Dade County · Código de ordenanzas
Part II - CODE / Chapter 18 - BUILDINGS AND BUILDING REGULATIONS / Article III - ELECTRICAL INSPECTIONS
Sec. 18-69. Inspection prior to service.
Sobre este texto
- As published by Municode, current through 2024-09-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
(a) After the effective date of the ordinance from which this article is derived, suppliers of electrical power shall not provide temporary electrical service to any construction site for any proposed structure requiring electrical power until such time as the county electrical inspector has inspected and approved the electrical service entrance from the power supplier's point of attachment to the customer's temporary breaker box. The inspection and approval shall be evidenced by the attachment of a numbered, signed and dated county electrical inspection certificate to the meter base.
(b) After the effective date of the ordinance from which this article is derived, suppliers of electrical power shall not provide permanent electrical service to any structure requiring electrical power until such time as the county electrical inspector has inspected and approved the electrical service entrance from the power supplier's point of attachment to the customer's breaker box. The inspection and approval shall be evidenced by the attachment of a numbered, signed and dated county electrical inspection certificate to the meter base.
(c) After the effective date of the ordinance from which this article is derived, suppliers of electrical power shall not provide electrical service to any manufactured home or modular home requiring electrical power until such time as the county electrical inspector has inspected and approved the electrical service entrance from the power supplier's point of attachment to the customer's breaker box. The inspection and approval shall be evidenced by the attachment of a numbered, signed and dated county electrical inspection certificate to the meter base.
(d) After the effective date of the ordinance from which this article is derived, temporary and/or permanent electrical utility connections for structures, manufactured homes or modular homes which are subject to the terms of this article are prohibited until such time as a duly authorized county electrical inspection certificate is affixed to the meter base by the county electrical inspector.
Historia
(Ord. No. O-2-97, § IV, 9-4-1997)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.