Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 58 - FLOODS / Article II - FLOOD DAMAGE PREVENTION / Division 3 - STANDARDS FOR DEVELOPMENT IN FLOODPLAIN
See. 58-66. Regulated; permitted uses.
Sobre este texto
- As published by Municode, current through 2025-11-20
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) Definition of floodplain boundaries.
(1) Studied A zones as identified in the flood insurance study (FIS), shall be used to establish base flood elevations whenever available.
(2) For special flood hazards areas and floodprone areas, the flood elevations for base flood and future-conditions shall be determined by a registered professional engineer using FEMA approved methodology and approved by the county water system stormwater management division.
(3) The boundaries or limits of the floodplain shall be within 0.5 feet vertical accuracy on the site plan containing existing topographic information.
(4) For all streams with a drainage area of 100 acres or greater, the future-conditions flood elevations shall be provided by the Cobb County Water System Stormwater Management DiviSupp. No. 19 CD58:15 sion. If future-conditions elevation data is not available from the Cobb County Water System Stormwater Management Division then it shall be determined by a registered professional engineer using a method approved by FEMA and the Cobb County Water System Stormwater Management Division.
(b) Definition of floodway boundaries.
(1) The width of a floodway shall be determined from the FIS or FEMA approved flood study.
For all streams with a drainage area of 100 acres or greater, the regulatory floodway shall be provided by the Cobb County Water System Stormwater Management Division. If floodway data is not available from the Cobb County Water System Stormwater Management Division, the applicant may set the regulatory floodway limit equal to the future conditions
100-year flood boundary (i.e. no encroachment), or it shall be determined by a registered professional engineer using a method approved by FEMA and the Cobb County Water System Stormwater Management Division.
(2) Following a pre-design conference with the county water system, stormwater management division, the boundaries or limits of the floodway shall be shown on the site plan
containing existing topographic information.
(c) General standards. For all streams with a drainage area of 100 acres or greater, the future-conditions flood elevations shall be provided by the Cobb County
Water System Stormwater Management Division. If future-conditions elevation data is not available from the Cobb County Water System Stormwater Management Division then it shall be determined by a registered professional engineer using a method approved by FEMA and the Cobb County Water System
Stormwater Management Division.
(1) No construction or structures, including grading, filling, cutting or displacement of earth shall be allowed within the future-conditions
floodplain that could result in any of the following:
a. Raising the base flood elevation or futureconditions flood elevation equal to or more than 0.01 foot beyond the boundaries of the ownership of the property being developed unless contained in a
drainage easement obtained by the developer;
(2) (3)
b. Reducing the base flood or future-conditions flood storage capacity. All compensation for storage capacity shall occur either within the boundaries of ownership of the property being developed, or within a permanent, recorded flood control easement, and shall be within a reasonable proximity to the location of
the encroachment. Acceptable means of providing required compensation include; lowering of natural ground elevation within the floodplain; or lowering of adjoining areas to create additional
floodplain; or raising of the base flood elevation or future-conditions flood elevation within the boundaries of ownership of the property being developed. All cut areas are to be graded to a slope of no
less than 1.0 percent. In no case shall any required compensation be provided via bottom storage or by excavating below the elevation of the top of the natural (pre-development) stream channel unless such excavation results from the widening or relocation of the stream channel. A step-backwater analysis will be required to determine the volume of flood
storage created by raising the base flood elevation or future-conditions flood elevation;
c. Changing the flow characteristics of the waters of the base flood or future-conditions flood as they pass both the upstream and downstream boundaries of the property. Verification shall be provided via a step-backwater analysis; or
d. Creating hazardous or erosion-producing velocities, or resulting in excessive sedimentation. In all cases effective transitions must be provided such that flow velocities occurring on both upstream
and downstream properties are not increased to cause an erosion problem or decreased, to result in excessive sedimentation.
All proposed development shall have public utilities and facilities, such as sewer, gas, electrical and water system, located and constructed to minimize flood damage.
Any significant physical changes to the base flood floodplain shall be submitted as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. The CLOMR submittal shall be subject to approval by the Cobb County Water System Stormwater Management Division using the community consent forms before forwarding the submittal package to FEMA for final approval. The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval shall be
the responsibility of the applicant. Within six months of the completion of construction, the applicant shall submit as-built surveys for a final letter of map revision (LOMR).
(d) Engineering study requirements for floodplain encroachments. An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and/or
floodways for which the provisions of subsection 58- 70(d) apply. This study shall be prepared by a currently registered professional engineer in the State of Georgia and made a part of the application for a permit. This information shall be submitted to and approved by the Cobb County Water System Stormwater Management Division prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain. Such study shall include:
(1) Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development;
(2) Step-backwater analysis (HEC-2 or HECRAS). Cross-sections which may be supplemented by the applicant and flow information will be obtained whenever available. Computations will be shown duplicating FIS results and will then be rerun with the proposed
modifications to determine the new base flood and profiles, and future-conditions flood profiles;
(3) Floodplain storage calculations based on crosssection (at least one every 100 feet) showing existing and proposed floodplain conditions to
show that base flood floodplain and futureconditions floodplain storage capacity would not be diminished by the development;
(4) If changes to the future flood elevation are proposed, profiles of the channel showing the existing and proposed future flood elevations must be provided; and
(5) The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future-conditions floodplain encroachments.
(e) Floodway encroachments. Located within areas of special flood hazard are areas designated as floodway.
A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, floodways must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore the following provisions shall apply:
(1) Encroachments are prohibited including earthen fill, new construction, replacement of substantially damaged structures, substantial improvements or other development within the regulatory floodway, except when required for the construction of bridges, culverts, roadways and
utilities, provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge. A registered
professional engineer must provide supporting technical data and certification thereof; and
(2) If the applicant proposes to revise the floodway boundaries, no permit authorizing the encroachment into or an alteration of the floodway shall be issued by the county community development agency or by county water system, stormwater management division until an affirmative conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable, is issued by FEMA and no rise certification is
approved by the Cobb County Water System Stormwater Management Division.
(3) If a pre-existing residence sustains substantial damage, regardless of source, that residence cannot be rebuilt within the regulatory floodway.
(f) Development will not be permitted in the floodway as established in this article.
Historia
(Ord. of 10-11-88, art. IV; Code 1977, § 3-14-25; Ord. of 4-13-04; Ord. of 2-27-07)