Dawson County · Código de ordenanzas
Dawson County Code of Ordinances
Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.
Sobre este texto
- As published by Municode, current through 2026-09-03
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Parte 9 de 13. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.
(2) Require that new development and redevelopment maintain the pre-development hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, streambank erosion, nonpoint source pollution and increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats;
(3) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality;
(4) Establish design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum post-development stormwater management standards;
(5) Encourage the use of nonstructural stormwater management and stormwater better site design practices, such as the preservation of greenspace and other conservation areas, to the maximum extent practicable.
(6) Establish provisions for the long-term responsibility for and maintenance of structural stormwater control facilities and nonstructural stormwater management practices to ensure that they continue to function as designed, are maintained, and pose no threat to public safety; and,
(7) Establish administrative procedures for the submission, review, approval and disapproval of stormwater management plans, and for the inspection of approved active projects, and long-term follow up.
(b) Applicability.
(1) This article shall be applicable to all land development, including, but not limited to, site plan applications, subdivision applications, and grading applications, unless exempt pursuant to subsection 109-141(b)(2) below. These standards apply to any new development or redevelopment site that meets one or more of the following criteria:
a. New development that involves the creation of 5,000 square feet or more of impervious cover, or that involves other land development activities of one acre or more;
b. Redevelopment that includes the creation, addition or replacement of 5,000 square feet or more of impervious cover, or that involves other land development activity of one acre or more;
c. Any new development or redevelopment, regardless of size, that is defined by the Dawson County Stormwater Manager to be a hotspot land use; or,
d. Land development activities that are smaller than the minimum applicability criteria set forth in items a. and b. above if such activities are part of a larger common plan of development, even though multiple, separate and distinct land development activities may take place at different times on different schedules.
(2) The following activities are exempt from this article:
a. Individual single-family or duplex residential lots that are not part of a subdivision or phased development project;
b. Additions or modifications to existing single-family or duplex residential structures;
c. Agricultural or silvicultural land management activities within areas zoned for these activities; and,
d. Repairs to any stormwater management facility or practice deemed necessary by the Dawson County Stormwater Manager.
(c) Designation of ordinance administrator. The Dawson County Stormwater Manager is hereby appointed to administer and implement the provisions of this ordinance.
(d) Compatibility with other regulations. This article is not intended to modify or repeal any other ordinance, rule, regulation or other provision of law. The requirements of this article are in addition to the requirements of any other ordinance, rule, regulation or other provision of law, and where any provision of this article imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control.
(e) Stormwater design manual. Dawson County will utilize the policy, criteria and information including technical specifications and standards in the latest edition of the Georgia Stormwater Management Manual and any relevant local addenda, for the proper implementation of the requirements of this ordinance. The manual may be updated and expanded periodically, based on improvements in science, engineering, monitoring and local maintenance experience.
(Ord. of 6-4-2015(3), § 1) Sec. 109-142. Definitions.
Applicant means a person submitting a post-development stormwater management application and plan for approval.
Channel means a natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water.
Conservation easement means an agreement between a land owner and the (local jurisdiction) or other government agency or land trust that permanently protects open space or greenspace on the owner's land by limiting the amount and type of development that can take place, but continues to leave the remainder of the fee interest in private ownership.
Detention means the temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling the peak discharge.
Detention facility means a detention basin or structure designed for the detention of stormwater runoff and gradual release of stored water at controlled rates.
Developer means a person who undertakes land development activities.
Development means a land development or land development project.
Drainage easement means an easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement.
Erosion and sedimentation control plan means a plan that is designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities.
Extended detention means the detention of stormwater runoff for an extended period, typically 24 hours or greater.
Extreme flood protection means measures taken to prevent adverse impacts from large lowfrequency storm events with a return frequency of 100 years or more.
Flooding means a volume of surface water that is too great to be confined within the banks or walls of a conveyance or stream channel and that overflows onto adjacent lands.
Greenspace or open space means permanently protected areas of the site that are preserved in a natural state.
Hotspot means an area where the use of the land has the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater.
Hydrologic Soil Group (HSG) means a Natural Resource Conservation Service classification system in which soils are categorized into four runoff potential groups. The groups range from group A soils, with high permeability and little runoff produced, to group D soils, which have low permeability rates and produce much more runoff.
Impervious cover means a surface composed of any material that significantly impedes or prevents the natural infiltration of water into soil. Impervious surfaces include, but are not limited to, rooftops, buildings, streets and roads, and any concrete or asphalt surface.
Industrial Stormwater Permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.
Infiltration means the process of percolating stormwater runoff into the subsoil.
Jurisdictional wetland means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for life in saturated soil conditions, commonly known as hydrophytic vegetation.
Land development means any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other installation of impervious cover.
Land development activities means those actions or activities which comprise, facilitate or result in land development.
Land development project means a discrete land development undertaking.
Inspection and maintenance agreement means a written agreement providing for the long-term inspection and maintenance of stormwater management facilities and practices on a site or with respect to a land development project, which when properly recorded in the deed records constitutes a restriction on the title to a site or other land involved in a land development project.
New development means a land development activity on a previously undeveloped site.
Nonpoint source pollution means a form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.
Nonstructural stormwater management practice or nonstructural practice means any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and greenspace areas, overland flow filtration areas, natural depressions, and vegetated channels.
Off-site facility means a stormwater management facility located outside the boundaries of the site.
On-site facility means a stormwater management facility located within the boundaries of the site.
Overbank flood protection means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain), and that are intended to protect downstream properties from flooding for the 2-year through 25-year frequency storm events.
Owner means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.
Permit means the permit issued by Dawson County to the applicant which is required for undertaking any land development activity.
Person means, except to the extent exempted from this ordinance, any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, city, county or other political subdivision of the state, any interstate body or any other legal entity.
Post-development refers to the time period, or the conditions that may reasonably be expected or anticipated to exist, after completion of the land development activity on a site as the context may require.
Pre-development refers to the time period, or the conditions that exist, on a site prior to the commencement of a land development project and at the time that plans for the land development of a site are approved by the plan approving authority. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.), the existing conditions at the time prior to the first item being approved or permitted shall establish pre-development conditions.
Project means a land development project.
Redevelopment means a land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution.
Regional stormwater management facility or regional facility means stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for on-site controls is either eliminated or reduced.
Runoff means stormwater runoff.
Site means the parcel of land being developed, or the portion thereof on which the land development project is located.
Stormwater better site design means nonstructural site design approaches and techniques that can reduce a site's impact on the watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious cover and using natural features for stormwater management.
Stormwater management means the collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner intended to prevent increased flood damage, streambank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare.
Stormwater management facility means any infrastructure that controls or conveys stormwater runoff.
Stormwater management measure means any stormwater management facility or nonstructural stormwater practice.
Stormwater management plan means a document describing how existing runoff characteristics will be affected by a land development project and containing measures for complying with the provisions of this ordinance.
Stormwater management system means the entire set of structural and nonstructural stormwater management facilities and practices that are used to capture, convey and control the quantity and quality of the stormwater runoff from a site.
Stormwater retrofit means a stormwater management practice designed for a currently developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site.
Stormwater runoff means the flow of surface water resulting from precipitation.
Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of such runoff.
Subdivision means the division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway.
(Ord. of 6-4-2015(3), § 2) Sec. 109-143. Permit procedures and requirements.
(a) Permit application requirements. Permitting of land disturbing activities is covered under the Dawson County Soil Erosion and Sedimentation Control Ordinance. The information required in this ordinance is in addendum to the E&S ordinance.
No owner or developer shall perform any land development activities without first meeting the requirements of this ordinance prior to commencing the proposed activity.
Unless specifically exempted by this ordinance, any owner or developer proposing a land development activity shall submit to Dawson County a permit application in accordance with the procedures established in the Dawson County Soil Erosion and Sedimentation Control Ordinance on a form provided by Dawson County for that purpose.
Unless otherwise exempted by this ordinance, a permit application shall be accompanied by the following items in order to be considered:
(1) Stormwater concept plan and consultation meeting certification in accordance with section 109-143(b);
(2) Stormwater management plan in accordance with section 109-143(c);
(3) Inspection and maintenance agreement in accordance with section 109-143(d), if applicable.
(b) Stormwater concept plan and consultation meeting. Before any stormwater management permit application is submitted, it is recommended that the land owner or developer [shall] meet with Dawson County for a consultation meeting on a concept plan for the post-development stormwater management system to be utilized in the proposed land development project. This consultation meeting should [shall] take place at the time of the preliminary plan of subdivision or other early step in the development process. The purpose of this meeting is to discuss the post-development stormwater management measures necessary for the proposed project, as well as to discuss and assess constraints, opportunities and potential ideas for stormwater management designs before the formal site design engineering is commenced.
To accomplish this goal the following information should [shall] be included in the concept plan which should [shall] be submitted in advance of the meeting:
A. Existing Conditions/Proposed Site Plans. Existing conditions and proposed site layout sketch plans, which illustrate at a minimum: existing and proposed topography; perennial and intermittent streams; mapping of predominant soils from soil surveys (when available);
boundaries of existing predominant vegetation and proposed limits of clearing and grading;
and location of existing and proposed roads, buildings, parking areas and other impervious surfaces.
B. Natural Resources Inventory. A written or graphic inventory of the natural resources at the site and surrounding area as it exists prior to the commencement of the project. This description should include a discussion of soil conditions, forest cover, topography, wetlands, and other native vegetative areas on the site, as well as the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.). Particular attention should be paid to environmentally sensitive features that provide particular opportunities or constraints for development.
C. Stormwater Management System Concept Plan. A written or graphic concept plan of the proposed post-development stormwater management system including: preliminary selection and location of proposed structural stormwater controls; location of existing and proposed conveyance systems such as grass channels, swales, and storm drains; flow paths; location of floodplain/floodway limits; relationship of site to upstream and downstream properties and drainages; and preliminary location of proposed stream channel modifications, such as bridge or culvert crossings.
Local watershed plans, and any relevant resource protection plans will be consulted in the discussion of the concept plan.
(c) Stormwater management plan requirements. The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this ordinance, including the performance criteria set forth in section 109-144 below.
This plan shall be in accordance with the criteria established in this section and be prepared under the direct supervisory control of either a registered professional engineer or a registered landscape architect licensed in the State of Georgia. Section C, D, E and F shall be prepared under the direct supervisory control of a registered professional engineer, who shall seal and sign the work. Portions of the overall plan may be prepared and stamped by a registered land surveyor licensed in the state of Georgia as appropriate, such as boundary surveys, contour maps, erosion and sedimentation control plans.
The stormwater management plan must ensure that the requirements and criteria in this ordinance are being complied with and that opportunities are being taken to minimize adverse postdevelopment stormwater runoff impacts from the development. The plan shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include all of the information required in the stormwater management site plan checklist found in the stormwater design manual. This includes:
A. Common address and legal description of site.
B. Vicinity map.
C. Existing conditions hydrologic analysis. The existing condition hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of existing site conditions with the drainage basin boundaries indicated; acreage, soil types and land cover of areas for each sub-basin affected by the project; all perennial and intermittent streams and other surface water features; all existing stormwater conveyances and structural control facilities; direction of flow and exits from the site; analysis of runoff provided by off-site areas upstream of the project site; and methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. For redevelopment sites, predevelopment conditions shall be modeled using the established guidelines for the portion of the site undergoing land development activities.
D. Post-development hydrologic analysis. The post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of developed site conditions with the post-development drainage basin boundaries indicated;
total area of post-development impervious surfaces and other land cover areas for each sub-basin affected by the project; calculations for determining the runoff volumes that need to be addressed for each sub-basin for the development project to meet the postdevelopment stormwater management performance criteria in section 109-144; location and boundaries of proposed natural feature protection and conservation areas; documentation and calculations for any applicable site design credits that are being utilized;
methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. If the land development activity on a redevelopment site constitutes more than 50 percent of the site area for the entire site, then the performance criteria in Section 109-144 must be met for the stormwater runoff from the entire site.
E. Stormwater management system. The description, scaled drawings and design calculations for the proposed post-development stormwater management system, which shall include: A map and/or drawing or sketch of the stormwater management facilities, including the location of nonstructural site design features and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; a narrative describing how the selected structural stormwater controls will be appropriate and effective; cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria; a hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (including stage-storage or outlet rating curves, and inflow and outflow hydrographs); documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management performance criteria in Section 109-144; drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas of overland flow; and where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans and/or local environmental protection plans.
F. Post-development downstream analysis. A downstream peak flow analysis which includes the assumptions, results and supporting calculations to show safe passage of postdevelopment design flows downstream. The analysis of downstream conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is 10 percent of the total basin area. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes. The analysis shall be in accordance with the stormwater design manual.
G. Construction-phase erosion and sedimentation control plan. An erosion and sedimentation control plan in accordance with the Dawson County Erosion and Sedimentation Control Ordinance. The plan shall also include information on the sequence/phasing of construction and temporary stabilization measures and temporary structures that will be converted into permanent stormwater controls.
H. Landscaping and open space plan. A detailed landscaping and vegetation plan describing the woody and herbaceous vegetation that will be used within and adjacent to stormwater management facilities and practices. The landscaping plan must also include: the arrangement of planted areas, natural and greenspace areas and other landscaped features on the site plan; information necessary to construct the landscaping elements shown on the plan drawings; descriptions and standards for the methods, materials and vegetation that are to be used in the construction; density of plantings; descriptions of the stabilization and management techniques used to establish vegetation; and a description of who will be responsible for ongoing maintenance of vegetation for the stormwater management facility and what practices will be employed to ensure that adequate vegetative cover is preserved.
I. Operations and maintenance plan. Detailed description of ongoing operations and maintenance procedures for stormwater management facilities and practices to ensure their continued function as designed and constructed or preserved. These plans will identify the parts or components of a stormwater management facility or practice that need to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary. The plan shall include an inspection and maintenance schedule, maintenance tasks, responsible parties for maintenance, funding, access and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan.
J. Maintenance access easements. The applicant must ensure access from public right-ofway to stormwater management facilities and practices requiring regular maintenance at the site for the purpose of inspection and repair by securing all the maintenance access easements needed on a permanent basis. Such access shall be sufficient for all necessary equipment for maintenance activities. Upon final inspection and approval, a plat or document indicating that such easements exist shall be recorded and shall remain in effect even with the transfer of title of the property.
K. Inspection and maintenance agreements. Unless an on-site stormwater management facility or practice is dedicated to and accepted by Dawson County as provided in section 109-143(d) below, the applicant must execute an easement and an inspection and maintenance agreement binding on all subsequent owners of land served by an on-site stormwater management facility or practice in accordance section 109-143(d).
L. Evidence of acquisition of applicable local and non-local permits. The applicant shall certify and provide documentation to Dawson County that all other applicable environmental permits have been acquired for the site prior to approval of the stormwater management plan.
(d) Stormwater management inspection and maintenance agreements. Prior to the issuance of any permit for a land development activity requiring a stormwater management facility or practice hereunder and for which Dawson County requires ongoing maintenance, the applicant or owner of the site must, unless an on-site stormwater management facility or practice is dedicated to and accepted by Dawson County, execute an inspection and maintenance agreement, and/or a conservation easement, if applicable, that shall be binding on all subsequent owners of the site.
The inspection and maintenance agreement, if applicable, must be approved by Dawson County prior to plan approval, and recorded in the deed records upon final plat approval.
The inspection and maintenance agreement shall identify by name or official title the person(s) responsible for carrying out the inspection and maintenance. Responsibility for the operation and maintenance of the stormwater management facility or practice, unless assumed by a governmental agency, shall remain with the property owner and shall pass to any successor owner. If portions of the land are sold or otherwise transferred, legally binding arrangements shall be made to pass the inspection and maintenance responsibility to the appropriate successors in title. These arrangements shall designate for each portion of the site, the person to be permanently responsible for its inspection and maintenance.
As part of the inspection and maintenance agreement, a schedule shall be developed for when and how often routine inspection and maintenance will occur to ensure proper function of the stormwater management facility or practice. The agreement shall also include plans for annual inspections to ensure proper performance of the facility between scheduled maintenance and shall also include remedies for the default thereof.
In addition to enforcing the terms of the inspection and maintenance agreement, Dawson County may also enforce all of the provisions for ongoing inspection and maintenance in section 109-146 of this article.
Dawson County, in lieu of an inspection and maintenance agreement, may accept dedication of any existing or future stormwater management facility for maintenance, provided such facility meets all the requirements of this ordinance and includes adequate and perpetual access and sufficient area, by easement or otherwise, for inspection and regular maintenance.
(e) Modifications for off-site facilities. The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility.
A stormwater management plan must be submitted to Dawson County which shows the adequacy of the off-site or regional facility.
To be eligible for a modification, the applicant must demonstrate to the satisfaction of Dawson County that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas:
(1) Increased threat of flood damage to public health, life, and property;
(2) Deterioration of existing culverts, bridges, dams, and other structures;
(3) Accelerated streambank or streambed erosion or siltation;
(4) Degradation of in-stream biological functions or habitat; or
(5) Water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations.
(Ord. of 6-4-2015(3), § 3) Sec. 109-144. Post-development stormwater management performance criteria.
The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this article:
(a) Water quality. All stormwater runoff generated from sites contained in the EPA designated urbanized area covered by the Dawson County Stormwater Management Plan shall be adequately treated before discharge. The stormwater management system shall be designed to remove 80 percent of the average annual post-development total suspended solids (TSS) load as defined in the Georgia Stormwater Management Manual. It will be presumed that a stormwater management system complies with this requirement if:
(1) It is sized to treat the prescribed water quality treatment volume from the site, as defined in the Georgia Stormwater Management Manual;
(2) Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual; and,
(3) Runoff from hotspot land uses and activities identified by Dawson County are adequately treated and addressed through the use of appropriate structural stormwater controls, nonstructural practices and pollution prevention practices.
(b) Stream channel protection. Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three approaches:
(1) Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer;
(2) 24-hour extended detention storage of the 1-year, 24-hour return frequency storm event;
(3) Erosion prevention measures such as energy dissipation and velocity control.
(c) Overbank flooding protection. Downstream overbank flood and property protection shall be provided by controlling (attenuating) the post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the 1-year, 24-hour storm under section 109-144(b) is exempted, then peak discharge rate attenuation of the 2-year through the 25-year return frequency storm event must be provided.
(d) Extreme flooding protection. Extreme flood and public safety protection shall be provided by controlling and safely conveying the 100-year, 24 hour return frequency storm event such that flooding is not exacerbated.
(e) Structural stormwater controls. All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the Georgia Stormwater Management Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from Dawson County before being included in the design of a stormwater management system.
In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, Dawson County may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question.
Applicants shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control.
(f) Stormwater credits for nonstructural measures. The use of one or more site design measures by the applicant may allow for a reduction in the water quality treatment volume required under section 109-144(a). The applicant may, if approved by Dawson County, take credit for the use of stormwater better site design practices and reduce the water quality volume requirement. For each potential credit, there is a minimum set of criteria and requirements which identify the conditions or circumstances under which the credit may be applied. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the Georgia Stormwater Management Manual.
(g) Drainage system guidelines. Stormwater conveyance facilities, which may include but are not limited to culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-of-way and private properties adjoining project sites and/or public right-of-ways. Stormwater conveyance facilities that are designed to carry runoff from more that one parcel, existing or proposed, shall meet the following requirements:
(1) Methods to calculate stormwater flows shall be in accordance with the stormwater design manual;
(2) All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the stormwater design manual; and,
(3) Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the stormwater design manual.
(h) Dam design guidelines. Any land disturbing activity that involves a site which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable.
(Ord. of 6-4-2015(3), § 4) Sec. 109-145. Construction inspections of post-development stormwater management system.
(a) Inspections to ensure plan compliance during construction. Periodic inspections of the stormwater management system construction shall be conducted by the Dawson County Stormwater Management Office or conducted and certified by a professional engineer who has been approved by Dawson County. Construction inspections shall utilize the approved stormwater management plan for establishing compliance.
All inspections shall be documented with written reports that contain the following information:
(1) The date and location of the inspection;
(2) Whether construction is in compliance with the approved stormwater management plan;
(3) Variations from the approved construction specifications; and,
(4) Any other variations or violations of the conditions of the approved stormwater management plan.
(5) A statement of the penalty or penalties that shall or may be assessed against the person to whom the notice of violation is directed.
If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions.
(b) Final inspection and as built plans. Upon completion of a project, and before a certificate of occupancy shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit actual "as built" plans for any stormwater management facilities or practices after final construction is completed. The plan must show the final design specifications for all stormwater management facilities and practices and must be certified by a professional engineer. Afinal inspection by Dawson County is required before the release of any certificates of occupancy or certificates of completion can occur.
(Ord. of 6-4-2015(3), § 5) Sec. 109-146. Ongoing inspection and maintenance of stormwater facilities and practices.
(a) Long-term maintenance inspection of stormwater facilities and practices. Stormwater management facilities and practices included in a stormwater management plan which are subject to an inspection and maintenance agreement must undergo ongoing inspections to document maintenance and repair needs and ensure compliance with the requirements of the agreement, the plan and this article.
A stormwater management facility or practice shall be inspected on a periodic basis by the responsible person in accordance with the approved inspection and maintenance agreement. In the event that the stormwater management facility has not been maintained and/or becomes a danger to public safety or public health, Dawson County shall notify the person responsible for carrying out the maintenance plan by registered or certified mail to the person specified in the inspection and maintenance agreement. The notice shall specify the measures needed to comply with the agreement and the plan and shall specify the time within which such measures shall be completed.
If the responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, Dawson County, may correct the violation as provided in subsection 109-146(d) hereof.
Inspection programs by Dawson County may be established on any reasonable basis, including but not limited to: routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to: reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in stormwater management facilities; and evaluating the condition of stormwater management facilities and practices.
(b) Right-of-entry for inspection. The terms of the inspection and maintenance agreement shall provide for Dawson County to enter the property at reasonable times and in a reasonable manner for the purpose of inspection. This includes the right to enter a property when it has a reasonable basis to believe that a violation of this article is occurring or has occurred and to enter when necessary for abatement of a public nuisance or correction of a violation of this article.
(c) Records of maintenance activities. Parties responsible for the operation and maintenance of a stormwater management facility shall provide records of all maintenance and repairs to Dawson County annually.
(d) Failure to maintain. If a responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, Dawson County, after 30 days written notice (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours notice shall be sufficient), may correct a violation of the design standards or maintenance requirements by performing the necessary work to place the facility or practice in proper working condition.
Dawson County may assess the owner(s) of the facility for the cost of repair work which shall be a lien on the property, and may be placed on the ad valorum tax bill for such property and collected in the ordinary manner for such taxes.
(Ord. of 6-4-2015(3), § 6) Sec. 109-147. Violations, enforcement and penalties.
Any action or inaction which violates the provisions of this article or the requirements of an approved stormwater management plan or permit may be subject to the enforcement actions outlined in this section. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief.
(a) Notice of violation. If Dawson County determines that an applicant or other responsible person has failed to comply with the terms and conditions of a permit, an approved stormwater management plan or the provisions of this article, it a written notice of violation shall issue to the applicant or other responsible person. If a person is engaged in activity covered by this ordinance without having first secured a permit therefor, then the notice of violation shall be served on the owner or the responsible person in charge of the activity being conducted on the site.
The notice of violation shall contain the following information:
(1) The name and address of the owner or the applicant or the responsible person;
(2) The address or other description of the site upon which the violation is occurring;
(3) A statement specifying the nature of the violation;
(4) A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the stormwater management plan or this ordinance and the date for the completion of such remedial action.
(b) Penalties. In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the notice of violation, any one or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, Dawson County shall first notify the applicant or other responsible person in writing of its intended action, and shall provide a reasonable opportunity, of not less than ten days (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours notice shall be sufficient) to cure such violation.
(1) Stop work order. Dawson County may issue a stop work order which shall be served on the applicant or other responsible person. The stop work order shall remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take the necessary remedial measures to cure such violation or violations.
(2) Withhold certificate of occupancy. Dawson County may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein.
(3) Suspension, revocation or modification of permit. Dawson County may suspend, revoke or modify the permit authorizing the land development project. A suspended, revoked or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided such permit may be reinstated [upon such conditions as Dawson County may deem necessary] to enable the applicant or other responsible person to take the necessary remedial measures to cure such violations.
(4) Civil penalties. In the event the applicant or other responsible person fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten days, or such greater period as Dawson County shall deem appropriate (except, that in the event the violation constitutes an immediate danger to public health or public safety, 24 hours notice shall be sufficient), Dawson County may impose a penalty not to exceed $1,000.00 for each day the violation remains unremedied after receipt of the notice of violation.
(5) Criminal penalties. A citation against the applicant or other responsible person. Upon conviction, such person shall be punished by a fine not to exceed $1,000.00 or imprisonment for 60 days or both. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.
(Ord. of 6-4-2015(3), § 7) Sec. 109-148. Repealer.
All resolutions or ordinances or parts thereof in conflict with the terms of this article are hereby repealed.
(Ord. of 6-4-2015(3), § 9) Chapters 110—112
RESERVED
Chapter 113
FLOOD DAMAGE PREVENTION
ARTICLE I. STATUTORY AUTHORIZATION, FINDINGS OF FACT, PURPOSE AND
OBJECTIVES
Sec. 113-1. Authorization.
Ga. Const. art. IX, § II and O.C.G.A. § 36-1-20(a) have delegated the responsibility to local governmental units to adopt regulations designed to promote the public health, safety, and general welfare of its citizenry. Therefore, the Board of Commissioners of Dawson County, Georgia, does ordain this chapter.
(Ord. of 9-4-2008, art. 1, § A) Sec. 113-2. Findings of fact.
(a) The flood hazard areas of Dawson County, Georgia, are subject to periodic inundation which results in loss of life and property, health and safety hazards, disruption of commerce and governmental services, extraordinary public expenditures for flood relief and protection, and impairment of the tax base, all of which adversely affect the public health, safety and general welfare.
(b) These flood losses are caused by the occupancy in flood hazard areas of uses vulnerable to floods, which are inadequately elevated, flood-proofed, or otherwise unprotected from flood damages, and by the cumulative effect of obstructions in floodplains causing increases in flood heights and velocities.
(Ord. of 9-4-2008, art. 1, § B) Sec. 113-3. Statement of purpose.
It is the purpose of this chapter to promote the public health, safety and general welfare and to minimize public and private losses due to flood conditions in specific areas by provisions designed to:
(1) Require that uses vulnerable to floods, including facilities, which serve such uses, be protected against flood damage at the time of initial construction;
(2) Restrict or prohibit uses which are dangerous to health, safety and property due to water or erosion hazards, or which increase flood heights, velocities, or erosion;
(3) Control filling, grading, dredging and other development which may increase flood damage or erosion; and
(4) Prevent or regulate the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards to other lands;
(5) Control the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of floodwaters.
(Ord. of 9-4-2008, art. 1, § C) Sec. 113-4. Objectives.
The objectives of this chapter are:
(1) To protect human life and health;
(2) To minimize damage to public facilities and utilities such as water and gas mains, electric, telephone and sewer lines, streets and bridges located in floodplains;
(3) To help maintain a stable tax base by providing for the sound use and development of flood prone areas in such a manner as to minimize flood blight areas;
(4) To minimize expenditure of public money for costly flood control projects;
(5) To minimize the need for rescue and relief efforts associated with flooding and generally undertaken at the expense of the general public;
(6) To minimize prolonged business interruptions; and
(7) To ensure that potential homebuyers are notified that property is in a flood area.
(Ord. of 9-4-2008, art. 1, §§ A—D) Secs. 113-5—113-26. Reserved.
ARTICLE II. GENERAL PROVISIONS
Sec. 113-27. Lands to which this chapter applies.
This chapter shall apply to all areas within the jurisdiction of Dawson County, Georgia.
(Ord. of 9-4-2008, art. 2, § A; Ord. of 9-18-2025(1), Exh. A, § 21) Sec. 113-28. Basis for area of special flood hazard.
(a) The areas of special flood hazard identified by the Federal Emergency Management Agency in its Flood Insurance Study (FIS), dated, April 4, 2018 with accompanying maps and other supporting data and any revision thereto, are adopted by reference and declared a part of this chapter.
(b) For those land areas acquired by a municipality through annexation, the current effective FIS dated April 4, 2018, with accompanying maps and other supporting data and any revision thereto, for Dawson County are hereby adopted by reference.
(c) The repository for public inspection of the flood insurance study (FIS), accompanying maps and other supporting data is located within the offices of the Dawson County Community Development Department.
(Ord. of 9-4-2008, art. 2, § B; Ord. of 9-18-2025(1), Exh. A, § 21) Sec. 113-29. Establishment of development permit.
A development permit shall be required in conformance with the provisions of this chapter prior to the commencement of any development activities.
(Ord. of 9-4-2008, art. 2, § C) Sec. 113-30. Compliance.
No structure or land shall hereafter be located, extended, converted or altered without full compliance with the terms of this chapter and other applicable regulations.
(Ord. of 9-4-2008, art. 2, § D) Sec. 113-31. Abrogation and greater restrictions.
This chapter is not intended to repeal, abrogate, or impair any existing ordinance, easements, covenants, or deed restrictions. However, where this chapter and another conflict or overlap, whichever imposes the more stringent restrictions shall prevail.
(Ord. of 9-4-2008, art. 2, § E) Sec. 113-32. Interpretation.
In the interpretation and application of this chapter all provisions shall be:
(1) Considered as minimum requirements;
(2) Liberally construed in favor of the governing body; and
(3) Deemed neither to limit nor repeal any other powers granted under state statutes.
(Ord. of 9-4-2008, art. 2, § F) Sec. 113-33. Warning and disclaimer of liability.
The degree of flood protection required by this chapter is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by man-made or natural causes. This chapter does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This chapter shall not create liability on the part of Dawson County or by any officer or employee thereof for any flood damages that result from reliance on this chapter or any administrative decision lawfully made hereunder.
(Ord. of 9-4-2008, art. 2, § G) Sec. 113-34. Penalties for violation.
Failure to comply with the provisions of this chapter or with any of its requirements, including conditions and safeguards established in connection with grants of variance or special exceptions shall constitute a violation. Any person who violates this chapter or fails to comply with any of its requirements shall, upon conviction thereof, be fined not more than $500.00 or imprisoned for not more than 60 days, or both, and in addition, shall pay all costs and expenses involved in the case.
Each day such violation continues shall be considered a separate offense. Nothing herein contained shall prevent Dawson County from taking such other lawful actions as is necessary to prevent or remedy any violation.
(Ord. of 9-4-2008, art. 2, § H) Secs. 113-35—113-56. Reserved.
ARTICLE III. ADMINISTRATION
Sec. 113-57. Designation of chapter administrator.
The building official or his or her designee is hereby appointed to administer and implement the provisions of this chapter.
(Ord. of 9-4-2008, art. 3, § A; Ord. of 9-18-2025(1), Exh. A, § 22) Sec. 113-58. Permit procedures.
Application for a development permit shall be made to the building official or his or her designee on forms furnished by the community prior to any development activities, and may include, but not be limited to, the following: plans in duplicate drawn to scale showing the elevations of the area in question and the nature, location, dimensions, of existing or proposed structures, earthen fill placement, storage of materials or equipment, and drainage facilities. Specifically, the following information is required:
(1) Application stage.
a. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures;
b. Elevation in relation to mean sea level to which any nonresidential structure will be flood-proofed;
c. Design certification from a registered professional engineer or architect that any proposed nonresidential flood-proofed structure will meet the flood-proofing criteria of section 113-78(2); and
d. Description of the extent to which any watercourse will be altered or relocated as a result of a proposed development.
(2) Construction stage.
a. For all new construction and substantial improvements, the permit holder shall provide to the administrator an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or flood-proofing is completed. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by same. When flood-proofing is utilized for nonresidential structures, said certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by same.
b. Any work undertaken prior to submission of these certifications shall be at the permit holder's risk.
c. The building official or his or her designee shall review the above-referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed. Failure to submit certification or failure to make said corrections required hereby, shall be cause to issue a stop-work order for the project.
(Ord. of 9-4-2008, art. 3, § B; Ord. of 9-18-2025(1), Exh. A, § 22) Sec. 113-59. Duties and responsibilities of the administrator.
Duties of the building official or his or her designee shall include, but shall not be limited to:
(1) Review proposed development to assure that the permit requirements of this chapter have been satisfied.
(2) Review proposed development to ensure that all necessary permits have been received from governmental agencies from which approval is required by federal or state law, including Section 404 of the Federal Water Pollution Control Act Amendments of 1972, 33 U.S.C. 1334. Require that copies of such permits be provided and maintained on file.
(3) Review all permit applications to determine whether proposed building sites will be reasonably safe from flooding.
(4) When base flood elevation data or floodway data have not been provided in accordance with section 113-28, then the building official or his or her designee shall obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other sources in order to administer the provisions of article IV of this chapter.
(5) Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new or substantially improved structures in accordance with section 113-58(2).
(6) Review and record the actual elevation, in relation to mean sea level to which any new or substantially improved structures have been flood-proofed, in accordance with section 113-58(2).
(7) When flood-proofing is utilized for a structure, the building official or his or her designee shall obtain certification of design criteria from a registered professional engineer or architect in accordance with section 113-58(1)c and section 113-78(2) or 113-80(2).
(8) Make substantial damage determinations following a flood event or any other event that causes damage to structures in flood hazard areas.
(9) Notify adjacent communities and the Georgia Department of Natural Resources prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA).
(10) For any altered or relocated watercourse, submit engineering data/analysis within six months to the FEMA to ensure accuracy of community flood maps through the letter of map revision process. Ensure flood carrying capacity of any altered or relocated watercourse is maintained.
(11) Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (for example, where there appears to be a conflict between a mapped boundary and actual field conditions) the building official or his or her designee shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this chapter.
(12) All records pertaining to the provisions of this chapter shall be maintained in the office of the building official or his or her designee and shall be open for public inspection.
(Ord. of 9-4-2008, art. 3, § C; Ord. of 9-18-2025(1), Exh. A, § 22) Secs. 113-60—113-76. Reserved.
ARTICLE IV. PROVISIONS FOR FLOOD HAZARD REDUCTION
Sec. 113-77. General standards.
In all areas of special flood hazard the following provisions are required:
(1) New construction and substantial improvements of existing structures shall be anchored to prevent flotation, collapse or lateral movement of the structure;
(2) New construction and substantial improvements of existing structures shall be constructed with materials and utility equipment resistant to flood damage;
(3) New construction or substantial improvements of existing structures shall be constructed by methods and practices that minimize flood damage;
(4) Elevated buildings. All new construction or substantial improvements of existing structures that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood-resistant enclosure.
The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater.
a. Designs for complying with this requirement must either be certified by a professional engineer or architect or meet the following minimum criteria:
1. Provide a minimum of two openings having a total net area of not less than one square inch for every square foot of enclosed area subject to flooding;
2. The bottom of all openings shall be no higher than one foot above grade; and
3. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both direction.
b. So as not to violate the "lowest floor" criteria of this chapter, the unfinished or flood-resistant enclosure shall only be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and
c. The interior portion of such enclosed area shall not be partitioned or finished into separate rooms.
(5) All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding;
(6) Manufactured homes shall be anchored to prevent flotation, collapse, or lateral movement.
Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces;
(7) New and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system;
(8) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters;
(9) On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding; and
(10) Any alteration, repair, reconstruction or improvement to a structure, which is not compliant with the provisions of this chapter, shall be undertaken only if the nonconformity is not furthered, extended or replaced.
(Ord. of 9-4-2008, art. 4, § A) Sec. 113-78. Specific standards.
In all areas of special flood hazard the following provisions are required:
(1) New construction and/or substantial improvements. Where base flood elevation data are available, new construction and/or substantial improvement of any structure or manufactured home shall have the lowest floor, including basement, elevated no lower than one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate equalization of flood hydrostatic forces on both sides of exterior walls shall be provided in accordance with standards of section 113-77(4), "Elevated buildings." All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated at or above one foot above the base flood elevation.
(2) Nonresidential construction. New construction and/or the substantial improvement of any structure located in A1-30, AE, or AH zones, may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to one foot above the base flood elevation, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and in section 113-59(7).
(3) Standards for manufactured homes. Where base flood elevation data are available:
a. All manufactured homes placed and/or substantially improved on:
1. Individual lots or parcels;
2. In new and/or substantially improved manufactured home parks or subdivisions;
3. In expansions to existing manufactured home parks or subdivisions; or
4. On a site in an existing manufactured home park or subdivision where a manufactured home has incurred "substantial damage" as the result of a flood;
must have the lowest floor including basement, elevated no lower than one foot above the base flood elevation.
b. Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision may be elevated so that either:
1. The lowest floor of the manufactured home is elevated no lower than one foot above the level of the base flood elevation; or
2. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than 36 inches in height above grade.
c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement. (Reference section 113-77(6).)
(4) Floodway. Located within areas of special flood hazard established in section 113-28, are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity floodwaters, debris or erosion potential. In addition, the area must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply:
a. Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway. Development may be permitted however, provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment shall not result in any increase in flood levels or floodway widths during a base flood discharge. A registered professional engineer must provide supporting technical data and certification thereof.
b. Only if subsection (4)a of this section is satisfied, then any new construction or substantial improvement shall comply with all other applicable flood hazard reduction provisions of this article.
(Ord. of 9-4-2008, art. 4, § B; Ord. of 9-18-2025(1), Exh. A, § 23) Sec. 113-79. Building standards for streams without established base flood elevations and/or floodway (A zones).
Located within the areas of special flood hazard established in section 113-28, where streams exist but no base flood data have been provided (A zones), or where base flood data have been provided but a floodway has not been delineated, the following provisions apply:
(1) When base flood elevation data or floodway data have not been provided in accordance with section 113-28, then the building official or his or her designee shall obtain, review, and reasonably utilize any scientific or historic base flood elevation and floodway data available from a federal, state, or other source, in order to administer the provisions of this article only if data are not available from these sources, then the following provisions of subsections (2) and (3) of this section shall apply.
(2) No encroachments, including structures or fill material, shall be located within an area equal to the width of the stream or 20 feet, whichever is greater, measured from the top of the stream bank, unless certification by a registered professional engineer is provided demonstrating that such encroachment shall not result in more than a one foot increase in flood levels during the occurrence of the base flood discharge.
(3) In special flood hazard areas without base flood elevation data, new construction and substantial improvements of existing structures shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three feet above the highest adjacent grade at the building site. (Note: Require the lowest floor to be elevated one foot above the estimated base flood elevation in A-zone areas where a limited detail study has been completed.) Openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided in accordance with standards of section 113-77(4), "Elevated buildings."
a. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be elevated no less than three feet above the highest adjacent grade at the building site.
The building official or his or her designee shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.
(Ord. of 9-4-2008, art. 4, § C; Ord. of 9-18-2025(1), Exh. A, § 23) Sec. 113-80. Standards for areas of shallow flooding (AO zones).
Areas of special flood hazard established in section 113-28, may include designated "AO" shallow flooding areas. These areas have base flood depths of one to three feet above ground, with no clearly defined channel. The following provisions apply:
(1) All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated to the flood depth number specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three feet above the highest adjacent grade. Openings sufficient to facilitate the unimpeded movements of flood waters shall be provided in accordance with standards of section 113-77(4), "Elevated buildings."
The building official or his or her designee shall certify the lowest floor elevation level and the record shall become a permanent part of the permit file.
(2) New construction or the substantial improvement of a nonresidential structure may be flood-proofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus one foot, above highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A registered professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the official as set forth above and as required in sections 113-58(1)c and (2).
(3) Drainage paths shall be provided to guide floodwater around and away from any proposed structure.
(Ord. of 9-4-2008, art. 4, § D; Ord. of 9-18-2025(1), Exh. A, § 23) Sec. 113-81. Standards for subdivisions and/or development proposals.
(a) All subdivision and/or development proposals shall be consistent with the need to minimize flood damage.
(b) All subdivision and/or development proposals shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage.
(c) All subdivision and/or development proposals shall have adequate drainage provided to reduce exposure to flood hazards.
(d) For subdivisions and/or developments greater than 50 lots or five acres, whichever is less, base flood elevation data shall be provided for subdivision and all other proposed development, including manufactured home parks and subdivisions. Any changes or revisions to the flood data adopted herein and shown on the FIRM shall be submitted to FEMA for review as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. Upon completion of the project, the developer is responsible for submitting the "as-built" data to FEMA in order to obtain the final LOMR.
(Ord. of 9-4-2008, art. 4, § E; Ord. of 9-18-2025(1), Exh. A, § 24) Sec. 113-82. Standards for critical facilities.
(a) Critical facilities shall not be located in the 100-year floodplain or the 500-year floodplain.
(b) All ingress and egress from any critical facility must be protected to the 500-year flood elevation.
(Ord. of 9-4-2008, art. 4, § F; Ord. of 9-18-2025(1), Exh. A, § 24) Sec. 113-83. Standards for areas of special flood hazard (zones AE) with established base flood elevations without designated floodways.
For locations within the areas of special flood hazard established in section 113-28, where streams with base flood elevations are provided but no floodways have been designated (zones AE), the following provisions apply:
(1) No encroachments, including fill material, new structures or substantial improvements shall be located within areas of special flood hazard, unless certification by a registered professional engineer is provided demonstrating that the cumulative effect of the proposed development, when combined with other existing and anticipated development, will not increase the water surface elevation of the base flood more than one foot at any point within the community. The engineering certification must be supported by data that conforms to standard hydraulic engineering principles.
(2) New construction or substantial improvements of buildings shall be elevated or floodproofed to elevations established in accordance with section 113-78.
(Ord. of 9-18-2025(1), Exh. A, § 24) Secs. 113-84—113-107. Reserved.
ARTICLE V. VARIANCE PROCEDURES
Sec. 113-108. Variances.
(a) The Dawson County Planning Commission shall hear and decide requests for appeals or variance from the requirements of this chapter.
(b) The planning commission shall hear and decide appeals when it is alleged an error in any requirement, decision, or determination is made by the building official or his or her designee in the enforcement or administration of this chapter.
(c) Any person aggrieved by the decision of the planning commission may appeal such decision to the Dawson County Board of Commissioners.
(d) Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as a historic structure and the variance is the minimum to preserve the historic character and design of the structure.
(e) Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this article are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety.
(f) Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result.
(g) In reviewing such requests, the planning commission shall consider all technical evaluations, relevant factors, and all standards specified in this and other sections of this chapter.
(h) Conditions for variances:
(1) A variance shall be issued only when there is:
a. A finding of good and sufficient cause;
b. A determination that failure to grant the variance would result in exceptional hardship;
and
c. A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisance, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.
(2) The provisions of this chapter are minimum standards for flood loss reduction; therefore, any deviation from the standards must be weighed carefully. Variances shall only be issued upon a determination that the variance is the minimum necessary, considering the flood hazard, to afford relief; and, in the instance of an historic structure, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building.
(3) Any applicant to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor and stating that the cost of flood insurance will be commensurate with the increased risk to life and property resulting from the reduced lowest floor elevation.
(4) The building official or his or her designee shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency upon request.
(i) Upon consideration of the factors listed above and the purposes of this chapter, the planning commission may attach such conditions to the granting of variances as it deems necessary to further the purposes of this chapter.
(Ord. of 9-4-2008, art. 5; Ord. of 9-18-2025(1), Exh. A, § 25) Secs. 113-109—113-129. Reserved.
ARTICLE VI. DEFINITIONS
Sec. 113-130. Definitions.
Unless specifically defined below, words or phrases used in this chapter shall be interpreted so as to give them the meaning they have in common usage and to give this chapter its most reasonable application.
Accessory structure means a structure having minimal value and used for parking, storage and other nonhabitable uses, such as garages, carports, storage sheds, pole barns, hay sheds and the like.
Addition (to an existing building) means any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a firewall. Any walled and roofed addition, which is connected by a firewall or is separated by an independent perimeter load-bearing wall, shall be considered "new construction."
Appeal means a request for a review of the building official or his or her designee's interpretation of any provision of this chapter.
Area of shallow flooding means a designated AO or AH zone on a community's flood insurance rate map (FIRM) with base flood depths from one to three feet, and/or where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident.
Area of special flood hazard means the land in the floodplain within a community subject to a one percent or greater chance of flooding in any given year. In the absence of official designation by the Federal Emergency Management Agency, areas of special flood hazard shall be those designated by the local community and referenced in section 113-28.
Base flood means the flood having a one percent chance of being equaled or exceeded in any given year.
Base flood elevation (BFE) means the elevation shown on the flood insurance rate map for zones AE, AH, A1-A30, AR, AR/A, AR/AE, AR/A1-A30, AR/AH, AR/AO, V1-V30, and VE that indicates the water surface elevation resulting from a flood that has a one percent chance of equaling or exceeding that level in any given year.
Basement means that portion of a building having its floor sub grade (below ground level) on all sides.
Building means any structure built for support, shelter, or enclosure for any occupancy or storage.
Critical facility means any public or private facility, which, if flooded, would create an added dimension to the disaster or would increase the hazard to life and health. Critical facilities include:
(1) Structures or facilities that produce, use, or store highly volatile, flammable, explosive, toxic, or water-reactive materials;
(2) Hospitals and nursing homes, and housing for the elderly, which are likely to contain occupants who may not be sufficiently mobile to avoid the loss of life or injury during flood and storm events;
(3) Emergency operation centers or data storage centers which contain records or services that may become lost or inoperative during flood and storm events; and
(4) Generating plants, and other principal points of utility lines.
Development means any man-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavating, drilling operations, and storage of materials or equipment.
Elevated building means a non-basement building built to have the lowest floor of the lowest enclosed area elevated above the ground level by means of, solid foundation perimeter walls, pilings, columns, piers, or shear walls adequately anchored so as not to impair the structural integrity of the building during a base flood event.
Existing construction, for the purposes of determining rates, means structures for which the start of construction commenced before December 15, 1990.
Existing manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum the installation of utilities, the construction of streets, and final site grading or the pouring of concrete pads) is completed before April 4, 1985.
Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed, including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads.
Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from:
(1) The overflow of inland or tidal waters; or
(2) The unusual and rapid accumulation or runoff of surface waters from any source.
Flood hazard boundary map (FHBM) means an official map of a community, issued by the Federal Insurance Administration, where the boundaries of areas of special flood hazard have been defined as zone A.
Flood insurance rate map (FIRM) means an official map of a community, issued by the Federal Insurance Administration, delineating the areas of special flood hazard and/or risk premium zones applicable to the community.
Flood insurance study means the official report by the Federal Insurance Administration evaluating flood hazards and containing flood profiles and water surface elevations of the base flood.
Floodplain means any land area susceptible to flooding.
Flood-proofing means any combination of structural and nonstructural additions, changes, or adjustments to structures, which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.
Floodway means the channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
Freeboard means a factor of safety usually expressed in feet above a flood level for purposes of floodplain management. "Freeboard" tends to compensate for the many unknown factors that could contribute to flood heights greater than the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization of the watershed.
Highest adjacent grade means the highest natural elevation of the ground surface, prior to construction, adjacent to the proposed foundation of a building.
Historic structure means any structure that is:
(1) Listed individually in the National Register of Historic Places (a listing maintained by the U.S.
Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the national register;
(2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the secretary to qualify as a registered historic district;
(3) Individually listed on a state inventory of historic places and determined as eligible by states with historic preservation programs which have been approved by the Secretary of the Interior; or
(4) Individually listed on a local inventory of historic places and determined as eligible by communities with historic preservation programs that have been certified either:
a. By an approved state program as determined by the Secretary of the Interior; or
b. Directly by the Secretary of the Interior in states without approved programs.
Lowest floor means the lowest floor of the lowest enclosed area, including basement. An unfinished or flood-resistant enclosure, used solely for parking of vehicles, building access, or storage, in an area other than a basement, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this Code.
Manufactured home means a building, transportable in one or more sections, built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term also includes park trailers, travel trailers, and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property.
Manufactured home park or subdivision means a parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
Mean sea level means the average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations within the floodplain. For purposes of this chapter, the term is synonymous with national geodetic vertical datum (NGVD).
National Geodetic Vertical Datum (NGVD) as corrected in 1929 is a vertical control used as a reference for establishing varying elevations within the floodplain.
New construction, for the purposes of determining insurance rates, means structures for which the start of construction commenced after December 15, 1990 and includes any subsequent improvements to such structures. For floodplain management purposes, new construction means structures for which the start of construction commenced after April 4, 1985 and includes any subsequent improvements to such structures.
New manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after April 4, 1985.
North American Vertical Datum (NAVD) as corrected in 1988 is a vertical control used as a reference for establishing varying elevations within the floodplain.
Recreational vehicle means a vehicle, which is:
(1) Built on a single chassis;
(2) 400 square feet or less when measured at the largest horizontal projection;
(3) Designed to be self-propelled or permanently towable by a light duty truck; and
(4) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use.
Start of construction means the date the development permit was issued, provided the actual start of construction, repair, reconstruction, or improvement was within 180 days of the permit date. The actual start means the first placement of permanent construction of the structure such as the pouring of slabs or footings, installation of piles, construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. (Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of buildings appurtenant to the permitted structure, such as garages or sheds not occupied as dwelling units or part of the main structure. [Note: Accessory structures are not exempt from any ordinance requirements.]) For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
Structure means a walled and roofed building that is principally above ground, a manufactured home, a gas or liquid storage tank.
Subdivision means the division of a single lot into two or more lots for the purpose of sale or development.
Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred.
Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during a five-year period, in which the cumulative cost equals or exceeds 50 percent of the market value of the structure prior to the start of construction of the improvement. Note: The market value of the structure should be:
(1) The appraised value of the structure prior to the start of the initial repair or improvement; or
(2) In the case of damage, the value of the structure prior to the damage occurring.
This term includes structures, which have incurred substantial damage, regardless of the actual amount of repair work performed. For the purposes of this definition, "substantial improvement" is considered to occur when the first alteration of any wall, ceiling, floor, or other structural part of the building commences, whether or not that alteration affects the external dimensions of the building.
The term does not, however, include:
(1) Those improvements of a structure required to comply with existing violations of state or local health, sanitary, or safety code specifications which are solely necessary to ensure safe living conditions and which have been identified by the code enforcement official, and not solely triggered by an improvement or repair project; or
(2) Any alteration of a "historic structure" provided that the alteration will not preclude the structure's continued designation as a "historic structure."
Substantially improved existing manufactured home parks or subdivisions is where the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced.
Variance is a grant of relief from the requirements of this chapter, which permits construction in a manner otherwise prohibited by this chapter.
Violation means the failure of a structure or other development to be fully compliant with the community's floodplain management regulations. A structure or other development without the elevation certificate, or other certifications, or other evidence of compliance required by this chapter is presumed to be in violation until such time as that documentation is provided.
(Ord. of 9-4-2008, art. 6; Ord. of 9-18-2025(1), Exh. A, § 26) Secs. 113-131—113-150. Reserved.
Chapters 114—116
RESERVED
Chapter 117
GEORGIA 400 DEVELOPMENT AND DESIGN GUIDELINES
Article II. 2000 Guidelines
ARTICLE I. IN GENERAL
Sec. 117-1. Signs and GA. 400 Development and Design Guidelines adopted.
The Board of Commissioners of Dawson County hereby adopt and approve this chapter affirming the current language of the Development and Design Guidelines for the Georgia 400 Corridor. The Sign Ordinance of Dawson County, as amended on August 20, 2009, shall continue to regulate signage as set forth within the Development and Design Guidelines for the Georgia 400 Corridor.
(Ord. of 8-20-2009(3)) Secs. 117-2—117-18. Reserved.
ARTICLE II. 2000 GUIDELINES
DIVISION 1. GENERALLY
Secs. 117-19—117-39. Reserved.
DIVISION 2. INTRODUCTION AND OVERVIEW
Sec. 117-40. About urban design.
(a) It is the intent of this corridor plan to provide detailed design guidelines for developments in the SR 400 corridor from the Forsyth County line to the Lumpkin County line. This plan is implemented by ordinance to be adopted by the board of commissioners.
(b) Urban design is a discipline that describes and evaluates the characteristics and interrelationships of all elements of the three-dimensional form of the urban environment. Urban designers use an interdisciplinary approach that combines architecture, landscape architecture, and urban planning. Urban designers interrelate and arrange various elements of the built environment— distance, materials, scales, views, building style, road alignments, vegetation and other items—to form an attractive built environment. In doing so, urban designers are concerned not only with people observing the built environment from fixed points with particular developments, but also with observers moving by and perceiving buildings from further distances.
(c) Careful attention to attractive and pedestrian-friendly urban design is in the economic interests of the county, its citizens, and business owners. Attractive and integrated urban design features tend to improve an area's image, raise overall property values, attract new businesses and residents, and improve the quality of life. Research and experience have shown that there is a positive return on investment for design features, for both government and property owners. For example, the money a community spends on landscaped roadway medians, sidewalks, and street trees is likely to be amply returned in the form of increased tax revenue resulting from the overall increase in property values that accompanies attractive and desirable urban areas.
(d) Design guidelines are a set of criteria, uniformly applied in the planning approval process, to evaluate the appropriateness of proposed changes to individual properties in a designated district.
The ultimate goal of design guidelines is to direct physical and visual changes in the district to create an architecturally and physically cohesive area of specified character. Design guidelines are meant to create a strong identity for the area as a distinctive place to shop, visit, work, and live. Design guidelines are a means of bringing together the interests of individual property owners and the general public to achieve mutual benefits.
(Ord. of 12-18-2000, § 1; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3)) Sec. 117-41. Purpose and intent.
(a) The subject area, the Georgia 400 corridor, contains multiple property owners with differing interests. Developers in the corridor have commissioned or will commission different architects, each with their own unique motivations and styles. As projects are designed and developed in the corridor, designers tend to focus on their own site as a self-contained unit.
(b) Left to its own workings, the real estate market has already shown signs that it will produce development that is dominated by single-function land uses, buildings that are not coordinated with adjacent buildings and isolated from other uses, and circulation systems that serve exclusively the automobile. The intersection of Georgia 400 and State Route 53 has already developed as the equivalent of a city center at a highway interchange—shopping centers, restaurants, hotels, and apartments—one where buildings do not fully relate to one another and where the only way to get around is by car. The Georgia 400/State Route 53 interchange development represents at least a partial example where urban design opportunities have been overlooked—a lost opportunity of sorts.
(c) Without guidance from the county, future developments in the Georgia 400 corridor will likely be self-contained, fragmented compartmentalized, without coherence and relationship with other developments. Without guidance, developers are unlikely to interrelate streets, buildings, human uses, and natural systems in a manner that results in a coordinated, pleasing, and sustainable built environment across property lines. Unless additional guidance is provided, the corridor will most likely witness additional development that results in an uncoordinated jumble of box stores, repetitive parking lot entrances, and blank building walls.
(d) The purpose of these guidelines is to help site planners and urban designers look beyond their individual buildings and single parcels of land to shape the physical features of their development in a manner consistent with preferred principles of community design. The guidelines seek to help unify what would otherwise become a disparate and irreconcilable collection of land uses and architectural traditions.
(e) In presenting these guidelines, however, it is not the county's intent to adopt an overall architectural theme for the corridor. The corridor is not envisioned to become one monotonous strip where all shopping centers look the same, or are designed to provide one big festival marketplace.
No single checklist can define what is good and bad design. Rather, the county intends to provide general guidance while allowing site designers the flexibility to propose multiple ways of meeting the letter and spirit of the guidelines. Furthermore, it is not the intent of these guidelines to try and convert what is surely an auto-related corridor into purely pedestrian friendly developments.
However, elements of human scale and reasonable accommodations for pedestrians are integral components of the guidelines.
(Ord. of 12-18-2000, § 1.2; Ord. of 8-20-2009(3)) Sec. 117-42. Georgia 400 corridor.
The development and design guidelines contained in this document shall apply to the Georgia 400 overlay district shown on the following corridor boundary map. All parcels lying wholly or partially within the corridor boundary shall be subject to these guidelines.
OC, Corr. CD117:7 OC, Corr. CD117:8 (Ord. of 12-18-2000, § 1.3; Ord. of 8-20-2009(3)) Sec. 117-43. Existing conditions and vision for the corridor.
(a) The Dawson County, Georgia, 400 overlay zone addresses the area adjacent to Georgia 400.
The southern part of the corridor is currently (Year 2000) undergoing intense development pressure.
Since this area is the main gateway to Dawson County, the development within this zone will have an immediate impact on how residents and travelers view the community. While development is logically suited for this area, it must be done in a quality, well-planned manner.
(b) High quality, mixed use development of commercial, light industrial, office, and residential is highly encouraged in this area. The southern portion of the corridor should have visual and functional designs that will create a pleasing environment for people to shop, conduct business, and reside.
The long-term maintenance of this corridor as a place of distinctive character is in the vital interests of Dawson County.
(c) The northern portion of the Georgia 400 corridor is still fairly rural in character. Development within this zone should attempt to retain a rural character through carefully planned site layout, landscaping, and architecture. Mixed use development of commercial, industrial, office, institutional, and residential that is compatible with the visual quality of this portion of the corridor is highly encouraged. Certain guidelines established herein apply only to the northern portion of the Georgia 400 corridor.
(d) The northern portion of the Georgia 400 corridor is still quite rural. The guidelines encourage the maintenance of a more rural landscape in the north portion of the corridor, through a buffer requirement along the right-of-way and a higher landscaped coverage ratio.
(Ord. of 12-18-2000, § 1.4; Ord. of 8-20-2009(3)) GA 400 North, north of Commercial Center at intersection of SR 53 Secs. 117-44—117-74. Reserved.
DIVISION 3. SITE PLANNING AND GRADING
Secs. 117-75—117-91. Reserved.
Sec. 117-92. Relate design to site and surroundings.
(a) The site plan, building design and landscaping of new development should achieve high quality and appearance, which will enhance and be compatible with the character of the surrounding area. Exterior maintenance or alterations, whether structural, or cosmetic, or changes in material, to developments within this corridor which are in conflict with the requirements for new construction are specifically not permitted.
(b) Site planning and design of projects proposed adjacent to dissimilar land uses should carefully address the potential undesirable impacts on
existing uses. These impacts may include traffic, parking, circulation and safety issues, light and glare, noise, odors, dust control and security concerns. When proposed adjacent to one or more dissimilar land uses, the development must mitigate impacts by carefully addressing the potential undesirable impacts on existing uses.
(Ord. of 12-18-2000, § 2.1.1; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3)) Sec. 117-93. Evaluate, retain, and incorporate natural features.
(a) Evaluate the proposed development's compatibility with the existing environment to determine the limitations and capabilities of the site for development. Development should be limited to a level that does not exceed the capabilities and requirements of a healthy environment.
(b) Significant site features such as natural ground forms, large rock outcroppings; water and significant view corridors shall be identified and incorporated into development plans.
(c) Riparian zones, stream corridors, and wetlands shall be protected for their wildlife habitat and other values. Development plans for these areas shall treat these components as assets.
(d) Preserve patches of high-quality habitat, as large and circular as possible, and connected by wildlife corridors.
(e) The design of outdoor spaces shall recognize and incorporate views, solar angles, climate, and the nature of outdoor activities which could occur in conjunction with the project.
(Ord. of 12-18-2000, § 2.1.2; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 27) Sec. 117-94. Protect environmentally sensitive areas.
(a) Conserve and protect natural resources, including air quality, trees, natural vegetation, existing topography, streams, creeks, wetlands, watersheds, water quality, and wildlife habitat.
(b) Limit development in environmentally sensitive areas such as severe topography and areas with drainage problems.
(c) Major considerations concerning water quality shall include organic pollution from infiltration and surface runoff; erosion and sedimentation; water temperature elevation; nutrients such as nitrogen and phosphorous; and toxic materials.
(d) Floodplain storage shall not be decreased from its present state. Utilize areas of floodplain for open space and passive recreational purpose.
(e) Restore and enhance environmental functions damaged by prior site activities.
(Ord. of 12-18-2000, § 2.1.3; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 27)
Sec. 117-95. Create public spaces and amenity areas.
(a) Development shall include public plazas, courtyards, and similar amenities or public assembly areas that are visible from the street and accessible from the business or other use. Such amenities should be scaled appropriately to the size and location of the project.
(b) Outdoor spaces are encouraged, including courtyards, patios, plazas, covered walkways (arcades and colonnades), passages, gardens, and trellised areas.
(Ord. of 12-18-2000, § 2.1.4; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 27) Secs. 117-96—117-118. Reserved.
Sec. 117-119. Site preparation, filling, and grading.
(a) Abrupt or unnatural-appearing grading design is not allowed. Grading on new project sites should blend with the contours of adjacent properties with minimum alteration of the natural topography necessary to accomplish the development.
(b) The area under the drip line of all existing trees to be retained shall be fenced prior to construction with orange plastic tree fencing material. Grading under the drip line of trees to be retained on-site is prohibited so as to prevent soil compaction and significant root damage.
(c) Proposed cut and fill slopes shall be rounded off both horizontally and vertically.
(d) Balancing the cut and fill is highly encouraged.
(e) No fill, removal, or modification of a riparian area should be approved unless there is no reasonable and feasible alternative, as determined by the county.
(f) Preserve smooth flowing planes in the ground form; minimize steep slopes and avoid harsh, easily eroded banks.
(Ord. of 12-18-2000, § 2.2.1; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 28) Sec. 117-120. Drainage and erosion control.
(a) All on-site drainage shall be collected and conveyed to an approved storm drainage system.
(b) Consider minimizing runoff by clustering development on the least porous soils. Consider using infiltration devices. Evaluate and if appropriate install permeable pavements for overflow and employee parking areas where possible.
(c) Natural on-site drainage patterns shall be used where practicable. Detain runoff with open, natural drainage systems.
(d) Design man-made lakes and storm water ponds for maximum habitat value.
(e) Best erosion control practices shall be followed.
(Ord. of 12-18-2000, § 2.2.2; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 28) Sec. 117-121. Retaining walls.
(a) Tall, smooth-faced concrete retaining walls are prohibited. Walls visible from the right-of-way shall be faced with brick, stone, or other architectural treatment in the southern part of the SR 400 corridor and shall be composed of wood or similar earthen material in the northern part of the SR 400 corridor. The height and length of retaining walls should be minimized and screened with appropriate landscaping.
(b) Terracing should be considered as an alternative to the use of tall or prominent retaining walls, particularly in highly visible areas on hillsides.
(c) A highly visible, long, smooth, concrete retaining wall that should be finished with brick, stone, or other architectural finish, or otherwise screened from view from the public right-of-way.
(Ord. of 12-18-2000, § 2.2.3; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 28)
Sec. 117-122. Utilities.
(a) Any utility installation proposed should be carefully assessed to insure against physical and visual damage to the landscape.
(b) Utility easements should be coordinated and combined to minimize the number of additional easements and stream and road crossings needed.
(c) All individual utilities serving developments shall be installed underground.
(d) Utility easements shall be naturally landscaped or stabilized per BMPs.
(Ord. of 12-18-2000, § 2.2.4; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 28)
Sec. 117-123. Berms.
(a) Berms shall be used to provide visual and acoustical separation from vehicle traffic and incompatible land uses. The height and slope of a berm should vary to provide for visual interest and a more natural effect.
(b) When used for screening, berms can be combined with a fence or planting. Berms should be constructed of good quality soil (for planting) on top of landfill, separated by an impervious layer of clay. Berms can be used for other purposes, besides screening, too, like recreational seating.
(Ord. of 12-18-2000, § 2.2.5; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 28) Secs. 117-124—117-144. Reserved.
DIVISION 4. PEDESTRIAN CIRCULATION
Sec. 117-145. Pedestrian systems must be provided.
(a) All pedestrian routes shall be identified in the design phase and provided for in the design process. These include linkages to individual buildings, neighboring properties, and access ways along public roads. Identifying pedestrian routes in advance will eliminate poor selection of landscape areas that become damaged due to pedestrian "short cuts."
(b) All site facilities and amenities shall be accessible to people with disabilities in accordance with the applicable federal and state codes.
(c) Pedestrian circulation measures (paths, crossings, etc.) shall be shown on project site plans.
(d) Where pedestrian circulation crosses vehicular routes, a change in grade, materials, textures or colors shall be provided to emphasize the conflict point and improve its visibility and safety. Brick pavers and other special paving materials and overhead features are encouraged to distinguish pedestrian walkway surfaces and areas.
(Ord. of 12-18-2000, ch. 3; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 29) Secs. 117-146—117-173. Reserved.
DIVISION 5. VEHICLE ACCESS AND CIRCULATION
Sec. 117-174. Principal site access.
(a) The entire parcel, rather than simply a particular project, shall be considered in formulating and approving access plans.
(b) A public frontage road shall be required parallel to Georgia 400.
(c) Parcels should not be subdivided such that they each require individual access to a state highway. If the parcel has frontage on a secondary or frontage road, access points shall occur there and not on a highway.
(d) The number of driveways shall be minimized, consistent with appropriate principles of highway and road access management and traffic engineering. Curb cuts (driveway accesses) will generally be restricted in number to one entrance and exit drive per development, if no other access is available.
(e) Inter-parcel site access shall be provided to adjacent properties.
(f) Shared driveways between two parcels, at the property line, shall be required.
(g) New driveways shall be sited away from or immediately opposite street intersections.
(h) Provide adequate driveway length. Driveways shall be long enough to allow adequate space for vehicles pulling off the road and stacking to enter the road.
(i) The width of curb cuts shall be minimized, but shall always meet the requirements of emergency service vehicles. A wider curb cut may be required on a higher speed highway.
(j) All elements of the site design shall accommodate access requirements of emergency vehicles and services.
(k) All access points and curb cuts shall meet minimum rules and regulations for driveway and encroachment control of the Georgia Department of Transportation, the Dawson County Public Works Director or his or her designee, and the specifications provided in these guidelines.
(Ord. of 12-18-2000, § 4.1; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 30) Sec. 117-175. Service functions.
(a) Service functions (e.g., deliveries, maintenance activities) shall be integrated into the circulation pattern in a manner which minimizes conflicts with vehicles and pedestrians.
(b) Access for service vehicles, trash collection and storage areas shall be located on alleys where alleys exist. When no alley exists, access should be provided to the rear or sides of buildings being served.
(c) Larger commercial developments shall have service and loading areas separate from main circulation and parking areas.
(Ord. of 12-18-2000, § 4.2; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 30) Sec. 117-176. Off-street parking.
(a) Any type of off-street parking configuration may be appropriate in the district, depending on site-specific development circumstances and objectives.
(b) Driveway entrances shall provide a 100-foot deep clear zone between the pavement of Georgia 400 and the first parking space. On any other state highway or county road, the clear zone should be at least 60 feet.
(c) The driveway entry "throat" of large shopping center parking areas shall provide at least 40 feet of clear zone before a turning movement occurs to provide sufficient queuing room for cars entering off the street.
(d) The visual impact and presence of vehicles shall be minimized, preferably by siting parking areas to the rear or side of the property rather than along the principal street frontage, or if siting options are limited, screening parking areas with vegetation and berms from views exterior to the site.
(e) Where a parking area fronts directly on a public street, a continuous opaque screen should be provided. Said screen should be a minimum height of two feet.
(f) Parking for the handicapped shall be provided in accordance with applicable codes.
(Ord. of 12-18-2000, § 4.3; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 30) Secs. 117-177—117-205. Reserved.
DIVISION 6. LANDSCAPE
Sec. 117-206. Generally.
(a) Landscaped areas shall be maximized within the viewshed of the highway and major streets.
(b) All landscaping shall be continually maintained in a healthy and weed-free condition.
(c) Tree and shrub planting shall be grouped together to create strong accent points within the site plan unless circumstances dictate otherwise.
(d) All plant materials should be sized so that the landscaping has an attractive appearance at the time of installation and a mature appearance within three years of planting.
(e) Landscaping of the site upon completion of the development shall be consistent, in terms of plant location, species, and size, with the landscape plan for the development as approved by the community development director or his or her designee.
(f) In prominent public areas, trees larger than the minimum shall be required to create a strong design element.
(g) All proposed shrubs except accent, color or ground cover planting shall be a minimum of three-gallon size. Shrubs and ground cover plants should be spaced close enough together to ensure an attractive and mature planting effect.
(h) Landscaping shall consider potential benefits of conserving energy in buildings. This can be done by recognizing the sun exposure on the site and providing appropriate tree species in advantageous locations: deciduous trees on the southern exposure, coniferous and broadleaf evergreen trees along the eastern and western exposures, and evergreens along the northern exposure.
(i) Trees shall be carefully selected and located where they will complement the building elevation and should not block all retail storefront signage from view.
(j) Tree species shall be selected with root growth habits that will not cause damage to sidewalks, or such tree species should be sited away from such hardscape areas. Tree species shall not be planted so close to building foundations that the mature roots and branches create structural damage or maintenance issues (such as window cleaning) or block or impede emergency exits or access.
(k) Utility easements should be landscaped.
(l) Dense landscaping and/or architectural treatments shall be provided to screen unattractive views and features such as storage areas, trash enclosures, transformers, generators, and other similar appurtenances.
(m) Standards for transplanting should be in keeping with those established in the International Society of Arboriculture publication, "Tree and Shrub Transplanting Manual" or similar publication.
Reference the American Association of Nurserymen publication "American Standard for Nursery Stock" (ANSI Z60, 1973) for plant material quality specifications. Reference the "Manual for Woody Landscape Plants" (Michael Dirr, 1983, Castle Books) or similar publication for information on tree species site requirements.
(n) Properties in the south portion of the Georgia 400 corridor shall require a minimum landscaped coverage ratio of 20 percent or as required by the Dawson County Tree Ordinance, whichever is greater. Properties in the north portion of the Georgia 400 corridor shall require a minimum landscaped coverage ratio of 30 percent or as required by the Dawson County Tree Ordinance, whichever is greater.
(Ord. of 12-18-2000, § 5.1; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 31) Sec. 117-207. Buffers.
(a) Buffers abutting residential districts.
(1) Where commercial, industrial, office, or institutional development adjoins/touches an existing single-family residential zoning district along a side or rear property line, minimum building setbacks and buffers shall be established according to the following table:
Zoning District Minimum Building Setback Along Side or Rear Yard Adjoining/touching a Single-family Residential Zoning District Minimum Buffer Along Side or Rear
Yard Adjoining/touching a Singlefamily Residential Zoning District Office or institutional 40 feet 30 feet Commercial 50 feet 40 feet Industrial 80 feet 70 feet
(2) Buffers required by this section shall be planted and maintained with sufficient density and vegetative material to effectively screen the adjacent residential use from the subject activities. Existing vegetation may be considered sufficient in meeting this requirement if the area is delineated on the landscape or development plan as a tree save area, is protected by the tree protection devices as prescribed by these guidelines, and provides sufficient screening. If an existing tree save area is proposed as a buffer but such area does not provide sufficient screening, said tree save area shall be supplemented with additional plantings until screening is achieved.
(b) Buffers along Georgia 400 right-of-way in north portion of corridor. Where a commercial, industrial, office, or institutional development abuts Georgia 400 in the north portion of the corridor, there shall be a minimum 30-foot-wide buffer (natural undisturbed, planted, or both) according to standards provided by these guidelines. The buffer shall provide a visual screen for at least 60 percent of the length of the property frontage.
(c) Buffer standards.
Tree Type Height # of Rows & Spacing Center to Center Spacing Notes Leyland Cypress 5—6 ft. 2/10—12' apart 10—12 ft. Requires pruning after 2 years
Hemlock, White Pine 8—10 ft. 2/8—10' apart 8—10 ft. Border line range Virginia Pine 5—6 ft. 2/8—10' apart 8—10 ft.
Eleagnus 42 in. min. 2/8' apart 8 ft. Specify fruitland variety Holly 6—8 ft. full 2/6—8' apart 6—8 ft. Specify Standard Burford, Nellie R Stevens, American or Greenleaf variety Magnolia 6—8 ft. 2/8—10' apart 10—12 ft.
The above specifications are intended to be illustrative and not intended to be applied rigidly.
Furthermore, the number of rows of landscaping needed depends on the required width of the buffer. Vegetative material used in meeting the requirements for buffering should be of a height and mass that meets or exceeds the vegetative material suggested in the buffer standards table above.
(Ord. of 12-18-2000, § 5.2; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 31)
Sec. 117-208. Right-of-way frontage planting strips.
This section applies to all properties fronting a public street, whether a county road, local public frontage road, or state highway, including Georgia 400; provided, however, that the buffer requirement in the north portion of the Georgia 400 corridor as specified in section 117-207(b) of these guidelines shall supersede the requirement for a right-of-way frontage-planting strip specified in this section.
(1) Provide a planting strip along the entire frontage of all road rights-of-way with a minimum depth from the street right-of-way line into the interior of the property as follows:
Zoning District Depth of Strip Adjoining Street Right-of-Way (feet) Multi-Family Residential 20 feet Commercial 10 feet Industrial 10 feet
(2) Trees equivalent to at least one three-inch caliper tree for every 30 linear feet of length shall be saved or planted in such strips (trees may be planted in groups rather than in a single line). Any trees placed between the right-of-way line and the construction area (the buildings, accessory uses, and parking area) may be considered to be in the planting strips.
(Ord. of 12-18-2000, § 5.3; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 31) Sec. 117-209. Tree protection.
(a) When a choice is available as to which existing trees to save, emphasis should be given to the preservation of significant trees, even isolated individual trees, over the retention of other trees.
Nonsignificant trees, however, should be saved in stands rather than as individual trees scattered over a site.
(b) All tree save areas must be delineated on the landscape plan.
(c) All buffers with existing trees shall be delineated on plans as tree save areas, unless the applicant clearly demonstrates the need for disturbance.
(d) Tree protection devices are necessary to eliminate activities detrimental to trees and are strongly recommended to guard against: soil compaction in the critical root zone resulting from heavy equipment, vehicular or excessive pedestrian traffic, or storage of equipment or materials;
root disturbance due to cuts, fills or trenching; wounds to exposed roots, trunks or limbs by mechanical equipment; and other activities such as chemical storage, etc. Tree protection devices shall be installed as shown on the landscape plan or otherwise completely surrounding the critical root zone of all trees to be preserved. The location and installation of all tree protection devices shall be installed prior to or concurrent with the issuance of the construction permit for clearing and/or grading.
(e) Active tree protection shall consist of chain link, orange laminated plastic, wooden post and rail fencing or other equivalent restraining material (see Details 2 and 3—Active Tree Protection and Active Tree Protection/CRZ). Passive protection should consist of heavy mil plastic flagging of a bright color or equivalent signage on a continuous, durable restraint sufficient to delineate the bounds of any tree protection or save areas.
(f) All tree protection devices shall be installed prior to or concurrent with any clearing, grubbing or grading. Tree protection devices need to remain in functioning condition throughout all phases of development and may be subject to inspection by the county.
(g) All tree protection zones shall be designated as such with "Tree Protection Area" signs posted visibly on all sides of the fenced-in area. These signs are intended to inform subcontractors of the tree protection process. Signs requesting subcontractor cooperation and compliance with the tree protection standards are recommended for site entrances.
(Ord. of 12-18-2000, § 5.4; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 31) Sec. 117-210. Parking lot landscaping.
(a) Parking lots that face a street should be partially screened from the street by a low fence, wall, hedge, berm, or vegetated buffer. If a parking lot fronts an arterial or major collector street, and is of such a size that it dominates views from the fronting arterial/collector street and detracts from the overall streetscape and community appearance, then the parking lot should be screened or buffered with vegetation in its entirety from view along the fronting roadway(s) within the required right-of-way frontage planting strip (see section 117-208).
(b) Landscape islands containing at least one overstory tree or two understory trees planted in each landscape island, shall be provided within parking areas with ten or more spaces and located in such a manner so as to divide and break up the expanse of parking area. One landscape island shall be located at the end of each row of parking spaces in the interior of the parking lot. In addition, one parking lot landscape island shall also be provided for every 150 linear feet of parking spaces, whether at the periphery or in the interior of the parking lot. Each landscape island shall be of sufficient shape and size so that one overstory tree or two understory trees will fit within the island.
No portion of an island shall be less than three feet in width. Root systems at maturity shall not compromise the parking surface.
(c) Landscaping should permit adequate sight distance for motorists and pedestrians entering and exiting a site and should not interfere with circulation patterns.
(d) Curbing shall be used at the edges of all planters and paving surfaces adjacent to vehicle circulation or parking areas. Vehicle overhang above or into landscape areas should be avoided unless wider or larger planting areas are provided to accommodate such instances. Landscaping should not be installed in areas of potential vehicle overhang.
(e) Painted end islands are ineffective and are not permitted.
(Ord. of 12-18-2000, § 5.5; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 31) Sec. 117-211. Street trees.
(a) In the north portion of the Georgia 400 corridor, street trees shall be installed in the public right-of-way of local streets for all development within nonresidential districts, subject to the approval of the county public works director or his or her designee.
(b) Street trees or parking lot trees shall be a minimum 15-gallon size. Street trees shall be overstory, nonornamental, with a minimum three-inch caliper planted at 75-foot intervals. In the south portion of the Georgia 400 corridor, street trees may be grouped rather than spaced at regular intervals. Street trees shall consist of a mixture of deciduous/evergreen native species including blossoming species. Street trees and landscaping shall not impede safe traffic and pedestrian travel line of sight.
(c) In lieu of street trees in the south portion of the Georgia 400 corridor, a right-of-way planting strip as required by these regulations shall contain landscaping with a minimum caliper of three inches planted thirty feet on center and/or a mixture of canopy and understory species.
(d) In commercial areas, street trees along driveways and other access roads shall be provided in addition to any proposed on-site landscaping to provide shading, visual enhancement, and continuity for the streetscape.
(e) Street tree placement should include consideration for vehicle line of sight, entrance and exit curb cuts, street light and traffic control devices, and other site-specific conditions. Street trees should be planted in a manner so that when they reach maturity they will not conflict with the visibility of signs.
(f) Street trees should be pruned from grade to a minimum height of seven feet, six inches to allow visibility of buildings and sufficient vertical clearance.
(Ord. of 12-18-2000, § 5.6; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 31) Sec. 117-212. Irrigation.
(a) Water-intensive landscaping, such as turf grass, shall be used minimally. The combined square footage of turf grass and decorative water (e.g., fountains, ponds, etc.) shall be minimized to reduce water use and evapotranspiration.
(b) Plant materials shall be chosen which grow well in the localized climate and the given soil conditions without requiring excessive irrigation.
(c) A plan for an automatic irrigation system shall be provided as appropriate to ensure that all plants receive adequate water for healthy growth. Plantings under roof overhangs shall be avoided as roof overhang plantings conceal potential insect infestations and require additional irrigation arrangements.
(Ord. of 12-18-2000, § 5.7; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 31) Secs. 117-213—117-232. Reserved.
DIVISION 7. ARCHITECTURE OF PRINCIPAL BUILDINGS
Sec. 117-233. Generally.
(a) Architectural design should be compatible with the developing character of the neighboring area. Design compatibility includes complementary building style, form, size, color, materials, and detailing.
(b) The relationship of a building to its site, the public right-of-way and adjacent buildings is one of the most important components of successful urban design. The appearance of a building with respect to the street and other surroundings should be considered. If the building is much different in elevation from adjacent buildings and improvements, it will look out of place.
(c) The designer should consider each of the following contexts as part of the design process:
(1) Size (the relationship of the project to its site).
(2) Scale (the relationship of the building to those around it).
(3) Massing (the relationship of the building's various parts to each other).
(4) Fenestration (the placement of windows and doors).
(5) Rhythm (the relationship of fenestration, recesses and projections).
(6) Setback (in relation to setback of immediate surroundings).
(7) Materials (their compatibility with the historic district).
(8) Context (the overall relationship of the project to its surroundings).
(Ord. of 12-18-2000, § 6.1; Ord. of 8-20-2009(3)) Sec. 117-234. Style.
(a) Diversity of architectural design shall be utilized unless the existing building or site is historically important to the district or necessary for architectural harmony.
(b) Multiple buildings on the same site shall be designed to create a cohesive visual relationship between and among the buildings.
(Ord. of 12-18-2000, § 6.2; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 32) Sec. 117-235. Exterior materials.
(a) For commercial and multifamily residential structures, front facades shall be brick and stone with the exception of windows, doors, and accent elements and trim. Side and rear facades shall be a minimum of 50 percent brick or stone with the remainder as windows, doors, fiber cement hardi-board siding, board and batten, or hard-coat stucco. This section shall not apply to development in the C-HI and C-IR districts.
(b) Prohibited exterior building materials are the following:
(1) Smooth-faced concrete block;
(2) Metal (except as accents);
(3) EIFS stucco;
(4) Vinyl siding;
(5) Reflective, shiny or mirror-like materials;
(6) Mill-finish (noncolored) aluminum metal windows or door frames;
(7) Exposed, unfinished foundation walls;
(8) Exposed plywood or particle board.
(c) All exterior facades of a structure located on an outparcel of a larger development shall be considered primary facades and should employ architectural, site, and landscaping design elements which are integrated with and common to those used on the primary structure on the site. Common design elements should include colors and materials associated with the main structure or structures on the larger development.
(d) Proposed corporate or franchise advertising using the building style shall be discouraged in favor of creating a harmonious visual relationship with other neighboring buildings.
(e) All vents, gutters, downspouts, flashing, electrical conduits, etc., shall be painted to match the color of the adjacent surface, unless being used expressly as a trim or accent element.
(f) Soffits and other architectural elements visible to the public but not detailed on the plans shall be finished in a material compatible with other exterior materials.
(g) Material or color changes generally should occur at a change of plane. Piecemeal embellishment and frequent changes in material shall be avoided unless utilized to avoid the monotony of large walls.
(h) Approved address numbers shall be provided so that they are legible to the public from the street fronting the property.
(i) Prior to issuance of a building permit, a project representative shall submit to the community development director or his or her designee a four-sided architectural view of the structure which shall meet these standards.
(Ord. of 12-18-2000, § 6.3; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 32)
Sec. 117-236. Colors.
(a) Facade colors should be low reflectance, subtle, neutral, or earth tone colors. High-intensity colors, metallic colors, black, or fluorescent colors should not be used. Building trim and accent areas may feature brighter colors, including primary colors, provided that the width of the trim should not exceed four feet.
(b) Building colors should be carefully chosen so that each building complements that of its neighbors. Colors can be classified as the "base" color (used on the majority of the building surface), "trim" color (used on the window trim, fascia, balustrades, and posts), and "accent" color (used on signs, awnings, and doors). The base color should consist of more subdued earth tones or brick shades. Trim colors should have contrasting lighter or darker shade than the base color. If natural brick is used, it should not be painted.
(Ord. of 12-18-2000, § 6.4; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 32) Sec. 117-237. Awnings and canopies.
(a) The use of awnings on buildings provides much needed protection from sun, wind, and rain, and improves aesthetics of the building exterior.
(b) Awnings shall be constructed with a durable frame covered by a canvas material. Awnings that are backlit through translucent materials are not permitted. Aluminum and other metal canopies are acceptable in most instances, particularly when integrated into shopping center designs.
Flameproof vinyl, canvas or metal awnings and canopies may be used.
(c) Solid colors are preferred over striped awnings, but striping is permitted if colors compliment the character of the structure or group of buildings.
(d) Awnings are encouraged for first floor retail uses to provide architectural interest and to encourage pedestrian activity. Where awnings are used, they should be designed to coordinate with the design of the building and any other awnings along the same block face.
(Ord. of 12-18-2000, § 6.5; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 32) Sec. 117-238. Parapets.
Parapets should not be unbroken on any given side of a building for more than 100 feet. Parapets with greater distances should be articulated by indentations and modulations or by the additions of elements such as balustrades or other exterior members.
(Ord. of 12-18-2000, § 6.6; Ord. of 8-20-2009(3)) Sec. 117-239. Cornices.
Cornice lines should be provided at the appropriate story of multi-story buildings, with architectural detailing compatible with the building design.
• Attractive two-story structure with an effective awning.
Dawson 400 shopping center at GA. 400 and SR 53 (southwest quadrant)
• Brick planter boxes in the front add attractiveness to the streetscape.
• Ground level windows in pedestrian retail districts should normally be larger than the windows for the second story use.
• The gabled (pitched) roof of the canopy structure and the embellishment at the top of the structure add architectural interest, but the support beams are exposed.
• Canopy overlighting should be recessed into the roof structure rather than protruding below the plane of the canopy ceiling.
Shopping center northbound on GA. 400 north of SR 136 The continuous building facade is broken up by varying the facade setback. While the awning does not necessarily need to be continuous, the same type of awning found in the left side of the picture could have been extended along the portion of the facade that houses the shopping carts and coke machines (the section of building to the left of the Kroger sign).
• The entrance to Dollar General is a distinct architectural feature.
• Pitched metal colored roof with cornice and brick facade are appropriate (recommended practices).
Kroger Shopping Center at GA 400 and SR 53 An attractive and well articulated facade at the Dawson 400 shopping center
• Use of gables adds further architectural interest. However, the gabled facade on the Ace Hardware tenant space is "false" in the sense that it is not fully integrated into the pitched roof (note the exposed support pole, discouraged practice).
(Ord. of 12-18-2000, § 6.7; Ord. of 8-20-2009(3)) Sec. 117-240. Building facades.
(a) Lengthy, featureless facades and building walls must be avoided. Large, flat, blank expanses on a facade are not acceptable and shall not be permitted.
A line of mature trees that almost entirely screens what would otherwise be a large, imposing side wall of a big box.
The rear side of this shopping center consists of a finished but monotonous wall. Trash receptacles are not enclosed.
(b) The walls of buildings for office, institutional, commercial, and industrial use shall not extend more than 200 linear feet parallel to a street unless the front facade of the building is designed in a way that breaks up the building face into discrete architectural elements, which can be accomplished through the following:
(1) Facade modulation: stepping back or extending forward a portion of the facade.
(2) Providing bay windows or repeating window patterns at regular intervals.
(3) Providing a porch, patio, deck, covered entry to portions of the facade at the ground level, or in the case of buildings containing two or more story, balconies.
(4) Changing the roofline by alternating dormers, or using stepped roofs, gables, or other roof elements.
(5) Changing materials with the change in building plane.
The continuous building facade is broken up by varying the facade setback. While the awning does not necessarily need to be continuous, the same type of awning found in the left side of the picture could have been extended along the portion of the facade that houses
the shopping carts and coke machines.
(Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3)) Sec. 117-241. Rooflines.
(a) Roof planes should be varied to increase visual interest, and awnings above windows and entrances also help to provide visual interest.
(b) Flat roofs with lengthy, nonarticulated walls are not acceptable.
The entrance to Dollar General is a distinct architectural feature.
Pitched metal colored roof with cornice and brick facade are appropriate (recommended practices). Use of gables adds further architectural interest. However, the gabled facade on the Ace Hardware tenant space is "false" in the sense that it is not fully integrated into the pitched roof (note the exposed support pole, discouraged practice).
(Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3)) Sec. 117-242. Outparcel development.
All exterior facades of a building located on an outparcel of a larger development shall be considered primary facades and shall employ architectural, site, and landscaping design elements which are integrated with and common to those used on the primary structure on the site. Common design elements should include colors and materials associated with the main structure or structures on the larger development.
(Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 33) Secs. 117-243—117-256. Reserved.
DIVISION 8. ACCESSORY STRUCTURES, USES, AND AREAS
Sec. 117-257. Generally.
(a) Unattractive project elements such as storage areas, transformers, generators and similar features shall be sited in areas which are generally not visible from the street and must also be screened from view.
(b) Electrical transformers which are installed as part of a new project shall be located to the rear of the site or other remote area, or placed undergrounded. Existing transformers located at the front of the site shall be screened by substantial landscaping and/or an architectural barrier.
(c) Utility lines are required to be undergrounded.
(Ord. of 12-18-2000, § 7.1; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 34) Sec. 117-258. Trash enclosures.
(a) Trash enclosures shall be constructed of sturdy, durable, opaque materials (with trash receptacles screened from view) which are designed to be compatible with the project architecture and shall use similar materials. Enclosures shall be at least one foot taller than the receptacle/ dumpster.
(b) Space shall be provided within enclosures for pallets, skids, cartons, etc., and no overflow of these or other debris shall be allowed in public view.
(Ord. of 12-18-2000, § 7.2; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 34) Sec. 117-259. Mechanical equipment.
Rooftop mechanical and electrical equipment shall be screened from public view by building elements that are designed as an integral part of the building architecture.
(Ord. of 12-18-2000, § 7.3; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 34) Sec. 117-260. Fences and walls.
(a) All walls or fences 50 feet in length or longer, and four feet in height or taller, should be designed to minimize visual monotony though changes in plane, height, material or material texture or significant landscape massing.
(b) Use of special fencing design or materials should be discussed with county staff in cases where site security is paramount. Chain link fencing shall be vinyl coated black or green and noted as such on a project site plan.
(c) Wooden fences shall be painted or stained in an appropriate fashion and should not normally exceed a height of six feet.
(d) The design of fences and walls shall be compatible with the architecture of the main building(s) and should use similar materials.
(Ord. of 12-18-2000, § 7.4; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 34) Sec. 117-261. Trash enclosures and recycling collection.
Trash enclosures shall be constructed of sturdy, durable, opaque materials (with trash receptacles screened from view) which are similar to or designed to be compatible with the project architecture. Trash enclosures should include adequate, accessible and convenient areas for collecting and loading recyclable materials. Space shall be provided within enclosures for pallets, skids, cartons, etc., and no overflow of these or other debris shall be allowed in public view.
Recommended practice for screening dumpsters. The dumpster is enclosed on three sides with a solid decorative block wall, approximately eight feet high, that matches the primary building on the site. Doors allow for the complete enclosure of the receptacle area. The dumpster area is kept free from debris.
(Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3)) Secs. 117-262—117-283. Reserved.
DIVISION 9. COMMERCIAL DEVELOPMENT
Sec. 117-284. Generally.
(a) Commercial buildings should be compatible in scale, mass, and form with adjacent structures and the pattern of the surrounding area.
(b) Efforts to coordinate the height of buildings and adjacent structures are encouraged.
This is especially applicable where buildings are located very close to each other. It is often possible to adjust the height of a wall, cornice or parapet line to match that of an adjacent building. Similar design linkages such as window lines should be placed in a pattern that reflects the same elements on neighboring buildings.
(c) Long or continuous wall planes should be avoided, particularly in the pedestrian activity areas, where buildings should exhibit more detail and elements appropriate for close range pedestrian view.
(d) Outside of pedestrian retail districts, building surfaces over two stories high or 50 feet in length should be relieved with changes of wall plane that provide strong shadow or visual interest.
(Ord. of 12-18-2000, § 8.1; Ord. of 8-20-2009(3)) Sec. 117-285. Pedestrian retail districts.
(a) The urban design objective of pedestrian retail districts is to create a high quality, pedestrian scale, and walkable areas with a traditional downtown atmosphere. Site and building design should address pedestrian needs and develop creative approaches to improving pedestrian interest,
access and enjoyment.
Recesses and Projections Source: Oregon Transportation and Growth Management Program 1999b.
(b) Frontage design and signage locations should be coordinated with streetscape landscaping and street trees.
(c) Building frontages should be active, with large nonreflective minimally tinted window openings at ground level.
Residential uses when mixed with commercial shops provide for active neighborhoods
(d) The ground level front elevation of the building, outdoor eating, and activity areas should be placed on or near the front property line to maintain the continuity of the street edge, or in alignment with adjacent property frontage. Outdoor seating and dining areas that face onto the street are encouraged.
(e) Street vendors are encouraged to add activity and interest to pedestrian areas.
(f) Pedestrian open spaces such as covered walkways, courtyards and plazas are encouraged, as well as the development of open and attractive passageways between buildings and blocks.
(g) Gaps created in the street wall by parking or other breaks in buildings should be minimized or eliminated.
(h) The sequence of continuous pedestrian activity should not be interrupted.
Blank walls and other "dead" or dull spaces at the street level should be avoided. Visually interesting activities at the sidewalk edge should be maintained and/or established to engage pedestrian interest.
(i) When alley access is not possible, driveway openings along public streets should be minimized and should be located on the street with the least traffic volume.
(j) Large structures should be designed to reduce their perceived height and bulk by dividing the building mass into smaller-scale components. The ratio of building height to right-of-way width should not exceed 1:3.
Source: Oregon Transportation and Growth Management Program 1999a.
(k) Sidewalk space should be at least ten feet in width, with street trees planted in a rhythmic pattern.
Building Height to Right-of-Way Width Ratio Source: Oregon Transportation and Growth Management Program 1999b.
(l) All developed sites should provide at least one continuous, on-site intra-parcel walkway of at least five feet in width to connect sidewalks adjoining rights-of-way to the main entrance(s) of that property's building(s), in compliance with the Americans with Disabilities Act (ADA).
(m) The rear of existing buildings should be enhanced, where appropriate, to improve public access from parking lots and service alleys.
(Ord. of 12-18-2000, § 8.2; Ord. of 8-20-2009(3)) Comparison of Sidewalk Widths Sec. 117-286. Automobile sales, parts, and service establishments.
(a) The service area and/or service bays should be screened or sited so they are not visible from the street.
(b) Vehicles under repair shall be kept either inside a structure or in an area which is screened from views from the street.
(c) Service areas shall provide adequate queuing space that does not impede vehicle circulation through the site or result in vehicles stacking into the street.
(d) Perimeter fencing, security fencing, or gateways shall be constructed of attractive materials which are compatible with the design and materials used throughout the project. Razor wire or electric fencing should not be allowed and chain link fencing is strongly discouraged.
Discouraged practice. Auto service facilities should not have their service bays facing street, and parking for all uses should be located to the side or rear of the building rather than in the front yard.
Express Lube, Alpharetta Highway, Roswell Location of Loading and Unloading Areas The architecture fits the company's logo and design specifications, but the small awning adds very little articulation and interest to the building facade. The all-metal building should be broken up and treated with some different materials, such as a partial brick base.
NAPA auto parts store on the south side of SR 53 east of GA. 400 This NAPA store's building exterior has a more finished appearance (textured block as opposed to metal siding), the sign is monument style rather than erected on a pole, and the front yard is landscaped with shrubs and street trees.
(Ord. of 12-18-2000, § 8.3; Ord. of 8-20-2009(3)) Sec. 117-287. Convenience stores.
(a) The on-site circulation pattern shall include adequate driving space to maneuver vehicles around cars parked at the pumps, with special attention to the circulation of vehicles not involved in the purchase of fuel.
(b) The amount of unrelieved pavement or asphalt area on the site shall be limited through the use of landscaping, contrasting colors and banding or pathways of alternate paver material.
Extensive expanses of single color concrete pavement shall be avoided.
(c) Building architecture shall be designed to provide an attractive appearance which is compatible with the surrounding area. All architectural details shall be related to an overall architectural theme.
(d) Separate structures (canopy, carwash, cashiers booth, etc.) on the site shall have consistent architectural detail and design elements to provide a cohesive project site. If a car wash is incorporated into the project, it shall be well integrated into the design. The car wash opening shall be sited so that it is not directly visible as the primary view from the street into the project site.
(Ord. of 12-18-2000, § 8.4; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 35) NAPA Auto Parts Store, Mansell Road, Alpharetta
Sec. 117-288. Commercial display lots.
(a) Where permitted, the outside storage or display of vehicles, equipment, and merchandise to be rented, leased, or sold, including manufactured home sales, should be visible along no more than 30 percent of the frontage of the property abutting the highway or major street, excluding approved driveway entrances and exits. Screening may be accomplished by a natural vegetative buffer, by a building, by an earthen berm, by a 100 percent opaque, solid wooden fence or wall, or combination of these screening methods. The use of low-lying landscaping that does not screen the display areas from view from the public right-of-way would not comply with this guideline.
(b) Outdoor sales for department stores shall be limited to no more than ten percent of the total building footprint of the site, and should be partially screened from view.
(Ord. of 12-18-2000, § 8.5; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 35)
Sec. 117-289. Fast food restaurants.
(a) Franchise or corporate style architecture and/or highly contrasting color schemes are discouraged. If the restaurant will occupy a pad within a shopping center, the building shall be designed to be consistent with the design of the center.
(b) Where drive-through elements are appropriate, they shall be architecturally integrated into the building. Drive-through elements shall not be located on the street side of the building.
(c) The site design shall accommodate a logical and safe vehicle and pedestrian access and circulation pattern through the site. Circulation needs to allow for adequate length of queuing lines for drive-through elements which do not interfere with the on-site parking for patrons entering the restaurant, nor result in traffic queuing into the street.
(d) Freestanding restaurant buildings shall be designed and detailed consistently on all sides, including the rear and side elevations.
(e) Outdoor seating areas, play equipment, and perimeter fencing shall be of compatible and attractive design that is integrated with the main building architecture.
(Ord. of 12-18-2000, § 8.6; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 35)
Sec. 117-290. Shopping centers.
(a) A unified architectural design should be incorporated into each commercial center, including freestanding pad buildings. However, this should not discourage variations in the facades of multi-tenant facilities to enhance the perception of individual places of business. Any such variations should be achieved without creating an uncoordinated appearance or disrupting the harmony of architecture created for the entire development.
(b) Outdoor gathering areas and public eating areas are encouraged.
(c) On larger commercial sites, a portion of the total building area should be located at the street perimeter, preferably on a corner location. Such siting, together with substantial landscape treatment, reinforces and strengthens the streetscape and helps to screen off-street parking areas.
(d) Shopping cart storage areas should be incorporated into the building design to provide a visual screen of carts from the parking area.
(e) Recycling collection boxes should be relocated in remote parts of the site and screened.
(Ord. of 12-18-2000, § 8.7; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 35) Sec. 117-291. Urban activity centers.
(a) Generally.
(1) An urban activity center is a mixed-use, pedestrian-oriented development that combines retail, service, civic, office, institutional and multi-family and other residential uses and links the uses together by a highly connected pattern of streets, sidewalks, and shared open spaces. Activity centers allow for more intense clustering of land uses within nodes of new development to prevent the "stripping" out the entire corridor.
(2) Activity centers must provide pedestrian access and vehicular and pedestrian interconnections between and among land uses within the development. Pedestrian facilities are expected to be included. Improved connections between key designation areas should be developed, such as between residential and commercial areas and connecting to parks and schools.
(b) On-street parking. Except on primary frontage roads that provide access through the development, on-street parking may and should be provided on local streets and private access drives, especially within storefront retail areas, to reduce the need for parking lots and act as a buffer between automobiles and pedestrians.
(c) Mix of uses. Mixed uses may be combined vertically within the same building or placed side by side on the same parcel, provided that they are in close proximity, planned as a unified and complementary whole, and functionally integrated to make use of shared vehicular and pedestrian access and parking areas.
(d) Street design.
(1) Streets, along with sidewalks and open spaces, should be designed as the main public spaces of activity centers. Activity centers should have a grid or modified grid of interconnected streets that disperse traffic and shall connect the activity center with surrounding development.
(2) Streets within the development should have a design speed of 25 mph.
(e) Height and mass. For activity centers, building heights should be greatest near the center of these developments and transition to lower heights outward toward the edge of the development.
Buildings at the edge should be comparable in height and massing to the adjacent and nearby properties as well as the surrounding neighborhood.
(f) Building placement. Buildings should be placed close to (with little if any setback from) streets internal to the development, or along public streets abutting the development area, as determined in the development review and approval process. The buildings should be generally placed so that the main entrance is oriented to the street sidewalk.
(g) Storefront retail areas.
(1) The ground level of multi-story buildings should contain retail or entertainment uses with direct entry from the street to provide pedestrian interest along sidewalks. Pedestrian interest can be enhanced with use of windows, entrances, and architectural details.
Pedestrian signage, awnings, and ornamentation are encouraged.
(2) Storefront windows should be transparent. Mirrored glass, faux windows or display casements are strongly discouraged.
(h) Residential uses in activity centers. Some residences should be developed above the retail.
A variety of housing types including single-family detached, town homes, multi-family units, and accessory dwellings should be created to provide diversity and a range of costs and types of housing in activity center developments.
(i) Pedestrian scale.
(1) Activity centers must be designed for the pedestrian as well as the automobile. The network of sidewalks, designated street crossings, and pathways shall be as complete as the one for automobiles and providing direct, convenient access. Sidewalks must be placed on both sides of streets within activity centers.
(2) Street trees shall be planted along local streets and frontage roads to provide a distinct separation and buffer between pedestrians and moving automobiles.
(j) Open spaces in activity centers. Activity centers shall provide useable open space in the form of urban spaces (plazas, greens, and pocket parks) and/or natural areas. Open spaces may include outdoor restaurant seating and playgrounds. Less formal open space uses such as walking or biking trails along natural streams, wetlands or other natural features should be used on the periphery of these developments.
(k) Civic and institutional uses. Sites for churches, schools, community or club buildings, and similar public or semi-public facilities are encouraged to be provided, where appropriate, within activity centers. Uses such as schools, churches, and other institutions where provided should be part of an integrated site design and located and designed to minimize negative impacts.
(Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 35) Sec. 117-292. Business park development.
(a) Purpose. The purpose of these design standards is to ensure that new business parks are high quality developments that support job creation and economic expansion and at the same time respect the rural character and natural environmental features of the area. To accomplish these objectives, business parks should be developed in a campus-like setting consisting of attractive buildings, significant natural open space and formal landscaped areas. The appropriate uses for these business parks are suburban light manufacturing and assembly, scientific and research laboratories and corporate and general offices.
(b) Perimeter buffer. Visual buffers consisting of existing vegetation supplemented by plantings and berms shall be located along the periphery of business parks in accordance with overall landscaping requirements.
(c) Outdoor storage and display.
(1) Outdoor storage of materials or products is discouraged. Storage trailers or containers shall be located in designated areas at the rear of properties and screened from view. No outdoor processes should be employed in the operation of any business in the business park. Any waste and recycling receptacles shall be located within an enclosed structure at the side or rear of the building.
(2) No outdoor display areas shall be allowed except for seasonal display as specified in commercial display lots. Display areas shall be located within screened areas, flex-space, or office buildings.
(d) Landscaping. A minimum of ten percent of each developed subdivided tract within the business park shall be devoted to landscaping. Large canopy street trees should be planted at 60 to 100-foot intervals along internal circulation roads.
(Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 35) Secs. 117-293—117-313. Reserved.
DIVISION 10. INDUSTRIAL USES
Sec. 117-314. Industrial districts.
Industrial districts are typically laid out in a gridiron of large blocks 1,000 to 2,000 feet long and 400 to 1,000 feet deep. Road rights-of-way should be 80—100 feet for major roads and 60 feet for secondary roads. Curves and radii must be large enough to accommodate large trailer trucks.
(Ord. of 12-18-2000, § 9.1; Ord. of 8-20-2009(3)) Sec. 117-315. Screening of industrial and storage yards.
All areas devoted to the outside storage of vehicles, merchandise, and/or equipment not intended for display for public rent, lease, or sale, shall be screened from view from the right-of-way of the highway or county road along the entire property frontage, except in areas where access crossings have been approved. Screening may be accomplished by a natural vegetative buffer, by a building, by an earthen berm, by a 100 percent opaque, solid wooden fence or wall, or combination of these screening methods. The use of low-lying landscaping that does not screen the display areas from view from the public right-of-way shall not be deemed to comply with this requirement. Loading areas should be located to the rear of the building unless site design precludes a rear location, in which case loading shall be to the side of a building. Loading areas shall not be permitted within front yards.
The rear side of J & M Laboratories provides a visible view of the loading and storage area (discouraged). This view should be at least partially screened with landscaping and/or a fence/wall.
The J & M Laboratories building is attractive architecture with appropriate use of columns and vertical articulation (generally good practice for business and industrial parks). However, the building is large enough that the building walls should also be broken vertically with recesses or projections to interrupt the continuous plan of the facade. Notice the reflection of the trees in the windows, while the windows are attractive they should not be too reflective.
J & M Laboratories building J & M Laboratories building Chain link fencing with barbed wire top strands may be necessary for security purposes in light industrial zoning districts. If so, it should be coated with vinyl. The vehicle storage area is not screened (discouraged practice). Solid wooden fencing without barbed wire, with vegetated landscaping to soften the fencing, is a recommended practice. Inserting plastic or metal slats into the chain links for screening is not recommended because the inserts bend and break and are typically not very well maintained. The storage tank should be buried underground or at least screened.
Loading areas should be located to the rear of the building unless site design precludes a rear location, in which case loading shall be to the side of a building. Loading areas shall not be permitted within front yards.
(Ord. of 12-18-2000, § 9.2; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3)) Secs. 117-316—117-333. Reserved.
DIVISION 11. MULTI-FAMILY RESIDENTIAL DEVELOPMENT
Sec. 117-334. Respect for adjacent residential neighborhoods; building facades; landscaping.
(a) New multiple-family residential developments shall respect the scale and character of the adjacent residential neighborhood through attention to views, building scale and orientation, proximity to adjacent uses, location of driveways, noise, lighting and landscape.
(b) Building facades shall be articulated by using color, arrangement, or change in materials to emphasize the facade elements. The planes of the exterior walls may be varied in height, depth or direction. Long facades should be designed with sufficient building articulation and landscaping to avoid a monotonous or overpowering institutional appearance.
Gainesville Welding and Maintenance, Henry Grady Highway
(c) Exterior site design and landscaping shall provide functional recreational spaces and/or community site amenities. Exterior spaces should be designed to enhance the overall appearance and compatibility of such development by providing privacy, buffering and daylight, and to provide a pleasant transition to the street.
(Ord. of 12-18-2000, ch. 10; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 36) Sec. 117-335. Planned residential communities.
(a) Planned residential communities may include golf-course master planned developments and exclusive (gated) neighborhoods. However, they may also provide a variety of dwelling types, including some combination of detached single-family (fee-simple or condominium), duplex, townhouse, multi-family dwellings and institutional (senior) living. Planned residential communities are therefore predominantly residential but not necessarily exclusively residential.
(b) Where predominantly single-family residential uses are proposed, the gross density should not exceed the recommendations of the comprehensive plan, land use element, as described for the land use classification in which the property is located, as shown on the county's future land use plan map.
(Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3)) Secs. 117-336—117-356. Reserved.
DIVISION 12. EXTERIOR LIGHTING
Sec. 117-357. Generally.
(a) Exterior lighting shall be architecturally compatible with the building style, material and colors.
(b) Exterior lighting of the building and site shall be designed so that light is not directed off the site and the light source is shielded from direct off-site viewing. All outdoor light fixtures shall be fully shielded or be designed or provided with light angle cut-offs, so as to eliminate uplighting, spill light, and glare.
(c) Excessive illumination of signage, building or site shall be avoided. Roof lighting, downlighting washing the building walls, and illuminated awnings are prohibited.
(d) Lighting limitations. The placement of street lights between buildings and the right-of-way of SR 400 in the northern portion of the SR 400 corridor are discouraged, except where they are necessary due to public safety concerns or in activity areas. It is intended that the northern part of the SR 400 corridor will remain a darker environment than the southern portion of the SR 400 corridor.
(Ord. of 12-18-2000, § 11.1; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 37)
Sec. 117-358. Mounting poles and height.
(a) Fixture mounting height shall be appropriate for the project and the setting. Low, bollard-type fixtures, three to four feet in height, shall be used as pedestrian area lighting.
(b) The mounting height of fixtures in smaller parking lots or service areas shall not exceed 20 feet, with lower mounting heights encouraged, particularly where adjacent to residential areas or other sensitive land uses.
(c) The placement of light poles within raised curb planter areas is encouraged, but conflicts with parking lot trees which can obscure the lighting should be avoided.
(d) Luminaries should be rugged for the application, adapted to the environment, and designed to give years of trouble-free service. Pole-mounted "lantern style" or "post-top" luminaries are preferred.
(e) Cut-off fixtures are required.
(1) All luminaries used for outdoor lighting shall be full cutoff luminaries which do not emit any direct light above a horizontal plane through the lowest direct-light-emitting part of the luminaire.
(2) Security lighting, unless activated by motion sensor devices, shall also meet this requirement.
(3) Wallpacks are not permitted unless fully shielded.
(Ord. of 12-18-2000, § 11.2; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 37)
Sec. 117-359. Types of lighting.
(a) Light fixtures that provide canopy overlighting shall be recessed into the canopy.
(b) Yard lights shall be oriented downward; uplighting is not permitted.
(c) Roof top lighting is discouraged.
(d) The use of excessive night-time security lighting is discouraged. Other security measures should instead be considered.
(e) The use of laser source light for outdoor advertising or entertainment is prohibited.
(f) High pressure sodium lighting is preferred over metal halide or other types of lighting for outdoor parking lots.
(Ord. of 12-18-2000, § 11.3; Ord. of 8-20-2009(3); Ord. of 9-18-2025(1), Exh. A, § 37) Sec. 117-360. Architectural lighting.
(a) Well-designed and distinctive lighting of building facades is one of the best ways to attract attention and make a favorable impression with a minimal investment. Building facade lighting can help enhance the intrinsic charm, beauty, and utility of any given setting. Architectural lighting may include outlining, floodlighting, spotlighting, or any applicable combination of these techniques.
(b) The discrete lighting of a few key architectural features or details is preferred over uniform floodlighting of the entire building facade. Focal points can also be established through careful floodlighting of major buildings, with the lighting of secondary buildings keyed in turn to these focal points.
(c) Highly polished surfaces such as glass, marble, glazed tile, glazed brick, porcelain enamel, and various metals can reflect the image of the light source. Designers should avoid lighting these reflective surfaces directly. Glass buildings usually cannot be lighted for nighttime viewing.
(Ord. of 12-18-2000, § 11.4; Ord. of 8-20-2009(3)) Sec. 117-361. Illuminance levels.
Illuminance levels for outdoor lighting fixtures should comply with the following standards, measured at three feet above the ground or finished grade.
At Property Lines Including Rights-of-Way Minimum Footcandles Maximum Footcandles At property line abutting a residential zoning district None 0.5 At property line abutting an office-professional zoning district None 1.0 At property line abutting a commercial or light industrial zoning district None 1.5 Off-Street Parking Lots Minimum
Footcandles Average Footcandles Maximum Footcandles Residential districts 0.5 2 4 Office-professional districts 1.0 3 6 Off-Street Parking Lots Minimum Footcandles Average Footcandles Maximum Footcandles Commercial districts 2.0 6 12 Light industrial districts 1.0 4 8 Source: Derived from Illuminating Engineering Society of North America 1999.
(Ord. of 12-18-2000, § 11.5; Ord. of 8-20-2009(3)) Secs. 117-362—117-380. Reserved.
DIVISION 13. RESERVED*
Secs. 117-381—117-410. Reserved.
DIVISION 14. APPLICATION REQUIREMENTS
Sec. 117-411. Generally.
The provisions of this article shall be in addition to the provisions of article VIII and article IX of the Land Use Resolution of Dawson County. A written design concept statement should be submitted as part of the design review application which identifies the significant site features, supports the reasoning behind the architecture and site plan proposed, and explains how important site features are incorporated into the project design. Among the elements that should be discussed include, but are not limited to, the following: soils, vegetation, hydrology, climate, topography, aesthetics, historical significance, and existing land use.
(Ord. of 12-18-2000, § 13.1; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3)) Sec. 117-412. Site plan requirements and specifications.
A site plan is required. It must be drawn to an engineering scale usually on a sheet or sheets no greater than 24 by 36 inches. It shall include surrounding streets (including rights-of-way), driveways, parking, building locations, and surrounding property lines and uses within 100 feet of the subject site.
(Ord. of 12-18-2000, § 13.2; Ord. of 8-20-2009(3)) Sec. 117-413. Landscaping plan.
Landscape plans shall be reviewed and approved by staff prior to the issuance of a building permit.
(Ord. of 12-18-2000, § 13.3; Ord. of 8-20-2009(3)) Sec. 117-414. Lighting plan.
Lighting plans shall be required for all development. When required, lighting plans shall illustrate proposed lighting. The plan shall show areas of night illumination and the amount of light at various places measured in footcandles. When required, the lighting plan shall consist of either isofootcandles (connecting points of equal light illumination levels, similar to a topographic contour) or a photometric grid with individual spot readings. The lighting plan shall also indicate light pole height, type, and number of fixtures per pole, along with fixture type and style.
(Ord. of 12-18-2000, § 13.4; Ord. of 8-3-2006, § 1(attachment); Ord. of 8-20-2009(3)) Sec. 117-415. Development and construction in accordance with approved plans.
All site development, landscaping, and improvements shall be carried out in accordance with approved plans. All building construction shall be carried out in accordance with approved elevations.
(Ord. of 12-18-2000, § 13.5; Ord. of 8-20-2009(3)) Sec. 117-416. Alternate design.
(a) Determination shall be made by planning commission. Should a design not meet all of the standards contained within division 7 of article II of chapter 117 of this Code, then the proposed design must be submitted, for public hearing, to the county planning commission for review and approval as an alternate design. In considering whether to approve such alternate design, the planning commission shall consider:
(1) How the alternate design will meet the intent of this Code;
(2) Whether there exists an architectural or structural reason why the existing requirement(s) cannot be met;
(3) What historical or iconic value is there in the proposed alternate design; and
(4) Effect upon adjoining property.
(b) The application for an alternate design shall be submitted in a form prescribed by the county, and shall include architectural elevation drawings, illustrating the design and exterior finish materials for all building sides. Photographs and artistic renderings may not be submitted in lieu of elevation drawings.
(c) Public hearing.
(1) The application for an alternate design shall be scheduled for public hearing and consideration by the planning commission upon submission of a complete application to the community development director in accordance with the submittal deadline established by the department of community development. The public hearing before the planning commission shall occur on the date advertised. The proponents shall have a minimum time period of ten minutes to present data, evidence, and opinions, and an equal minimum time period of ten minutes shall be permitted for presentation by opponents of each request. No alternate design shall be permitted unless approved after a public hearing.
(2) At least 15 but not more than 45 days before the date of the hearing by the planning commission, the county shall publish a notice of the hearing within a newspaper of general circulation within Dawson County. The notice shall state the time, place, and purpose of the hearing.
(3) A public hearing sign shall be placed in a conspicuous location on the subject property at least 15 but not more than 45 days prior to the date of the scheduled hearing. The required sign shall state the time, place, and purpose of the public hearing.
(4) At least 15 days before each hearing, a notification shall be sent to each adjoining property owner within Dawson County by regular mail sent to the address provided by the applicant or the address as shown on the current tax records.
(Ord. of 3-17-2022(1), § 1(Exh. A); Ord. of 4-21-2022(1), § 1(Exh. A); Ord. of 4-21-2022(3), § 1(Exh.
A); Ord. of 9-18-2025(1), Exh. A, § 38) Secs. 117-417—117-443. Reserved.
DIVISION 15. GLOSSARY
Sec. 117-444. Glossary.
Amenity. Aesthetic or other characteristics that increase a development's desirability to a community or its marketability to the public. Amenities may differ from development to development but may include such things as recreational facilities, pedestrian plazas, views, streetscape improvements, special landscaping, or attractive site design.
Anchor tenant. The major store or stores within a shopping center.
Appearance. The outward aspect that is visible to the public.
Appropriate. Fitting to the context of a site, neighborhood or community.
Arcade, entry. An arcade that provides public access to a building entrance, retail space, and/or public space.
Architectural concept. The basic aesthetic idea of a structure, or group of structures, including the site, signs, buildings and landscape development that produces the architectural character.
Architectural features. Ornamental or decorative features attached to or protruding from an exterior wall, including cornices, eaves, gutters, belt courses, sills, lintels, bay windows, chimneys, and decorative ornaments.
Architectural recesses. Portions of a building wall at street level which are set back from the street line so as to create articulation of the building wall and/or to provide space for windows or doors.
Architecture. The art and science of designing and constructing buildings adapted to their purposes, one of which is beauty.
Attractive. Having qualities that arouse satisfaction and pleasure in numerous, but not necessarily all, observers.
Awning. A hood or cover that forms a roof-like structure, often of fabric, metal, or glass, designed and intended for the protection from the weather or as a decorative embellishment, and which projects from the wall or roof of a structure over a window, walk, door, or the like. Awnings may be retractable but are most often fixed with a rigid frame.
Awning, internally illuminated. A fixed awning covered with a translucent membrane that is, in whole or part, illuminated by light passing through the membrane from within the structure.
Balustrade. A railing consisting of a handrail or balusters.
Bollards. Luminaries having the appearance of a short, thick post, used for walkway and grounds lighting. The optical components are usually top mounted.
Brightness. The subjective sensation to measured luminance's. Brightness is affected by the environment in which the luminaire resides and is also a function of average luminance, luminous intensity, mounting height, beam angle, and background luminance. As the background luminance of a scene gets higher, the apparent brightness of a luminaire becomes lower. Brightness is difficult if not impossible to measure. However, higher luminous intensities generally mean higher brightness.
Buffer. A strip of land along a property, lease line, or other border, never less than 15 feet, between one use and another or between an environmentally sensitive area and another use, to screen, separate and shield one use area from another and obstruct noise, illumination, visual, and other incompatibilities or nuisances. A buffer may be a natural, undisturbed area of trees and undergrowth that provides opaque or near opaque screening. A buffer, where sparsely vegetated, is replanted with trees and shrubs to enhance its screening functions to opaque or near opaque conditions. A fence or wall can be included within a buffer but a fence or wall in itself does not constitute a buffer.
Build-to line. An alignment established a certain distance from the curb or right-of-way line to a line along which a building or buildings shall be built.
Building bulk. The visual and physical mass of a building.
Built environment. The elements of the environment that are generally built or made by people as contrasted with natural processes.
Caliper. A forest standard of tree trunk measurement for understory or replacement trees.
Canopy. A roof-like structure, supported by a building and/or columns, poles, or braces extending from the ground, including an awning, that projects from the wall of a building over a sidewalk, driveway, entry, window, or similar area, or which may be freestanding.
Character. The nature of a building.
Cohesiveness. Unity of composition among elements of a structure or among structures, and their landscape development.
Common area. Land within a development, not individually owned or dedicated to the public, and designed for the common usage of the development. These areas include green open spaces and yards and may include pedestrian walkways and complimentary structures and improvements for the enjoyment of residents of the development. Maintenance of such areas is the responsibility of a private association, not the public.
Compatibility. With regard to development, the characteristics of different land uses or activities that permit them to be located near each other in harmony and without conflict. With regard to buildings, harmony in appearance of architectural features in the same vicinity.
Continuity. The flow of elements or ideas in a noninterrupted manner.
Cornice. A horizontal element member, structural or nonstructural (i.e., molding), at the top of the exterior wall or projecting outward from an exterior wall at the roof line, including eaves and other roof overhang.
Curb cut. The providing of vehicular ingress and/or egress between property and an abutting street or road. Where a curb exists, curb cut means an opening along the road curb for an access driveway.
Design guideline. A standard of appropriate activity that will preserve or enhance the architectural character and site design and function of a building, structure, or development.
Detail. A small feature or element that gives character to a building.
Detention area. An area that is designed to capture specific quantities of stormwater and to gradually release the stormwater at a sufficiently slow rate to avert flooding or erosion.
Dormer. A window projecting from a roof.
Drainage:
(1) The outflow of water from a site; and
(2) The removal of surface water from land by drains, grading, or other means that include runoff controls to minimize erosion and sedimentation.
Driveway. A private roadway providing access for vehicles to a parking or loading area, dwelling, or other structure.
Driveway, common. A privately owned and maintained driveway shared by adjacent property owners.
Drip line. An imaginary vertical line of a tree's outermost branch tips down to the ground. The circular area of land surrounding the tree from the trunk to the outermost branches.
Earthen berm. A continuous mound of earth, normally landscaped, used to shield site objects from view and to provide visual interest.
Eave. The projecting lower edges of a roof overhanging the wall of a building.
Eave line. The extension of a roof line beyond the vertical wall of a building.
External design feature. The general arrangement of any portion of structures or landscaping, including the type, and texture of the materials, the type of roof, windows, doors, lights, signs, and fixtures of portions which are open to the public view.
Facade. Typically the front of a building; however, any building square on view is considered a facade (see definitions below).
Facade, front. Any facade with a main public entrance which faces one of the primary streets.
Facade, rear. Any facade without a public entry that does not face a public road.
Facade, side. Any facade without a public entry but facing a public street.
Fenestration. The organization of windows on a building wall.
Flag. Any fabric or other flexible material attached to or designed to be flown from a flagpole or similar device.
Flag, business. A flag displaying the name, insignia, emblem, or logo of a profit-making entity.
Footcandle. A unit of illuminance on a surface that is everywhere one foot from a uniform point source of light of one candle and equal to one lumen per square foot. One footcandle (FC) is the equivalent of 10.76 Lux (1 Lux = 0.0929 FC).
Footprint. The horizontal area as seen in plan, measured from the outside of all exterior walls and supporting columns. It includes garages, covered carports, and accessory structures.
Gable. The triangular upper portion of an end wall, underneath a peaked roof.
Glare. The sensation produced by luminance within the visual field that is sufficiently greater than the luminance to which the eyes are adapted to cause annoyance, discomfort, or loss in visual performance and visibility.
Grade, natural. The existing grade or elevation of the ground surface that exists or existed prior to man-made alterations, such as grading, grubbing, filling, or excavating.
Habitat. The physical location or type of environment in which an organism or biological population lives or occurs.
Harmony. A quality that represents an attractive arrangement and agreement of parts of a composition, as in architectural elements.
Hedge. A row of closely planted shrubs, bushes, or any kind of plant forming a boundary.
Illuminance. The area density of the luminous flux incident at a point on the surface. It is a measure of light incident on a surface, expressed in lux or footcandles.
Impervious surface. Any hard-surfaced, man-made area that does not readily absorb water, including but not limited to building roofs, parking and driveway areas, graveled areas, sidewalks, and paved recreation areas.
Irrigation. The methods of supply and application of water other than natural rainfall.
Irrigation system. A permanent, artificial watering system designed to transport and distribute water to plants.
Isofootcandle plan: A site plan of a proposed development showing proposed outdoor illuminance with a series of isofootcandle lines that join points on a surface where the illuminance is the same.
Landscaped coverage ratio. The area of a property devoted to landscaping, including natural buffers, divided by the total area of the property.
Landscaping. The area within the boundaries of a given lot that consists of planting materials, including but not limited to, trees, shrubs, ground covers, grass, flowers, decorative rock, bark, mulch, and other similar materials.
Lighting, neon outline. Outline lighting formed in whole or part with neon.
Lighting, outline. An arrangement of lighting that outlines or calls attention to certain features of a building, such as its shape or the decoration of a window.
Lighting, pedestrian-scale. Light standards or placements no greater than 15 feet in height located along walkways.
Luminaire (light fixture). A complete lighting unit consisting of a lamp or lamps and ballasting (when applicable) together with the parts designed to distribute the light, to position and protect the lamps, and to connect the lamps to the power supply. This term shall be interpreted broadly as applying to all outdoor electrically powered illuminating devices, outdoor lighting or reflective surfaces, lamps and similar devices, permanently installed or portable, used for illumination or advertisement. Such devices shall include, but are not limited to, building facade and canopy lighting, recreational area lighting; parking lot lighting; landscape lighting; billboards and other sign (advertising or other) lighting; driveway and street lighting; and product display area lighting.
Luminaire, cutoff. A luminaire that provides a light distribution where the candela per 1,000 lamp lumens does not numerically exceed 25 (2.5 percent) at an angle of 90 degrees above nadir, and 100 (ten percent) at a vertical angle of 80 degrees above nadir. This applies to all lateral angles around the luminaire.
Luminaire, full cutoff. A luminaire the provides a light distribution where zero candela intensity occurs at an angle of 90 degrees above nadir, and at all greater angles from nadir. Additionally, the candela per 1,000 lamp lumens does not numerically exceed 100 (ten percent) at a vertical angle of 80 degrees above nadir. This applies to all lateral angles around the luminaire.
Luminance. Within the context of outdoor lighting, the quantity of light reflected or emitted toward an observer.
Massing. The overall visual impact of a structure's volume; a combination of height and width and the relationship of the heights and widths of the building's components.
Modularity. Design composition comprised of a rhythmic organization of parts.
Modulation. A measured setback or offset.
Natural drainage. Channels formed in the existing surface topography of the earth prior to changes made by unnatural causes.
Natural features. Components and processes present or produced by nature, including soil types, geology, slopes, vegetation, surface water, drainage patterns, aquifers, climate, floodplains, aquatic life, and wildlife.
Outdoor storage. The keeping of personal or business property or motor vehicles in an area outside of a building for a period of time greater than 24 hours, including items for sale, lease, processing, and repair.
Parapet. A low retaining wall at the edge of or along a roof.
Pedestrian-oriented development. Development designed with an emphasis primarily on the street sidewalk and on pedestrian access to the site and building, rather than auto access and parking areas. The building is generally placed close to the street and the main entrance is oriented to the street sidewalk. There are generally windows or display cases along building facades which face the street.
Portico. An exterior appendage to a building, normally at the entry, usually roofed.
Proportion. Balanced relationship of parts of a building, signs and other structures, and landscape to each other and to the whole.
Recessed canopy fixture. An outdoor lighting fixture recessed into a canopy ceiling so that the bottom of the fixture is flush with the ceiling.
Retaining wall. A wall or similar structure used at a grade change to hold soil on the up-hillside from slumping, sliding, or falling.
Retention pond. A basin to hold storm water runoff and to provide a gradual release of it through drainage facilities.
Ridge. The peak of a roof. Also, the horizontal member at the peak into which the rafters join.
Roof. The cover of a building, including the eaves and similar projections.
Roof, flat. A roof having no pitch or a pitch of not more than 2:12.
Roof, pitched. A shed, gabled, or hipped roof having a slope or pitch of at least one foot rise for each four feet of horizontal distance.
Safety lighting. Exterior lighting that involves ensuring proper levels of illumination to provide safe working conditions, safe passage, and the identification of outdoor hazards.
Scale. Proportional relationships of the size of parts to one another and to humans.
Scenic vista. A visual panorama with particular scenic value.
Security lighting. Exterior lighting installed solely to enhance the security of people and property.
Sheet flow. Flow of liquid moving evenly over an area without being concentrated in swales.
Sign, abandoned. A sign or sign structure on a site where all buildings have been demolished or removed, or a sign or signs pertaining to a business or other use that has not operated on the site for a period of 90 days or more.
Sign, freestanding. Any sign supported wholly or in part by some structure other than the building or buildings housing the business to which the sign pertains, usually supported by a pole, mast, frame or other structure that is not itself an integral part of the sign.
Sign, monument. A freestanding sign supported primarily by an internal structural framework or integrated into landscaping or other solid structure features other than support poles.
Sign, pole. A sign that is mounted on a freestanding pole or other support that is not itself an integral part of the sign.
Sign, roof. A sign erected on a roof or any sign that projects above the highest point of the roof line, parapet, or fascia of the building.
Sign, wall. A sign mounted flat against and projecting no more than 12 inches from the wall of a building or structure.
Sign, window. A sign affixed to the interior or exterior of a window or placed immediately behind a window pane so as to attract the attention of persons outside the building.
Sky glow. Atmospheric or astronomical light pollution that deprives urban residents of the opportunity to stargaze and hampers astronomers' attempts to view the night sky through telescopes.
Spill light. Light emitted by an outdoor light fixture that falls outside the boundaries of the property on which the installation is sited.
Street furniture. Those features associated with a street that are intended to enhance the street's physical character and use by pedestrians, such as benches, trash receptacles, planting containers, pedestrian lighting, kiosks, etc.
Street hardware. Objects other than buildings or street furniture that are part of the streetscape.
Examples are: nonpedestrian street light fixtures, utility poles, traffic lights and their fixtures, fire hydrants, etc.
Streetscape. The appearance and organization along a street of buildings, paving, plantings, street hardware, street furniture, and miscellaneous structures.
Trash enclosure. An accessory use of a site where trash and/or recyclable material containers, or any other type of waste or refuse container is stored.
Tree. Any self-supporting, woody perennial plant usually having a single trunk diameter of three inches or more which normally attains a mature height of at least 15 feet.
Tree, overstory. A tree that composes the top layer or canopy of vegetation and that will generally reach a mature height of greater than 40 feet.
Tree, significant. Any tree deemed by a qualified arborist, registered forester or landscape architect to be of a rare or unusual species.
Tree cover. An area characterized by a dense vegetation canopy and limited views through woodlands.
Tree save area. An area composed of closely grouped trees designated for preservation.
Undergrounding. The placement of utility lines below ground, with the removal of above-ground poles, wires and structures as applicable.
Uplighting. Any light source that distributes illumination above a 90-degree horizontal plane of the light source.
View corridor. The line of signed identified as to height, width, and distance of an observer looking toward an object.
Viewshed. The area within view from a defined observation point.
Xeriscaping. Landscaping characterized by the use of vegetation that is drought-tolerant or a low water use in character.
(Ord. of 12-18-2000, glossary; Ord. of 8-20-2009(3)) References.
Barnett, Jonathan, and Gary Hack. 2000. Urban Design. In The Practice of Local Government Planning, 3rd Ed., Charles J. Hoch, Linda C. Dalton, and Frank S. So, Editors. Washington, DC:
International City/County Management Association.
Bishop, Kirk R. 1989. Designing Urban Corridors. Planning Advisory Service Report Number 418.
Chicago: American Planning Association.
Davidson, Michael, and Fay Dolnick, eds. 1999. A Glossary of Zoning, Development, and Planning Terms. Planning Advisory Service Report No. 491/492. Chicago: American Planning Association.
DeChiara, Joseph, and Lee E. Koppelmann. 1984. Time Saver Standards for Site Planning. New York: McGraw-Hill.
Illuminating Engineering Society of North America. 1999. Lighting for Exterior Environments: An IESNA Recommended Practice. RP-33-99.
Oregon Transportation and Growth Management Program. 1999a. Main Street...When a Highway Runs Through It: A Handbook for Oregon Communities. Salem, OR: Department of Land Conservation and Development.
Oregon Transportation and Growth Management Program. 1999b. Model Development Code and User's Guide for Small Cities. Salem, OR: Department of Land Conservation and Development.
Oregon Transportation and Growth Management Program. 1999c. The Infill and Redevelopment Code Handbook. Salem, OR: Department of Land Conservation and Development.
Prouse, Robert. May 1992. Lighting Our Streets. Planning Commissioners Journal, No. 4.
Sternberg, Ernest. 2000. An Integrative Theory of Urban Design. Journal of the American Planning Association 66, 3: 265-278.
Stover, Virgil G., and Frank J. Koepke. 1988. Transportation and Land Development. Washington, DC: Institute of Transportation Engineers.
(Ord. of 12-18-2000, references; Ord. of 8-20-2009(3))
APPENDIX
APPLICATION REVIEW CHECKLIST
PROJECT NAME:
LOCATION:
NAME OF PERSON
COMPLETING THIS FORM:
This checklist is intended for use by the designer as a summary of the development and design guidelines established in this document. It is not intended to serve as a substitute for a reading and application of these guidelines. This checklist will also be used by the county planning and zoning department as a means of determining compliance with specific guidelines. For more information, consult the actual text of these guidelines. The designer must demonstrate how the recommended guidelines are met or why they cannot be met.
GUIDELINE
(reference) YES NO COMMENTS Does the proposed development relate to the site and its surroundings?
(section 117-92) Does the project evaluate, retain, and incorporate natural features, where appropriate? (section 117-93) Are significant site features identified and incorporated into development plans? (section 117-93) Are riparian zones, wetlands, flood plains, etc. and other environmentally sensitive areas protected? (section 117-93, 117-94) Are amenity features incorporated into the development? (section 117-95) Does the grading plan avoid an unnatural site appearance, and are cuts and fills more or less balanced on the site?
(section 117-119) (reference) YES NO COMMENTS Is grading prohibited underneath trees to be retained? (section 117-119) Does the plan avoid the filling of riparian areas? (section 117-119) Do plans reflect adherence to best erosion control practices? (section 117- 120) Have permeable pavements been considered for parking lot overflow and employee parking areas? (section 117- 120) Does the proposed development use the natural, on-site drainage system to the extent it is possible? (section 117-120) Are stormwater ponds and lakes designed for maximum habitat value?
(section 117-120) If retaining walls are visible from the public right-of-way, have they been faced with brick, stone, or some other architectural treatment, and/or screened with landscaping? (section 117-121) Are all utility installations serving the development installed underground?
(section 117-122) Are utility easements combined where possible? (section 117-122) Are berms used to provide separation from vehicle traffic and incompatible land uses? (section 117-123) Has an analysis been made of the likely and necessary pedestrian routes, including linkages to individual buildings, neighboring properties, and access ways along public roads? (Division 4 of this article) (reference) YES NO COMMENTS
Does the access plan meet state requirements and these guidelines, including interparcel access, driveway separation, and shared driveways?
(section 117-174) Is a public frontage road incorporated into the site development plan and provided? (section 117-1744) Is access provided only to the frontage road, or in cases where no other access is available, is access limited
to one entrance/exit per development?
(section 117-174) Is inter-parcel site access provided?
(section 117-174) Do all driveway openings meet minimum access spacing requirements?
(section 117-174) Are service functions separated from main circulation areas, or at least integrated into the circulation pattern in a manner that minimizes conflicts with
vehicles and pedestrians? (section 117-175) Do off-street parking areas meet specifications? (section 117-176) Are clear zones and driveway entry throat distances sufficient to allow safe turning movements after exiting from the highway? (section 117-176) Is a continuous, opaque screen provided where parking areas directly front on a public street? (section 117-176)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.