Dawson County · Código de ordenanzas
Dawson County Code of Ordinances
Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.
Sobre este texto
- As published by Municode, current through 2026-09-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Parte 7 de 13. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.
(d) Hazardous waste and industrial waste. No hazardous waste or industrial waste shall be placed in any receptacle at any time. All hazardous waste shall be secured against the possibility of causing injury to any person and shall not be placed on public property or private property without the written consent of the state environmental protection division and the owner thereof.
(e) Yard trimmings.
(1) It shall be unlawful to place or mix yard trimmings with municipal solid waste within Dawson County.
(2) Yard trimmings shall not be disposed of at any municipal solid waste disposal facility having a liner and leachate collection system or requiring vertical expansion located within Dawson County.
Yard trimmings, including, but not limited to, grass, leaves and tree limbs shall be composted on the owner's premises or removed by the owner of the property and/or disposed of in a manner consistent with state law. This part shall not require the removal of wood cut and stored for later use as firewood. Tree and shrubbery branches, limbs and trimming cut by landscape or tree service contractors or other commercial workmen or resulting from land being cleared shall be removed by the person(s) or entity completing said work.
(f) Receptacles and Containers.
(1) Every person in possession, charge or control of any building or residence from which trash, industrial waste or other waste is accumulated or produced shall provide and keep in a suitable place readily accessible to licensed private collectors' receptacles and containers suitable for the storage of all such waste materials which will normally accumulate between the established collection dates. This provision shall not be construed to require such persons to use the services of a licensed private collector for solid wastes removal so long as each person assures the removal and disposal of such solid wastes in a manner permitted by this chapter at least as frequently as private collector's normal schedule for the area, but in any event at least once each week.
(2) All receptacles and containers as required by this chapter shall be constructed of an opaque, non-porous material such as metals, hard plastics or similar materials, or safe construction and design and shall be maintained in good, orderly and serviceable condition at all times. Any receptacle or container which does not conform to the requirements of this chapter, or which have ragged or sharp edges or any other defects likely to hamper or injure the person collecting the contents therefrom or the public generally, shall be promptly replaced by the user thereof.
(g) Maintenance. It shall be the duty and responsibility of the owner of any private property and the tenant in possession of any private property, jointly and severally, to keep the property in an orderly condition and maintained so as not to be a public nuisance or a menace to public health.
(h) Burning. No garbage, solid wastes, litter or other trash shall be burned as a private means of disposal. This provision shall not be construed to prohibit commercial incinerators where appropriate and necessary approvals have been obtained from state and federal authorities, a special permit is obtained from Dawson County, and the incinerator is operated and maintained in compliance with all applicable regulations.
(i) Handbills and advertising matter. The distribution of information such as public announcement, political endorsement, opinions, invitation, solicitations, and commercial advertisements is an activity protected by both the U.S. Constitution and the Georgia Constitution. This section is to regulate and control litter incidental to the distribution of papers and packaging.
(1) Unless otherwise prohibited by state or federal law, nothing herein shall restrict the placement of any handbill, circular, pamphlet, poster, or other literature on any automobile in the county so long as the same is secured to prevent wind-driven debris and unsightly litter.
(2) Unless otherwise prohibited by state or federal law, nothing herein shall restrict the placement on any private property any handbill, circular, pamphlet, poster, postcard, newspaper or other literature or advertising device, so longs the following conditions are met:
a. Such publications and materials may be placed in a box provided for that purpose, secured to a doorknob or placed in a secure area of a building such as a door jamb or screen door; or
b. Such publications and materials may be placed or thrown on to private property so long as the distributor of such materials "sweeps" the distribution area and retrieves all remaining items within four days of distribution. This procedure shall be referred to as "sweeping." Any papers distributed and not "Swept" from private property, vacant lands, and/or public rights of way become litter under this ordinance after four days, and citations can be issued pursuant to this ordinance for violations thereof.
(3) Should such publications and materials be placed or thrown on to private property and the owner of said property notifies the publisher in writing that he/she does not wish to receive such publications at a particular street address, continued delivery of publication directly to said property by the publisher or his/her agents shall constitute a violation of this chapter.
Absent a written expression of intent to the contrary, a property owner shall be presumed to consent to delivery by such means.
(4) It shall be unlawful for any person to tack, post, or nail any paper, metal, wood or other signs of any character on any telegraph, telephone or electric light pole, located in any public right-of-way or in any means erect said signs within the public right-of-way.
(j) Dead animals.
(1) Any person who owns or is caring for an animal which has died or been killed shall dispose of said dead animal in the manner provided for in either the Georgia Dead Animal Disposal Act, O.C.G.A. § 4-5-1 et seq.; the Rules and Regulations of the Georgia Department of Agriculture, O.C.G.A. ch. 40-16-2; or the Georgia Comprehensive Solid Waste Management Act, O.C.G.A. § 12-8-20 et seq., as applicable.
(k) Lead acid vehicle batteries. No person shall place or dispose of a lead acid vehicle or boat battery in any compactor, dumpster, or landfill located in Dawson County, Georgia, or otherwise discard or dispose of a lead acid vehicle or boat battery except by delivery to a battery retailer or wholesaler, to a secondary lead smelter, or to a collection or recovered materials processing facility that accepts lead acid vehicle or boat batteries.
(l) Motor oil. No person shall place or dispose of motor oil in any compactor, dumpster, or landfill located in Dawson County, Georgia, or otherwise discard or dispose of motor oil except by delivery to a recycling collection facility or a disposal facility authorized and specifically designed to accept motor oil.
(m) Recyclable material. The collection, transportation, handling, storage and conversion of recyclable materials shall be permitted so long as such activities conform to the requirements of State law.
(n) Biomedical wastes. All biomedical wastes shall be handled and disposed of in accordance with the Rules of the Georgia Department of Natural Resources Environmental Protection Division and the Georgia Comprehensive Solid Waste Management Act of 1990, as now or hereafter amended.
(Ord. of 12-1-2022(2)) Sec. 46-7. Community health and welfare.
(a) Declared nuisances. Declared nuisances shall be governed by the Dawson County Nuisance Abatement Ordinance. Declared nuisances shall not apply to poultry farms, agricultural activities and or farm operations which are in compliance with state guidelines regarding the same.
(b) Trash. Within the county, it shall be unlawful for any person to maintain his premises, including vacant lots or land, in such a way as to allow trash, garbage or miscellaneous solid wastes to accumulate if the condition of the property causes a nuisance, or causes injury to the health or welfare of residents in the vicinity, or causes injury to neighboring property.
(Ord. of 12-1-2022(2)) Sec. 46-8. Enforcement.
(a) Enforcing officers. The Dawson County Marshal's Office and or the Dawson County Sheriff's Office or designee shall be authorized to issue citations to violators of any provision of this chapter or to the owner or any other person who may be in possession of any property upon which any condition exists, which constitutes a violation of any provision of this chapter. Such citation shall state the time and place at which the accused is to appear for trial, shall identify the offense with which the accused is charged, shall have an identifying number by which it shall be filed with the court, shall indicate the identity of the accused and the date of service, and shall be signed by the representative of the public official who completes and serves it.
(b) Rebuttable presumptions.
(1) Whenever solid waste is thrown, deposited, dropped, or dumped from any motor vehicle, boat, airplane, or other conveyance in violation of this chapter, it shall be prima-facie evidence that the operator of the conveyance has violated this chapter. In the case of a commercial or private hauler if the operator is unknown, then it shall be prima-facie evidence that the company or owner of the service has violated this chapter.
(2) Whenever any solid waste which is dumped, deposited, thrown, or left on public or private property in violation of this chapter is discovered to contain any article or articles, including but not limited letters, bills, publications, or other writings which display the name of a person thereon in such a manner as to indicate that the article belongs or belonged to such person, it shall be a rebuttable presumption that such person has violated this chapter.
(3) Whenever this chapter is violated by an employee or agent, then the employer or principal shall be rebuttably presumed to have violated this chapter.
(c) Enforcement. This chapter shall be enforced by the appropriate public officer as may be applicable to the particular offense.
(d) Penalties.
(1) The applicable public officer is hereby authorized and directed to administer and enforce all the provisions of this chapter. Failure to comply with any requirement of this chapter shall constitute a violation subject to citation and penalty as provided herein.
(2) Upon the first violation of any of the provisions of this chapter, a warning notice shall be issued by the public officer with a notice to cure the violation within a time determined reasonable under the circumstances by the public officer. Upon the second violation of any of the provisions of this chapter, a citation shall be issued, and the individual shall go before the Dawson County Magistrate Court. Upon conviction by a court of competent jurisdiction, the offending person will be guilty of a criminal misdemeanor and shall be subject to criminal penalties not to exceed $1,000.00, by imprisonment in the county jail for a period of time not to exceed 60 days, or by both such fine and imprisonment, or up to the limits of any penalty provided by state law for the ordinance. For purposes of sentencing, the first citation before the magistrate court shall be deemed the "first offense," however; consideration may be given by the court to the previous warning citation.
(3) Nothing contained in this section shall be construed to preclude Dawson County from pursuing any and all other remedies provided by law, including, but not limited to, pursuit of a restraining order, injunction, abatement of the nuisance, condemnation, or other appropriate legal action, or proceeding through a court of competent jurisdiction to prevent, restrain, or abate the unlawful use or activity.
(4) Each violation of this chapter shall constitute a separate offence. Additionally, each day of noncompliance with the terms of this chapter is considered a separate offense and the offending person will be subject to the penalties in subsection (b) above for each day of noncompliance.
(Ord. of 12-1-2022(2)) Chapters 47
RESERVED
Chapter 48
ABATEMENT OF NUISANCE PROPERTY*
Sec. 48-1. Purpose and authority.
This chapter is intended to provide additional enforcement authority to the County in accordance with the abatement of nuisance provisions set forth in O.C.G.A. § 41-2-1, et seq.
(a) The county intends that this chapter shall comport with, and be susceptible to enforcement under, O.C.G.A. § 41-2-1, et seq. Pursuant thereto, it is found and declared that there is the existence or occupancy of dwellings or other buildings or structures which are unfit for human habitation or for commercial, industrial, or business occupancy or use and are detrimental to the welfare and are dangerous and injurious to the health, safety, and welfare of the people of this county; and that a public necessity exists for the repair, closing, or demolition of such dwellings, buildings or structures. It is further found and declared that where there is in existence a condition or use of property which renders adjacent property unsafe or inimical to safe human habitation, such use is dangerous and injurious to the health, safety, and welfare of the people of this county and a public necessity exists for the repair of such condition or the cessation of such use which renders the adjacent property unsafe or inimical to safe human habitation.
(b) Such dwellings, buildings, and property may be deemed unfit due to the following reasons;
dilapidation and not in compliance with applicable codes; defects increasing the hazards of fire, accidents, or other calamities; lack of adequate ventilation, light or sanitary facilities;
properties that have an accumulation of weeds, trash, junk, filth, and/or other unsanitary or unsafe conditions which create a public health hazard or a general nuisance to those persons residing in the vicinity; other conditions resulting in a violation of this article which renders such dwellings, buildings, or property unsafe, unsanitary, dangerous or detrimental to the health, safety, or welfare, or otherwise detrimental to the welfare of the residents of the County; or vacant, dilapidated dwellings or buildings in which drug crimes are being committed.
(Ord. of 12-1-2022(1)) Sec. 48-2. Definitions.
Except as otherwise provided herein, all words shall have the customary dictionary meaning. The present tense includes the future tense; the singular shall include the plural, and the plural the singular; and the use of masculine or feminine gender is for convenience only, and the use of each shall include the other.
As used in this chapter, the term:
Applicable codes mean:
(1) any optional housing or abatement standard provided in O.C.G.A. Title 8, Chapter 2, as adopted by ordinance or operation of law, or other property maintenance or solid waste standards as adopted by ordinance or operation of law, or general nuisance law, relative to the safe use of real property;
(2) a. any fire or life safety code as provided for in O.C.G.A. Title 25, Chapter 2; and
(3) b. any building codes adopted by local ordinance prior to October 1, 1991, or the minimum standard codes provided in O.C.G.A. Title 8, Chapter 2, after October 1, provided that such building or minimum standard codes for real property improvements shall be deemed to mean those building or minimum standard codes in existence at the time such real property improvements were constructed unless otherwise provided by law.
Closing means causing a dwelling, building, structure, or property to be vacated and secured against unauthorized entry.
County means Dawson County.
Drug crime means an act which is a violation of O.C.G.A. Title 16, Chapter 14, art. 2, known as the "Georgia Controlled Substances Act."
Dwellings, buildings, structures, or properties means any building or structure or part thereof used and occupied for human habitation or commercial, industrial, or business uses, or intended to be so used, and includes any outhouses, improvements, and appurtenances belonging thereto or usually enjoyed therewith and also includes any building or structure of any design and any associated property. However, as used in this article, the term "dwellings, buildings, structures, or properties" shall not mean or include any farm, any building, structure, or property located on a farm, or any agricultural facility or other building or structure used for the production, growing, raising, harvesting, storage, or processing of crops, livestock, poultry, or other farm products.
Interested parties means:
(1) Owner;
(2) Those parties having an interest in the property as revealed by a certification of title to the property conducted in accordance with the title standards of the State Bar of Georgia;
(3) Those parties having filed a notice in accordance with O.C.G.A. § 48-3-9;
(4) Any other party having an interest in the property whose identity and address are reasonably ascertainable from the records of the petitioner or records maintained in the county courthouse or by the clerk of the court. Interested parties shall not include the holder of the benefit or burden of any easement or right of way whose interest is properly recorded which interest shall remain unaffected; and
(5) Persons in possession of said property and premises.
Owner means the holder of the title in fee simple and every mortgagee of record.
Public authority means any member of a governing authority, any housing authority officer, or any officer who is in charge of any department or branch of the government of Dawson County or the state relating to health, fire, or building regulations or to other activities concerning dwellings, buildings, structures, or properties in the county.
Public officer means the officer or officers who are authorized to exercise the powers prescribed by this article or any agent or designee of such officer or officers.
Repair means altering or improving a dwelling, building, structure, or property so as to bring the structure or property into compliance with the applicable codes in the jurisdiction where the property is located. This includes, but is not limited to, and the cleaning or removal of tall grass, weeds, debris, trash, and other accumulated materials which create a health or safety hazard in or about any dwelling, building, structure, or property.
Resident means any person residing in Dawson County on or after the date on which the alleged nuisance arose.
(Ord. of 12-1-2022(1)) Sec. 48-3. Duty of owners.
Every owner of every dwelling, building, structure, or property within Dawson County, Georgia, has the duty to construct and maintain such dwelling, building, structure, or property in conformance with the applicable Dawson County Ordinances or other applicable codes which regulate and prohibit activities on property and which declare it to be a public nuisance to construct or maintain any dwelling, building, structure, or property in violation of such codes or ordinances.
(Ord. of 12-1-2022(1)) Sec. 48-4. Enforcement.
(a) Designation of public officers. The Dawson County Manager, Dawson County Director of the Planning and Development, the Dawson County Marshal, Dawson County Building Official, the Dawson County Sheriff's Office and their designees are all designated and appointed to exercise the power presented by this chapter as public officers.
(b) Powers of enforcement authorized. Each public officer is hereby authorized to exercise such power as may be necessary or convenient to carry out and effectuate the purpose and provisions of this chapter and O.C.G.A §§ 41-2-8—41-2-17, including the following additional powers:
(1) To investigate the dwelling conditions in the unincorporated area of the County in order to determine which dwellings, buildings, structures, or properties therein are unfit for human habitation or are unfit for current commercial, industrial, or business use;
(2) To administer oaths and affirmations, to examine witnesses, and to receive evidence;
(3) To enter upon premises for the purpose of making examinations provided, however, that such entries shall be made in such manner as to cause the least possible inconvenience to the persons in possession and shall follow applicable due process of law;
(4) To appoint and fix the duties of such officers, agents and employees as he/she deems necessary to carry out the purposes of this chapter;
(5) To delegate any of his/her functions and powers under this chapter to such officers and agents as he may designate; and
(6) To consult with any engineers or other qualified professionals in carrying out the functions and powers of this chapter.
(c) Standards for determining violation. The public officer may determine, under existing ordinances, including, but not limited to, the Dawson County Property Maintenance Ordinance and the Dawson County Litter Control and Solid Waste Management Ordinance, that a dwelling, building, structure, or property is unfit for human habitation or is unfit for its current residential, commercial, industrial, or business use if he/she finds that conditions exist in such building, dwelling, structure, or property which are dangerous or injurious to the health, safety, or morals of the occupants of such dwelling, building, structure or property; of the occupants of neighborhood dwellings, buildings, structures or properties; or of other residents of Dawson County, Georgia; such conditions may include the following (without limiting the generality of the foregoing):
(1) Defects increasing the hazards of fire, accidents, or other calamities;
(2) Lack of adequate ventilation, light or sanitary facilities;
(3) Dilapidation;
(4) Disrepair;
(5) Structural defects;
(6) Uncleanliness constituting an unsanitary condition;
(7) Tall grass and weeds which indicate long-term neglect, abandonment or vacancy;
(8) Improperly maintained swimming pools which indicate long-term neglect, abandonment, or vacancy;
(9) Dwellings, buildings or structures that have been burned and left unrepaired;
(10) An accumulation of solid waste or presence of inoperable or junked vehicles or inoperable or junked marine vessels as such are defined in the Dawson County Property Maintenance Ordinance and the Litter Control and Solid Waste Management Ordinance;
(11) Standing water allowed to pool in containers or on surfaces; and
(12) Tire storage piles located less than 50 feet from lot lines and buildings.
(Ord. of 12-1-2022(1)) Sec. 48-5. Complaints relating to unfit dwellings or structures.
(a) Whenever a written request for an investigation to be conducted using the appropriate form is filed with the marshal's office or notification is received from a public authority or by at least five residents of the county charging that any dwelling or building is unfit for human habitation or for commercial, industrial, or business use and not in compliance with applicable codes; or is vacant and being used in connection with the commission of illegal activities; or constitutes an endangerment to the public health or safety as a result of unsanitary or unsafe conditions, the marshal's office along with other appropriate personnel shall make an investigation or inspection of the specific dwelling, building, structure, or property.
(b) If the marshal's office investigation or inspection identifies that any dwelling, building, structure, or property is unfit for human habitation or for commercial, industrial, or business use and not in compliance with applicable codes; is vacant and being used in connection with commission of illegal activities; or constitutes an endangerment to the public health or safety as the result of unsanitary or unsafe conditions, the marshal's office shall notify the board of commissioners of such finding and shall either issue a 30-day notice to comply or file a complaint in rem as indicated below.
(c) Issuance of 30-day notice. The marshal's office may issue and cause to be served via certified and regular mail upon the owner and any interested parties notice that the dwelling, building, structure, or property is unfit for human habitation or for commercial, industrial, or business use and not in compliance with applicable codes; is vacant and being used in connection with the commission of illegal activities; or constitutes an endangerment to the public health or safety as a result of unsanitary or unsafe conditions. The notice shall instruct the owner to repair, alter, improve, vacate and close or demolish said dwelling, building, structure, or property within 30 days of the date the notice is mailed via regular delivery.
(d) Filing a complaint. If the dwelling, building, structure or property is not repaired, altered, improved, vacated and closed or demolished within 30 days, or, if the public official determines that it is in the best interest of the county to proceed without first issuing a 30-day notice, the marshal's office may issue a complaint in rem against the lot, tract, or parcel of real property on which such dwelling, building, or structure is situated or where such public health hazard or general nuisance exists and shall cause summons and a copy of the complaint to be served on the interested parties for such dwelling, building, structure or property.
(e) The complaint shall identify the subject real property by appropriate street address and official tax map reference; identify the owner and other interested parties; state with particularity the factual basis for the action; and contain a statement of the actions sought by the marshal's office to abate the nuisance. The summons shall notify the interested parties that a hearing will be held before the magistrate court at a date and time certain and at a place within the county where the property is located. Such hearing shall be held not less than 15 days, nor more than 45 days after the filing of said complaint in the magistrate court. The interested parties shall have the right to file an answer to the complaint and to appear in person or by attorney and offer testimony at the time and place fixed for the hearing.
(Ord. of 12-1-2022(1)) Sec. 48-6. Service of complaints.
(a) Complaints issued by the marshal's office pursuant to this division shall be served in the following manner. At least 14 days prior to the date of the hearing, the marshal's office shall mail copies of the complaint by certified mail or statutory overnight delivery, return receipt requested, to all interested parties whose identities and addresses are reasonably ascertainable. Copies of the complaint shall also be mailed by First Class Mail to the property address to the attention of the occupants of the property, if any, and shall be posted on the property within three business days of filing the complaint and at least 14 days prior to the date of the hearing.
(b) For interested parties whose mailing address is unknown, a notice stating the date, time and place of the hearing shall be published in the legal organ in which the county's advertisements appear in Dawson County once a week for two consecutive weeks prior to the hearing.
(c) A notice of lis pendens shall be filed in the office of the Clerk of Superior Court in Dawson County at the time of filing the complaint in the magistrate court. Such notice shall have the same force and effect as other lis pendens notices provided by law.
(d) Orders and other filings made subsequent to service of the initial complaint shall be served in the manner provided in this section on any interested party who answers the complaint or appears at the hearing. Any interested party who fails to answer or appear at the hearing shall be deemed to have waived all further notice in the proceedings.
(Ord. of 12-1-2022(1)) Sec. 48-7. Order of the court.
If, after notice and hearing as provided above, the magistrate court determines that the dwelling, building, structure, or property under consideration is unfit for human habitation or is unfit for its current commercial, industrial, or business use; or is vacant, and being used in connection with the commission of drug crimes; or constitutes an endangerment to the public health or safety as a result of unsanitary or unsafe conditions, the court shall issue an order that states in writing its findings of fact in support of such determination and shall issue and cause to be served upon the interested parties that have answered the complaint or appeared at the hearing, an order as follows:
(a) If the repair, alteration, or improvement of the said dwelling, building, structure, or property can be made at a reasonable cost in relation to the present value of the dwelling, building, structure, or property requiring the owner within the time specified in the order, to repair, alter or improve such dwelling, building, structure, or property so as to bring it into full compliance with the applicable codes relevant to the cited violation, and, if applicable, to secure the structure so that it cannot be used in connection with the commission of drug crimes; or
(b) If the repair, alteration or improvement of the said dwelling, building, structure, or property cannot be made at a reasonable cost in relation to the present value of the dwelling, building, structure, or property requiring the owner, within the time specified in the order, to demolish and remove such dwelling, building or structure and all debris from the property.
For purposes of this section, the court shall make its determination of "reasonable cost in relation to the present value of the dwelling, building, structure or property" without consideration of the value of the land on which the structure is situated; provided, however, that costs of the preparation necessary to repair, alter, or improve a structure may be considered. Income and financial status of the owner shall not be a factor in the court's determination. The present value of the structure and the costs of repair, alteration, or improvement may be established by affidavits of real estate appraisers with a Georgia Appraiser classification as provided in O.C.G.A. Title 43, Chapter 39A, qualified building contractors, or qualified building inspectors without actual testimony presented. Costs of repair, alternation, or improvement of the structure shall be the costs necessary to bring the structure into compliance with the applicable codes relevant to the cited violations in force in Dawson County.
(Ord. of 12-1-2022(1)) Sec. 48-8. Failure to comply with order of the court.
If the owner fails to comply with an order of the court to repair, alter, improve, remove, close, or demolish the dwelling, building, structure, or property, the marshal's office may cause such dwelling, building, structure, or property to be repaired, altered, or improved or to be vacated and closed or demolished. Such abatement action shall commence within 270 days after the expiration of time specified in the order for abatement by the owner. Any time during which such action is prohibited by a court order issued pursuant to O.C.G.A. § 41-2-13 or any other equitable relief granted by a court of competent jurisdiction shall not be counted toward the 270 days in which such abatement action must commence. The marshal's office shall cause to be posted on the main entrance of the dwelling, building, structure, or property a placard with the following words: "This building is unfit for human habitation or commercial, industrial, or business use and does not comply with the applicable codes or has been ordered secured to prevent its use in connection with drug crimes or constitutes an endangerment to public health or safety as a result of unsanitary or unsafe conditions. The use or occupation of this dwelling, building or structure is prohibited and unlawful."
(Ord. of 12-1-2022(1)) Sec. 48-9. Salvage of reusable materials.
If the marshal's office has the structure demolished, reasonable effort shall be made to salvage reusable materials for credit against the cost of demolition. The proceeds of any money shall be used or applied against the cost of the demolition and removal of the structure, and proper records shall be kept showing application of sales proceeds. Any such sale of salvaged materials may be made without the necessity of public advertisement and bid, according to O.C.G.A. § 41-2-9(a)(6). The marshal's office and board of commissioners are relieved of any and all liability resulting from, or occasioned by, the sale of any such salvaged materials, including, without limitation, defects in such salvaged materials consistent with O.C.G.A. § 41-2-9(a)(6).
(Ord. of 12-1-2022(1)) Sec. 48-10. Lien on property.
(a) The cost of repairing, altering, improving, removing, closing or demolishing the dwelling, building or structure incurred by the marshal's office in accordance with exercising his/her authority as described in this article, including all court costs, appraisal fees, administrative costs incurred by the Dawson County Tax Commissioner, and all other costs necessarily associated with the abatement action, including restoration to grade of the real property after demolition, shall be a lien against the real property upon which such cost was incurred. Said lien shall attach to the real property upon the filing of a certified copy of the order requiring repair, closure or demolition in the Office of the Clerk of Superior Court of Dawson County and shall relate back to the date of the filing of the lis pendens notice required in this article. The Clerk of Superior Court shall record and index such certified copy of the order in the deed records of the county and enter the lien on the general execution docket. The lien shall be superior to all other liens on the property, except liens for taxes to which the lien shall be inferior, and shall continue in force until paid.
(b) Upon final determination of costs, fees and expenses incurred in accordance with this section, the marshal's office shall transmit to the Dawson County Tax Commissioner a statement of the total amount due and secured by said lien, together with copies of all notices provided to interested parties. The statement of the marshal's office shall be transmitted within 90 days of completion of the repairs, demolition or closure. It shall be the duty of the county tax commissioner to collect the amount of the lien using all methods available for collecting real property ad valorem taxes, including, specifically, O.C.G.A. Title 48, Chapter 4; provided, however, that the limitation of O.C.G.A. § 48-4-78, which requires 12 months of delinquency before commencing a tax foreclosure, shall not apply. The county tax commissioner shall remit the amount collected to the Dawson County Board of Commissioners.
(c) Enforcement of liens pursuant to this section may be initiated at any time following receipt by the Dawson County Tax Commissioner of the final determination of costs. The unpaid lien amount shall bear interest and penalties from and after the date of final determination of costs in the same amount as applicable to interest and penalties on unpaid real property ad valorem taxes. An enforcement proceeding pursuant to O.C.G.A. § 48-4-78 for delinquent ad valorem taxes may include all amounts due under this section.
(d) The redemption amount in any enforcement proceeding pursuant to this article shall be the full amount of the costs as finally determined in accordance with this section, together with interest, penalties, and costs incurred by the county and the Dawson County Tax Commissioner in the enforcement of such lien. Redemption of property from the lien may be in accordance with O.C.G.A.
§§ 48-4-80 and 48-4-81.
(e) This section is intended to adopt and be consistent with O.C.G.A. § 41-2-9(b).
(Ord. of 12-1-2022(1)) Sec. 48-11. Waiver of lien.
The county may waive and release any lien imposed on property if the owner of such property enters into a contract with the county agreeing to a timetable for rehabilitation of the real property or the dwelling, building or structure on the property and demonstrating the financial means to accomplish such rehabilitation.
(Ord. of 12-1-2022(1)) Sec. 48-12. Appellate review; injunction.
Review of the magistrate court's order requiring the repair, alteration, improvement, or demolition of a dwelling, building or structure shall be by direct appeal to the Dawson County Superior Court according to O.C.G.A. § 5-3-29.
Any person affected by an order issued by the public officer may petition to the Dawson County Superior Court for an injunction restraining the public officer from carrying out the provisions of the order, and the court may, upon such petition, issue a temporary injunction restraining the public officer pending the final disposition of the cause; provided, however, that such person shall present such petition to the court within 15 days of the posting and service of the order of the public officer.
De novo hearings shall be held by the court on petitions within 20 days. The court shall hear and determine the issues raised and shall enter such final order or decree as law and justice may require;
provided, however, that it shall not be necessary to file bond in any amount before obtaining a temporary injunction under this section.
(Ord. of 12-1-2022(1)) Sec. 48-13. Summary proceedings.
Nothing in this article shall be construed to impair or limit in any way the power of the county to define and declare nuisances and to cause their removal or abatement by summary proceedings or otherwise when, upon a majority vote of the Dawson County Board of Commissioners, the county determines that a nuisance exists and the repair, alteration, improvement, removal, closing or demolition will not exceed $1,000.00.
(Ord. of 12-1-2022(1)) Chapters 49
RESERVED
Chapter 50
TRAFFIC AND VEHICLES*
Sec. 50-1. Truck traffic.
(a) As used in this section, the term "motor truck" means any motor vehicle having a gross weight of 18,000 pounds or over that is designed and used for the transportation of merchandise or freight.
(b) No motor truck shall be permitted to travel through the portion of Landrum Road shown on "Exhibit A."
(c) Penalty. Any person who violates the provisions of this section shall be amenable to the magistrate court of Dawson County for prosecution of such offense. The maximum fine for any violation shall be $1,000.00.
(Ord. of 7-3-2003, §§ 1—3) Chapters 51—100
RESERVED
Subpart B
LAND DEVELOPMENT ORDINANCES
Chapter 101
GENERAL AND ADMINISTRATIVE PROVISIONS
ARTICLE I. IN GENERAL
Sec. 101-1. Enforcement of certain ordinances.
(a) Enforcement.
(1) Enforcement of Dawson County ordinances including, but not limited to, Land Use Resolution, Sign Resolution, Georgia 400 Corridor Regulations, Subdivision Regulations and others, shall be the responsibility of the Dawson County Board of Commissioners, the environmental education and enforcement officer, zoning code enforcement officer or his/her designee, and/or the Dawson County Sheriff's Office.
(2) Any person or persons authorized to enforce this subpart shall be empowered to enter any property, upon reasonable cause, at reasonable or necessary times in order to properly inspect for ordinance violations, subject to the condition that entry onto private property for inspection is permitted only if the alleged ordinance violation is visible from a public road or right-of-way or the enforcement officer(s) has/have received a valid complaint alleging an ordinance violation, or if a judge's order, based upon probable cause that a threat to the health and safety of the community and/or the environment has occurred or is about to occur authorizes entry onto private property.
(b) Conflicting resolutions or ordinances.
(1) All conflicting resolutions, ordinances or sections of resolutions, or resolutions in conflict with this chapter shall be held to the higher standard.
(2) The ordinance from which this chapter is derived shall take effect after passage by the Dawson County Board of Commissioners, and shall be enforced from and after such date, the public health and welfare demanding it such enforcement.
(Ord. of 10-28-2002, §§ I, III) Secs. 101-2—101-22. Reserved.
ARTICLE II. PLANNING COMMISSION
Sec. 101-23. Established.
The Dawson County Commission hereby establishes the Dawson County Planning Commission, to be governed by the provisions of this article.
(Res. of 6-17-1997, intro.)
Sec. 101-24. Membership; requirements; vacancy; term; removal; expenses.
(a) Membership.
(1) The Dawson County Planning Commission shall consist of five members. Each member of the Dawson County Board of Commissioners shall nominate one person to be a member of the Dawson County Planning Commission and one person to be an alternate to the Dawson County Planning Commission in accord with the following procedure:
a. The chairman of the Dawson County Board of Commissioners (chairman) shall nominate one member at large to the planning commission and one alternate;
b. The commissioner from district 1 shall nominate one member and one alternate from district 1;
c. The commissioner from district 2 shall nominate one member and one alternate from district 2;
d. The commissioner from district 3 shall nominate one member and one alternate from district 3; and
e. The commissioner from district 4 shall nominate one member and one alternate from district 4.
(2) The chairman and each district commissioner shall present the nomination to the entire board of commissioners for a vote before a term begins so that the person appointed may attend training and/or seminars. If the board of commissioners fails to approve a nomination, then the chairman or district commissioner who submitted the nomination shall have 30 days to submit another nomination.
(3) If a district commissioner:
a. Fails to submit a nomination within 90 days of the expiration of the term of a planning commission member or alternate member that the district commissioner nominates in accord with the terms hereof; or
b. Fails to submit a nomination within 30 days of the vote denying a nomination;
then the chairman of the board of commissioners shall submit a nomination to the board of commissioners for the member and/or alternate position to be filled, and the residency requirements for nominations by a district commissioner shall apply.
(b) Residency requirements. The member of the planning commission and the alternate appointed by the chairman of the Dawson County Board of Commissioners may reside anywhere within Dawson County. The members and alternates of the planning commission appointed by the district commissioners shall reside within the commission district of the commissioner who nominated or who should have nominated in accord with the terms of this article, unless otherwise approved by the board of commissioners. In no event shall more than two planning commission members or alternates reside within the same commission district. Each member and alternate appointed to the planning commission shall have resided within the commission district designated in accord with the terms hereof for at least 12 months before the date of such appointment, unless otherwise approved by the board of commissioners.
(c) Vacancy—Planning commission member. A vacancy of a planning commission member shall be filled for the unexpired term by the alternate member appointed by the board of commissioners in accord with the terms hereof.
(d) Vacancy—Alternate member. A vacancy of an alternate member to the planning commission shall be filled for the unexpired term by appointment by the board of commissioners.
(e) Terms.
(1) Beginning with terms to commence on January 1, 2025, the term of a member of the planning commission shall run concurrently with the term of the respective member of the board of commissioners who nominated that member.
(2) The term of a member of the planning commission shall expire concurrently with the term of the member of the board of commissioners who nominated that member.
(3) A member of the planning commission is not automatically renominated if the member of the board of commissioners who nominated that member is reelected for an additional term.
Members of the planning commission must be renominated by a member of the board of commissioners in order to serve an additional term.
(4) If a member of the board of commissioners vacates his/her seat for any reason prior to the expiration of his/her term, the term of the member of the planning commission nominated by that vacating commissioner shall expire at the time that the vacancy is filled by a new member of the board of commissioners. The new member of the board of commissioners shall nominate a member of the planning commission upon filling the vacancy and that planning commission member's term shall run concurrently with that commissioner's term consistent with paragraph (e)(1). If, however, a member of the board of commissioners vacates his/her position prior to the expiration of his/her term, but the vacancy is not filled, the respective planning commission member will continue to serve until the conclusion of the board of commissioners member's intended term.
(f) Removal. The board of commissioners shall have the authority to remove any member of the planning commission or any alternate for cause on written charges after a public hearing before the board of commissioners that may be waived by the member or alternate so charged.
(g) Reimbursement, actual expenses. Members and alternates of the planning commission may be reimbursed for actual expenses incurred while fulfilling duties of the planning commission.
(Res. of 6-17-1997, § A; Ord. of 8-16-1999, §§ III, IV; Ord. of 5-7-2009, §§ I—VII; Ord. of 8-6-2020(2);
Ord. of 3-6-2025(1), § I) Sec. 101-25. Chairman and vice-chairman.
The Dawson County Planning Commission shall elect its chairman and vice-chairman from among its members. The term of the chairman and vice-chairman shall be for one year with eligibility for reelection.
(Ord. of 5-7-2009, § VIII) Sec. 101-26. Secretary-treasurer.
The planning commission shall appoint a secretary-treasurer who may be a member of the commission or an employee of the county.
(Res. of 6-17-1997, § B) Sec. 101-27. Meetings.
The regular meetings of planning commission shall be on the third Tuesday of each month beginning at 6:00 p.m. at a meeting place properly designated by the planning commission.
(Res. of 6-17-1997, § D; Ord. of 5-7-2009, § IX) Sec. 101-28. Rules of procedure.
Robert's Rules of Order shall govern the proceedings of all meetings of the planning commission, unless any such rule conflicts with applicable federal, state, or county statute, law, regulation, or ordinance.
(Res. of 6-17-1997, § E; Ord. of 5-7-2009, § IX) Sec. 101-29. Limitation of debate.
(a) At any public hearing, any person(s) speaking for or against an item that is before the planning commission for consideration shall be limited to three minutes for that particular item with a maximum of ten minutes per side if several speakers are involved, unless such time limitations are waived or amended by the planning commission.
(b) No part of the time allotted to a speaker may be assigned to any other person, whether in favor of or against the item being considered.
(c) The petitioner of the item may be allowed whatever time the chairman considers necessary to outline the reasons for the request being discussed, answer questions raised, and to rebut objections.
(Res. of 6-17-1997, § F; Ord. of 8-16-1999, §§ VI, VII) Sec. 101-30. Workshops.
Discussions at workshops or organizational meetings of the commission shall be limited to members of the commission, although the meeting shall be open to the public.
(Res. of 6-17-1997, § G) Sec. 101-31. Meetings are public.
(a) All meetings of the planning commission shall be open to the public. All records of the planning commission shall be public records.
(b) At least 24 hours public notice of called meetings must be posted at the courthouse and local newspapers notified of the pending meeting.
(c) At least 15, but not more than 45, days notice must be advertised in a newspaper of general circulation within the territorial boundaries of Dawson County before any regular meeting.
(Res. of 6-17-1997, § H) Sec. 101-32. Quorum.
A quorum at any meeting shall consist of three members.
(Res. of 6-17-1997, § I; Ord. of 8-16-1999, § VIII) Sec. 101-33. Order of business.
The order of business at all regular meetings shall be:
(1) Invocation;
(2) Roll call;
(3) Approval of the minutes of the previous meeting;
(4) Unfinished business;
(5) New business;
(6) Adjournment.
(Res. of 6-17-1997, § J) Sec. 101-34. Amendments.
These bylaws may be amended by the affirmative vote of four members of the board of commissioners.
(Res. of 6-17-1997, § K; Ord. of 8-16-1999, § IX) Secs. 101-35—101-56. Reserved.
ARTICLE III. DEVELOPMENT IMPACT FEES*
Sec. 101-57. Short title, authority, and applicability.
(a) Short title. This article shall be known and may be cited as the Development Impact Fee Ordinance of Dawson County, Georgia, or, for brevity, the impact fee ordinance.
(b) Authority. This article has been prepared and adopted by the Board of Commissioners of Dawson County, Georgia, in accordance with the authority provided by Article 9, Section 2, Paragraph 3 of the Constitution of the State of Georgia, the Georgia Development Impact Fee Act O.C.G.A. § 36-71-1 et seq., as amended and such other laws as may apply to the provision of public facilities and the power to charge fees for such facilities.
(c) Applicability.
(1) The provisions of this article shall not be construed to limit the power of the county, to use any other legal methods or powers otherwise available for accomplishing the purposes set forth herein either in substitution of or in conjunction with this article.
(2) This article shall apply to all areas under the regulatory control and authority of the county and such other areas as may be included by intergovernmental agreement.
(Ord. of 7-20-2006, § 1; Ord. of. 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-58. Findings, purpose, and intent.
(a) Findings. The Board of Commissioners of Dawson County, Georgia, finds and declares:
(1) That an equitable program for planning and financing public facilities to serve new growth and development is necessary in order to promote and accommodate orderly growth and development and to protect the public health, safety, and general welfare of the citizens of the county;
(2) That certain public facilities as herein defined have been and must be further expanded if new growth and development is to be accommodated at the same level of service available to existing development; and
(3) That it is fair and equitable that new growth and development shall bear a proportionate share of the cost of such public facilities necessary to serve new growth and development.
(b) Purpose.
(1) The purpose of this article is to impose impact fees as hereinafter set forth for certain public facilities as hereinafter defined.
(2) It is also the purpose of this article to ensure that adequate public facilities are available to serve new growth and development in the county and to ensure that new growth and development bears a proportionate share of the cost of new public facilities needed to serve them.
(c) Intent. This article is intended to implement and be consistent with the Dawson County Comprehensive Plan, as it may be adopted or amended in accordance with the Georgia Comprehensive Planning Act (O.C.G.A. § 50-8-1 et seq.) and the applicable Minimum Standards and Procedures for Local Comprehensive Planning and the Development Impact Fee Compliance Requirements both as adopted by the Georgia Board of Community Affairs and amended from time to time.
(Ord. of 7-20-2006, § 2; Ord. of. 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-59. Rules of construction and definitions.
(a) The provisions of this article shall be construed to effectively carry out its purpose in the interest of the public health, safety, and general welfare of the citizens of Dawson County.
(b) Rules of construction. Unless otherwise stated in this article, the following rules of construction shall apply to the text of this article:
(1) In the case of any difference of meaning or implication between words or phrases as used in this article and as used in other codes, regulations, or laws of Dawson County, such difference shall not affect the meaning or implication of such words or phrases as used in this article.
(2) In the case of any difference of meaning or implication between the text of this article and any caption illustration, summary table, or illustrative table, the text shall control.
(3) The word "shall" is always mandatory and not discretionary; the word "may" is permissive.
(4) Words used in the present tense shall include the future unless the context clearly indicates the contrary.
(5) The word "person" includes an individual, a corporation, a partnership, an incorporated association, or any other legal or similar entity.
(6) The conjunction "and" indicates that all the connected terms, conditions, provisions, or events shall apply.
(7) The conjunction "or" indicates that the connected items, conditions, provisions, or events may apply singly or in any combination.
(8) The use of "either... or" indicates that the connected items, conditions, provisions, or events shall apply singly and not in combination.
(9) The word "includes" or "including" shall not limit a term to the specific example but is intended to extend its meaning to all other instances or circumstances of like kind or character.
(10) The article, section, and paragraph headings and enumerations used in this article are included solely for convenience and shall not affect the interpretation of this article.
(c) Definitions. As used in this article, the following terms shall have the meanings set forth below:
Administrator means the County Manager of Dawson County, Georgia, or the county manager's designee, who is hereby charged with the implementation and enforcement of this article.
Annual CIE update means the annual update to the capital improvements element that includes an annual financial report for the last completed fiscal year and a schedule of improvements (i.e., community work program or short-term work program) for the current year plus the next four years, in accordance with the development impact fee compliance requirements of the Georgia Department of Community Affairs.
Board of commissioners means the Board of Commissioners of Dawson County, Georgia.
Building permit is the permit required for new construction, completion of construction, or an interior finish pursuant to the applicable building code. As used herein, the term shall not include permits required for remodeling, rehabilitation, or other improvements to an existing structure, provided there is no increase in the demand placed on those public facilities as defined herein.
Capital improvement means an improvement with a useful life of ten years or more, by new construction or other action, which increases the service capacity of a public facility.
Capital improvements element means that portion of the Dawson County Comprehensive Plan that sets out projected needs for system improvements during the planning horizon established therein, which provides a schedule that will meet the anticipated need for system improvements, and which provides a description of anticipated funding sources for each required improvement, as most recently adopted or amended by the board of commissioners.
Change of use in land. Any change in the occupancy classification of a building or structure or change in the purpose of, or a change in the level of activity within a building or structure, or on land.
Commencement of construction for private development means the initiation of physical construction activities as authorized by a development or building permit and leading to completion of a foundation inspection or other initial inspection and approval by a public official charged with such duties; and for public projects, means expenditure or encumbrance of any funds whether they be development impact fee funds or not, for a public facilities project or advertising of bids to undertake a public facilities project.
Community work program means the component of the comprehensive plan that identifies the specific activities the county plans to undertake during the five years following adoption of the plan.
Completion of construction means the issuance of the final certificate of occupancy by a county official charged with such duties. The date of completion is the date on which such a certificate is issued.
Comprehensive plan means the Dawson County plan or planning elements as adopted or amended in accord with the Georgia Comprehensive Planning Act (O.C.G.A. § 50-8-1 et seq.)
and the applicable minimum standards and procedures for local comprehensive planning as adopted by the Georgia Board of Community Affairs.
County means Dawson County, Georgia, a legal subdivision of the State of Georgia, and also refers to the Board of Commissioners of Dawson County, Georgia, or the appropriate county official appointed by the board of commissioners, whenever official action is taken or required.
Day means a calendar day unless otherwise specifically identified as a work day or other designation when used in the text.
Developer means any person or legal entity undertaking development.
Development means any action which creates additional demand on or need for public facilities, as defined herein, and includes any construction or expansion of a building, structure, or use; and any change in use of land, a building, or a structure.
Development approval means any written authorization, such as issuance of a building permit, land disturbance permit, or other approval for grading or site development, or other forms of official action required by local law or regulation prior to the commencement of construction.
Development impact fee means the payment of money imposed upon and paid by new development as a condition of development approval as its proportionate share of the cost of system improvements needed to serve new growth and development.
Encumber means to legally obligate by contract or otherwise commit to use by appropriation or other official act of the county.
Excess capacity means that portion of the capacity of a public facility or system of public facilities which is beyond that necessary to provide adequate service to existing development at the adopted level of service standard.
Fee payor means that person or entity who pays a development impact fee or his or her legal successor in interest when the right or entitlement to any refund of previously paid development impact fees which is required by this article has been expressly transferred or assigned to the successor in interest. In the absence of an express transfer or assignment of the right or entitlement to any refund of previously paid development impact fees, the right or entitlement shall be deemed "not to run with the land."
Individual assessment means the engineering, financial, or economic documentation prepared by a fee payor or applicant to allow individual determination of a development impact fee other than by use of the applicable fee schedule.
Individual assessment determination means a finding by the administrator that an individual assessment study does or does not meet the requirements for such a study as established by this article or if the requirements are met, the fee calculated therefrom.
Level of service means a measure of the relationship between service capacity and service demand for specified public facilities as established by the county, in terms of demand to capacity ratios, the comfort and convenience of use or service of such public facilities, or both.
Present value means the current value of past, present, or future payments, contributions, or dedications of goods, services, materials, construction, or money, as calculated using accepted methods of financial analysis for the determination of net present value.
Project means a single improvement or set of interrelated improvements undertaken together within a finite time period at a specific location. With regard to land development, a project may be identified as those construction activities authorized collectively by a single building permit or other development approval or for an interrelated collection of buildings and common public facilities, such as a residential subdivision or an office park.
Project improvements means site-specific improvements or facilities planned, designed, or built to provide service for a specific development project and that are necessary for the use and convenience of the occupants or users of that project only and that are not "system" improvements. The character of the improvement shall control a determination of whether an improvement is a "project" improvement or a "system" improvement and the physical location of the improvement on-site or off-site shall not be considered determinative of whether an improvement is a "project" improvement or a "system" improvement. A project improvement may provide no more than incidental service or facility capacity to persons other than users or occupants of the particular project they serve. No improvement or facility included in a plan for public facilities and approved for public funding by the county, shall be considered a project improvement.
Property owner means that person or entity that holds legal title to property.
Proportionate share means that portion of the cost of system improvements that is reasonably and fairly related to the service demands and needs of a project.
Public facilities (and public facility categories) means:
(1) Parks, open space, and recreation areas, and related facilities;
(2) Public safety facilities, including sheriff, and inmate housing;
(3) Fire, emergency medical, and rescue facilities;
(4) Libraries and related facilities; and
(5) Roads, streets, and bridges, including rights-of-way, traffic signals, landscaping, and any local components of state or federal highways.
Regional commission means the Georgia Mountains Regional Commission as designated by the Georgia Department of Community Affairs.
Service area means a geographically defined area as designated in the capital improvements element of the comprehensive plan in which a defined set of public facilities provide or are proposed to provide service to existing or future development.
System improvement costs mean costs incurred to provide public facilities capacity to serve new growth and development, including the costs of planning, design, engineering, construction, land acquisition, and land improvement for the construction or reconstruction of facility improvements or expansion. System improvement costs include the construction, contract price, surveying, and engineering fees, related land acquisition costs, including land purchases, court awards, and costs, attorneys' fees and expert witness fees; and expenses incurred for qualified staff or any qualified engineer, planner, architect, landscape architect, or financial consultant for preparing or updating the capital improvements element; and administrative costs of up to three percent of the total of all other system improvement costs. Projected interest charges and other finance costs may be included if the impact fees are to be used for the payment of principal and interest on bonds, notes, or other financial obligations issued to finance system improvements. System improvement costs do not include routine and periodic maintenance expenditures, personnel training, and other operating costs.
System improvements mean capital improvements that are public facilities and are designed to provide service to more than one project or the community at large, in contrast to "project" improvements.
Unit of development means the standard governmental measure of land development activity for a specific type of land use upon which the rate of demand for public service and facilities is based, such as a dwelling unit, square foot of nonresidential floor area, motel room, etc.
Unused or excess impact fee means any individual impact fee payment from which no amount of money or only a portion thereof has been encumbered or expended according to the requirements of this article.
(Ord. of 7-20-2006, § 3; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-60. Imposition of development impact fees.
(a) When required; amount. Any person who, after March 1, 2025 engages in development shall pay a development impact fee in the manner and amount set forth in this article.
(b) Construction not subject to impact fees. The following projects and construction activities do not constitute "development" as defined in this article and are therefore not subject to the imposition of impact fees:
(1) Rebuilding no more than the same number of units of development as defined in this article that were removed by demolition or destroyed by fire or other catastrophe on the same lot or property by obtaining a county building permit within one year or less of date of demolition or destruction. After one year from the date of demolition or destruction, if a county building permit has not been issued for the project to rebuild or replace a structure on the property, impact fees shall apply.
(2) Remodeling or repairing a structure that does not result in an increase in the number of units of development.
(3) Replacing a residential housing unit with another housing unit on the same lot or property by obtaining a county building permit within one year or less of date of demolition or destruction.
After one year from the date of demolition or destruction, if a county building permit has not been issued for the project to replace a residence on the property, impact fees shall apply.
(4) Placing or replacing a manufactured home in a manufactured home park on a prepared manufactured home pad in existence and operation prior to the effective date of this article.
(5) Placing a temporary construction office or temporary sales office on a lot during the period of construction or build-out of a development project.
(6) Constructing an addition to or expansion of a residential housing unit that does not increase the number of housing units.
(7) Adding uses that are typically accessory to residential uses and intended for the personal use of the residents, such as a deck or patio, satellite antenna, pet enclosure, or private recreational facilities such as a swimming pool.
(c) Nonconforming projects.
(1) Notwithstanding any other provision of this article, any project for which a valid building permit had been issued prior to the effective date of an amendment to this article, shall not be subject to additional development impact fees so long as the project remains valid and construction commenced and is pursued according to the terms of such building permit.
(2) Any building for which a valid and complete application for a building permit has been received prior to the effective date of an amendment to this article may proceed without payment of additional impact fees otherwise imposed by this article, provided that:
a. All fees and development impact fees in effect prior to the effective date of this article shall be or have been paid in full; and
b. Said construction shall be commenced, pursued, and completed within the time established by the building permit or within 180 days, whichever is later.
(3) Work for which a valid permit has been issued shall continue with grandfathered status until the permit expires, at which time the renewal of the permit or the issuance of a new permit for the same work or additional work on the same property shall require payment of the applicable impact fee. Such fee shall be the amount of the increase over the amount previously paid, if any.
(d) Method of calculation.
(1) Any development impact fee imposed pursuant to this article shall not exceed a project's proportionate share of the cost of system improvements, shall be calculated on the basis of the establishment of service areas, and shall be calculated on the basis of levels of service for public facilities that are the same for existing development as for new growth and development, as established in the capital improvements element of the comprehensive plan.
(2) Notwithstanding anything to the contrary in this article, the calculation of impact fees shall be net of credits for the present value of ad valorem taxes or other revenues as established in the capital improvements element of the comprehensive plan and which:
a. Are reasonably expected to be generated by new growth and development; and
b. Are reasonably expected on the basis of historical funding patterns to be made available to pay for system improvements of the same category and in the same service area for which an impact fee is imposed.
(3) The method of calculating impact fees for public facilities under this article shall be maintained for public inspection as a part of the official records of the county, and may be amended from time to time by official act of the board of commissioners.
(4) In addition to the cost of new or expanded system improvements needed to be built to serve new development, the cost basis of a development impact fee may also include the proportionate cost of existing system improvements to the extent that such public facilities have excess service capacity and new development will be served by such facilities as established in the capital improvements element.
(5) Development impact fees shall be based on actual system improvement costs or reasonable estimates of such costs as set forth in the capital improvements element.
(Ord. of 7-20-2006, § 4; Ord. of 5-21-2009(1), § I; Ord. of 8-16-2018; Ord. of 1-16-2025(2); Ord. of 9-18-2025(1), Exh. A, § 9)
Sec. 101-61. Fee assessment and payment.
(a) Fee schedule.
(1) Payment of a development impact fee pursuant to the fee schedule attached hereto and incorporated herein as attachment A shall constitute full and complete payment of the project's proportionate share of system improvements as individually levied by the county and shall be deemed to be in compliance with the requirements of this article.
(2) When a land development activity for which an application for a building permit has been made includes two or more buildings, structures, or other land uses in any combination, including two or more uses within a building or structure, the total development impact fee shall be the sum of the fees for each and every building, structure, or use, including each and every use within a building or structure.
(3) In the event that an applicant contends that the land use category of the proposed project is not shown on the fee schedule or fits within a different category, then:
a. The administrator in his or her sole discretion shall make a determination as to the appropriate land use designation and the appropriate development impact fee.
b. In making such determination, the administrator may require additional information from the applicant to form a logical fee determination relative to the impact fees shown on the adopted fee schedule.
c. If a land use designation is not in a category contained in this article, then an appropriate new category may be added by the administrator and an appropriate fee established under the county's current impact fee methodology, subject to annual confirmation by the board of commissioners.
d. Appeals from the decision of the administrator shall be made to the board of commissioners in accordance with the administrative appeals section of this article.
(b) Timing of assessment and payment.
(1) Development impact fees shall be assessed at the time of application for a building permit.
(2) All development impact fees shall be collected by the time of issuance of a building permit, and as a prerequisite to issuance of a certificate of occupancy for the building.
(3) For projects not involving the issuance of a building permit, all development impact fees shall be collected at the time of approval of the development permit or such other authorization to commence construction or to commence use of a property.
(4) If the final use of a building cannot be determined at the time of the initial building permit, the administrator shall have the authority to assess a development impact fee based on the most likely use of the building and shall adjust the fee in accordance with the actual use prior to issuance of an interior finishes permit or approval of a certificate of occupancy. An adjustment may result in a refund to the fee payor or payment of the marginal increase of the adjusted fee over the amount already paid.
(5) Notwithstanding any other provision of this article, any future change in demand for public facilities in excess of the average demand anticipated at the time of issuance of the building permit shall be assessed such additional fee as would otherwise have been due. The feepayer shall furnish all documentation the impact fee administrator requires to determine the previous use. Future changes in demand may result from a change in the land use category of the occupant of the building or property, the expansion of a building, or the expansion of a land use on a property that results in an increase in the units of development (as defined herein), or the subsequent discovery of facts unknown or misrepresented at the time of issuance of the building permit. Should the proposed change to the building or use as described above result in a net decrease in demand for public facilities, no refunds or credits for impact fees previously paid shall be made.
(c) Individual assessment determinations. Individual assessments of development impact fees may be established as follows:
(1) At their option, an applicant for development approval may petition the administrator for an individual assessment determination of development impact fees due for their project in lieu of the fee established on the fee schedule attached hereto and incorporated herein as attachment A.
(2) In the event that an applicant elects an individual assessment, the applicant shall submit an individual assessment study. Each assessment study shall:
a. Be based on relevant and credible information from an accepted standard source of engineering or planning data; or
b. Be based on actual, relevant, and credible studies or surveys of facility demand conducted in Dawson County or its region, carried out by qualified engineers or planners pursuant to an accepted methodology; and
c. Provide any other written specifications as may be reasonably required by the administrator to substantiate the individual assessment determination.
(3) The administrator in his or her sole discretion shall determine whether the content of an individual assessment study satisfies the requirements of this article. A negative determination by the administrator may be appealed to the board of commissioners in accordance with the administrative appeals section of this article.
(4) Any fee approved as an individual assessment determination shall have standing for 180 days following the date of approval. Payment of such an approved individual assessment determination shall constitute full and complete payment of the project's proportionate share of system improvement as individually levied by the county, and shall be deemed to be in compliance with the requirements of this article.
(d) Fee certification. Upon application to the administrator, a developer or property owner may receive a certification of the development impact fee schedule attached hereto and incorporated herein as attachment A or a certified fee for a particular project, as applicable. Such certified schedule or fee shall establish the development impact fee due for a period of 180 days from the date of certification, even if new or revised rate schedules are adopted in the interim.
(1) The administrator shall provide an applicant with a written certification of the impact fee schedule or individual fee determination for a particular project, as applicable, within five working days after the administrator's receipt of a completed application.
(2) The fee certification shall establish the individual fee schedule or individual determination for a particular project for the proposed development activity for the 180-day period immediately following the date of such certification.
(3) Notwithstanding the issuance of any certification of an individual fee determination for a particular project, any additions to the proposed development activity or changes to the land use identified in the original application shall negate any such certification.
(Ord. of 7-20-2006, § 5; Ord. of 5-9-2009(1), § II; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-62. Exemptions.
(a) Economic development exemptions. According to the following provisions, the board of commissioners may waive a percentage of impact fees for particular development projects that create extraordinary economic development and employment growth:
(1) The board of commissioners shall make a finding that the proposed development would create employment growth.
(2) The board of commissioners shall appropriate non-impact fee revenue to pay for the exemption.
(3) The impact fee administrator shall transfer funds into the appropriate impact fee accounts and issue the exemption. The exemption documentation shall include the application for a building permit.
(Ord. of 7-20-2006, § 6; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-63. Deposit and expenditure of fees.
(a) Maintenance of funds.
(1) All development impact fee funds collected for future expenditure on construction or expansion of facilities pursuant to this article shall be maintained in one or more interestbearing accounts until encumbered or expended. Restrictions on the investment of development impact fee funds shall be the same that apply to investment of all such funds.
(2) Separate accounting records shall be maintained for each public facility category of system improvements.
(3) Interest earned on development impact fees shall be considered funds of the account on which it is earned and shall be subject to all restrictions placed on the use of development impact fees under this article. Interest earned each fiscal year shall be distributed among the various funds in proportion to their end-of-year balances.
(b) Expenditures; restrictions.
(1) Expenditures from the impact fee accounts shall be made only for the system improvements in the public facility category for which the development impact fee was assessed and collected.
(2) Expenditures from the impact fee account for a particular public facility category shall be made only for projects listed for that category in the most recently adopted capital improvements element.
a. Such expenditures for a specific project may be based on the amount of the actual cost of the project, but;
b. Such expenditures may not exceed the percentage of impact fee eligibility established for such projects in the capital improvements element;
c. Expenditures for projects not listed in the capital improvements element may be made only after they have been included in the capital improvements element by amendment adopted by the board of commissioners.
(3) Notwithstanding anything contrary in this article, the following shall be considered general revenue of the county and may be expended accordingly:
a. Impact fees collected to recover the present value of excess capacity in existing system improvements;
b. Any portion of an impact fee collected as a requirement for expenditures made by the county for system improvements intended to be funded by such impact fee; and
c. Any portion of the impact fee collected for administration of the impact fee program and such additional amount assessed for repayment of the cost of preparing the capital improvements element (CIE) or required annual CIE update reports to the state.
(c) Annual CIE update.
(1) The administrator shall prepare an annual CIE update to the board of commissioners based on the preceding annual audit describing the amount of any development impact fees collected, encumbered, and used during the preceding fiscal year by the public facility category.
(2) Such CIE update shall be prepared following guidelines of the Georgia Department of Community Affairs (DCA) and submitted to the Georgia Mountains Regional Commission in conjunction with the annual update of the community work program of the comprehensive plan, in accordance with section 101-67(b) of this article.
(Ord. of 7-20-2006, § 7; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-64. Credits.
When eligible, fee payors shall be entitled to a credit against impact fees otherwise due and owing under the circumstances and in the manner set forth in this section.
(1) Credits; restrictions.
a. Except as provided in subsection (1)b of this section, no credit shall be given for construction, contribution, or dedication of any system improvement or funds for system improvements made before the effective date of this article.
b. If the value of any construction, dedication of land, or contribution of money made by a developer (or his or her predecessor in title or interest) prior to the effective date of this article for system improvements that are included for impact fee funding in the most recently adopted capital improvements element is greater than the impact fee that would otherwise be paid for the project, then the developer shall be entitled to a credit for such excess construction, dedication, or funding. Notwithstanding anything to the contrary in this article, any credit due under this section shall not constitute a liability of the county, and shall accrue to the developer to the extent of impact fees assessed for new development for the same category of system improvements.
c. In no event shall credit be given for project improvements or for system improvements not included for impact fee funding the most recently adopted capital improvements element.
(2) Granting of credits.
a. Credit shall be given for the present value of any construction of improvements, contribution or dedication of land, or payment of money by a developer or his or her predecessor in title or interest for system improvements of the same public facilities category for which a development impact fee is imposed, provided that:
1. The system improvement is included for impact fee funding in the most recently adopted capital improvements element;
2. The amount of the credit does not exceed the portion of the system improvement's cost that is eligible for impact fee funding, as shown in the capital improvements element; and
3. The board of commissioners shall have explicitly approved said improvement, contribution, dedication, or payment and the value thereof prior to its construction dedication or transfer.
b. The credit allowed pursuant to this section shall not exceed the impact fee due for such system improvement unless a greater credit is authorized under a private agreement executed under the provisions of section 101-66.
(3) Guidelines for credit valuation. Credits under this section shall be valued using the following guidelines:
a. For the construction of any system improvements by a developer or his or her predecessor in title or interest and accepted by the county, the developer must present evidence satisfactory to the administrator of the original cost of the improvement, from which present value may be calculated.
b. For any contribution or dedication of land for system improvements by a developer or his or her predecessor in title or interest and accepted by the county, the original value of the land shall be the same as that attributed to the property by the validated tax appraisal at the time of dedication, from which present value may be calculated.
c. For any contribution of capital equipment that qualifies as a system improvement by a developer or his or her predecessor in title or interest and accepted by the county, the value shall be the original cost to the developer of the capital equipment or the cost that the county would normally pay for such equipment, whichever is less.
d. For any contribution of money for system improvements from a developer or his or her predecessor in title or interest accepted by the county, the original value of the money shall be the same as that at the time of contribution from which present value may be calculated.
e. In making a present value calculation, the discount rate used shall be the net of the interest returned on a State of Georgia, AA rated or better municipal bond, less average annual inflation, or such other discount rate as the board of commissioners in its sole discretion may deem appropriate.
(4) Credits; application.
a. Credits shall be giver only upon written request of the developer to the administrator.
A developer must present written evidence satisfactory to the administrator at or before the time of development impact fee assessment.
b. The administrator in his or her sole discretion shall review all claims for credits and make determinations regarding the allowance of any claimed credit, and the value of any allowed credit.
c. Any credit approved by the administrator shall be acknowledged in writing by the administrator and calculated at the time of impact fee assessment.
d. Credit denials by the administrator may be appealed to the board of commissioners in accordance with section 101-68, administrative appeals.
(5) Credits; abandoned building permits. In the event that an impact fee is paid but the building permit is abandoned, credit shall be given for the impact fee paid against future impact fees for the same parcel of land upon submission of adequate evidence to the administrator that an impact fee was received by the county, the amount paid, and that the building permit was abandoned.
(Ord. of 7-20-2006, § 8; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-65. Refunds.
(a) Eligibility for a refund.
(1) Upon the request of a fee payor regarding a property on which a development impact fee has been paid, the development impact fee shall be refunded if:
a. Capacity is available in the public facilities for which the fee was collected but service is permanently denied; or
b. The development impact fee has not been encumbered or construction has not been commenced within six years after the date the fee was collected.
(2) In determining whether development impact fees have been encumbered, development impact fees shall be considered encumbered on a first-in first-out (FIFO) basis.
(b) Notice of entitlement to a refund. When the right to a refund exists due to a failure to encumber the development impact fees, the administrator shall provide written notice of entitlement to a refund to the fee payor who paid the development impact fee at the address shown on the application for development approval or to a successor in interest who has given adequate notice to the administrator of a legal transfer or assignment of the right to entitlement to a refund and who has provided a mailing address. Such notice shall also be published in a newspaper of general circulation in Dawson County within 30 days after the expiration of the six-year period after the date that the development impact fee was collected, and shall contain a heading notice of entitlement to development impact fee refund. No refund shall be made for a period of 30 days from the date of said publication.
(c) Filing a request for a refund. All requests for refunds shall be made in writing to the administrator within one year of the time the refund becomes payable or within one year of publication of the notice of entitlement to a refund, whichever is later. Failure to claim a refund within said time period shall result in a waiver of all claims to said funds.
(d) Payment of refunds.
(1) All refunds shall be made to the fee payor within 60 days after it is determined by the administrator that a sufficient proof of claim for refund has been made, but no sooner than 30 days after publication of the notice of entitlement to the refund.
(2) A refund shall include a refund of a pro rata share of interest earned on the unused or excess impact fee collected.
(3) In no event shall a fee payor be entitled to a refund for impact fees assessed and paid to recover the cost of excess capacity in existing system improvements, for any portion of an impact fee collected as a repayment for expenditures made by the county, for system improvements intended to be funded by such impact fee, for that portion of the fee payment that was assessed for administration of the impact fee ordinance, or for recovery of the cost of preparation of the capital improvements element.
(Ord. of 7-20-2006, § 9; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-66. Private contractual agreements.
(a) Private agreements: authorized. Nothing in this article shall prohibit the voluntary mutual approval of a private contractual agreement between the county and any developer or property owner or group of developers and property owners in regard to the construction or installation of system improvements and providing for credits or reimbursement for system improvement costs incurred by a developer, including interproject transfers of credits or providing for reimbursement for project improvement costs which are used or shared by more than one development project, provided that:
(1) The system improvements are included for impact fee funding in the most recently adopted capital improvements element; and
(2) The amount of any credit or reimbursement granted shall not exceed the portion of the system improvements cost that is eligible for impact fee funding.
(b) Private agreements; provisions. A private contractual agreement for system improvements may include, but shall not be limited to, provisions that:
(1) Modify the estimates of impact on public facilities according to the methods and provisions concerning the calculation of impact fees, provided that any such agreement shall allow the county to assess additional development impact fees after the completion of construction according to the fee schedule set forth in this article as attachment A.
(2) Permit construction of, dedication of property for, or other in-kind contribution for specific public facilities of the type for which development impact fees would be imposed in lieu of or with a credit against applicable development impact fees.
(3) Permit a schedule and method of payment appropriate to particular and unique circumstances of a proposed project in lieu of the requirements for payment under this article, provided that acceptable security is posted, ensuring payment of the development impact fees. Forms of security that may be acceptable include a cash bond, an irrevocable letter of credit from a bank authorized to do business within the State of Georgia, a surety bond, or a lien or mortgage on lands to be covered by the building permit.
(c) Private agreements; procedure.
(1) Any private agreement proposed by an applicant pursuant to this section shall be submitted to the administrator for review, negotiation, and submission to the board of commissioners.
(2) Any such agreement must be presented to and approved by the board of commissioners prior to the issuance of a building permit.
(3) Any such agreement shall provide for execution by mortgages, lien holders, or contract purchasers in addition to the landowner, and shall require the applicant to submit such agreement to the clerk of the superior court for recording.
(Ord. of 7-20-2006, § 10; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-67. Periodic review and amendments.
(a) Ordinance amendments.
(1) This article may be amended from time to time as deemed appropriate or desirable.
(2) Interim amendments to the impact fee schedule regarding the establishment of new land use categories by the administrator under section 101-61(a)(3) are expressly authorized.
(b) Annual CIE update.
(1) Once each year, the county shall prepare an annual CIE update for submission to the regional commission for regional and state review. The report must include a financial report for the impact fee program based on the latest adopted audit. In addition, the report must update the community work program to maintain, at a minimum, a schedule of system improvements to be undertaken for each of the subsequent five years.
(2) The financial report shall include the beginning balances, the impact fees collected in each public facility category, interest earned on the funds on hand, refunds made, funds expended, and the ending balances in each public facility category (such as parks & recreation, roads, etc.).
(3) The community work program shall be updated by adding a future year and deleting the past year, such that a total of five years is always shown. Impact fee-funded projects that are anticipated to be undertaken are to be listed individually, with the year of implementation the cost of the project the source of funds, and the department responsible for implementation.
(4) The annual CIE update may include changes in funding sources or project costs, or changes in the scheduling of projects. However, new projects not included in the list of impact fee eligible projects contained in the most recently adopted capital improvements element itself cannot be added in the annual CIE update, unless the capital improvements element is amended in accordance with section 101-67(c).
(5) The annual CIE update is to be submitted to the regional commission for regional and state review, in accordance with the development impact fee compliance requirements as adopted by the Georgia Department of Community Affairs.
(c) Capital improvements element amendment.
(1) From time to time, the board of commissioners may determine to amend the capital improvements element. Amendments to the capital improvements element shall be required for any change to the capital improvements element that would:
a. Change the list of system improvement projects by adding, deleting or substantially modifying the projects;
b. Redefine or extend growth projections, land development assumptions, or goals or objectives that would affect system improvements proposed in the capital improvements element;
c. Add new public facility categories for impact fee funding;
d. Change the level of service established for a public facility category; or
e. Make any other revisions needed to keep the capital improvements element up to date.
(2) The capital improvements element amendment shall be prepared in accordance with the development impact fee compliance requirements as adopted by the Georgia Department of Community Affairs and submitted to the Georgia Mountains Regional Commission for regional and state review.
(d) Continuation of validity. The failure of the board of commissioners to undertake a periodic review of the capital improvement element shall result in the continued use and application of the latest adopted development impact fee schedule, service areas, project listings, impact eligibility percentages, and other data upon with the level of service standards and impact fee calculations are based. The failure to periodically review the capital improvements element shall not invalidate this article.
(Ord. of 7-20-2006, § 11; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-68. Administrative appeals.
(a) Eligibility to file an appeal. Only applicants or fee payors who have already been assessed an impact fee by the county or who have already received a written determination of individual assessment refund or credit amount shall be entitled to an appeal.
(b) Appeals process.
(1) The aggrieved applicant or fee payor (hereinafter the "appellant") must file a written appeal with the administrator within 15 days of the decision or receipt of the written determination from which the appeal is taken.
(2) Such written appeal shall constitute an application for relief shall include:
a. The basis for the appeal and the relief sought;
b. The name and address of the appellant;
c. The location of the affected property;
c. A copy of any applicable written decision or determination made by the administrator from which the appeal is taken.
(3) Within 15 days after receipt of the appeal, the administrator shall make a written final decision with respect to the appeal. Such a decision shall be of sufficient content to set forth the basis for the determination.
(4) Appeals from the final decision of the administrator shall be made to the board of commissioners within 30 days of receipt by the appellant of the administrator's decision. Delivery by hand or certified mail to or posting upon the property at the address given by the appellant in the application for relief shall constitute "receipt by the appellant" under this provision.
(5) The board of commissioners shall thereafter hold a hearing on the appeal within 30 days, provided that at least two weeks written notice thereof can be given to the appellant. The board of commissioners shall decide the issue within a reasonable time following the hearing, but in no case more than 30 days following the hearing unless the appellant agrees to an extension to a later date. Any party making an appeal shall have the right to appear at the hearing to present evidence and may be represented by counsel.
(c) Payment of impact fee during appeal.
(1) The filing of an appeal shall not stay the assessment or collection of a development impact fee as a condition to the issuance of development approval.
(2) A developer may pay a development impact fee under protest to obtain a building permit or development approval and by making such payment shall not be estopped from exercising his or her right of appeal or receiving a refund of any amount deemed to have been collected in excess.
(Ord. of 7-20-2006, § 12; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-69. Enforcement and penalties.
(a) Enforcement authority.
(1) The enforcement of this article shall be the responsibility of the administrator and such personnel as the administrator may designate from time to time.
(2) The administrator shall have the right to inspect the lands affected by this article and shall have the right to issue a written notice of violation, or a stop work order. Refusal of written notice of violation, or stop work order, under this article shall constitute legal notice of service. The receipt of a written notice of violation shall require that corrective action be taken within 30 days unless otherwise extended at the discretion of the administrator.
(3) The administrator may suspend or revoke any building permit or withhold the issuance of other development approvals if the provisions of this article have been violated by the developer or the owner or their assigns.
(b) Violations.
(1) Knowingly furnishing false information on any matter relating to the administration of an ordinance shall constitute an actionable violation.
(2) Proceeding with the construction of a project inconsistent with the impact fee assessment, such as the use category claimed, or units of development indicated, shall constitute an actionable violation.
(3) Failure to take corrective action following the receipt of a written notice of violation or stop work order shall constitute an actionable violation.
(4) A violation of this article shall be a misdemeanor punishable according to law, including the general penalty provisions of the Dawson County Code of Ordinances. In addition to or in lieu of criminal prosecution, the board of commissioners shall have the power to sue in law or equity for relief in civil court to enforce this article, including recourse to such civil and criminal remedies in law and equity as may be necessary to ensure compliance with the provisions of this article, and including but not limited to injunctive relief to enjoin and restrain any person from violating the provisions of this article, and to recover such damages as may be incurred by the implementation of specific corrective actions.
(Ord. of 7-20-2006, § 13; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-70. Incorporation by reference to Georgia laws.
It is the intent of the board of commissioners that the development impact fee ordinance complies with the terms and provisions of the Georgia Development Impact Fee Act (O.C.G.A. § 36-71-1 et seq.) as amended. To the extent that any provision of this article is inconsistent with the provisions of said act, the latter shall control. Furthermore, to the extent that this article is silent as to any provision of said chapter that is otherwise made mandatory by said chapter, such provision shall control and be binding upon the county.
(Ord. of 7-20-2006, § 14.03; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Sec. 101-71. Effective date.
This article or any amendments thereto shall take effect on March 1, 2025.
(Ord. of 7-20-2006, § 14.04; Ord. of 8-16-2018; Ord. of 1-16-2025(2)) Attachment A:
Impact Fee Schedule Land Use Library Services Parks and Recreation Law Enforcement Fire Protection Road Improve- ments Admin. Fee CIE Prep Fee Total Impact Fee Unit of Measure Residential
Single-Family Detached Housing $ 100.0000 $ 4,162.6225 $ 324.4095 $ 1,022.7044 $ 21.3316 $ 84.4660 $ 84.4660 $ 5,800.0000 per dwelling Duplex or Townhouse 1—3
stories $ 100.0000 $ 4,162.6225 $ 324.4095 $ 1,022.7044 $ 16.2871 $ 84.3904 $ 84.3904 $ 5,794.8042 per dwelling Multi-Family Low Rise 2 & 3
stories $ 100.0000 $ 4,162.6225 $ 324.4095 $ 1,022.7044 $ 15.2465 $ 84.3747 $ 84.3747 $ 5,793.7324 per dwelling Senior Adult Single-Family
Housing $ 100.0000 $ 4,162.6225 $ 324.4095 $ 1,022.7044 $ 9.7496 $ 84.2923 $ 84.2923 $ 5,788.0706 per dwelling Senior Adult Multi-Family
Housing $ 100.0000 $ 4,162.6225 $ 324.4095 $ 1,022.7044 $ 7.3292 $ 84.2560 $ 84.2560 $ 5,785.5775 per dwelling Congregate Care Facility $ 100.0000 $ 4,162.6225 $ 324.4095 $ 1,022.7044 $ 4.9992 $ 84.2210 $ 84.2210 $ 5,783.1777 per dwelling Industrial
General Light Industrial $ - $ - $ 0.2369 $ 0.7468 $ 0.0101 $ 0.0149 $ 0.0149 $ 1.0236 per square foot Manufacturing $ - $ - $ 0.2854 $ 0.8996 $ 0.0099 $ 0.0179 $ 0.0179 $ 1.2307 per square foot Warehousing $ - $ - $ 0.0511 $ 0.1610 $ 0.0036 $ 0.0032 $ 0.0032 $ 0.2220 per square foot Mini-Warehouse
(Self Storage) $ - $ - $ 0.0511 $ 0.1610 $ 0.0030 $ 0.0032 $ 0.0032 $ 0.2215 per square foot High-Cube Warehouse,
short-term $ - $ - $ 0.0986 $ 0.3110 $ 0.0029 $ 0.0062 $ 0.0062 $ 0.4249 per square foot High-Cube Warehouse,
fulfillment center $ - $ - $ 0.0985 $ 0.3106 $ 0.0038 $ 0.0062 $ 0.0062 $ 0.4253 per square foot High-Cube Hub Warehouse $ - $ - $ 0.1031 $ 0.3251 $ 0.0096 $ 0.0066 $ 0.0066 $ 0.4510 per square foot Data Center $ - $ - $ 0.0698 $ 0.2199 $ 0.0021 $ 0.0044 $ 0.0044 $ 0.3005 per square foot Specialty Trade Contractor $ - $ - $ 0.4079 $ 1.2860 $ 0.0204 $ 0.0257 $ 0.0257 $ 1.7657 per square foot Lodging
Hotel or Conference Motel $ - $ - $ 84.0167 $ 264.8635 $ 12.8326 $ 5.4257 $ 5.4257 $ 372.5642 per room All Suites Hotel $ - $ - $ 139.3842 $ 439.4102 $ 7.0668 $ 8.7879 $ 8.7879 $ 603.4371 per room Art. III, Att. A DAWSON COUNTY CODE
Land Use Library Services Parks and Recreation Law Enforcement Fire Protection Road Improve- ments Admin. Fee CIE Prep Fee Total Impact Fee Unit of Measure Motel $ - $ - $ 20.0692 $ 63.2683 $ 4.4710 $ 1.3171 $ 1.3171 $ 90.4427 per room Recreational
Golf Course $ - $ - $ 37.0357 $ 116.7556 $ 10.2609 $ 2.4608 $ 2.4608 $ 168.9737 per acre Movie Theater $ - $ - $ 0.2136 $ 0.6735 $ 0.1501 $ 0.0156 $ 0.0156 $ 1.0684 per square foot Tennis Courts $ - $ - $ 36.7755 $ 115.9350 $ 33.1035 $ 2.7872 $ 2.7872 $ 191.3883 per acre Racquet/Tennis Club $ - $ - $ 0.0716 $ 0.2258 $ 0.0368 $ 0.0050 $ 0.0050 $ 0.3442 per square foot Recreational Community
Center $ - $ - $ 0.1595 $ 0.5027 $ 0.0554 $ 0.0108 $ 0.0108 $ 0.7392 per square foot Institutional
Private Elementary School $ - $ - $ 0.1034 $ 0.3260 $ 0.0279 $ 0.0069 $ 0.0069 $ 0.4710 per square foot Private High School $ - $ - $ 0.0954 $ 0.3006 $ 0.0271 $ 0.0063 $ 0.0063 $ 0.4357 per square foot Church/Place of Worship $ - $ - $ 0.0555 $ 0.1750 $ 0.0155 $ 0.0037 $ 0.0037 $ 0.2534 per square foot Day Care Center $ - $ - $ 0.3359 $ 1.0588 $ 0.0108 $ 0.0211 $ 0.0211 $ 1.4476 per square foot Cemetery $ - $ - $ 15.7185 $ 49.5529 $ 12.2560 $ 1.1629 $ 1.1629 $ 79.8533 per acre Medical
Hospital $ - $ - $ 0.4308 $ 1.3580 $ 0.0188 $ 0.0271 $ 0.0271 $ 1.8617 per square foot Nursing Home $ - $ - $ 0.3075 $ 0.9694 $ 0.0115 $ 0.0193 $ 0.0193 $ 1.3270 per square foot Clinic $ - $ - $ 0.4079 $ 1.2859 $ 0.0655 $ 0.0264 $ 0.0264 $ 1.8120 per square foot Veterinary Clinic $ - $ - $ 0.2555 $ 0.8054 $ 0.0340 $ 0.0164 $ 0.0164 $ 1.1277 per square foot Office
General Office Building (= or >10,000 sf ) $ - $ - $ 0.4909 $ 1.5474 $ 0.0226 $ 0.0309 $ 0.0309 $ 2.1227 per square foot Small Office Building
(<10,000 sf) $ - $ - $ 0.2761 $ 0.8703 $ 0.0299 $ 0.0176 $ 0.0176 $ 1.2116 per square foot Corporate Headquarters
Building $ - $ - $ 0.5189 $ 1.6360 $ 0.0165 $ 0.0326 $ 0.0326 $ 2.2366 per square foot
GENERAL AND ADMINISTRATIVE PROVISIONS Art. III, Att. A
Land Use Library Services Parks and Recreation Law Enforcement Fire Protection Road Improve- ments Admin. Fee CIE Prep Fee Total Impact Fee Unit of Measure Single-Tenant Office
Building $ - $ - $ 0.5119 $ 1.6138 $ 0.0272 $ 0.0323 $ 0.0323 $ 2.2174 per square foot Medical-Dental Office
Building $ - $ - $ 0.6232 $ 1.9648 $ 0.0627 $ 0.0398 $ 0.0398 $ 2.7302 per square foot Office Park $ - $ - $ 0.4715 $ 1.4865 $ 0.0230 $ 0.0297 $ 0.0297 $ 2.0405 per square foot Research and Development
Center $ - $ - $ 0.4958 $ 1.5629 $ 0.0231 $ 0.0312 $ 0.0312 $ 2.1442 per square foot Business Park $ - $ - $ 0.4643 $ 1.4637 $ 0.0259 $ 0.0293 $ 0.0293 $ 2.0126 per square foot Retail
Building Materials and Lumber Store $ - $ - $ 0.0998 $ 0.3145 $ 0.0312 $ 0.0067 $ 0.0067 $ 0.4589 per square foot Free-Standing Discount
Superstore $ - $ - $ 0.3478 $ 1.0966 $ 0.0823 $ 0.0229 $ 0.0229 $ 1.5725 per square foot Variety Store (Dollar Store) $ - $ - $ 0.1004 $ 0.3166 $ 0.0706 $ 0.0073 $ 0.0073 $ 0.5022 per square foot Free-Standing Discount
Store $ - $ - $ 0.3298 $ 1.0397 $ 0.0500 $ 0.0213 $ 0.0213 $ 1.4620 per square foot Hardware/Paint Store $ - $ - $ 0.0439 $ 0.1385 $ 0.0073 $ 0.0028 $ 0.0028 $ 0.1955 per square foot Nursery (Garden Center) $ - $ - $ 0.4704 $ 1.4829 $ 0.1248 $ 0.0312 $ 0.0312 $ 2.1404 per square foot Nursery (Wholesale) $ - $ - $ 0.2513 $ 0.7923 $ 0.0715 $ 0.0167 $ 0.0167 $ 1.1485 per square foot Shopping Center
(150,000 sf +) $ - $ - $ 0.3204 $ 1.0099 $ 0.0360 $ 0.0205 $ 0.0205 $ 1.4073 per square foot Shopping Plaza (40—150K) $ - $ - $ 0.3204 $ 1.0099 $ 0.0834 $ 0.0212 $ 0.0212 $ 1.4561 per square foot Strip Retail Plaza
(< 40,000 sf) $ - $ - $ 0.3204 $ 1.0099 $ 0.0813 $ 0.0212 $ 0.0212 $ 1.4539 per square foot Automobile Sales (New) $ - $ - $ 0.3748 $ 1.1816 $ 0.0498 $ 0.0241 $ 0.0241 $ 1.6544 per square foot Automobile Sales (Used) $ - $ - $ 0.3269 $ 1.0307 $ 0.0484 $ 0.0211 $ 0.0211 $ 1.4482 per square foot Recreation Vehicle Sales $ - $ - $ 0.0957 $ 0.3016 $ 0.0089 $ 0.0061 $ 0.0061 $ 0.4184 per square foot Auto Parts Store $ - $ - $ 0.2440 $ 0.7691 $ 0.0543 $ 0.0160 $ 0.0160 $ 1.0994 per square foot Art. III, Att. A DAWSON COUNTY CODE
Land Use Library Services Parks and Recreation Law Enforcement Fire Protection Road Improve- ments Admin. Fee CIE Prep Fee Total Impact Fee Unit of Measure Tire Store $ - $ - $ 0.2488 $ 0.7844 $ 0.0420 $ 0.0161 $ 0.0161 $ 1.1075 per square foot Supermarket $ - $ - $ 0.3226 $ 1.0171 $ 0.0722 $ 0.0212 $ 0.0212 $ 1.4542 per square foot Discount Club $ - $ - $ 0.1988 $ 0.6266 $ 0.0586 $ 0.0133 $ 0.0133 $ 0.9105 per square foot Sporting Goods Superstore $ - $ - $ 0.8076 $ 2.5460 $ 0.0323 $ 0.0508 $ 0.0508 $ 3.4874 per square foot Home Improvement
Superstore $ - $ - $ 0.8076 $ 2.5460 $ 0.0223 $ 0.0506 $ 0.0506 $ 3.4771 per square foot Pharmacy/Drugstore
w/drive-through $ - $ - $ 0.2363 $ 0.7450 $ 0.0932 $ 0.0161 $ 0.0161 $ 1.1067 per square foot Furniture Store $ - $ - $ 0.0869 $ 0.2740 $ 0.0029 $ 0.0055 $ 0.0055 $ 0.3747 per square foot Services
Drive-in Bank $ - $ - $ 0.4623 $ 1.4575 $ 0.0499 $ 0.0295 $ 0.0295 $ 2.0288 per square foot Fast Casual Restaurant $ - $ - $ 0.7603 $ 2.3969 $ 0.0813 $ 0.0486 $ 0.0486 $ 3.3357 per square foot Fine Dining Restaurant $ - $ - $ 0.7603 $ 2.3969 $ 0.0721 $ 0.0484 $ 0.0484 $ 3.3262 per square foot High-Turnover (Sit-Down)
Restauant $ - $ - $ 0.7603 $ 2.3969 $ 0.0897 $ 0.0487 $ 0.0487 $ 3.3444 per square foot Fast-Food Restaurant w/o
drive-thru window $ - $ - $ 1.2393 $ 3.9071 $ 0.2751 $ 0.0813 $ 0.0813 $ 5.5842 per square foot Fast-Food Restaurant
w/drive-thru window $ - $ - $ 1.5833 $ 4.9915 $ 0.2855 $ 0.1029 $ 0.1029 $ 7.0662 per square foot Quick Lubrication Vehicle
Shop $ - $ - $ 0.6556 $ 2.0669 $ 0.1133 $ 0.0425 $ 0.0425 $ 2.9210 per square foot Automobile Parts & Service
Center $ - $ - $ 0.2188 $ 0.6898 $ 0.0214 $ 0.0139 $ 0.0139 $ 0.9579 per square foot Gasoline/Service Station $ - $ - $ 94.0500 $ 296.4936 $ 53.1126 $ 6.6548 $ 6.6548 $ 456.9659 per pump Convenience Store with
Gas $ - $ - $ 0.3902 $ 1.2301 $ 0.2378 $ 0.0279 $ 0.0279 $ 1.9139 per square foot (Ord. of 8-16-2018; Ord. of 3-21-2019; Ord. of 1-16-2025(2))
GENERAL AND ADMINISTRATIVE PROVISIONS Art. III, Att. A
Secs. 101-72—101-100. Reserved.
ARTICLE IV. FEE SCHEDULE
Sec. 101-101. Fee schedule.
All fees for applications and permits related to land use and development activities imposed by this Code are charges made in pursuant of the police power for the regulations and control of the development for the protection and welfare of the citizens of Dawson County. These fees shall be established from time to time by resolution of the board of commissioners. A copy of the fee schedule shall be maintained for public inspection in the Dawson County Community Development Office.
(Ord. of 8-16-2018; Ord. of 3-21-2019; Ord. of 2-3-2022(1), § 1; Ord. of 9-4-2025(1), § 2) Chapters 102—104
RESERVED
Chapter 105
BUILDINGS AND BUILDING REGULATIONS*
DIVISION 1. SCOPE AND APPLICATION
Sec. 105-1. Minimum standards code.
This division provides for the administration and enforcement of the Dawson County Minimum Standards Code, adopted from the Georgia State Minimum Standard Building Code, as adopted and amended by the Georgia Department of Community Affairs. The Dawson County Minimum Standards Code shall be referred to as "this code."
(Ord. of 6-20-2024(1)) Sec. 105-2. Scope.
Dawson County implements comprehensive administrative provisions to properly administer and enforce the state minimum standard codes. The power to adopt administrative procedures is outlined in O.C.G.A. § 8-2-26(a)(1). The provisions of this code cover the construction, alteration, relocation, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal, and demolition of every building or structure or any appurtenances connected or attached to such buildings or structures.
(Ord. of 6-20-2024(1)) Sec. 105-3. Intent.
The purpose of this chapter is to establish the minimum requirements to provide a reasonable level of safety, public health, and general welfare through structural strength, means of egress facilities, stability, sanitation, adequate light and ventilation, energy conservation, and safety to life and property from fire, explosion, and other hazards, and to provide a reasonable level of protection to emergency responders during emergency operations.
(Ord. of 6-20-2024(1)) Sec. 105-4. Referenced codes.
Codes listed and referenced elsewhere in this Code shall be considered part of the requirements of this chapter to the prescribed extent of each such reference. Dawson County enforces the current state minimum standard codes adopted by the Georgia Department of Community Affairs.
(1) Construction. The provisions of Georgia State Minimum Standard Building Code shall apply to the construction, alteration, relocation, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal, and demolition of every building or structure or any appurtenances connected or attached to such buildings or structures.
(2) Administration. Dawson County further adopts Sections 101 through 116 of the International Building Code, as amended, to administer such code.
(3) Gas. The provisions of the Georgia State Minimum Standard Gas Code shall apply to the installation of gas piping from the point of delivery, gas appliances, and related accessories as covered in this chapter. These requirements apply to gas piping systems extending from the point of delivery to the inlet connections of appliances and installing and operating residential and commercial gas appliances and related accessories.
(4) Mechanical. The provisions of the Georgia State Minimum Standard Mechanical Code shall apply to the installation, alterations, repairs, and replacement of mechanical systems, including equipment, appliances, fixtures, fittings, and appurtenances, including ventilating, heating, cooling, air-conditioning, refrigeration systems, incinerators, and other energyrelated systems.
(5) Plumbing. The provisions of the Georgia State Minimum Standard Plumbing Code shall apply to the installation, alteration, repair, and replacement of plumbing systems, including equipment, appliances, fixtures, fittings, and appurtenances, and where connected to a water or sewage system and all aspects of a medical gas system. The provisions of the International Private Sewage Disposal Code shall apply to private sewage disposal systems.
(6) Electrical. The provisions of the Georgia State Minimum Standard Electrical Code shall apply to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings, and appurtenances.
(7) Energy. The provisions of the Georgia State Minimum Standard Energy Code shall apply to all matters governing the design and construction of buildings for energy efficiency.
(8) Detached one- and two-family dwellings. The provisions of the Georgia State Minimum Standard One- and Two-Family Dwelling Code shall apply to detached one- and two-family dwellings and multiple single-family dwellings.
(9) Townhouses. The provisions of the Georgia State Minimum Standard One and Two-Family Dwelling Code shall apply to two-family dwellings and multiple single-family dwellings.
Townhouses shall be separated by a two-hour fire-resistance-rated wall assembly not more than three stories above grade plane in height with a separate means of egress and their accessory structures.
(10) Fire prevention. The provisions of Georgia State Minimum Fire Prevention Code, as supplemented by chapter 22, Fire Prevention and Protection, of the Dawson County Code, shall apply to matters affecting or relating to structures, processes, and premises from the hazard of fire and explosion arising from the storage, handling, or use of structures, materials, or devices; from conditions hazardous to life, property or public welfare in the occupancy of structures or premises; and from the construction, extension, repair, alteration or removal of fire suppression, automatic sprinkler systems, and alarm systems or fire hazards in the structure or on the premises from occupancy or operation.
(Ord. of 6-20-2024(1)) Sec. 105-5. Applicability.
(a) General. Where a general requirement conflicts with a specific requirement, the specific requirement shall be applicable. Where, in any specific case, different sections of this code specify different materials, construction methods, or other requirements, the most restrictive shall govern.
(b) Other laws. The provisions of this code shall not be deemed to nullify any provisions of local, state, or federal law.
(c) Application of references. References to chapter or section numbers or to provisions not specifically identified by number shall be construed to refer to such chapter, section, or provision of this code.
(d) Referenced codes and standards. The codes and standards referenced in this chapter shall be considered part of the requirements of this code to the prescribed extent of each such reference and as further regulated in section 105-4.
(e) Provisions in referenced codes and standards. Where the extent of the reference to a referenced code or standard includes subject matter that is within the scope of this code or the Georgia State Minimum Standard Codes listed in section 105-4, the provisions of this code or the Georgia State Minimum Standard Codes listed in section 105-4, as applicable, shall take precedence over the provisions in the referenced code or standard.
(f) Conflicts. Where conflicts occur between provisions of this code and referenced codes and standards, the provisions of this code shall apply.
(g) Partial invalidity. If any part or provision of this code is held to be illegal or void, this shall not have the effect of making void or illegal any of the other parts or provisions.
(h) Existing structures. The legal occupancy of any structure existing on the date of adoption of this code shall be permitted to continue without change, except as otherwise specifically provided in the Georgia State Minimum Fire Protection Code, as supplemented by chapter 22 of the Dawson County Code, or chapter 121 of the Code of Dawson County, Georgia, or as is deemed necessary by the building official for the general safety and welfare of the occupants and the public.
(i) Buildings not previously occupied. A building or portion of a building that has not been previously occupied or used for its intended purpose by the laws in existence at the time of its completion shall comply with the provisions of the Georgia State Minimum Standard Building Code or the Georgia State Minimum Standard One and Two-Family Dwelling Code, as applicable, for new construction or with any current permit for such occupancy.
(Ord. of 6-20-2024(1))
DIVISION 2. ADMINISTRATION AND ENFORCEMENT
Sec. 105-6. The department of community development.
(a) Enforcement agency. The department of community development is hereby designated as the enforcement agency, and the official in charge shall be known as the community development director.
(b) Appointment. The community development director shall appoint the building official.
(c) Employing inspectors. The building official shall have the authority to employ inspectors and other personnel necessary to enforce codes. Such employees shall have powers as delegated by the building official.
(Ord. of 6-20-2024(1); Ord. of 9-18-2025(1), Exh. A, § 10) Sec. 105-7. Duties and powers of building official.
(a) General. The building official is hereby authorized and directed to enforce the provisions of this code. Such interpretations, policies, and procedures shall comply with this code's intent and purpose. Such policies and procedures shall not have the effect of waiving requirements specifically provided for in this code.
(b) Applications and permits. The building official or his or her designee shall have the authority to receive applications, review construction documents, and issue permits for the erection, alteration, demolition, and moving of buildings and structures. The building official or his or her designee shall also inspect the premises for which such permits have been issued and enforce compliance with the provisions of this code. The building official shall have the authority to review and approve limited-time requests for temporary living conditions in a recreational vehicle/camper in association with and only after a county building permit for a single-family residence on an individual lot or parcel has been issued. The building official shall be authorized to permit temporary living for a six-month period, which may be extended for one additional six-month period upon finding that multiple inspections on the new residence have been completed and significant progress has been made toward the completion of the residence. The building official shall be authorized to revoke this approval at any time upon finding that the situation is unsafe, unsanitary (illicit discharge), or creates a nuisance.
(c) Determination of substantially improved or substantially damaged existing buildings and structures in flood hazard areas. For applications for reconstruction, rehabilitation, repair, alteration, addition, or other improvement of existing buildings or structures located in flood hazard areas, the building official shall determine if the proposed work constitutes substantial improvement or repair of substantial damage. Where the building official determines that the proposed work constitutes substantial improvement or repair of substantial damage, and where required by this code, the building official shall require the building to meet the requirements of the Georgia State Minimum Standard Building Code.
(d) Notices and orders. The building official shall issue necessary notices or orders to ensure compliance with this code.
(e) Inspecting buildings and other structures to ensure compliance with the code. The building official shall have the authority to make the required inspections or accept inspection reports by state-certified agencies or individuals. Reports of such inspections shall be in writing and certified by a responsible officer of such approved agency or the accountable individual. The building official is authorized to engage such expert opinion as necessary to report on unusual technical issues that arise, subject to the approval of the appointing authority.
(f) Identification. The building official shall carry proper identification when inspecting structures or premises in performing duties under this code.
(g) Right of entry. Where it is necessary to make an inspection to enforce the provisions of this code, or where the building official has reasonable cause to believe that there exists in a structure or on-premises a condition that is contrary to or in violation of this code that makes the structure or premises unsafe, dangerous or hazardous, the building official is authorized to enter the structure or premises at reasonable times to inspect or to perform the duties imposed by this code, provided that if such structure or premises be occupied that credentials be presented to the occupant and entry requested. If such structure or premises are unoccupied, the building official shall first make a reasonable effort to locate the owner or other person in charge or control of the structure or premises and request entry. If entry is refused, the building official shall have recourse to the remedies provided by law to secure entry.
(h) Department records. The building official shall keep official records of applications received, permits and certificates issued, fees collected, reports of inspections, and notices and orders issued.
Such records shall be retained in the official documents for the period required to maintain public records.
(i) Liability. The building official, members of the construction board of appeals, and employees charged with the enforcement of this code, while acting for Dawson County in good faith and without malice in the discharge of the duties required by this code or other pertinent law or ordinance, shall not thereby be civilly or criminally rendered liable personally and are hereby relieved from personal liability for any damage accruing to persons or property as a result of any act or because of an act or omission in the discharge of official duties.
(j) Legal defense. Any suit or criminal complaint instituted against an officer or employee because of an act performed by that officer or employee in the lawful discharge of duties and under the provisions of this code shall be defended by the Dawson County legal representatives until the final termination of the proceedings. The building official or any subordinate shall not be liable for cost in any action, suit, or proceeding instituted in pursuance of the provisions of this code.
(k) Approved materials and equipment. Materials, equipment, and devices approved by the building official shall be constructed and installed in compliance with such approval.
(l) Used materials and equipment. Reused materials must comply with the requirements of this code for new materials. Used equipment and devices may not be reused unless the building official approves.
(m) Modifications. Where there are practical difficulties involved in carrying out the provisions of this code, the building official shall have the authority to grant modifications for individual cases upon application of the owner or the owner's authorized agent, provided that the building official shall first find that unique individual reason makes the strict letter of this code impractical, the modification complies with the intent and purpose of this code and that such modification does not lessen the health, accessibility, life, and fire safety or structural requirements. The details of action granting modifications shall be recorded and entered into the community development department files. Any provisions for the fire code shall reference the Georgia State Minimum Fire Prevention Code, as supplemented by chapter 22, Fire Prevention and Protection, of the Dawson County Code.
(n) Alternative materials, design, and methods of construction and equipment. The provisions of this Code are not intended to prevent the installation of any material or to prohibit any design or method of construction not specifically prescribed by this code, provided that the building official has approved any such alternative. An alternative material, design, or method of construction shall be approved where the building official finds that the proposed design is satisfactory and complies with the intent of the provisions of this code and that the material, method, or work offered is, for the purpose intended, not less than the equivalent of that prescribed in this code in quality, strength, effectiveness, fire resistance, durability, and safety. Where the alternative material, design, or construction method is not approved, the building official shall respond in writing, stating why the alternative was not approved. Any provisions for the fire code shall reference chapter 22, Fire Prevention and Protection.
(o) Technical reports. Supporting data, where necessary to approve materials or assemblies not specifically provided for in this code, shall consist of valid research reports from approved industry sources.
(p) Tests. Whenever there is insufficient evidence of compliance with the provisions of this code or evidence that material or method does not conform to the requirements of this code or to substantiate claims for alternative materials or techniques, the building official shall have the authority to require tests as evidence of compliance to be made without expense to Dawson County.
Test methods shall be specified in this code or other recognized test standards. Without recognized and accepted test methods, the building official must approve the testing procedures. An approved agency shall perform tests. Reports of such tests shall be retained by the building official for the period required to maintain public records.
(Ord. of 6-20-2024(1); Ord. of 9-18-2025(1), Exh. A, § 10) Sec. 105-8. Permits.
(a) Required. Any owner or owner's authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure or to erect, install, enlarge, adjust, repair, remove, convert, or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by this code, or to cause any such work to be performed, shall first make application to the building official and obtain the required building permit.
(b) Annual permit. Instead of an individual permit for each alteration to an already approved electrical, gas, mechanical, or plumbing installation, the building official is authorized to issue an annual permit upon application therefor to any person, firm, or corporation regularly employing one or more qualified trade persons in the building, structure or on the premises owned or operated by the applicant for the permit.
(c) Annual permit records. The person to whom an annual permit is issued shall keep a detailed record of alterations made under such annual permit. The building official shall have access to such records at all times, or such records shall be filed with the building official as designated.
(d) Work exempt from permit. Exemptions from permit requirements of this code shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of this code or any other laws or ordinances of Dawson County. Building permits shall not be required for the following:
(1) Building:
a. One-story detached accessory structures that are used as tool and storage sheds, playhouses, and similar residential uses, provided the floor area is not over 200 square feet.
b. One-story detached accessory structures in commercial or industrial zoning districts, provided the floor area is not greater than 120 square feet.
c. Fences not over seven feet high.
d. Retaining walls not over four feet in height measured from the bottom of the footing to the top of the wall unless supporting a surcharge or impounding Class I, II, or IIIA liquids.
e. Water tanks that are supported directly on grade if the capacity is not greater than 5,000 gallons and the height-to-diameter or width ratio is not greater than 2:1.
f. Sidewalks and driveways that are not more than 30 inches above adjacent grade, not over any basement or story below, and are not part of an accessible route.
g. Painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work.
h. Prefabricated swimming pool less than 24 inches deep and installed entirely above ground.
i. Shade cloth structures constructed for nursery or agricultural purposes, not including service systems.
j. Swings and other traditional playground equipment accessory to detached one- and two-family dwellings.
k. Window awnings in Group R-3 and U occupancies that are supported by an exterior wall that does not project more than 54 inches from the exterior wall and does not require additional support.
l. Non-fixed and movable fixtures, cases, racks, counters, and partitions not over five feet nine inches in height.
m. Buildings and structures specifically regulated and preempted by the federal government.
n. Temporary buildings or sheds used exclusively for construction purposes.
o. Mobile or modular structures used as temporary offices, except that the provisions relating to accessibility by persons with disabilities apply to such mobile or modular structures.
p. Those structures or facilities of electric utilities directly involved in generating, transmitting, or distributing electricity.
q. Temporary sets, assemblies, or structures used in commercial motion picture or television production or any sound recording equipment used in such production, onor off-premises.
(2) Electrical:
a. Repairs and maintenance: Minor repair work, including replacing lamps or connecting approved portable electrical equipment to approved permanently installed receptacles.
b. Radio and television transmitting stations: The provisions of this code shall not apply to electrical equipment used for radio and television transmissions but shall apply to equipment and wiring for a power supply and the installation of towers and antennas.
c. Temporary testing systems: A permit shall not be required to install any temporary system to test or service electrical equipment or apparatus.
(3) Gas:
a. Portable heating appliance.
b. Replacement of any minor part that does not alter equipment approval or make such equipment unsafe.
(4) Mechanical:
a. Portable heating appliance.
b. Portable ventilation equipment.
c. Portable cooling unit.
d. Steam, hot, or chilled water piping within any heating or cooling equipment.
e. Replacement of any part that does not alter its approval or make it unsafe.
f. Portable evaporative cooler.
g. A self-contained refrigeration system containing ten pounds or less of refrigerant and actuated by one horsepower or fewer motors.
(5) Plumbing:
a. Stopping leaks in drains, water, soil, waste, or vent pipes; provided, however, that if any concealed trap, drain pipe, water, soil, waste, or vent pipe becomes defective and it becomes necessary to remove and replace it with new material, such work shall be considered new work. A permit shall be obtained and an inspection made.
b. Clearing stoppages or repairing leaks in pipes, valves, or fixtures and removing and reinstalling water closets are permitted, provided such repairs do not involve replacing or rearranging valves, pipes, or fixtures.
(6) Emergency repairs: Where equipment replacements and repairs must be performed in an emergency; however, a permit application shall be submitted to the building official within the next working business day.
(7) Public service agencies: A permit shall not be required for the installation, alteration, or repair of generation, transmission, distribution or, metering or other related equipment under the ownership and control of public service agencies by established right.
(Ord. of 6-20-2024(1)) Sec. 105-9. Manufactured/mobile homes.
This section applies to all mobile homes used as residences, places of business, classrooms, or other activities of a non-temporary nature. Mobile homes used temporarily at construction sites, mobile health units, or similar uses of a temporary nature may be exempt from this regulation at the discretion of building official where the public health, safety, and welfare are served by such exemption and subject to such conditions as the building official deems appropriate to protect the public health, safety, and welfare.
(Ord. of 6-20-2024(1)) Sec. 105-10. Manufactured/mobile home compatibility standards.
Manufactured or mobile homes shall meet the following compatibility standards: Every pre-owned manufactured home located in the county shall comply with the Federal Manufactured Housing Construction and Safety Standards Act, 43 U.S.C. § 5401-5455 ("HUD Code"), and shall not have been altered in such a way that it no longer meets the HUD Code.
(1) The home shall be attached to a permanent foundation; each home shall be provided with anchors and tie-downs, such as cast-in-place concrete dead men or other similar devices approved by the building official, that secure the stability of the home.
(2) All towing devices, wheels, axles, and hitches must be removed.
(3) Each exit door must have a landing of at least 48 inches by 48 inches. Landings shall not be attached to the structure and must be freestanding and fully self-supporting.
(4) The roof shall have a surface of wood shakes, asphalt composition, wood shingles, concrete, fiberglass, metal tiles, slate built-up gravel materials, or other similar materials approved by the building official. All roofs shall have a minimum of three-twelfths pitch to approximate the traditional architecture within the county and protect public health, safety, and welfare.
(5) The exterior siding materials shall consist of wood, masonry, concrete, stucco, Masonite metal or vinyl lap, or other materials of like appearance. The exterior of all pre-owned manufactured homes shall be free of loose or rotting boards or timbers and any other conditions that might admit rain or moisture to the interior portions of the walls or occupied spaces. The exterior siding shall be free of rot and rust. Roofs shall be structurally sound and have no obvious defects that might admit rain or cause moisture to collect on the interior portion of the home.
(6) Each home shall be skirted entirely with an appropriate barrier, properly ventilated, to enclose the area between the bottom of the structure and the ground. Such skirting shall not be required for a home with a complete masonry or concrete perimeter foundation.
(7) Each home shall be established according to the manufacturer's installation instructions, as appropriate. If manufacturer instructions are unavailable, installation shall follow the HUD model manufactured home installation standards available from the housing and urban development website.
(8) All utility connections, including, but not limited to, water, sanitary sewer/septic tank, electricity, and gas, shall be made as required by the county's building codes.
(9) Any pre-owned manufactured home or mobile home proposed for setup and placement within Dawson County shall not pre-date 1976 (date of establishment of the manufactured home construction and safety standards) and shall be inspected pursuant to section 105-11 to determine sound condition and compliance with this resolution prior to permitting.
(Ord. of 6-20-2024(1); Ord. of 9-18-2025(1), Exh. A, § 11) Sec. 105-11. Inspection checklist for pre-owned manufactured/mobile homes.
All pre-owned manufactured or mobile homes being located in Dawson County or moved into Dawson County under this section must meet the following regulations:
(1) Electric.
a. Electrical systems. All parts of the home's electrical systems (including, but not limited to, switches, receptacles, fixtures, etc.) shall be properly installed and wired and shall be in working condition. Distribution panels shall be in compliance with the approved listing, complete with required breakers, and all unused openings covered with solid covers approved and listed for that purpose. The home shall be subject to an electrical continuity test to ensure that all metallic parts are properly bonded.
b. Smoke detectors. Each pre-owned manufactured home shall contain one operable battery-powered smoke detector in each bedroom and the kitchen, which must be installed per the manufacturer's recommendations.
(2) Plumbing.
a. Every plumbing fixture, water, and waste pipe of a pre-owned manufactured home shall be in sanitary working condition when properly connected and free from leaks and obstructions. Each home shall contain a kitchen sink. Each bathroom shall contain a lavatory and water closet. At least one bathroom shall include a tub and/or shower facility. Each of these fixtures shall be checked upon being connected to ensure they are in good working condition.
b. Hot water supply. Each home shall contain a water heater that is in safe and working condition.
(3) HVAC—Heating system. Heating systems shall be safe and in working condition. Un-vented heaters shall be prohibited.
(4) Manufactured or mobile home unit.
a. Every floor, interior wall, and ceiling of a pre-owned manufactured home shall be in sound condition. Doors and windows shall be operable, watertight, and in good working condition. The floor system shall be in sound condition and free of warping, holes, water damage, or deterioration.
b. Roofs shall be structurally sound and have no apparent defects that might admit rain or cause moisture to collect on the interior portion of the home.
c. The exterior of all pre-owned manufactured homes shall be free of loose or rotting boards or timbers and any other conditions that might admit rain or moisture to the interior portions of the walls or to occupied spaces.
d. HUD Code. Every pre-owned manufactured home located in Dawson County shall be in compliance with the Federal Manufactured Housing Construction and Safety Standards Act, 42 U.S.C. 5401-5445 ("the HUD Code"), and shall not have been altered in such a way that it no longer meets the HUD Code.
e. Newly manufactured units that have never been used must be verified by the manufacturer.
(5) Additional requirements for pre-owned manufactured/mobile homes.
a. Scheduled by building inspector;
b. If inside the county: Subject to the following fees: $500.00 per inspection;
c. If outside the county: Subject to the following fees: $500.00 per inspection plus $0.25 per mile. These fees are in addition to permit fees for manufactured or mobile homes, which include inspection fees on manufactured or mobile homes after being located inside the county;
d. Inspections may be performed by a licensed structural engineer regardless of distance; however, an inspection by a licensed structural engineer shall be required for all manufactured or mobile homes outside of a 50-mile radius of the City of Dawsonville;
e. All third-party inspections shall cover the requirements of this division, and the licensed structural engineer shall stamp the inspection results.
(Ord. of 6-20-2024(1); Ord. of 9-18-2025(1), Exh. A, § 11) Sec. 105-12. Application for permit.
(a) To obtain a permit, the applicant shall first apply in writing on a form furnished by the community development department. Such application shall:
(1) Identify and describe the work to be covered by the permit for which the application is made;
(2) Describe the land on which the proposed work is to be done by street address and tax parcel identification that will readily identify and locate the proposed building or work;
(3) Indicate the use and occupancy for which the proposed work is intended;
(4) Be accompanied by construction documents and other information as required by this code;
(5) Be signed by the applicant, or the applicant's authorized agent; and
(6) Provide such other data and information as the Building Official reasonably requires to ensure compliance with this code.
(b) Maximum permit application submittal. A total of ten permit applications by a representative of a single entity on behalf of any one common development, shall be submitted at one time. Upon issuance of said permits or if 30 calendar days or more has passed from the date of submittal of permit applications, additional permit applications may be submitted for review provided that the total number of applications in process at any one time shall not exceed ten.
(c) Action on application. The building official or his or her designee shall examine or cause to be examined applications for permits and amendments to it within a minimum of five and a maximum of ten business days after filing. If the application or the construction documents do not conform to the requirements of pertinent laws, the building official or his or her designee shall reject such application in writing, stating the reasons. If the building official or his or her designee is satisfied that the proposed work conforms to the requirements of this code and laws and ordinances, the building official or his or her designee shall issue a permit.
(d) Time limitation of application. An application for a permit for any proposed work shall be deemed to have been abandoned 180 days after the date of filing unless such application has been pursued in good faith or a permit has been issued, except that the building official is authorized to grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing, and justifiable cause demonstrated.
(e) Validity of permit. The issuance or granting of a permit shall not be construed as a permit for, or approval of, any violation of any of the provisions of this code or any other ordinance of Dawson County. Permits presuming to give authority to violate or cancel the provisions of this code or other ordinances of Dawson County shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the building official from requiring the correction of errors in the construction documents and other data.
(f) Expiration. Every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 180 days after its issuance or if the work authorized on the site by such permit is suspended or abandoned for 180 days after the time the work is commenced, or if the expiration date on the face of the permit has been reached without any inspections for 180 days. The building official is authorized to grant one or more extensions of time for periods not more than 180 days each from the expiration date. The extension shall be requested in writing, and justifiable cause demonstrated.
(g) Suspension or revocation. The building official is authorized to suspend or revoke a permit issued under the provisions of this code whenever it is issued in error, based on incorrect, inaccurate, or incomplete information, or in violation of any ordinance or regulation or any of the provisions of this code. A permit previously issued may be suspended or revoked if a subsequent violation occurs with respect to the project.
(h) Placement of permit. The building permit or copy shall be kept on the job site in a conspicuous place until the project's completion.
(Ord. of 6-20-2024(1); Ord. of 9-18-2025(1), Exh. A, § 11) Sec. 105-13. Floor and roof design loads.
(a) Live loads posted. In commercial or industrial buildings, for each floor or portion designed for live loads exceeding 50 psf, the owner or the owner's authorized agent shall conspicuously post such designed live load limits using durable signs in that part of each story to which they apply. It shall be unlawful to remove or deface such signs.
(b) Issuance of certificate of occupancy. A certificate of occupancy shall not be issued until the floor load signs required by this code have been installed.
(c) Restrictions on loading. It shall be unlawful to place, cause, or permit the placement of a load greater than the limit set by the Georgia State Minimum Standard Building Code on any floor or roof of a building, structure, or portion thereof.
(Ord. of 6-20-2024(1)) Sec. 105-14. Submittal documents.
(a) General. Submittal documents consisting of construction documents, statements of special inspections, geotechnical reports, and other data shall be submitted in two or more sets and digital media as required, e.g., pdf., with each permit application. A registered design professional shall prepare the construction documents. Where special conditions exist, to ensure full consideration of an application, the building official is authorized to require additional construction documents prepared by a registered design professional to be submitted.
Exception: The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for makes a review of construction documents unnecessary to obtain compliance with this code.
(b) Information on construction documents. Construction documents shall be dimensioned and drawn on suitable material. Construction documents shall be sufficiently clear to indicate the location, nature, and extent of the proposed work and show in detail that it will conform to the provisions of this code and relevant laws, ordinances, rules, and regulations.
(c) Fire protection system shop drawings. Shop drawings for the fire protection system(s) shall be submitted to indicate conformance to this code and the construction documents and shall be approved before the start of system installation. Shop drawings shall contain all information required by the referenced installation standards in Chapter 9 of the International Building Code. Any provisions for the fire code shall reference the Georgia State Minimum Fire Prevention Code, as supplemented by Dawson County chapter 22.
(d) Means of egress. The construction documents shall show in sufficient detail the location, construction, size, and character of all portions of the means of egress, including the path of the exit discharge to the public way, in compliance with the provisions of this code. Other than occupancies in Groups R-2, R-3, and I-1, the construction documents shall designate the number of occupants to be accommodated on every floor and in all rooms and spaces. Any provisions for the fire code shall reference the Georgia State Minimum Fire Prevention Code, as supplemented by Dawson County chapter 22.
(e) Exterior wall envelope.
(1) Construction documents shall describe the exterior wall envelope in sufficient detail to determine compliance with this code. Construction documents shall provide details of the exterior wall envelope as required, including flashing, intersections with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of drainage, water-resistive membrane, and details around openings.
(2) Construction documents shall include the manufacturer's installation instructions, which provide supporting documentation that the proposed penetration and opening details described in the construction documents maintain the exterior wall envelope's weather resistance. The supporting documentation shall fully describe the tested exterior wall system, where applicable, and the test procedure used.
(f) Exterior balconies and elevated walking surfaces. Where balconies or other elevated walking surfaces are exposed to water from direct or blowing rain, snow, or irrigation and an impervious moisture barrier protects the structural framing, the construction documents shall include details for all impervious moisture barrier system elements and the manufacturer's installation instructions.
(g) Site plan. Construction documents submitted with the permit application shall include an accurate boundary line survey accompanied by a site plan showing the scale, size, and location of new construction and existing structures on the site, distances from lot lines, the established street grades, and the proposed finished grades, as applicable, flood hazard areas, floodways, stream buffers, and design flood elevations.
(h) Site plan for a demolition permit. The site plan submitted with an application for a demolition permit shall show the construction to be demolished and the location and size of existing structures and construction that remain on the site or tract. The building official is authorized to waive or modify the requirement for a site plan where the permit application is for an interior alteration or repair or where otherwise warranted.
(i) Design flood elevations. Where design flood elevations are not specified, they shall be established in accordance with section 1612.3.1 of the Georgia State Minimum Standard Building Code.
(j) Structural information. The construction documents shall provide the information specified in section 1603 of the Georgia State Minimum Standard Building Code.
(k) Relocatable buildings. Construction documents for relocatable buildings shall comply with section 3113 of the Georgia State Minimum Standard Building Code.
(l) Examination of documents. The building official shall examine or cause the submittal documents to be reviewed and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of this code and other pertinent laws or ordinances.
(m) Approval of construction documents. When the building official issues a permit, the construction documents shall be approved, in writing or digital format, as "Reviewed for Code Compliance."
The building official shall retain one set of construction documents so reviewed. The other set shall be returned to the applicant, kept at the work site, and open to inspection by the building official or a duly authorized representative.
(n) Previous approvals. This code shall not require changes in the construction documents, construction, or designated occupancy of a structure for which a lawful permit has been heretofore issued or otherwise lawfully authorized, and the construction of which has been pursued in good faith within 180 days after the effective date of this code and has not been abandoned. The building official is authorized to prevent occupancy or use of a structure violating this code.
(o) Phased approval. The building official is authorized to issue a permit for the construction of foundations or any other part of a building or structure before the construction documents for the whole building or structure have been submitted, provided that adequate information and detailed statements have been filed complying with pertinent requirements of this code. The holder of such permit for the foundation or other parts of a building or structure shall proceed at the holder's own risk with the building operation and without assurance that a permit for the entire structure will be granted.
(p) Design professional in responsible charge.
(1) Where it is required that documents be prepared by a registered design professional, the building official shall be authorized to require the owner or the owner's authorized agent to engage and designate on the building permit application a registered design professional who shall act as the registered design professional in responsible charge. If the circumstances require, the owner or the owner's authorized agent shall designate a substitute registered design professional in responsible charge who shall perform the duties required of the original registered design professional in the responsible charge. The building official shall be notified in writing by the owner or the owner's authorized agent if the registered design professional in responsible charge is changed or cannot continue to perform the duties.
(2) The registered design professional in charge shall be responsible for reviewing and coordinating submittal documents prepared by others, including phased and deferred submittal items, for compatibility with the design of the building.
(q) Deferred submittals. Deferral of any submittal items shall have the prior approval of the building official. The registered design professional in charge shall list the deferred submittals on the construction documents for review by the building official. Documents for deferred submittal items shall be submitted to the registered design professional in responsible charge, who shall review them and forward them to the building official with a notation indicating that the deferred submittal documents have been reviewed and found to be in general conformance to the design of the building. The deferred submittal items shall not be installed until the building official has approved the deferred submittal documents.
(r) Amended construction documents. Work shall be installed in accordance with the approved construction documents, and any changes made during construction that are not in compliance with them shall be resubmitted for approval as an amended set of construction documents.
(s) Retention of construction documents. The building official shall retain one set of approved construction documents for not less than 180 days from the completion date of the permitted work or as required by state or local laws.
(Ord. of 6-20-2024(1)) Sec. 105-15. Temporary structures and uses.
(a) General. The building official is authorized to permit temporary structures and uses. Such permits shall be limited in time of service but not for more than 180 days. The building official is authorized to grant extensions for demonstrated cause.
(b) Conformance. Temporary structures and uses shall comply with section 3103 of the Georgia State Minimum Standard Building Code requirements.
(c) Temporary power. The building official is authorized to permit the temporary supply and use of power in part of an electric installation before such installation has been fully completed and the final certificate of completion has been issued. As amended, the part covered by the temporary certificate shall comply with the requirements specified for temporary lighting, heat, or power in
NFPA 70.
(d) Termination of approval. The building official is authorized to terminate a permit for a temporary structure or use and order its discontinuance if the building official deems it appropriate to protect public health, safety, and welfare.
(Ord. of 6-20-2024(1)) Sec. 105-16. Fees.
(a) Payment of fees. A permit shall not be valid until the fees prescribed by law have been paid, nor shall an amendment to a permit be released until any additional fees, if any, have been paid.
(b) Schedule of permit fees. A fee for each permit shall be paid per the schedule established by the Dawson County Board of Commissioners for buildings, structures, electrical, gas, mechanical, and plumbing systems or alterations requiring a permit.
(c) Work commencing before permit issuance. Anyone who commences any work on a building, structure, electrical, gas, mechanical, or plumbing system before obtaining the necessary permits shall be subject to twice the required fees.
(d) Related fees. The payment of the fee for the construction, alteration, removal, or demolition of work done in connection to or concurrently with the work authorized by a building permit shall not relieve the applicant or holder of the permit from the payment of other fees prescribed by law.
(Ord. of 6-20-2024(1)) Sec. 105-17. Inspections.
(a) Required inspections. The building official, upon request from the permit holder or his or her agent, shall make the minimum required inspections or any other such inspection as deemed necessary and shall either release that portion of the construction or shall notify the permit holder or his or her agent of any violations which must be corrected to comply with the adopted codes. The building official shall determine the timing and sequencing of when inspections occur and what elements are inspected at each inspection.
(b) General. Construction or work for which a permit is required shall be subject to inspection by the building official, and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed as an approval of a violation of this code's provisions or other county ordinances. Inspections presuming to give authority to violate or cancel the provisions of this code or other ordinances of Dawson County shall not be valid. It shall be the owner's or the authorized agent's duty to make the work visible and accessible for inspection. Neither the building official nor Dawson County shall be liable for the expense of removing or replacing any material required to allow inspection.
(c) Preliminary inspection. Before issuing a permit, the building official is authorized to examine or cause to be examined buildings, structures, and sites for which an application has been filed.
(d) Lot grading inspection. If required, site staking and erosion control measures in compliance with an approved grading plan shall be taken before any construction activities.
(e) Footing and foundation inspection. Footing and foundation inspections shall be made after excavations for footings are complete and any required reinforcing steel is in place. Any required forms for concrete foundations shall be in place before the inspection. Materials for the foundation shall be on the job, except where concrete is ready-mixed in accordance with ASTM C94; the concrete need not be on the job.
(f) Concrete slab and under-floor inspection. Concrete slab and under-floor inspections shall be made after in-slab or under-floor reinforcing steel and building service equipment, conduit, piping accessories, and other ancillary equipment items are in place but before any concrete is placed or floor sheathing installed, including the subfloor.
(g) Lowest floor elevation. In flood hazard areas, the elevation certification required in section 1612.4 of the Georgia State Minimum Standard shall be submitted to the building official upon placement of the lowest floor, including the basement, and before further vertical construction.
(h) Frame inspection. Framing inspections shall be made after the roof deck or sheathing, all framing, fire-blocking, and bracing are in place, pipes, chimneys, and vents to be concealed are complete, and the rough electrical, plumbing, heating wires, pipes, and ducts are approved.
(i) Lath, gypsum board and gypsum panel product inspection.
(1) Lath, gypsum board, and gypsum panel product inspections shall be made after lathing, gypsum board, and gypsum panel products, interior and exterior, are in place, but before any plastering is applied or gypsum board and gypsum panel product joints and fasteners are taped and finished.
(2) Gypsum board and gypsum panel products are not part of a fire-resistance-rated or shear assembly.
(j) Weather-exposed balcony and walking surface waterproofing.
(1) Where balconies or other elevated walking surfaces are exposed to water from direct or blowing rain, snow, or irrigation, and an impervious moisture barrier protects the structural framing, all elements of the impervious moisture barrier system shall not be concealed until inspected and approved.
(2) Where special inspections are provided in accordance with section 1705.1.1, Item 3 of the Georgia State Minimum Standard Building Code.
(k) Fire- and smoke-resistant penetrations. Protection of joints and penetrations in fire-resistancerated assemblies, smoke barriers, and smoke partitions shall not be concealed from view until inspected and approved.
(l) Energy efficiency inspections. Inspections shall be made to determine compliance with Chapter 13 of the Georgia State Minimum Standard Building Code. They shall include, but are not limited to, inspections for envelope insulation R- and U-values, fenestration U-value, duct system R-value, and HVAC and water-heating equipment efficiency.
(m) Other inspections. In addition to the inspections specified in this code, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with its provisions and other laws that the department of planning and development enforces.
(n) Special inspections. Qualified, independent agents may perform special inspections and tests with special expertise as approved by the building official. Special inspections are in addition to the inspections conducted by the building official, structural observation by the design professional, and tests or inspections required by the construction documents. (Reference the Special Inspections Guide on the Georgia Department of Community Affairs web page.)
(o) Final inspection. The final inspection shall be made after all work authorized by the building permit is completed.
(p) Flood hazard documentation. If located in a flood hazard area, documentation of the elevation of the lowest floor, as required by the Federal Emergency Management Agency (FEMA), shall be submitted to the building official before the final inspection.
(q) Inspection agencies. The building official is authorized to accept reports from approved and licensed inspection agencies, provided that such agencies satisfy the requirements regarding qualifications and reliability.
(r) Inspection requests. The holder of the building permit or their duly authorized agent shall notify the building official when work is ready for inspection and provide access to and means for inspections of such work as required by this code.
(s) Work not ready for inspection. The holder of the building permit or their duly authorized agent shall ensure the work is ready for inspection. If it is not, a complete re-inspection shall be required.
(t) Approval required. Work shall not be done beyond the point indicated in each successive inspection without first obtaining the building official's approval. The building official, upon notification, shall make the requested inspections and either indicate the portion of the construction that is satisfactory as completed or notify the permit holder or his or her agent wherein the same fails to comply with this code. Any portions that do not comply shall be corrected, and such portions shall not be covered or concealed until authorized by the building official.
(u) Site debris. The contractor and owner of any active or inactive construction project shall be responsible for cleaning up and removing all construction debris or any other miscellaneous discarded articles before receiving final inspections. Construction job sites must be kept clean, such that accumulation of construction debris must not remain on the property for a time exceeding 30 days. All debris shall be kept in such a manner as to prevent it from being spread by any means.
(Ord. of 6-20-2024(1)) Sec. 105-18. Certificate of occupancy.
(a) Change of occupancy. A building or dwelling structure shall not be used or occupied, and a change of occupancy or change of use of a building or dwelling structure or portion thereof shall not be made until the building official has issued a certificate of occupancy, as provided herein. Issuing a certificate of occupancy shall not be construed as approval of violating this code's provisions or other Dawson County ordinances. Certificates of occupancy presuming to give authority to violate or cancel the provisions of this code or other ordinances of Dawson County shall not be valid.
Certificates of occupancy are issued to permits where occupancy applies.
(b) Certificate of occupancy issued. After the building official inspects the building or dwelling structure and does not find violations of the provisions of this code or other laws that the department of planning and development enforces, the building official shall issue a certificate of occupancy that contains the following:
• The building permit number.
• The address of the structure.
• The owner's or authorized agent's name and address.
• Use and occupancy.
• The name of the building official.
• Certificate issue date.
(c) Exceptions.
(1) Certificates of occupancy are not required for work exempt from permits in accordance with section 105-8 of this chapter.
(2) Certificates of completion are issued for trade-specific permits, retaining walls, white box or shell buildings, and pools.
(d) Temporary occupancy. The building official shall not issue a temporary certificate of occupancy before the completion of all the work covered by the permit.
(e) Revocation. The building official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of this code whenever the certificate is issued in error, based on incorrect information supplied, or where it is determined that the building, structure, or portion thereof violates any ordinance or regulation or any of the provisions of this code.
(Ord. of 6-20-2024(1)) Sec. 105-19. Service utilities.
(a) Connection of service utilities. A person shall not make connections from a utility, energy source, fuel, or power to any building or system regulated by this code for which a permit is required until released by the building official.
(b) Temporary connection. The building official shall have the authority to authorize the temporary connection of the building or system to the utility, source of energy, fuel, or power.
(c) Authority to disconnect service utilities. The building official shall have the authority to authorize disconnection of utility service to the building, structure, or system regulated by this code and the referenced codes and standards outlined in section 105-4 of this chapter in case of emergency where necessary to eliminate an immediate hazard to life or property or where such utility connection has been made without the approval required by sections 105-1 or 105-2 or 105-16(a) and (b) of this chapter. The building official shall notify the serving utility and, wherever possible, the owner and occupant of the building, structure, or service system of the decision to disconnect before taking such action. If not notified before disconnecting, the owner or occupant of the building, structure, or service system shall be informed in writing as soon as possible.
(d) On-site septic system. The holder of the building permit or their duly authorized agent shall notify the Dawson County Environmental Health Department of the necessity to inspect infrastructure associated with an on-site septic system(s).
(Ord. of 6-20-2024(1)) Sec. 105-20. Construction board of adjustment and appeals.
(a) General. The construction board of adjustment and appeals shall be and is hereby created to hear and decide appeals of orders, decisions, or other written determinations made by the building official relative to the application and interpretation of this code. The board of commissioners shall appoint the five-member board. The board adopts rules of procedure for conducting its business.
(b) Terms. The terms of the board members' offices shall be three years staggered, so no more than one-third of the board is appointed or replaced within any 12 months.
(c) Limitations on authority. An application for appeal shall be based on a claim that the true intent of this code or the rules legally adopted thereunder have been incorrectly interpreted, the provisions of this code do not fully apply, or an equally good or better form of construction is proposed. The board shall not have the authority to waive building code requirements.
(d) Qualifications. The construction board of adjustment and appeals shall consist of members qualified by experience and training, such as design professionals, contractors, or building industry representatives, to advise on building construction matters, not Dawson County employees.
(e) Meetings. The construction board of adjustment and appeals shall hold meetings as needed.
(f) A person aggrieved by the building official's or his or her designee's written decision of approval or denial of a permit may appeal the decision to the Dawson County Construction Board of Adjustment and Appeals (CBAA). The appeal must be filed with the Dawson County Community Development staff in writing, within 30 calendar days of the date of decision, contain a concise statement of the reason for appeal, and be accompanied by the appeal fee as set out in Dawson County Community Development Fee Schedule as amended by the Dawson County Board of Commissioners from time to time.
(g) The CBAA shall conduct a hearing on an appeal within 45 days provided required notice of the hearing can be provided. At the hearing, the building official or his or her designee shall present the facts upon which the denial, suspension, or revocation of the permit, or other decision, were based.
After presentation of the case against the aggrieved party, the aggrieved party will have an opportunity to present his/her case, to rebut the allegations made against him/her, and present whatever defenses he/she has. The aggrieved party shall have the right to be represented by an attorney, at the expense of the aggrieved party, and to present evidence and cross-examine opposing witnesses.
(h) At the conclusion of the hearing, the Dawson County Construction Board of Adjustment and Appeals shall place any findings and conclusions in writing, which shall be forwarded by the community development director or his or her designee to the aggrieved party.
(i) The decision of the Dawson County Construction Board of Adjustment and Appeals shall be final unless appealed to the board of commissioners, within 30 calendar days of the date of decision, in the same manner as an appeal to the construction board of adjustment and appeals.
(j) The Dawson County Board of Commissioners shall follow the same procedures as the construction board of adjustment and appeals in holding a hearing; reviewing facts; and placing its findings and conclusions in writing, which shall be forwarded by the community development director or his or her designee to the aggrieved party.
(Ord. of 6-20-2024(1); Ord. of 9-18-2025(1), Exh. A, § 12) Sec. 105-21. Violations.
(a) Unlawful acts. It shall be unlawful for any person, firm, or corporation to erect, construct, alter, extend, repair, move, remove, demolish, or occupy any building, structure, or equipment regulated by this code or cause the same to be done, in conflict with or in violation of any of the provisions of this code.
(b) Notice of violation. The building official is authorized to serve a notice of violation or order on the person responsible for the erection, construction, alteration, extension, repair, moving, removal, demolition, or occupancy of a building or structure in violation of the provisions of this code, or violation of a permit or certificate issued under the provisions of this code. Such order shall direct the discontinuance of the illegal action or condition and the abatement of the violation.
(c) Prosecution of violation. If the notice of violation is not complied with promptly, the building official is authorized to request the county attorney to institute the appropriate proceeding at law or in equity to restrain, correct, or abate such violation or to require the removal or termination of the unlawful occupancy of the building or structure in violation of the provisions of this code or of the order or direction made pursuant thereto.
(d) Violation penalties. Any person who violates a provision of this code or fails to comply with any of its requirements or who erects, constructs, alters, or repairs a building or structure in violation of the approved construction documents or directive of the building official or of a permit or certificate issued under the provisions of this code shall be subject to penalties as prescribed by law.
(Ord. of 6-20-2024(1)) Sec. 105-22. Stop work order.
(a) Authority. Where the building official finds any work regulated by this code being performed either contrary to its provisions or dangerous or unsafe, the building official is authorized to issue a stop work order.
(b) Issuance. A stop-work order shall be in writing and given to the property owner, the owner's authorized agent, or the person performing the work. The stop-work order shall be posted on the job site. The cited work shall immediately cease upon issuance of a stop work order on the job site. The stop-work order shall state the reason for the order.
(c) Unlawful continuance. Any person who continues work after being served with a stop work order, except work directed to be performed to remove a violation or unsafe condition, shall be subject to penalties as prescribed by law.
(Ord. of 6-20-2024(1)) Sec. 105-23. Unsafe and unfit structures and equipment.
(a) Conditions. Structures or existing equipment that are or hereafter become unsafe, unsanitary, or deficient because of inadequate means of egress facilities, inadequate light, and ventilation, or that constitute a fire hazard, or are otherwise dangerous to human life or the public welfare, or that involve illegal or improper occupancy, shall be deemed an unsafe condition. Unsafe structures shall be taken down, removed, or made safe as the building official deems necessary and as provided in this section. A vacant structure that is not secured against entry shall be deemed unsafe.
(b) Renting an unsafe or unfit dwelling or building. It shall be unlawful for an owner, operator, occupant, and/or any party in interest of a dwelling or of a building to rent or offer for rent any dwelling, building, or rooming unit which is unsafe or unfit for human habitation as determined by inspection by the Dawson County Building Official due to the dilapidation, leaking water lines, leaking gas lines, electrical defects increasing hazards of fire, accidents or other calamities, lack of ventilation, light or sanitary facilities, or due to other conditions rendering such dwelling or building or rooming unit unsafe or unsanitary or dangerous. An unsafe or unfit structure is any dwelling or building which has any or all of the conditions per section 105-23(a) as determined by the building official, deemed unfit for human habitation, and subject to condemnation by the county.
(c) Record. The building official shall report an unsafe condition to Dawson County. The report shall state the occupancy of the structure and the nature of the unsafe condition.
(d) Notice. If an unsafe condition is found, the building official shall serve the owner, agent, or person in control of the structure a written notice that describes the condition deemed unsafe and specifies the required repairs or improvements to be made to abate the unsafe condition, or that requires the unsafe structure to be demolished within a stipulated time. Such notice shall require the person thus notified to declare immediately to the building official acceptance or rejection of the terms of the order.
(e) Method of service. Such notice of an unsafe condition shall be deemed properly served if a copy is delivered to the owner personally, sent by certified or registered mail addressed to the owner at the last known address with the return receipt requested, or delivered in any other manner as prescribed by local law. If the certified or registered letter is returned showing that the letter was not delivered, a copy shall be posted in a conspicuous place in or about the structure affected by such notice. Service of such notice in the preceding manner on the owner's agent or the person responsible for the structure shall constitute service of notice on the owner.
(Ord. of 6-20-2024(1); Ord. of 9-18-2025(1), Exh. A, § 13) Secs. 105-24—105-50. Reserved.
ARTICLE II. THIRD-PARTY INSPECTION: A PROGRAM FOR ENHANCED QUALITY
ASSURANCE*
Sec. 105-51. Definitions.
For purposes of this third-party inspection ordinance, the following definitions shall apply unless the context indicates otherwise:
Approved third-party inspectors and plans reviewer list. The department maintains a comprehensive list comprising the names of qualified and experienced professionals who have complied with the application and renewal requirements of the Dawson County Third Party Inspection and Plans Review Program. These individuals have been approved to perform third-party inspections and plan reviews, ensuring the minimum safety and quality standards in unincorporated Dawson County.
(1) An approved third-party inspector, a registered professional engineer, or an architect plays a significant role in the inspection process. They have successfully met the application and renewal requirements of the Dawson County Third Party Inspection and Plans Review Program. These professionals are authorized to conduct third-party inspections in unincorporated Dawson County, as per the provisions of this article of the Dawson County Code. It's important to note that an approved third-party inspector is intended to function as a "private, professional provider" for inspections, as described in the state Act.
(2) An approved third-party plans reviewer, a registered professional engineer or architect, is critical in the plan review process. They have successfully met the application and renewal requirements of the Dawson County Third Party Inspection and Plans Review Program.
These professionals are authorized to conduct third-party plan reviews in unincorporated Dawson County, as per the provisions of this article of the Dawson County Code. Approved third-party plans reviewer is intended to function as a "private, professional provider" for the review of building construction plans, as described in the state Act.
County. Dawson County is outside of the municipal limits of the City of Dawsonville.
Department. The Dawson County Department of Community Development, or the other department the Dawson County Board of Commissioners may assign to be responsible for performing inspections and overseeing the third-party inspection and plans review system described herein.
Inspection. The observance of work and the performance of tests for specific components and elements to establish conformance with Dawson County approved construction documents, building codes and ordinances adopted by Dawson County, and the requirements of the state minimum standards as adopted and amended by the Georgia Department of Community Affairs.
Inspection certification. A written statement signed by an approved third party inspector or their approved technician, which shall indicate that the item(s) being inspected, in the authorized third party inspector's professional opinion and to the best of their knowledge, complies with Dawson County approved construction documents, building codes and ordinances adopted by Dawson County, the requirements of the state minimum standards as adopted and amended by the Georgia Department of Community Affairs, and any other applicable inspections that inspectors employed by Dawson County typically performs.
Inspection field report. A written report prepared by an approved third-party inspector or a technician working under an approved third-party inspector's direct supervision which describes the work conducted and the findings of an inspection.
Plans review affidavit. A written affidavit that is completed and signed under oath by an approved third-party plans reviewer, which shall indicate the plans that have been reviewed for a building permit for the application in question, in the approved third-party plans reviewer's professional opinion and to the best of their knowledge, complies with the regulatory requirements as designated by Dawson County, including the Georgia State Minimum Standard Codes most recently adopted by the Georgia Department of Community Affairs and any locally adopted ordinances and amendments to such codes, applicable zoning ordinances and conditions, design standards, and any other applicable laws and regulations that would otherwise be required of staff employed by the Dawson County Community Development Department.
Registered professional architect. An individual that holds a certificate of registration issued under O.C.G.A. tit. 43, ch. 4.
Registered professional engineer. An individual that holds a certificate of registration issued under O.C.G.A. tit. 43, ch. 15.
Regulatory fees. All fees established by the department are to be paid to the department for any regulatory action, inspection services, or plan review services as provided by the state Act and this article.
State Act. O.C.G.A. §§ 8-2-26 and 8-2-26.1.
Technician. An individual who performs inspections under the direct supervision of an approved third-party inspector.
Third-party inspection. An inspection is performed in conformance with this program by an approved third-party inspector.
Third-party inspection and plan review program. This chapter describes the rules and procedures for this program.
Third-party plans review. A review of building construction plans was performed in conformity with this program by approved third-party plan reviewers.
(Ord. of 6-20-2024(1); Ord. of 9-18-2025(1), Exh. A, § 14) Sec. 105-52. Third-party inspection and plans review program.
(a) The department will establish and maintain an approved list of approved third-party inspectors and plan reviewers from whom it will accept third-party inspections and third-party plan reviews in accordance with this third-party inspection and plan review ordinance.
(b) In full compliance with the requirements of the state Act, Dawson County shall allow owners, developers, and contractors to submit inspection certifications by approved third-party inspectors and plans review affidavits by approved third-party plans reviewers to satisfy specific inspection and plans review requirements.
(c) The department will only consider inspection certifications and plans review affidavits from individuals listed on the approved third-party inspector and plans reviewer list. Dawson County makes no representation concerning the approved third-party inspectors and approved third-party plan reviewers, other than that they have submitted evidence that they have met the minimum criteria necessary to qualify for the third-party inspection and plans review program described herein.
(d) For an inspection certification or plans review affidavit to be accepted by the department for a particular project, an approved third-party inspector or approved third-party plans reviewer must be independent of and must not be an employee of, otherwise affiliated with, or financially interested in the person, firm, or corporation engaged in the construction project to be inspected.
(e) The person, firm, or corporation retaining an approved third-party inspector or approved third-party plans reviewer to conduct an inspection or plans review shall be required to pay to the county the same regulatory fees that would have been required had a county inspector, or county plan reviewer has conducted the inspection or plans review. Upon paying in full the costs associated with the complete application, the applicant may nevertheless choose to retain, at its own expense, an approved third-party inspector or approved third-party plans reviewer to provide the required inspection or plan review, subject to the requirements outlined in this article. Any regulatory fees or convenience fees paid to the county are nonrefundable.
(f) All other fees and costs related to the performance of the third-party inspections or third-party plans review are matters solely between the approved third-party inspector or approved third-party plans reviewer and the person, firm, or corporation engaging the approved third-party inspector or approved third-party plans reviewer.
(g) Notwithstanding the submission of an inspection certification or plans review affidavit, the department retains the authority to make all code interpretations and to monitor the quality of all third-party inspections and third-party plans reviews. Nothing in this article shall be construed as authorizing any approved third-party inspector or approved third-party plans reviewer to issue a certificate of occupancy or compliance.
(h) The department will continue to provide full support to customers who choose not to utilize the services of approved third-party inspectors or approved third-party plan reviewers.
(i) The department will follow all applicable procedures outlined in the state Act for all inspections and plan reviews. For processing applications compliant with the state Act, an application submitted to the department shall not be considered complete until all applicable fees have been paid and all applicable county departments have previously received the application and provided any required approvals.
(Ord. of 6-20-2024(1)) Sec. 105-53. Inspections types.
(a) The department will, at minimum, accept third-party inspections in compliance with the state Act for any construction inspections required by state and local codes.
(b) Approved third-party inspectors shall be authorized to conduct any inspection required by the county necessary or required to determine compliance with all regulatory requirements and for the issuance of a building permit or certificate of occupancy, certificate of completion, provided that the inspection being performed is within the scope of the approved third-party inspector's area of competency. Nothing in this article shall be construed as authorizing any approved third-party inspection of local fire safety standards.
(c) Nothing in this article shall be construed as authorizing any approved third-party inspection of site staking and erosion control measures in compliance with an approved grading plan, which shall be taken before any construction activities if required.
(Ord. of 6-20-2024(1)) Sec. 105-54. Approved third-party inspector qualifications.
(a) Individuals wishing to be placed on the approved third-party inspectors and plans reviewer list must submit an initial application to the department.
(b) To qualify as an approved third-party inspector, an individual must:
(1) Be a registered professional engineer or architect as defined in this article.
(2) Otherwise, be in good standing with all pertinent certification and professional accreditation boards.
(3) Possess and maintain minimum insurance as described herein.
(4) Demonstrate relevant experience of at least one year.
(c) An individual shall not be qualified to be placed on the approved third-party inspectors and plans reviewer list if they have had the authority to issue third-party inspection certifications in any other jurisdictions revoked. If an individual previously qualified to be on the approved third-party inspectors and plans reviewer list and subsequently has his/her authority to issue third-party inspection certifications revoked, the individual shall be removed from the approved third-party inspectors and plans reviewer list.
(d) An approved third-party inspector may not submit an inspection certification if the inspector is an officer or employee of the owner, developer, contractor, or other party or if the inspector is employed by or a partner in a firm that is affiliated with or financially interested in the owner, developer, contractor, or other party on whose behalf the inspection certification is submitted.
(e) Technicians may perform inspections under the supervision of an approved third-party inspector provided that the technician has satisfied any specific requirements as may be designated by the building official.
(f) Technicians performing inspections under the supervision of an approved third-party inspector shall possess ICC certifications relevant to the types of inspections performed. For zoning inspections, technicians shall provide documentation demonstrating three years of experience and training, including general building construction, construction trades, and code enforcement/ interpretation, or any equivalent combination of education, training, and experience to be determined at the building official's discretion.
(g) Approved third-party inspectors shall obtain and maintain the following minimum insurance coverages and provisions, evidence of which shall be submitted to the department with the initial application:
(1) Comprehensive general liability insurance for liability and property damage for not less than $1,000,000.00 per occurrence.
(2) Professional liability insurance for errors and omissions in an amount of not less than $1,000,000.00 per occurrence and $1,000,000.00 in aggregate coverage for any project with a construction cost of $5,000,000.00 or less. For any project with a construction cost of more than $5,000,000.00, the amount of professional liability insurance for errors and omissions shall not be less than $2,000,000.00 per claim and $2,000,000.00 in aggregate coverage.
(3) Such insurance may be a practice policy or project-specific coverage. If the insurance is a practice policy, it shall contain prior acts coverage for the private professional provider. If the insurance is project-specific, it shall continue in effect for two years following the issuance of the final certificate of occupancy or certification of completion for the project.
(4) The cancellation provision shall provide for 30 days' cancellation notice.
(5) Dawson County, Georgia, its officers, officials, employees, and representatives shall be named additional insureds on the required insurance policies.
(6) The required insurance coverages shall be provided by an insurance company licensed to do business by and in good standing with the Georgia Department of Insurance at all times.
(7) Approved third-party inspectors shall maintain the minimum insurance coverage as required above at all times during which they are listed as approved third-party inspectors.
Approved third-party inspectors shall provide the department with evidence of minimum insurance coverages and provisions annually before any policy or coverage expiration and upon request by the department. Should any insurance coverage or information change, the approved third-party inspector shall provide written notice of any such change to the county within ten business days. If at any time an approved third-party inspector fails to maintain the required insurance coverage, the department may remove them from the approved thirdparty inspectors and plans reviewer list.
(h) Suspension of technicians and approved third-party inspectors:
(1) An individual who performs inspections under this article, whether a technician or an individual approved third-party inspector, shall be subject to suspension from the authorized third-party inspector and plans reviewer list and from submitting inspection field reports and inspection certifications for the following infractions:
a. Inspections are provided without an appropriate license or certification.
b. Inspection services are provided before the issuance of a valid building permit.
c. Failing to identify any noncompliance with any applicable code, as amended, governing individual and public safety and welfare (including, but not limited to, sections 308, 310-312, 314, and 315 of the International Residential Code, section 607 of the International Plumbing Code, sections 406, 502, and 503 of the International Fuel Gas Code, and sections 210, 240, and 250 of the National Electric Code, as adopted by the Georgia Department of Community Affairs) as determined in the sole good faith discretion of the building official. However, it is the express intent of the county not to impose sanctions on an individual under this article for failing to identify multiple instances of noncompliance in one inspection, such as that each such failure constitutes an individual and separate infraction. Instead, various failures contained in a single inspection under this paragraph shall be treated as a single infraction.
d. Authorizing any deviation from the approved permit.
e. Falsifying reports.
f. Unauthorized employee performing inspections.
g. Performing unauthorized types of inspections.
h. Inspections are passed with a hold on a project or under stop-work.
i. Failure to identify noncompliance with any applicable code not captured in subsection
(c) above upon identification of such failure by the county on multiple occasions, as determined in the sole good faith discretion of the building official.
(2) Infractions within 12 months. Suspension for submitting inspection field reports and inspection certifications for infractions by a technician or individual approved third-party inspector shall be progressive based on the number of infractions in the previous 12-month period.
For any combination of infractions within 12 months, the following actions and suspensions against a technician or individual approved third-party inspector shall be assessed:
First infraction: Warning letter Second infraction: Warning letter and notice to permit holder Third infraction: A 30-day suspension from eligibility to perform inspections and submit inspection field reports and inspection certifications
Fourth infraction: A 90-day suspension from eligibility to perform inspections and submit inspection field reports and inspection certifications
Fifth infraction: One-year suspension from eligibility to perform inspections and submit inspection field reports and inspection certifications
(3) Violations within 24 months. An approved third-party inspector shall be subject to progressive action based on the number of infractions in the previous 24-month period by individuals performing inspections, including the individual approved third-party inspector or any one or more technicians acting under the supervision of the authorized third-party inspector (which shall include technicians serving as employees, independent contractors, agents, etc.). Violations under this paragraph shall accrue upon every third infraction by an individual contemplated in paragraph (h)(2) above. They shall subject approved third-party inspectors to the following actions and suspensions for any combination of infractions within 24 months:
First violation (upon third individual infraction):
A written letter of reprimand from the building official Second violation (upon sixth individual infraction):
Seven-day suspension from approved third-party inspector and plans reviewer list Third violation (upon ninth individual infraction):
A 30-day suspension from approved third-party inspector and plans reviewer list Fourth violation (upon 12th individual infraction):
A 90-day suspension from approved third-party inspector and plans reviewer list Fifth violation (upon 15th individual infraction):
Two-year suspension from approved third-party inspector and plans reviewer list The county shall send a written notice to the approved third-party inspector for each infraction as contemplated in paragraph (h)(2) above, the purpose of which shall be to inform the approved third-party inspector of the number of infractions accruing under paragraph (h)(2) to put the authorized third party inspector on notice of possible violations under this paragraph (h)(3), and so the approved third party inspector has the opportunity to take any remedial action necessary to prevent future infractions and violations.
(4) Notwithstanding any other provision of this article, in the event a technician or individual approved third-party inspector is found to have violated subsection (h)(1)e. falsifying reports, the progressive actions and suspensions of this article may, at the county's discretion, be bypassed with an immediate suspension and disqualification imposed.
(5) Suspension and disqualification appeals shall be processed through the construction board of appeals at its next meeting as appeals of building official decisions.
(Ord. of 6-20-2024(1)) Sec. 105-55. Procedures for conducting third-party inspections.
(a) An approved third-party inspector shall not suggest, direct, or authorize any deviation from approved construction documents without obtaining the building official's approval.
(b) The following procedures shall apply to all third-party inspections:
(1) To ensure quality control of the third-party inspection and plans review program, the department shall receive a copy of all inspection field reports within one business day of the inspection.
(2) All inspection field reports shall note the type of inspection and any deficiencies observed.
(3) Inspection certifications shall be submitted one business day after the inspection. Once the certification is received, the department will update the inspection status in the ordinary course of business.
(4) Final inspections will not be scheduled until all outstanding reinspection fees have been paid.
(5) Third-party inspectors shall not be authorized to perform final inspections.
(6) Third-party inspectors shall not be authorized to approve power release inspections.
(7) When performing re-inspections for violations initially noted by department staff, each corrected item shall be addressed individually.
(8) Testing criteria, means, and procedures shall be noted for after-the-fact and after-cover-up inspections. Inspection letters submitted without meeting these requirements or those that are contrary to building codes will not be accepted.
(c) The department shall have a right to enter any premises inspected by an approved third-party inspector or technician to ensure compliance with this article and the state Act.
(Ord. of 6-20-2024(1); Ord. of 9-18-2025(1), Exh. A, § 15) Sec. 105-56. Approved third-party plans reviewer qualifications.
(a) Individuals wishing to be placed on the approved third-party inspectors and plans reviewer list as approved plans reviewers must submit an initial application to the department.
(b) To qualify as an approved third-party plans reviewer, an individual must:
(1) Be a partner in or employed by an engineering or architect firm in full compliance with the Dawson County, Georgia Code of Ordinances.
(2) Be a registered professional engineer or registered professional architect as defined in this article.
(3) Otherwise, be in good standing with all pertinent certification and professional accreditation boards.
(4) Possess and maintain minimum insurance as described herein.
(5) Demonstrate relevant experience of at least one year.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.