Douglas County · Código de ordenanzas
Chapter 14 - ROADS, STREETS AND SIDEWALKS / Article III - USE OF PUBLIC RIGHT-OF-WAY
Sec. 14-50.2. Penalties.
Sobre este texto
- As published by Municode, current through 2026-03-31
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Any utility or CSP that does not notify the transportation department in advance of the date and time of the roadway backfilling and repaving, shall be fined two hundred fifty dollars ($250.00) per occurrence. In addition, the utility or CSP may be required by the transportation department to core the patching, at the utility's or CSP's cost, to determine its compliance with the county transportation department standard number 3.01, Backfilling and Repaving Utility Cuts. All cost or expenses incurred by the county in repairing or replacing any structure, shrubbery, driveway, embankment, ground cover or any other item which has been altered or disturbed and not left or returned to the original condition by the utility or CSP, shall be chargeable to the utility or CSP which disturbed the area or cut the county roadway. The county shall be entitled to collect reasonable attorney's fees incurred in the collection of such costs or expenses and all costs of collection.
Historia
(Ord. of 9-17-19, § 1(Exh. A))
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.