Ir al contenido
Georgia Commons
Menú

Butts County · Código de ordenanzas

Part II - OFFICIAL CODE / Chapter 90 - UTILITIES / Article III - SEWER USE REGULATIONS / Division 5 - INDUSTRIAL WASTE SURCHARGES

Sec. 90-105. Computation based on water consumption.

Sobre este texto

  • As published by Municode, current through 2026-04-13
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

The volume of flow used to compute industrial waste surcharges shall be based upon metered, estimated or prorated water consumption as shown in the records of meter reading maintained by the authority. If a person discharging waste into the public sewer system produces evidence to the authority that a significant portion of the total annual volume of water used for all purposes does not reach the public sewer system, an estimated percentage of total water consumption to be used in computing charges may be agreed upon between the authority and persons discharging industrial waste into the sewer.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:butts-county/code/90-105@2026-04-13-f017bb8d9b

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Butts County Code of Ordinances, Sec. 90-105. Computation based on water consumption | Georgia Commons