Ir al contenido
Georgia Commons
Menú

Cook County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 58 - SUBDIVISIONS / Article II - PLAT REVIEW

Sec. 58-52. Preliminary plat.

Sobre este texto

  • As published by Municode, current through 2020-04-06
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Purpose. The purpose of the preliminary plat is to safeguard the subdivider from unnecessary loss of time and expense in preparation of a subdivision plat which does not conform with the specifications of this chapter. The preliminary plat requires only approximate accuracy of scale and dimension. Public reviewing agencies having jurisdiction, including but not limited to the county health department, county engineer, county road superintendent, and the appropriate municipality, if applicable, will review preliminary plats regarding matters within their jurisdiction. During the review process, the subdivider or his agent may be called upon for consultation.

(b) Subdivisions requiring no new street, water or sewer facilities. All subdivisions which do not involve the platting, construction, or opening of new streets, water or sewer facilities may be accepted by the building and zoning official in the form of a final plat, provided that essential data required by the reviewing agencies to ensure compliance with the intent of this chapter is submitted.

(c) Filing. Any person desiring to subdivide land shall file with the building and zoning official five copies of the preliminary plat accompanied by a letter of application. The letter of application shall contain the name and address of the developers and his agents, the zoning of the property to be subdivided, whether or not the subdivision will be developed in phases, plans for potential annexation, and plans for serving the proposed subdivision with sewer and water facilities. The plat shall be prepared in accordance with this chapter and with applicable county specifications by a registered land surveyor, who is licensed under the laws of the state.

The preliminary plat shall be deemed filed with the county when it is filed with the building and zoning official. At the time of filing, a certificate of filing shall be provided to the subdivider and shall include the time and date of filing. Filing of the preliminary plat shall be accomplished at least 15 working days prior to the regular planning commission meeting at which it is to be considered. The preliminary plat shall include:

(1) Title block and north arrow. The preliminary plat will show the name of the proposed subdivision, its location, the name, address and registration number of the surveyor preparing the plat and the date of the plat. A north arrow shall be included with a notation referencing the bearings to magnetic north, astronomical north or grid north.

(2) General layout. The preliminary plat shall show information as to the proposed street layout and widths, layout of lots with a notation as to the minimum size and width of lots and any proposed open space. Any lands to be dedicated will be clearly identified.

Plat scale, total acreage of the site and total number of lots created shall also be indicated. Lot and block identification and building setback lines shall also be indicated.

(3) Topography. The plat shall show existing contour lines dashed and any proposed contour lines solid, both set of lines to be at two-foot intervals, mean sea level (MSL).

Prominent drainage features such as lakes, depressions, streams, etc., which could affect the design of the subdivision shall be shown. Engineering data showing the high water elevation and how it was established shall be submitted with the plat. This may be best accomplished by utilization of the county flood hazard boundary maps. Any identified flood hazard area shall be clearly indicated on the plat.

(4) Existing features. The preliminary plat shall show the locations and names of existing and platted property lines, streets (and its right-of-way), railroads (and its right-ofway), public and private rights-of-ways, sanitary sewer (and size), water mains (and size), bridges, culverts, storm drainage (and size), easements, parks and other public open spaces. Land lot and land district lines, and names of adjoining property owners or subdivisions shall also be indicated. Floodplain areas, as identified on officially adopted county maps, and any wetlands areas, as identified on draft U.S. Department of the Interior National Wetlands Inventory Maps, shall be clearly delineated.

(5) Location map. The preliminary plat shall include a small scale map of sufficient clarity so that the location of the proposed subdivision can be readily determined.

(6) Water and sewer. A statement from the subdivider shall be submitted with the preliminary plat which will describe the method by which sewage disposal and water facilities will be provided. If private sewer is proposed to serve a subdivision, then soils will be identified according to local soil conservation service soil maps (see section 58-3) and soils percolation test results and contour map shall accompany the preliminary plat at the time of submission. The contour map shall show location and identification of each soil class and site of each percolation test. Percolation tests shall be made in accordance with county health department requirements. If public water or sewer are proposed, a letter from the providing jurisdiction shall accompany the submittals.

(7) Future tract plan. In cases where a subdivision is to be developed in stages with additional plats being filed with the planning commission at a later date, the filing of the initial plat will be accompanied by a future tract plan, a reasonably accurate plat in sketch form of the entire tract which will show the future street system and topography for the entire tract. Once the required tract plan has been given approval by the planning commission, five copies of the approved future tract plan must be provided for distribution to the various reviewing agencies and the inspections office.

(8) Soil erosion control. A soil erosion control plan, prepared in accordance with the county soil erosion and sedimentation control ordinance's latest revisions, shall be submitted to the county building and zoning official simultaneous with the improvement plan.

(See section 58-53.)

(9) Wetlands. Approximate location of wetlands boundaries shall be delineated on the preliminary plat. All preliminary plats delineating wetlands shall have on the face of the preliminary plat the note: "No fill or work shall be permitted within jurisdictional wetlands without a prior permit from the U.S. Army Corps of Engineers." All minimum lot areas per designated zoning classification requirements shall be calculated upland of any wetlands boundaries within or contiguous to the project.

(d) Completeness. If any of the information required by subsection (c) of this section is omitted or misrepresented on the plat, the county building and zoning official may refuse to review the plat and shall return the plat to the subdivider to be completed or revised. The plat, upon revision, may be resubmitted as a new preliminary plat.

(e) Approval by individual agencies. No preliminary plat shall be approved by the planning commission unless it is approved by the county engineer, road superintendent and the board of health. Such agencies shall, with or without modification, approve the preliminary plat to the extent that each has jurisdiction. If the plat is rejected, the respective reviewing agency shall provide the planning commission with a written statement specifying all aspects where the plat fails to comply.

(f) Coordination. Upon receipt of the filing of the preliminary plat, the building and zoning official shall prepare the submitted materials for review by the appropriate agencies. The various agencies shall complete their reports in a timely fashion, and shall submit their findings to the planning commission for review and approval. It shall be the responsibility of the building and zoning official to coordinate these reviews and to ensure reports are brought together in a timely fashion for proper presentation to the planning commission.

(g) Approval by planning commission. Approval or disapproval of the preliminary plat shall be accomplished within 30 days after the plat is filed with the planning commission. If after 30 days the planning commission has failed to act, the preliminary plat shall be deemed approved; provided, however, that the subdivider may waive in writing this requirement and consent to an extension of such period. If the preliminary plat is disapproved, the reasons therefore shall be stated in the resolution disapproving the same, and the subdivider shall be so informed.

(h) Approval duration. Approved preliminary plats are valid for one year only from the date of approval. If the final plat or improvement plan has not been submitted within this time period, preliminary plat approval becomes invalid and must be resubmitted.

Historia

La línea de historia que la fuente imprime al final de la sección.

(Ord. of 7-7-1997, § 4-1.8)

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:cook-county/code/58-52@2020-04-06-da574fbf4f

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.