Ir al contenido
Georgia Commons
Menú

Colquitt County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 54 - ROADS, BRIDGES AND PUBLIC PLACES / Article II - PLACEMENT, CONSTRUCTION, ACCEPTANCE OF ROADS / Division 3 - REQUIRED STANDARDS

Sec. 54-83. Utilities.

Sobre este texto

  • As published by Municode, current through 2025-02-04
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Before any utilities are placed on any county roads the utility company shall furnish the county a drawing of the proposed construction and the county issue a permit to the utility company to do the work.

(b) All utilities crossing the right-of-way shall be encased within the road bed structure and shall be placed three feet below the ditch bottom.

Those running parallel with the right-of-way or roadway shall be placed in the outer five feet of the right-of-way at a minimum depth of 2½ feet.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Code 1981, § 20-59)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:colquitt-county/code/54-83@2025-02-04-1816ca94b1

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.