Early County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 10 - BUILDINGS AND BUILDING REGULATIONS / Article II - ADMINISTRATION / Division 7 - PERMITS
Sec. 10-215. Schedule of permit fees.
Sobre este texto
- As published by Municode, current through 2022-11-07
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Appropriate building permit, code compliance permit, subdivision, land disturbing permit, certificate of occupancy, contractor registration and inspection fees must be paid and are available in the county schedule of development fees.
(1) Re-inspection. Where inspections are required, the inspection and the first re-inspection shall be at no cost; for each and every re-inspection thereafter, there shall be paid a re-inspection fee, however, the building official may waive the re-inspection fee if he determines that the reinspection was not required as a result of the failure of the contractor to have the work ready to inspect or to have performed the work correctly.
(2) Certificates of occupancy. The issuance of certificate of occupancy shall be at no cost except as follows:
a. Temporary certificates of occupancy.
b. Certificates of occupancy requested for existing buildings for which a building permit has not been issued.
(3) Contractor registration. There shall be a charge imposed for contractor registration.
Historia
(Res. of 6-1-1998(2), ch. 6, art. III, § 6.3-7)
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.