(2) Landscaping and buffers: Minimum buffer width and planting requirements may be reduced to create a more natural undulating buffer, provided that the average width of the buffer on each side of a parcel meets the minimum and not more than 20 percent of the length of a buffer is below the minimum required width.

(3) Parking spaces: The number of parking spaces may be reduced based on the proposed use, site conditions and availability of on-street parking. Applicant shall submit a parking study or parking analysis from a recognized publication, e.g., ITE Trip and Parking Generation Manual, when requesting such administrative relief.

(4) Parking dimensions: The minimum parking aisle width may be reduced by up to one foot per travel lane if parking space width of every space along the aisle is increased by at least one-half foot.

(5) Arterial and collector road buffers: The arterial and collector road buffer may be eliminated, if the subject property meets the criteria specified in section 114-117(e).

(d) Criteria for 114-117(c)(1) through (c)(4). Administrative relief may be granted when the community development director finds that the application meets each of the following criteria:

(1) The relief will not create a burden on adjacent property owners or conflict with the zoning district's purposes;

(2) The relief is necessary to allow efficient use of the property due to site conditions or circumstances that do not commonly affect properties in the district;

(3) The relief does not convey a right or privilege that would be unavailable to similarly situated properties; and

(4) For development within a PD zoning district, the request is for an individual lot or building and would not constitute a PD amendment.

(e) Criteria for section 114-117(c)(5). Administrative relief may be granted for arterial and collector road buffers when the community development director finds that the application meets each of the following criteria:

(1) The proposed development advances Bryan County's Comprehensive Plan goal to create and maintain a long-term sustainable and diverse economic base;

(2) The subject property is zoned I-1 or I-2;

(3) The subject property is at least 1,000 acres in size;

(4) The proposed development is a significant economic development project, such as a project identified as a megasite by the State of Georgia or a joint development project between Bryan County, a development authority and/or the state; and

(5) The proposed development has received state and local tax incentives.

(f) Action. After a review period of not more than 15 business days, the community development director shall approve, conditionally approve or disapprove any application for administrative relief and provide written documentation justifying the action.

(Ord. No. 06-2020, § 3, 12-8-2020; Ord. No. 18-2022, § 3, 12-13-2022) Sec. 114-418. Zoning certification.

As part of any development approval listed in articles III and IV of this UDO, the community development director shall be required to certify whether the proposed development is consistent with the existing zoning of the property being developed.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-419. Site development plan.

(a) Purpose. Site development plan review is intended to ensure that the layout and general design of proposed development in areas regulated by this chapter complies with all applicable standards in this UDO and all other applicable rules and regulations. The purpose of this section is to establish the submittal requirements and review process for the approval of site plans.

(b) Applicability. Site development plan approval is required for any development of multi-family, mixed-use or non-residential structures, the establishment of any non-residential land use, and any change to an existing multifamily, mixed-use, or non-residential development or change of use that causes an increase in required parking by more than the lesser of ten percent of current requirement or ten spaces.

(c) Initiation.

(1) Applications for site plan review may be initiated by any party with an interest in developing property within areas regulated by this UDO. Written approval from the current landowner shall be required as part of any application for site plan review.

(2) The applicant or an authorized agent of the applicant shall submit to the community development director a complete site plan application as required by section 114-213 and Appendix D.

(3) All site plans shall be prepared to scale and with sufficient detail and clarity to demonstrate compliance with applicable technical rules and regulations. Site plans shall be prepared by a licensed professional engineer in the State of Georgia, unless waived by the community development director and engineering director.

(4) The community development director shall review the application and shall determine if the application is complete pursuant to section 114-213.

(d) Approval criteria. All site plans shall comply with the following criteria:

(1) The proposed land uses, densities and intensities comply with applicable zoning district requirements and prior development approvals, including but not limited to subdivision, variance, rezoning, or conditional use permit approvals;

(2) The site and building design comply with applicable standards in this UDO, including the design guidelines in article VIII;

(3) Minor deviations not granted through the administrative relief provisions of section 114-417 have been granted by the community development director and are noted on the site plan;

(4) Variances, if needed, are granted prior to site plan approval;

(5) The applicant has applied for approval of an ESA, land disturbance and wetlands permits, and will receive final approval prior to site plan approval; and

(6) The applicant shall demonstrate compliance with the tree protection and preservation plan and other applicable requirements of this UDO.

(e) Review and action. After determining that the application is complete, the community development director shall solicit comments from the DRC and review the site plan for compliance with the criteria established in paragraph (d) of this section. If a site plan complies with all of the provisions of this chapter, including the approval criteria in paragraph (d) of this section, the community development director may approve the site plan or approve the site plan subject to conditions. If the community development director determines the site plan does not comply with this UDO or other local, state, or federal laws, the community development director shall disapprove the site plan.

(f) Appeals to site plans. If the applicant objects to the community development director's decision, the applicant may appeal the decision to the board of adjustment pursuant to article III, division 6.

(g) Effect of approval.

(1) Site plan approval authorizes issuance of a building permit subject to approval of building plans. If no building permit is obtained within 12 months or the building permit lapses, the site plan approval lapses.

(2) Development activities shall conform to the approved site plan and any conditions of approval.

Any deviation from the approved site plan, unless approved in advance and in writing by the community development director is deemed a violation of this UDO.

(3) Construction, however, may not commence until the applicant obtains a land disturbance permit pursuant to section 114-426.

(h) Site plan amendments. A site plan may be modified in accordance with the procedures established for site plan review in this section.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-420. Landscape plans.

(a) Purpose. Landscape plans are intended to:

(1) Document existing vegetation to be removed or protected and preserved;

(2) Analyze existing and proposed canopy for applicable developments;

(3) Identify the locations, species and dimensions of proposed plantings;

(4) Demonstrate compliance with the provisions of article VI, division 5 for canopy retention, tree preservation, buffers and other required plantings; and

(5) Document plans for protection, planting and maintenance of existing and proposed plantings.

(b) Applicability. Landscape plans shall be submitted in conjunction with construction plans for major subdivisions and site development plans for multi-family, non-residential, and mixed-use developments. If sketch plat approval is required, however, the tree survey shall be submitted with the sketch plat application. Additionally, a tree survey shall be included with the final development plan for a planned development. The community development director may waive specific submittal requirements if a previously approved landscape plan achieves the purposes of this section. Landscape plans shall comply with the requirements identified in Appendix D.

(c) Tree preservation and protection plan. As part of the landscape plan, the applicant shall submit a tree preservation and protection plan demonstrating compliance with the tree protection and preservation requirements identified in section 114-634. The tree preservation and protection plan shall be prepared and stamped by a registered landscape architect or a certified arborist. The tree preservation and protection plan shall include all required information as identified in Appendix D.

(d) Tree Survey. A tree survey, which is a foundational element of the landscape plan shall comply with the following provisions:

(1) The tree survey shall be prepared by a certified arborist or forester and shall depict the location, species, and size in dbh of all protected trees in the development area and differentiate them as to whether they are heritage or historic trees. The development area shall be defined as all areas within 50 feet of any proposed grading, temporary and permanent structures, and other improvements; and as wetlands proposed to be disturbed. The survey shall specify which trees are proposed for removal.

(2) For developments disturbing more than 25 acres, the community development director may authorize the applicant to prepare a tree survey using one or more "sample areas." Each sample shall cover at least one acre. Sample areas shall be evenly distributed throughout the site and proportional to the acreage of types of forest found on the site. Sample areas shall represent at least five percent of the site or five acres, whichever is greater. The surveyor shall estimate the relative densities and total number of Heritage Trees across the site based on the distribution of these trees in the samples. Historic trees shall nevertheless be individually surveyed and documented by location, species, and size in dbh. Upon reviewing the sample survey, the community development director may require that inventories be taken of additional sample sites.

(3) For development plans disturbing 25 or fewer acres, both heritage and historic trees shall be individually surveyed.

(e) Review process. The landscape plan shall follow the same process as the application the plan is submitted with for review and approval.

(f) Effect of approval. Landscape plan approval is required prior to or in conjunction with final development plan, construction plan, and site plan approval. Landscape plan approval in conjunction with one of these approvals entitles the applicant to development activities authorized by the specified approval.

(g) Deviation from plans. At any time after the approval of any landscape plan, an applicant shall have the right to amend the proposed plan. Approval for deviations from the approved plan shall follow the same steps as changes or revisions to any other required plat/site plans within the county.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-421. Tree removal permits.

(a) Purpose. Tree removal permits are required to prevent the unnecessary removal of Heritage and historic trees.

(b) Applicability. A tree removal permit is required prior to the removal of any Heritage or historic tree except for:

(1) Trees that are removed pursuant to a bona fide silviculture operation;

(2) Trees located on individual lots, not within a platted (major or minor) subdivision; or

(3) Trees located within minor platted subdivisions in the A-5 and RR zoning districts.

(c) Initiation. The applicant for removal of one or more heritage or historic trees shall submit the application to the community development director on a form provided by the director.

(1) Application for permits must be made at least five business days in advance of the proposed tree removal. The community development director shall issue the permit, valid for 60 days, if the request meets the criteria for tree removal.

(2) Authorization for removal of a heritage or historic tree may be granted in conjunction with a final development plan, major subdivision sketch plat, site development plan, land disturbance permit or building permit approval. Any heritage or historic tree removed subject to the provisions of this paragraph (c)(2) shall provide for mitigation in accordance with article VI, division 5, section 114-634(f).

(d) Review and action. After determining that the application is complete, the community development director shall review the application for compliance with the criteria listed in paragraph (e) of this section. If the application demonstrates compliance, the community development director shall approve the tree removal permit within five days of certifying that the application is complete. The applicant shall post the tree removal permit on the property in a place that is visible from the public right-of-way throughout any tree removal activity.

(e) Tree removal permit criteria. The following criteria, when attested to by a registered forester or certified, qualified arborist (ISA Certified Arborist), shall constitute grounds for issuance of a tree removal permit regardless of use or zone:

(1) Trees potentially hazardous to surrounding trees, permanent structures, public utilities, rightsof-way, or persons due to a loss of stability caused by high wind, unstable soil, age, or other natural forces.

(2) Diseased and/or infectious trees and trees in decline.

(3) Trees or their root systems causing visible damage to permanent structures that cannot be prevented through proper pruning.

(4) Trees or their root systems causing damage to utility lines that cannot be prevented through proper pruning.

(5) Trees inhibiting access through a public right-of-way such that proper pruning cannot mitigate the condition.

(6) Trees creating hazardous conditions on pedestrian walkways underneath such trees due to excessive debris of a size and shape known to cause injuries from tripping and falling, as determined by the community development director.

(7) The tree or its critical root zone are not within 25 feet of waters of the state.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-422. Sign permits.

(a) Purpose. This section documents the procedures for issuance of sign permits for signs that comply with this section and article VI, division 8 of this UDO.

(b) Applicability. Except as otherwise provided in the sign regulations of this UDO, no sign may be erected, moved, enlarged or substantially altered except in accordance with the provisions of this section.

Mere repainting, changing the message of a sign, or replacing a sign face with a sign face of the same type and dimensions shall not be considered a substantial alteration. Changes to the location, height, width, thickness or structure of the sign shall be considered substantial changes.

(c) Initiation. An applicant shall submit an application complying with the provisions of Appendix D.

(d) Master and common signage plans.

(1) Purpose. Large-scale development projects may benefit from implementing a master or common signage plans that establish a coordinated set of sign design requirements for multi-tenant or multi-owner projects.

(2) Applicability. Master and common signage plans may be established for development in B-2, C-I, PD, I-1 and I-2 zoning districts. Master signage plans apply to developments where all properties are under control of a single person or entity at the time of application and the standards of the master signage plan will be applied to future owners, tenants and users of the property. Common signage plans apply where the owners of two or more contiguous (disregarding intervening streets and alleys) lots file with the county a common signage plan conforming with the provisions of this section

(3) Effect of a master or common signage plan. Where a master or common signage plan has been approved, no permit shall be issued for an individual sign requiring a permit unless it conforms to the plan as approved by the county.

(4) Incentive for submittal of a master or common signage plan. Up to 20 percent more sign area than would be otherwise allowed by this UDO may be approved for a development subject to a master or common signage plan.

(5) Submittal requirements. A master or common signage plan application shall include the following information:

a. An accurate plot plan of the lot at such scale as the county may reasonably require.

b. Existing and proposed locations of buildings, parking lots, driveways, and landscaped areas on such lot.

c. Computation of the maximum total sign area, the maximum area for individual signs, and the allocation of sign area to freestanding and wall signs for each lot or business within a multi-tenant parcel.

d. For freestanding signs, the height of signs, and the number, location, lighting, dimensions, materials, and design of freestanding signs allowed on the lot(s) and buildings included in the plan and a general description of the design of all signs which are proposed to be erected or installed on the property.

e. For wall signs and other allowed signs that are attached to structures, a coordinated set of design standards for signs that meet or exceed the standards that would otherwise be required under this UDO. While there may be some variation in the shapes, colors, and materials used in signs to accommodate diverse users, the master or common signage plan shall specify the minimum requirements for each type of sign allowed so that signs appear to be a coordinated design element of the development.

(6) Limit on freestanding signs under master signage plan. The master signage plan shall limit the number of freestanding signs to one per parcel or, where parcels have more than 500 feet of street frontage, one per 500 feet of frontage or fraction thereof.

(7) Limit on freestanding signs under common signage plan. The common signage plan, for all lots with multiple uses or multiple users, shall limit the number of freestanding signs to a total of one for each street on which the lots included in the plan have frontage. For projects with intervening streets, one freestanding sign may be allowed on each side of a street frontage.

(8) Other provisions of master or common signage plans. The master or common signage plan may contain such other restrictions as the owner(s) of the lots may reasonably determine.

(9) Consent. The master or common signage plan shall be signed by all owners or their authorized agents in such form as the county shall require.

(10) Joint processing. A master or common signage plan shall be included in any site plan, planned development plan, or other official plan required by the county for all proposed commercial development and shall be processed simultaneously with such other plans. The master signage plan for a planned development shall be submitted for review and approval in conjunction with the preliminary development plan.

(11) Amendment. A master or common signage plan may be amended by filing a new master or common signage plan that conforms with all requirements of this UDO then in effect. Amendments shall be reviewed and acted upon by the community development director; provided, however, that any amendment to a master signage plan for a planned development that is determined to be a significant deviation from the plan approved in conjunction with a preliminary development plan of a planned development may be referred to the board of commissioners for review and action at the director's discretion.

(12) Existing signs not conforming to master or common signage plan. When a master or common signage plan is filed for a property on which existing signs are located, it shall include a schedule for bringing into conformance all signs not conforming to the proposed amended plan or to the requirements of this UDO within three years of approval of the application.

(13) Binding effect. After approval of a master or common signage plan, no sign shall be erected, placed, painted, or maintained on the property referenced by the plan, except in conformance with such plan and such plan may be enforced in the same way as any provision of this section.

In case of any conflict between the provisions of such plan and any other provision of this UDO, this section shall have precedence and control.

(e) Substitution of noncommercial speech for commercial speech. Notwithstanding anything contained in this section or sign code to the contrary, any sign erected pursuant to the provisions of this section or sign code, or otherwise lawfully existing with a commercial message, may, at the option of the owner, contain a noncommercial message unrelated to the business located on the premises where the sign is erected. The noncommercial message may occupy the entire sign face or any portion thereof. The sign face may be changed from commercial to noncommercial messages, or from one noncommercial message to another, as frequently as desired by the owner of the sign, provided that the sign is not a prohibited sign or sign type.

(f) Content neutrality as to sign message. Notwithstanding anything in this section or sign code to the contrary, no sign or sign structure shall be subject to any limitation based on the content of the message contained on such sign or displayed on such a sign structure unless the sign's shape, message or imagery are determined by the community development director to be obscene pursuant to section 114-664.

(g) Signs excluded from regulation. See section 114-663 for a listing of signs that are exempt from certain sign regulations.

(h) Approval. After the community development director determines that the sign complies with the requirements of this UDO, the building official shall review the application for compliance with building and electrical code compliance prior to issuing a sign permit.

(i) Effect of approval. The work authorized under a sign permit must be begun within three months of its issue date and must be completed no more than one year after the permit issue date, otherwise the permit shall lapse and be void.

(j) Inspection.

(1) The county shall inspect each sign for which a permit for a new sign, or for modification of an existing sign, is issued. Such inspection shall include a zoning inspection, as well as applicable building code inspections.

(2) All outdoor advertising and freestanding signs shall be subject to a footing inspection prior to erection of the sign. All signs shall be subject to a final inspection to ensure that they comply with the sign permit and all applicable provisions of County Code. The building official shall direct the applicant to bring non-compliant signs into compliance within a specified time upon determining that the sign does not comply with the terms of the permit. Upon failure to do so, the permit shall be revoked, and the sign removed.

(k) Non-conforming signs. Non-conforming signs are subject to the provisions of section 114-671.

(l) Discontinued signs. Upon the discontinuance of business occupancy of an establishment for a consecutive period of six months, the building official shall require the removal of the on-premises sign(s) advertising or identifying the establishment. If the owner fails to remove the sign, the building official shall give 30 days' notice to the property owner to remove the sign(s), including all its attendant supports, frames and hardware. Failure to remove the sign(s) within the 30 day period shall constitute a violation of this UDO and shall be remedied in accordance with the provisions of this UDO. If a new establishment will use the sign, the owner of the property must submit to the community development department a letter requesting the sign be allowed to remain, identify the new establishment, timeframe for the new establishment commencing operation, and acknowledging the sign will need to meet current regulations and standards. The community development director may grant the property owner a maximum of one year to demonstrate the new establishment has commenced operations, and the sign complies with current regulations. No extensions shall be granted. If the new establishment does not commence operations within the year, the property owner must remove the sign within 30 days. Failure to do so will constitute a violation of this UDO and shall be remedied in accordance with the provisions of this UDO.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-423. Home occupation permits.

(a) Purpose. This section documents the procedures for issuance of home occupation permits for uses that comply with this section and section 114-707 of this UDO.

(b) Applicability. No home occupation may be established, enlarged or substantially altered except in accordance with the provisions of this section. If any retail sales are proposed or the home occupation will have on-site customers, the applicant shall be required to secure a conditional use permit pursuant to article III, division 4 as provided in section 114-707. The conditional use permit shall establish conditions under which on-site customers or retail sales may occur.

(c) Initiation. An applicant shall submit an application complying with the provisions of Appendix D to the community development director.

(1) Applications may be initiated by the owner or occupant of a residence. However, written approval from the current property owner shall be required as part of any application for a home occupation.

(2) The community development director shall review the application and shall determine if the application is complete pursuant to section 114-213.

(d) Review and action. If the application complies with all applicable provisions of this UDO, the community development director may approve the home occupation permit, approve the application subject to conditions or disapprove the application.

(e) Effect of approval. Home occupation permit approval authorizes the applicant to conduct the subject home occupation subject to the conditions of approval. If the occupation is not established within 12 months of approval, the approval lapses.

(f) Appeals. An applicant may appeal the decision of the community development department to the board of adjustment pursuant to article III, division 6.

(g) Business license and occupation tax. If a home occupation permit is granted, the applicant is responsible for obtaining the required business license and paying the annual occupation tax. Failure to maintain the required business license and payment of annual occupation tax shall result in a termination of the home occupation permit.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-424. Temporary use and special events permits.

(a) Purpose. This section documents the procedures for issuance of a temporary use or special events permit for uses that comply with this section and section 114-744.

(b) Applicability. No temporary use or special event may be established, enlarged or substantially altered except in accordance with the provisions of this section.

(c) Initiation. An applicant shall submit an application complying with the provisions of Appendix D to the community development director.

(1) Applications may be initiated by the owner or the proposed operator of the temporary use or special event. However, written approval from the current property owner shall be required as part of any application for a temporary use or special event permit.

(2) The community development director shall review the application and shall determine if the application is complete pursuant to section 114-213.

(d) Review and action. If the application complies with all applicable provisions of this UDO, the community development director may approve the temporary use or special event permit, approve the application subject to conditions, disapprove the application or, upon determining that the proposed use will obstruct traffic or interfere with emergency access, forward the application to the board of commissioners for review and action at the board's next public meeting. A public hearing will not be required, but the Chairman of the board of commissioners or the county administrator may schedule public hearing if they determine public comment is necessary.

(e) Effect of approval. Temporary use or special event permit approval authorizes the applicant to conduct the use subject to the conditions of approval. If the temporary use or special event is not held on the date(s) specified in the application, the approval is void, and the applicant must obtain a new permit.

(f) New permit required. If the special event is not held on the date(s) specified in the application, the applicant must obtain a new permit.

(Ord. No. 06-2020, § 3, 12-8-2020; Ord. No. 16-2021, § 2, 8-10-2021) Sec. 114-425. Reserved.

DIVISION 4. DEVELOPMENT APPROVALS BY ENGINEERING DIRECTOR

Sec. 114-426. Land disturbance permit.

(a) Purpose. A land disturbance permit is required pursuant to chapter 111 of the County Code to ensure compliance with state and local requirements for erosion, sedimentation, and stormwater management, in addition to the county's tree preservation requirements as established in section 114-634.

(b) Applicability.

(1) No clearing of land, grading, or filling may occur until a land disturbance permit has been issued by the engineering director in accordance with chapter 111 of the County Code.

(2) Erosion and sedimentation controls shall be required on all sites in accordance with chapter 111, the Erosion and Sedimentation Act of 1975 (O.C.G.A. § 12-7-1 et seq.) in addition to all other outside agency approvals being obtained prior to land disturbance commencing.

(c) Types of permits. The county has three types of land disturbance permits. These permits are:

(1) Clearing and grading permit - A clearing and grading permit allows an applicant to clear and grade a site, including removing trees stumps. An applicant shall submit an application for a clearing and grading permit in compliance with the requirements in Appendix D. As a condition of the permit, an applicant will have to post a restoration bond in an amount approved by the engineering director.

(2) Road construction permit - A road construction permit allows an applicant to clear and grade a site and construct a new road, including the installation of underground utilities (water, sewer, electrical, cable, gas, stormwater) or install improvements and/or repairs related to existing roads. For roads that are part of a major subdivision, the applicant shall comply with the process identified in section 114-366.

(3) Site development permit - A site development permit allows an applicant to clear and grade a site and install infrastructure and other improvements not associated with a major subdivision. An applicant shall submit an application for a site development permit in compliance with the requirements in Appendix D. The process for approval shall follow the construction plan approval process identified in section 114-366, otherwise all other applications shall comply with section 114-429.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-427. Floodplain development permits.

(a) Purpose and applicability. All development shall comply with the provisions of chapter 105 of the County Code to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to:

(1) Require uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial construction;

(2) Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which increase flood heights, velocities, or erosion;

(3) Control grading activities and other development which may increase erosion or flood damage;

(4) Prevent or regulate the construction of flood barriers that will unnaturally divert floodwaters or may increase flood hazards to other lands; and

(5) Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters.

(b) Procedures. Permits for development within the bounds of a special flood hazard area (SFHA) shall comply with the procedures and standards of chapter 105 of the County Code.

(c) Appeals. Appeals to the engineering director's decisions on floodplain development permits shall be heard by the building and construction board of appeals.

(Ord. No. 06-2020, § 3, 12-8-2020) Sec. 114-428. Traffic impact assessment.

(a) General applicability. Traffic studies may be required in conjunction with a subdivision, planned development, conditional use permit, rezoning, or site plan application if projected traffic from a development reaches the thresholds established in paragraphs (c) and (d) of this section. Exhibit 428 summarizes the process for traffic study review

Exhibit 428: Traffic Study Review Process Summary Traffic Study Review Process Applicability and Scoping Meeting with Engineering Director Preparation and Submittal of Study Initial Review by Engineering Director (30 days) Final Review and Approval by Engineering Director (30 days)

(b) Types of studies.

(1) Traffic Impact Analysis - for projects having impacts on major roads, multiple roads, or multiple intersections.

(2) Traffic Design Analysis - for projects having more localized impacts and focused on ingress, egress and abutting intersections.

(c) Traffic impact analysis (TIA) purpose and applicability.

(1) Purposes: The purposes of a TIA will be to:

a. Evaluate traffic operations and impacts at site access points under projected traffic loads;

b. Evaluate the impact of site-generated traffic on affected intersections in the impact area;

c. Evaluate the impact of site-generated traffic on the quality of traffic flow on public roads located in the impact area;

d. Evaluate the impact of the proposed development on residential roads in the impact area;

e. Ensure that site access and other improvements needed to mitigate the traffic impact of the development meet commonly accepted engineering design standards;

f. Ensure that adequate facilities for pedestrians, transit users and bicyclists have been provided; and

g. Identify transportation infrastructure needs and related costs created by the development and cost sharing for needed improvements.

(2) Applicability: A TIA will be required to be submitted and approved by the director of engineering prior to approval of a sketch plat, zoning map amendment, conditional use permit, planned development plan, or site plan for development that exceeds the following thresholds in one or more development applications submitted for a parcel or contiguous parcels under common ownership at the time of the adoption of this UDO or at the time of the development application:

a. The proposed development will generate more than 1,000 average daily trips at full occupancy, according to most current version of the ITE Trip Generation Manual or comparable research data approved by the engineering director; or

b. The proposed development will concentrate 300 or more trips per day through a single access point

(d) Traffic design analysis (TDA) purpose and applicability. All development projected to generate 200 average daily trips more than existing conditions that does not require a TIA shall be required to complete a traffic design analysis (TDA). The purposes of a TDA will be to:

(1) Ensure that the proposed road layout is consistent with adopted road design standards;

(2) Ensure the proper design and spacing of site access points and identify where limitations on access should be established;

(3) Ensure that potential safety problems have been properly evaluated and addressed;

(4) Ensure that internal circulation patterns will not interfere with traffic flow on existing public roads;

(5) Ensure that appropriate facilities for pedestrians, transit users and bicyclists have been provided in plans for the development; and

(6) Identify the transportation infrastructure needs and related costs created by the development.

(e) Waiver. The engineering director may waive requirements of a TIA or TDA upon the receipt and review of such written request accompanied by supporting documentation from the applicant's traffic engineer, which provides sufficient data in determining that the analysis is not necessary to determine needed road improvements, that adequate capacity exists to serve the proposed development, and that no unsafe or hazardous conditions will be created by the development as proposed.

(f) Preparation. The cost of TIA or TDA preparation shall be the responsibility of the applicant. The applicant shall retain the services of a qualified traffic engineer approved by the engineering director.

TIAs and TDAs shall be sealed by a Georgia licensed professional civil engineer.

(g) Traffic level of service standards. The standards for traffic service that shall be used to evaluate the findings of a TIA or TDA are:

(1) Level of service. Level of Service D (LOS D) or less congested shall be maintained on all arterial and collector road segments and intersections. LOS C or less congested shall be maintained on all other road segments and intersections. For multi-phase developments, the applicable levels of service shall be maintained for each phase.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.