Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 18 - BUILDING REGULATIONS / Article XIII - DEVELOPMENT BLASTING

Sec. 18-359. Blasting permit application requirements.

Sobre este texto

  • As published by Municode, current through 2025-11-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Application. Only a state registered user with a "Blaster Certification Card" as required by Chapter 120-3-10 of the Rules and Regulations of the Safety Fire Commissioner of Georgia and O.C.G.A. §§ 25-2-4, 25-2-17 and 25-8-9 may apply for a blasting permit.

The application must include the following:

(1) Name, address and contact information for the following individuals:

a. User (the permit applicant);

b. Blaster;

c. Developer;

d. Property owner;

e. Engineer creating or corroborating the blasting plan

f. Seismograph operator; and

g. Person to conduct pre-blast and postblast surveys.

(2) State registrations for the user and blaster responsible for proposed activity, including "Blaster Certification Card" as required by Chapter 120-3-10 of the Rules and Regulations of the Safety Fire Commissioner of Georgia and per O.C.G.A. §§ 25-2-4, 25-2-17 and 25-8-9.

(3) A sketch of the proposed blasting site/project superimposed over an aerial, showing

measured distances from all structures, buildings, streets, above and below ground utilities, wells and other facilities within 1,000 feet of the blasting site.

(4) Traffic control, barricading and sign plan (which may include hiring off-duty public safety personnel).

(5) Other information deemed necessary or appropriate by the director, which may include, but is not limited to:

a. Pre-blast assessment, prepared by a geotechnical engineer or other blasting professional, which assesses the geology of the blast site and surrounding area out to 2,000 feet and the potential for damage to structures and facilities

within 2,000 feet of the blast site;

b. Pre-blast inspection of structures and facilities located near the proposed blast location (including videotaping of

structures);

c. Bond to protect county facilities;

d. Hydrological study;

e. Geological study; and

f. Test wells.

(b) Fees. The established fees for blasting permit applications and blasting inspections are as established by the Cobb County Board of Commissioners, and as may be amended from time to time.

(c) Escrow agreement. Prior to issuance of the blasting permit, the applicant may be required to deliver an executed escrow agreement, acceptable to the county attorney's office, and fully funded with cash in the amount of $50,000.00.

(d) The fire marshal may prescribe any forms required for the administration of this article.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 2-27-07; Amd. of 2-24-15)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cobb-county/code/18-359@2025-11-20-119080d0c1

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Cobb County Code of Ordinances, Sec. 18-359. Blasting permit application requirements | Georgia Commons