Ir al contenido
Georgia Commons
Menú

Cobb County · Código de ordenanzas

Part I - OFFICIAL CODE OF COBB COUNTY, GEORGIA / Chapter 58 - FLOODS / Article II - FLOOD DAMAGE PREVENTION / Division 3 - STANDARDS FOR DEVELOPMENT IN FLOODPLAIN

Sec. 58-68. Subdivision plats.

Sobre este texto

  • As published by Municode, current through 2025-11-20
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Proposed tentative and final plats of development, both residential and commercial, located contiguous to or within the flood hazard areas shall not be approved, except in accordance with the following requirements:

(1) Each plat shall contain a notation clearly stating the water surface elevation of the base flood in relation to mean sea level, as approved and accepted by the director. Any lands below this elevation shall be designated on the plat by a heavy contour type line, depicting the base flood level and created as a drainage easement.

(2) Final subdivision plats approved by the county prior to the effective date of this article are exempt from the requirements of subsection

(1) of this section.

(3) A property plat of each residential lot, any portion thereof which is below the futureconditions flood elevation, shall be submitted to the director for review and approval prior to

issuance of the building permit. Such plat shall have located and noted thereon the building, driveway, setbacks, finished floor elevations, including basement, above base flood, floodplain coverage and elevations, area above

base flood elevation, and all easements. All elevations shall be referenced to mean sea level. An elevation certificate shall be submitted to the director for each residential lot, or any portion thereof which is flooded by the

base flood.

Prior to pouring the foundation slab and/or footing, certification of lowest floor elevation and housing siting, in compliance with this article, in drawing form, signed and sealed by a registered land surveyor, shall be submitted to the director for approval. This requirement is applicable to all subdivision lots encumbered by the floodplain which are unbuilt and unpermitted as of the effective date of this

article.

(4) Before the final plat for a subdivision is accepted by the county any required CLOMR's and/or LOMR's to FEMA must be submitted to

FEMA for approval. The director at his discretion may withhold acceptance until the CLOMR and/or LOMR is approved by FEMA.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 10-11-88, art. VII; Code 1977, § 3-14-28; Ord. of 4-13-04; Ord. of 2-27-07)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cobb-county/code/58-68@2025-11-20-102d6fc762

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Cobb County Code of Ordinances, Sec. 58-68. Subdivision plats | Georgia Commons