Ir al contenido
Georgia Commons
Menú

Fulton County · Código de ordenanzas

Fulton County Code of Ordinances

Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.

Sobre este texto

  • As published by Municode, current through 2026-08-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
  • Read by OCR from a scanned page: a character, a name, or a number may be misread.

Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

Parte 3 de 14. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.

(7) If the applicant, any partners, members, managers, corporate officers or directors have been convicted of, or pleaded guilty or nolo contendere to, a drug or alcohol related felony or sex-related crime in the past five years or has an outstanding arrest for a drug or alcohol-related felony or sex-related crime, a complete description of any such crime including date of violation, date of conviction, jurisdiction,

and any disposition, including any fine or sentence imposed and whether terms of disposition have been fully completed.

(8) If applicant is a person doing business under a trade name, a copy of the trade name properly recorded.

(9) Address of the premises to be regulated and whether the premises are owned or rented.

(10) A statement that said adult entertainment establishment meets all applicable county ordinances and state laws and

regulations.

(11) Each application for an adult entertainment establishment license shall be verified and acknowledged under oath to be true and correct by:

a. The applicant if the applicant is an individual;

b. By the managing or general partner if the applicant is a partnership;

c. By the president of the corporation if the applicant is a corporation;

d. By the members or managers of a limited liability company; or

e. By the chief administrative official if the applicant is any other organization or association.

(12) Each application must be complete in its entirety before being accepted by the county for filing and processing. All applicants shall furnish all data, information, and records pertinent to obtaining an adult entertainment establishment license which is requested by the county and failure to furnish such data, information, and re- cords shall suspend the application process until the data, information and records are submitted and if not submitted within 30 days from the date of such

request, the application shall be deemed withdrawn.

(Res. No. 06-0470, Exh. A, 5-3-06) Sec. 18-84. Application investigation.

The county shall have 45 days (unless the application is suspended by the failure of the applicant to provide data, information or records as reasonably requested by the county to complete the investigation) from the receipt of a completed application to make a decision in which

to grant or deny an adult entertainment establishment license. The director of finance shall make a recommendation to the board of commissioners regarding the approval or denial of the license and the board shall make the final decision after a public hearing regarding the same. In the event the board of commissioners has not

granted or denied the application within 45 days (unless the application is suspended by the failure of the applicant to provide data, information pr records as reasonably requested by the county to complete the investigation), the license shall automatically issue and the applicant shall have the right to operate its adult entertainment establishment.

(Res. No. 06-0470, Exh. A, 5-3-06) Sec. 18-85. General qualifications of applicant.

No license for an adult entertainment establishment provided for by this article shall be issued to or held by:

(1) Any applicant who has not paid all required fees and taxes for a business at that location.

(2) Any person or business entity who is not of good moral character as defined in this article, is not qualified to hold and conduct business according to the laws of the United States, State of Georgia or Fulton

County, or who has had any license for an adult entertainment establishment or for the sale of alcoholic beverages in Fulton County or any other state or political subdivision thereof previously suspended or revoked.

(3) Any applicant whose license had been rejected or withdrawn without permission of the board of commissioners within seven days immediately preceding the date set for the hearing before the board, unless at least one year shall have expired from such rejection or withdrawal of said application. This requirement shall not apply where the applicant applies for a new location that had not been rejected or

withdrawn within the one-year period.

(4) Any applicant where there is evidence that, even though there is compliance with the minimum distance requirements as set forth in the Zoning Resolution, the type and number of schools or churches or other such facilities in the vicinity of the adult entertainment establishment causes minors to frequent the immediate area.

(5) Any applicant if applicant is a previous holder of any license under this article or of an alcoholic beverage license, the manner in which the applicant conducted the business thereunder as to the necessity

for unusual police observation and inspection in order to prevent the violation of any law, regulation or ordinance relating

to such business;

(6) An applicant if the applicant's spouse could not meet the qualifications of an applicant, particularly if it appears that the applicant's spouse or another person is using the applicant as a guise or "dummy" to obtain a license.

(Res. No. 06-0470, Exh. A, 5-3-06) Sec. 18-86. Notice of intent to operate an adult entertainment establishment.

(a) Newspaper advertisement.

(1) The applicant for an adult entertainment license under this article shall give notice that an application has been filed by publication of an advertisement once a week for two consecutive weeks prior to the

date of consideration of the application by the board of commissioners in the newspaper in which legal advertisements are published in Fulton County. Said notice

need not appear on the same day as legal advertisements are regularly published.

(2) The advertisement shall not appear more than 30 days prior to the date of such consideration. The advertisement shall be of type not smaller than ten-point capital and lower case and shall be at least a one-inch column.

(3) The advertisement shall contain a particular description of the location of the proposed business and the name of the

applicant or business designees named in subsection 18-83(6) and the time and place of the board of commissioners' hearing at which time the license shall be considered.

(b) Signage on property. The applicant shall cause to be placed upon the location of the proposed business a sign stating the following: "A Fulton County Adult Entertainment License has

been applied for. Any objection to this application must be made at or prior to o'clock , on the day of , 20 , in Assembly Hall located at 141 Pryor Street, S.W. Atlanta, Georgia, which is the date and time of Board of Commissioners' hearing." The sign shall be at least 18 inches by 24 inches in size and shall face toward all public streets, sidewalks or other public property which adjoins the location so as to be clearly visible by persons using such public area. The sign shall be posted on the property from the date of the first publication of the newspaper advertisement through the date of the consideration by the board.

(Res. No. 06-0470, Exh. A, 5-3-06) Sec. 18-87. Adult entertainment license notice of denial; appeal.

In the event the application for an adult entertainment establishment license is denied by the board of commissioners, the applicant shall be

notified in writing of such denial within 10 days by U.S. mail. A decision by the board of commissioners regarding denial of said license is a final action; therefore, any appeal of such decision

shall be pursued by application for Writ of Certiorari filed with the Superior Court of Fulton County within 30 days of the decision.

(Res. No. 06-0470, Exh. A, 5-3-06) Sec. 18-88. Renewal of adult entertainment licenses.

Each adult entertainment license is valid for a period of one year from the date of issuance. The license may be renewed provided that the licensee continues to meet the requirements set out in this article. Renewal applications are due two months prior to the expiration of the license and shall include a nonrefundable renewal fee according to a fee schedule adopted by the board of commissioners prior to an updated investigation by the Fulton County Police based upon the information

contained on file at the time of the renewal. In the event no action is taken on the renewal application by the expiration date of the previously issued license, the licensee shall have the right to

continue operation for the renewal year.

(Res. No. 06-0470, Exh. A, 5-3-06; Res. No. 11- 0075, 1-19-11) Sec. 18-89. Adult entertainment licenses are nontransferable.

No license for an adult entertainment establishment may be sold, transferred or assigned by a licensee, or by operation of law, to any other

person(s) or business entity. Any such sale, transfer or assignment, or attempted sale, transfer or assignment, shall be deemed to constitute a voluntary surrender of such license and such license shall thereafter be null and void; provided and

excepting, however, that if the licensee is a partnership and one or more of the partners should die, one or more of the surviving partners may

acquire, by purchase or otherwise, the interest of the deceased partner or partners without effecting a surrender or termination of such license, and in such case, the license, upon notification to

the county, shall be placed in the name of the surviving partner. A license issued to a corporation shall be deemed terminated and void when either any outstanding stock of the corporation is

sold, transferred or assigned after the issuance of a license, or any stock authorized but not issued at the time of the granting of such license an is thereafter issued and sold, transferred or assigned. A license issued to a limited liability company shall be deemed terminated and void

when any members and managers are added who have not been previously identified on the license application.

(Res. No. 06-0470, Exh. A, 5-3-06) Sec. 18-90. Change of location or name of adult entertainment establishment.

(a) No licensee shall change the location of the establishment without obtaining a new license.

An application for a license due to a change of location is subject to all requirements of this article.

(b) Upon change of the name of the establishment, the licensee must notify the department of finance within 30 days prior to the change.

(c) No licensee shall operate, conduct, manage, engage in, or carry on an adult entertainment establishment under any name other than his name and the name of the business as specified on his or her adult entertainment license.

(Res. No. 06-0470, Exh. A, 5-3-06) Sec. 18-91. Procedure for suspension or revocation of an adult entertainment license.

(a) No license issued under this article shall be suspended or revoked except for due cause as defined in this section, and after a hearing before the board of commissioners following written notice to the holder of such license of the time, place and purpose of such hearing, along with a summary of the charge(s) upon which such hearing shall be held. Such notice shall be addressed to

the licensee at the last address the licensee provided to the county. Three days' notice shall be deemed reasonable, but shorter or longer periods

of notice shall be authorized as the circumstances may justify.

(b) The following shall constitute due cause for suspension or revocation of a license:

(1) The violation of any federal or state laws or regulations or local ordinances by either the applicant or business entity that owns, in whole or in part, the adult entertainment establishment;

(2) A determination that said applicant/business designees named in subsection 18- 83(6) no longer meet the requirement of

having good moral character, as defined in this article or that any person or business entity is not qualified to hold and conduct business according to the laws of

the United States, State of Georgia or Fulton County;

(3) If it is discovered that the license application (or renewal application) is found to have contained any material omission or

untrue or misleading information; or

(4) A violation of any other section of this article.

(c) Following the board of commissioners' hearing on this matter, the board may suspend or revoke the license of the adult entertainment

establishment. The decision of the board with regard to the suspension or revocation of an adult entertainment establishment license is a final action; therefore, any appeal of such decision shall be pursued by application for Writ of Certiorari filed with the Superior Court of Fulton County within 30 days of the decision.

(d) When any adult entertainment establishment license is revoked or suspended, all signs indicating that such business is conducted on the

premises shall be removed, both outside and inside, during the period of revocation or suspension.

(Res. No. 06-0470, Exh. A, 5-3-06) Sec. 18-92. Penalty for violation of this article.

Any person violating the provisions of this article shall be subject to punishment by a fine not to exceed $1,000.00 or imprisonment for 60 days, or both.

(Res. No. 06-0470, Exh. A, 5-3-06) Sec. 18-93. Repealer.

Any provisions of Chapter 18, Article III of the Code of Laws of Fulton County inconsistent herewith are hereby repealed, specifically sections 18-76 through 18-145.

(Res. No. 06-0470, Exh. A, 5-3-06) Sec. 18-94. Effective date.

This article shall become effective upon the adoption of this ordinance, except for the provisions regarding obtaining an adult entertainment license for any establishment which has been

granted a license prior to the date of adoption of this ordinance; each such preexisting establishment must meet the licensing standards of this ordinance at the time its current adult entertainment license expires.

(Res. No. 06-0470, Exh. A, 5-3-06) Secs. 18-95—18-145. Reserved.

ARTICLE IV. MASSAGE THERAPY*

DIVISION 1. GENERALLY

Sec. 18-146. Compliance.

No person shall conduct the business of massage therapy in the unincorporated area of the county without first meeting the requirements of

this article.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-147. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Advertising includes telephone directory listings and business cards.

Department of finance means the department of finance of Fulton County, Georgia.

Director of finance means the director of the department of finance.

Licensee means any person holding a license issued hereunder.

Massage clinic/corporation/parlor means any business where one or more massage therapists perform massage therapy.

Massage therapist means a person who performs massage on the human trunk or limbs.

Massage therapy means the manipulation of soft tissue for therapeutic purposes and includes, but is not limited to, effleurage (stroking skin without going deep), petrissage (kneading movement by lifting and grasping), tapotement (brisk blows in rapid alternating

fashion), compression, vibration, friction, nerve strokes and other movements, whether by hand or with mechanical or electrical apparatus, for the purpose of muscular massage. This may include the use of oil, salt glows, hot and cold packs, and other recognized forms of massage therapy. Massage therapy shall not include a diagnosis, service or procedure normally provided by a doctor of medicine, doctor of chiropractic or doctor of podiatry, nor shall it

apply to athletic trainers, technicians, or physical therapists who act by a prescription or under the supervision of a person authorized to

practice medicine or surgery. Massage therapy shall not include any conduct or activity which is otherwise prohibited by state, federal or local law.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-148. Copy of article provided upon request.

Upon request, the director of finance shall provide each applicant hereunder with a copy of this article.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-149. Information concerning employees to be filed with the finance director; background investigation required.

(a) All licensees must file with the director of finance their home address, home telephone number, and place of employment. Changes thereto shall be filed with the director of finance within

ten days from the date the change becomes effective.

Sec. 18-150. Records of treatment to be kept.

(a) It shall be the duty of the licensee to maintain correct and accurate records of the names and addresses of the persons receiving treatment, the type of treatment administered, and the name of the person administering the treatment. Records shall be kept for a minimum of three years.

These records shall be subject to inspection at any time by the director of finance and the county's police department.

(b) No massage therapy shall be performed by any massage therapist in the home of any client or in any place except for the place of business of a licensee hereunder, unless a written memorandum is first made in a log or record kept in the place of business for the purpose of recording

consecutively the date, time of treatment, place of treatment, name and address of person to receive treatment, type of treatment to be received, name of person to render treatment, and the lee charged.

The therapist shall record in the log or record the time each treatment began and ended.

(c) Failure to maintain records as required in this section is a violation of this article.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-151. Hours of operation.

Massage therapists shall conduct business only between the hours of 7:00 a.m. and 9:00 p.m.

(Res. No. 06-0465, Exh. A, 5-3-06) Secs. 18-152—18-180. Reserved.

DIVISION 2. MASSAGE THERAPY LICENSE

Sec. 18-181. Application; information to be given.

(a) The use of the word "massage" in any business name or business advertising all be prohibited unless the person providing the massage and the business are licensed under this article. A Fulton County Massage Therapist Certificate Number must appear in all advertising.

(b) A massage clinic/corporation/parlor, being established for the purpose of massage therapy, must also obtain an occupation tax certificate.

(c) Any person desiring to engage in any business, trade, advertising, or practice of massage therapy shall, before engaging in such business,

trade, advertising, or practice, file an application with the Fulton County Finance Department located at 141 Pryor Street, Atlanta, Georgia. This application shall be typewritten or legibly handwritten and shall contain the following as appendices:

(1) Name, home and business address of applicant, date of birth, social security number, and sex.

(2) The applicant and employees must submit to a background investigation. The director of finance shall provide the release form used to conduct the background investigation. After the release form has been signed and witnessed, the

county's police department shall investigate the police record of the employee.

The release form must be signed at least 15 days prior to the issuance of a license to allow for the investigation of the applicant, and for the employee, at least 15 days prior to the commencement of work

to allow for the investigation of the employee.

(3) The applicant must furnish a list of at least three character witnesses by name, address, and telephone number.

(4) Applicants shall furnish the name and address of any person having previously employed the applicant (in whatever position) for the last two years, if applicable.

(5) Applicants shall provide two recent identical photographs to the director of finance. The photographs must have been taken within the past six months and be a

good likeness of the applicant. The photographs must be clear with a full front view of the applicants face. Photographs

may be in color or black and white and the size must be two inches by two inches.

The photograph must be taken without head covering unless a signed statement is submitted indicating that the head covering is worn daily for religious or medical reasons. Dark glasses may not be worn in

the photographs unless a doctor's statement is submitted supporting the wearing of dark glasses for medical reasons.

The director of finance shall permanently affix one photograph to the permit.

(d) The county police department shall be notified within ten days of any change of ownership and/or partners/employees of the clinic or corporation.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-182. Qualifications of applicant.

Any applicant hereunder, prior to making application for a license, must have the following qualifications:

(1) The applicant must be of good moral character; must not have been convicted or have pled guilty or entered a plea of nolo

contendere to any sexual offense asset out in Title 16, Chapter 6 of the Official Code of Georgia Annotated, or to any offense involving the lottery, illegal possession or sale of narcotics or alcoholic beverages or possession or receiving of stolen property, for a period of five years immediately prior to the filing of the application. If after having been granted a license, the applicant is found not to be of good moral character, or pleads guilty or enters a plea of nolo contendere to any of the above offenses, said license shall be subject to suspension and/or revocation.

(2) The applicant must furnish a photostatic copy of a diploma indicating graduation from a massage school as an exhibit to the application. The school shall be approved by the American Massage Therapy Association or some other professional massage organization of equivalent professional membership standards. The diploma should be representative of the fact that

applicant attended a course of study of not less than six months, or 500 hours, wherein the course of study consisted of a curriculum of physical culture, anatomy, physiology, massage, hydrotherapy, electrotherapy, hygiene, health service management, and other such related subjects.

As an alternative, the applicant may produce evidence of membership in the American Massage Therapy Association, or other professional massage therapy organization of equivalent professional membership standards.

(3) Effective February 1, 2001, all applicants must provide a certified statement from the National Certification Board of Therapeutic Massage and Bodywork (NCTMB) evidencing passage by the applicant of the

exam administered by the NCTMB.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-183. Fees.

(a) License fees for the massage therapy license and for the background investigation fee shall be as fixed from time to time by the board of

commissioners. No license can be issued by the director of finance until applicant satisfies the qualifications listed in this article and pays all license fees.

(b) The renewal license fee shall be as fixed from time to time by the board of commissioners.

Before renewing a license issued hereunder, the director of finance shall ensure that a subsequent investigation is conducted by the county police department, that the licensee continues to satisfy the qualifications listed in this article, and that the renewal license fee is paid.

(Res. No. 06-0465, Exh. A, 5-3-06; Res. No. 11- 0075, 1-19-11) Sec. 18-184. Training of personnel.

Only the holder of a current Fulton County Massage Therapy License may train others in the practice of massage therapy. The license holder must be present at all times during any massage given by the trainee.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-185. Notice of denial of license.

The director of finance shall provide the applicant with written notice of the denial of the massage therapy license. The notice of denial

shall include the grounds for denial.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-186. Suspension or revocation of license.

(a) No license issued hereunder may be transferred.

(b) Each license granted hereunder shall be subject to suspension or revocation for violation of any rule or regulation of the county now in force or hereafter adopted.

(c) Whenever the director of finance determines there is cause to suspend or revoke the license issued hereunder, the director of finance

shall give the licensee ten-day written notice of intention to suspend or revoke the license issued hereunder. A hearing will be scheduled wherein the licensee may present his/her case before the board of commissioners or such board as the board of commissioners may designate. The tenday written notice shall include the time, place, and purpose of such hearing, and a statement of

the charges upon which such hearing will be held.

After the hearing, the board may suspend or revoke the license issued hereunder if the grounds set forth below exist. A massage therapist license may be suspended or revoked upon one or more of the following grounds:

(1) The licensee is guilty of fraud in the practice of massage, or fraud or deceit in being licensed to practice massage therapy;

(2) The licensee is engaged in the practice of massage therapy under a false or assumed name, or is impersonating another therapist of a like or different name;

(3) The licensee is addicted to the habitual use of intoxicating liquors, narcotics, or stimulants to such an extent as to incapacitate such person to the extent that he is unable to perform his or her duties;

(4) The licensee is guilty of fraudulent, false, misleading, or deceptive advertising or practices;

(5) The licensee has been convicted of or has pled guilty or nolo contendere to any sexual offense as set out in Title 16, Chapter 6 of the Official Code of Georgia Annotated, or to any offense involving the lottery, illegal possession or sale of narcotics or alcoholic beverages or possession or receiving of stolen property, for a period of

five years immediately prior to the filing of the application. If after having been granted a license, the licensee is found not to be of good moral character, or pleads guilty or enters a plea of nolo contendere to any of the above offenses, said license shall be subject to suspension and/or revocation;

(6) The original application or renewal thereof contains materially false information, or the applicant has deliberately sought to falsify information contained therein;

(7) The applicant/licensee fails to pay all fees, taxes or other charges imposed by the provisions of this article;

(8) The licensee fails to maintain all of the general qualifications applicable to initial issuance of a license under this article;

(9) The licensee refuses to accept a client solely on the basis of race, color, national origin, religious belief, sex or sexual orientation. Sexual orientation shall mean the state of being heterosexual, homosexual or bisexual. License holders shall not refuse to accept a client unless the client

is obviously intoxicated or dangerous;

(10) The licensee allows or permits any person who is not a licensed massage therapist to administer a massage in said massage clinic, corporation, or parlor;

(11) The establishment is a threat or nuisance to public health, safety or welfare; or

(12) Any other violation of this article. After the director of finance makes a recommendation to the board of commissioners to suspend or revoke a license issued hereunder, the board of commissioners, or such board as the board of commissioners

may designate, will conduct a hearing to hear evidence relevant to the alleged violation. At the hearing, the director of finance proceeds first and presents all

evidence and argument in support of the recommendation to suspend or revoke the license issued hereunder. Board members will have the right to ask questions at any time. After the director of finance makes his presentation, the licensee or the licensee's legal counsel, will present evidence and argument as to why the license issued hereunder should not be suspended or revoked. Board members will have the

right to ask questions at any time. After hearing all of the evidence and arguments of the parties, the board will render a decision. The suspension or revocation of a massage therapy license is final unless the licensee files a petition for writ of certiorari to the Superior Court of Fulton County within 30 days of the date of the decision.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-187. Effective date.

This article shall become effective January 1, 2001. Annual registration and payment shall be conducted in accordance with the terms of this article.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-188. No proration of license fee.

No license fees shall be prorated.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-189. Repealer; exceptions.

All resolutions providing for massage therapy license fees in conflict with this article are hereby repealed, provided, however, that nothing herein shall affect any resolution providing for occupational or business taxes.

(Res. No. 06-0465, Exh. A, 5-3-06) Sec. 18-190. Intent of article.

It is the intent of the article to regulate the operation of massage therapists operating in the unincorporated area of the county consistent with the requirements of the Constitution and laws of the State of Georgia. In the event that the regulations and/or fees imposed hereby shall not be authorized in whole or in part, such regulation

and/or fee shall be imposed only to the extent authorized by law. The invalidity of any part of this article shall not affect the validity of the remaining portion here of. In the event that this article may not be enforced against any class of business mentioned herein, such inability to enforce the same shall not affect its validity against the other business specified herein.

(Res. No. 06-0465, Exh. A, 5-3-06) Secs. 18-191—18-199. Reserved.

ARTICLE V. ESCORT AND/OR DATING

SERVICE*

DIVISION 1. GENERAL

Sec. 18-200. Compliance.

No person shall conduct the business of an escort and/or dating service in the unincorporated area of the county without first meeting the requirements of this article.

(Res. No. 06-0469, Exh. A, 5-3-06; Res. No. 11- 0075, 1-19-11) Sec. 18-201. Administration of article; copy of article provided upon request.

This article shall be administered by the Director of the Department of Finance of Fulton County, or the director's designee referred to herein as the

director of finance.

Upon request; the director of the finance department shall provide each applicant hereunder with a copy of this article.

(Res. No. 06-0469, Exh. A, 5-3-06) Sec. 18-202. Information concerning employees to be filed with the director of finance; background investigation required.

(a) All licensees under this article must file with the director of finance their home address, home telephone number, and place of employment. Changes thereto shall be filed with the director of finance within ten days from the date

the change becomes effective.

(b) All employees of the licensee must submit to a background investigation not less than 15 days prior to commencing work to allow for the investigation of the employee. The director of finance shall provide the release fain used to conduct the background investigation. After the release has been signed, the county police department shall investigate the police record of the employee.

(Res. No. 06-0469, Exh. A, 5-3-06) Sec. 18-203. Records of clients to be kept.

(a) It shall be the duty of the licensee to maintain correct and accurate records of the name and address of the persons receiving escort and/or dating services and to provide the name of the employee providing such service. Records shall be kept for a minimum of three years. These records shall be subject to inspection at any time by the director of finance and the county police department.

(b) Failure to maintain records as required in this section is a violation of this article.

(Res. No. 06-0469, Exh. A, 5-3-06) Secs. 18-204—18-209. Reserved.

DIVISION 2. ESCORT AND/OR DATING

SERVICE LICENSE

Sec. 18-210. Application; information to be given.

(a) Any person desiring to engage in the business, trade or profession of providing and/or arranging dates, escorts, or partners for persons shall, before engaging in such business, trade or

profession, file an application with the Department of Finance located at 141 Pryor Street, Atlanta, Georgia. This application shall be typewritten or legibly handwritten and shall contain the following as appendices:

(1) Name, home and business address of applicant, date of birth, social security number, and sex.

(2) The applicant and employees must submit to a background investigation. The director of finance shall provide the release form used to conduct the background investigation. After the release form has been signed and witnessed, the

county police department shall investigate the police record of the employee.

The release form must be signed at least 15 days prior to the issuance of a license to allow for the investigation of the applicant, and for the employee, at least 15 enacted by Res. No. 01-0372, § 2, adopted March 21, 2001. See the Code Comparative Table—Ordinances and Resolutions for a detailed analysis of inclusion.

Sec. 18-211. Qualifications of applicant.

The applicant must be of good moral character;

must not have been convicted or have pled guilty or entered a plea of nolo contendere to any sexual offense as set out in Title 16, Chapter 6 of the Official Code of Georgia Annotated, or to any offense involving the lottery, illegal possession or sale of narcotics or alcoholic beverages, or possession or receiving of stolen property, for a period of five years immediately prior to the filing of the

application. If after having been granted a license, the applicant is found not to be of good moral character, or pleads guilty or enters a plea

of nolo contendere to any of the above offenses, said license shall be subject to suspension and/or revocation.

(Res. No. 06-0469, Exh. A, 5-3-06) Sec. 18-212. Fees.

(a) License fees for the escort and/or dating service license and for the background investigation fee shall be as fixed from time to time by the board of commissioners. No license can be issued

by the director of finance until applicant satisfies the qualifications listed in this article and pays all license fees.

(b) The renewal license fee shall be as fixed from time to time by the board of commissioners.

Before renewing a license issued hereunder, the director of finance shall ensure that a subsequent investigation is conducted by the county police department, that the licensee continues to satisfy the qualifications listed in this article, and that the renewal license fee is paid.

(Res. No. 06-0469, Exh. A, 5-3-06; Res. No. 11- 0075, 1-19-11) Sec. 18-213. Unlawful or prohibited activities.

No person under 18 years of age shall be employed by an escort and/or dating service in any capacity.

(Res. No. 06-0469, Exh. A, 5-3-06) Sec. 18-214. Notice of denial of license.

The director of finance shall provide the applicant with written notice of the denial of the escort and/or dating service license. The notice of denial

shall include the grounds for denial.

(Res. No. 06-0469, Exh. A, 5-3-06) Sec. 18-215. Suspension or revocation of license.

(a) No license issued hereunder may be transferred.

(b) Each license granted hereunder shall be subject to suspension or revocation for violation of any rule or regulation of the county now in force or hereafter adopted.

(c) Whenever the director of finance determines there is cause to suspend or revoke the license issued hereunder, the director of finance

must give the licensee ten-day written notice of intention to suspend or revoke the license. A hearing will be scheduled wherein the licensee may present a defense to the suspension or revocation before the board of commissioners or such board as the board of commissioners may designate. The ten-day written notice must include the time, place, and purpose of such hearing, and a

statement of the charges upon which such hearing shall be held. After the hearing, the board may suspend or revoke the license issued hereunBUSINESSES § 18-215 der if any of the grounds set forth below exist. A

license may be suspended or revoked upon one or more of the following grounds:

(1) The licensee is engaged in the escort and/or dating service under a false or assumed name, or is impersonating another practitioner of a like or different name;

(2) The licensee is addicted to the habitual use of intoxicating liquors, narcotics, or stimulants to such an extent as to incapacitate such person to the extent that he is unable to perform his or her duties;

(3) The licensee is guilty of fraudulent, false, misleading, or deceptive advertising or practices;

(4) The licensee has been convicted of or has pled guilty or nolo contendere to any sexual offense as set out in Title 16, Chapter 6 of the Official Code of Georgia Annotated, or to any offense involving the lottery, illegal possession or sale of narcotics or alcoholic beverages or possession or receiving of stolen property, for a period of

five years immediately prior to the filing of the application. If after having been granted a license, the licensee is found not to be of good moral character, or pleads guilty or enters a plea of nolo contendere to any of the above offenses, said license shall be subject to suspension and/or revocation;

(5) The original application or renewal thereof contains materially false information, or the applicant has deliberately sought to falsify information contained therein;

(6) The applicant/licensee fails to pay all fees, taxes or other charges imposed by the provisions of this article;

(7) The licensee fails to maintain all of the general qualifications applicable to initial issuance of a license under this article;

(8) The licensee refuses to accept a client solely on the basis of race, color, national origin, religious belief, sex or sexual orientation. Sexual orientation shall mean the state of being heterosexual, homosexual or bisexual. License holders shall not refuse to accept a client unless the client

is obviously intoxicated or dangerous;

(9) The establishment is a threat or nuisance to public health, safety or welfare; or

(10) Any other violation of this article.

After the director of finance makes a recommendation to the board of commissioners to suspend or revoke a license issued hereunder,

the board of commissioners, or such board as the board of commissioners may designate, will conduct a hearing to hear evidence relevant to the alleged violation. At the hearing, the director of finance proceeds first and presents all evidence and argument in support of the recommendation to suspend or revoke the license issued hereunder. Board members will have

the right to ask questions at any time. After the director of finance makes his/her presentation, the licensee or the licensee's legal counsel, will present evidence and argument as to why the license issued hereunder should not be suspended or revoked. Board members will have the right to ask questions at any time. After

hearing all of the evidence and arguments of the parties, the board will render a decision.

The suspension or revocation decision is final unless the licensee files a petition for writ of certiorari to the Superior Court of Fulton County within 30 days of the date of the decision.

(Res. No. 06-0469, Exh. A, 5-3-06) Sec. 18-216. Effective date.

This article shall become effective April 19, 2006. Annual registration and payment shall be conducted in accordance with the terms of this article.

(Res. No. 06-0469, Exh. A, 5-3-06) Sec. 18-217. No proration of license fee.

No license fees shall be prorated.

(Res. No. 06-0469, Exh. A, 5-3-06) Sec. 18-218. Repealer; exceptions.

All resolutions providing for escort and/or dating service license fees in conflict with this article are hereby repealed, provided, however, that nothing herein shall affect any resolution providing for occupational or business taxes.

(Res. No. 06-0469, Exh. A, 5-3-06) Sec. 18-219. Intent of article.

It is the intent of the article to regulate the operation of escort and/or dating services operating in the unincorporated area of the county consistent with the requirements of the Constitution and laws of the State of Georgia. In the event that the regulations and/or fees imposed hereby

shall not be authorized in whole or in part, such regulation and/or fee shall be imposed only to the extent authorized by law. The invalidity of any part of this article shall not affect the validity of the remaining portion hereof. In the event that this article may not be enforced against any class of business mentioned herein, such inability to enforce the same shall not affect its validity against the other business specified herein.

(Res. No. 06-0469, Exh. A, 5-3-06) Chapters 19-21

RESERVED

Chapter 22

CODE ENFORCEMENT*

ARTICLE I. IN GENERAL

Sec. 22-1. Intent.

The intent of this chapter is to promote, protect, and improve the health, safety, and welfare of the citizens of unincorporated Fulton County

by creating a code enforcement board which will provide an equitable, expeditious, effective, and inexpensive method of enforcing the Fulton County Code of Laws, where pending or repeated violations exist.

(00-1494, § 2, 12-20-00) Secs. 22-2—22-25. Reserved.

ARTICLE II. BOARD OF CODE

ENFORCEMENT*

Sec. 22-26. Creation.

The board of commissioners hereby establishes the Fulton County Board of Code Enforcement for unincorporated Fulton County to be structured and to function as provided in this article.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-27. Definitions.

The following definitions shall apply in the interpretation and enforcement of this chapter, unless otherwise specifically stated:

Act means The Georgia Local Government Code Enforcement Boards Act, O.C.G.A. Section 36-74-1, et seq., as it may be amended from time to time.

Board means the Board of Code Enforcement for Fulton County Georgia.

Code of Laws means the Fulton County's Code of Laws, as it may be amended from time to time, and which is deemed to include all other codified or uncodified county ordinances, (including site-specific condition of zonings and use permits) they may be amended from time to time, as well as all codes or laws adopted by reference in the Code of Laws.

Code inspector means any authorized agent or employee of Fulton County whose duty is to investigate and determine compliance with the Code of Laws.

County means Fulton County, Georgia. Unless otherwise specified, the rules and regulations herein apply to all land lying within the unincorporated portion of Fulton County as

now or hereafter constituted.

Department means the Department of Environment and Community Development for Fulton County, Georgia.

Repeat violation means any violation of the Code of Laws by a violator whom the Board has previously found in violation of the Code of Laws within one year prior to the repeat violation.

Violator means any person, firm, partnership of corporation, tenant, agent or other entity which has committed a violation of one

or more provisions of the Code of Laws or which has assisted in the commission of any such violation.

Violation involving the health or safety of a third party means a violation of the Code of Laws that creates a legitimate concern for the health and safety of a third party occupant of a dwelling place or that creates an immediate and substantial danger to the environment or members of the community at large, especially minor children.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-28. Authority of the board of code enforcement.

The Fulton County Board of Code Enforcement shall have the following powers and duties under the provisions of this chapter:

(1) To hear and decide cases alleging violations of the Code of Laws, to the maximum extent allowed by the Act;

(2) To adopt rules for the conduct of its hearings, which rules shall, at a minimum, ensure that each side has an equal opportunity to present evidence and argument in support of its case;

(3) To subpoena alleged violators and witnesses to its hearings, with the approval of the Fulton Magistrate Court or other

court with jurisdiction over criminal violations of the Code of Laws. Subpoenas may be served by the Fulton County Sheriff, Fulton County Marshal, or Fulton County Police Department or by any other

individual authorized by O.C.G.A. § 24- 10-23 to serve subpoenas;

(4) To subpoena evidence to its hearing in the same manner as provided in paragraph (3);

(5) To take testimony under oath;

(6) To issue orders having the force of law to command whatever steps are necessary to bring a violation into compliance;

(7) To impose fines upon violators and real and personal property of violators; and

(8) To exercise any and all other powers set forth in the Act and this chapter.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-29. Membership.

The board shall consist of seven members.

Each member of the Board of Commissioners of Fulton County shall nominate one member to the board, subject to confirmation by the Board of Commissioners of Fulton County. The membership and composition of the board as it exists on the date of amendment to this section and chapter

shall continue in force until changed by the board of commissioners as provided for herein.

Upon expiration of the initial terms as specified in the Act, all terms of board members shall be for three years. Any member of the board may

be suspended or removed for cause by the board of commissioners following notice and opportunity to be heard. The board of commissioners may, with or without cause, refuse to reappoint any member of the board at the expiration of his or her term of office. Any board member whose term has expired may continue to serve as a member until reappointed or replaced by the board of commissioners. No member of the board shall hold any other appointive or elective public office or position during his or her term. An appointment to fill any vacancy on the board shall be for the remainder of the unexpired term of office. The

Fulton County Board of Commissioners may reduce the board to five members upon the simultaneous expiration of the terms of office of two members of the board. A board member may be

reappointed upon approval of the Fulton County Board of Commissioners.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-30. Qualifications of board members.

Members of the board shall be residents of Fulton County. The board of commissioners shall make good faith efforts to appoint one or more individuals who have experience or expertise relevant to one or more of the county codes under the jurisdiction of the Board, such as property management, engineering (structural or civil), construction, and/or law experience. The absence of such individuals from the membership of the

Board shall in no way limit the authority and jurisdiction of the board.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-31. Compensation of members.

Board members shall serve without compensation except reimbursement for travel, mileage and per diem expenses as may be authorized by

the board of commissioners.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-32. Officers and rules.

The members of the board shall elect a chairperson and vice-chairperson, both of whom shall be voting members of the board. The presence of

four or more members shall constitute a quorum.

The decisions of the board shall be by motion approved by a majority of those members present and voting, except that at least four members must vote in order for an action of the board to be official. The Fulton County Attorney or his/her designee shall represent and be counsel to the board.

If a board member fails to attend two of three successive meetings without cause or without approval of the chairperson, the board shall declare the member's office vacant and ask the board of commissioners to promptly fill the vacancy. The board shall adopt and publish policies, procedures and rules in keeping with the provisions of this chapter. Such policies, procedures and rules shall be available in the office of the

department.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-33. Staff to the board of code enforcement.

The director of the department or his/her designee shall serve as the secretary to the board.

The secretary or his/her designee shall keep minutes and a detailed record of all proceedings, showing the vote of each member on each case,

and shall keep records of evidence and official actions, all of which shall be filed in the department and shall be available for public inspection.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-34. Meetings.

The board shall meet at least the second and fourth Tuesday of each month to dispose of matters scheduled. Additional meetings may be called by the chairman or as otherwise provided in the

Act. All hearings before the board shall be open to the public except as provided by law. The alleged violator, the alleged violator's representative, the code inspector and any person whose interests are affected shall be given an opportunity to be heard.

The board shall proceed to hear the cases on the agenda for that day. All testimony shall be under oath and shall be recorded. The board shall take testimony from the code inspector and alleged violator. Formal rules of evidence shall not apply, but fundamental due process shall be observed and shall govern the proceedings. The initial presentation of each case before the board shall be by the code inspector.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-35. Hearing.

(a) General. No member of the board shall have the power to initiate enforcement proceedings under this chapter. If a violation of any provision of the Code of Laws is found, the code

inspector shall notify the violator and specify a reasonable time to correct the violation. If the violation is corrected and then recurs or if the violation is not corrected by the time specified the code inspector may so notify the violator, but is not required to give the violator a reasonable time to correct the violation. If a violation is not corrected within the time specified, the code inspector shall request a hearing before the board.

(b) [Notification.] If a repeat violation is found, the code inspector shall notify the violator but is not required to give the violator a reasonable time to correct the violation. The code inspector, upon notifying the violator of a repeat violation, shall notify the board and request a hearing. The case may be presented to the board even if the repeat violation has been corrected prior to the hearing, and the notice for the violator shall so state. The matter shall be scheduled for the next available hearing before the board, and notice of the hearing shall be given as provided in section 22-36.

(c) [Violation presents threat to public welfare.]

If the code inspector has substantial reason to believe a violation presents a serious threat to the public health, safety, and welfare or if the violation is irreparable or irreversible in nature, the code inspector shall make a reasonable effort to

notify the violator and immediately notify the board and request a hearing.

(d) Continuance. The board may continue the hearing from time to time for good cause. The board shall, in all instances, reach a decision within 15 calendar days from the date of the final hearing at which receipt of all evidence has been concluded.

(e) Postponed hearing. When a quorum if not present, or the board is unable to reach a decision on a case, the hearing shall be postponed until the next scheduled board meeting, with notification provided in accordance with section 22-36 of this chapter.

(f) Order to comply/order to pay fine. Every order to comply and/or order to pay fine entered by the board shall be executed by the chairperson, or, in the chairperson's absence, the vice-chairperson, and shall be filed in the office of the secretary to the board.

(1) If, after the conclusion of the hearing, the board finds that a violation does exist, the board may issue an order to comply consistent with the powers granted in this chapter and the Act, with findings and

conclusions. An order to comply shall set forth the street address or a description of the structure and/or premises sufficient for identification. An order to comply shall include notice that it must be complied with by a specified date and that an administrative fine may be imposed if the order is not complied with by said date.

The order shall state the nature of the violation, and the board shall consider the following factors in determining the content of the order to comply.

a. Existence or nonexistence of a life, health or other type of hazard to the occupant or others in the building or premises;

b. Severity of the hazard or negative effect upon the community;

c. Number and extent of separate items that must be completed in order to bring the building or premises into compliance with the relevant codes;

d. Length of time the violation (s) has been known to exist and the amount of time the code inspector has previously given for compliance;

e. The existence or nonexistence of mitigating factors which caused the building or premises to be in violation or which may affect the amount of time for compliance.

f. The board may divide the violation

(s) into groups requiring compliance at various intervals, with inspections to be conducted at each stage by the code inspector.

(2) An order to pay fine shall specify the fine amount as determined and voted upon by the board, as well as the date and time the fine is due. A certified copy of such order may be recorded in the public records of Fulton County and shall constitute notice to any subsequent purchasers, successors in interest, or assigns if the violation concerns real property, and the findings therein shall be binding upon the violator and, if the violation concerns real property, any subsequent purchasers, successors in interest or assigns. If an order to pay fine is recorded in the public records

pursuant to this subsection and the fine is paid by the date and time specified in the order, the board shall issue an order acknowledging that the fine has been paid in full and such order shall be recorded in

the public records. A hearing is not required to issue such an order acknowledging the payment of a fine.

The board may issue an order to pay a fine against the violator if the cited violation was not corrected within the time specified on the code inspector's notice or

if an order to comply was not satisfied within the time specified in said order, even if said violation was corrected and brought into compliance prior to the hearing at which the fine was imposed.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-36. Hearing notification.

(a) Notification of the board hearing to the alleged violator shall be given by the director of the department or his/her designee by certified mail, return receipt requested or hand delivery by the code inspector or other persons designated by the department to the alleged violator's usual place of residence; or by leaving said notice at the violator's usual place of residence with any person therein who is over 15 years of age and informing such person of the contents of the notice; or by leaving the notice at the violator's usual place of business with a manager or other upper level employee who is over 15 years of age and informing such person of the contents of the notice, no later than the 15th day before the date of the

hearing. The notice shall be in a form approved by the director of the department and shall include a reference to the provisions of the Code of Laws and/or conditions of zoning being violated, and the date, time and location of the hearing.

(b) At the option of the board, and in addition to the notice described above, notice of the hearing may be published 30 days prior to the hearing once a week for four consecutive weeks in the

newspaper in which the sheriffs advertisements are printed for Fulton County. Proof of publication shall be provided and maintained for the official record.

(c) Where efforts to provide notice pursuant to paragraph (a) of this section are unsuccessful, evidence of an attempt to serve the alleged violator pursuant to paragraph (a) together with proof of publication as provided in paragraph (b) shall

be sufficient to show that the notice requirements of this section have been met, without regard to whether or not the alleged violator actually received such notice.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-37. Notification of decision.

The board shall provide the violator a copy of the order to comply and/or the order to pay fine by hand delivery or certified United States mail, postage prepaid and return receipt requested, within a reasonable period of time after the decision.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-38. Fines and fees.

The board may impose fees and fines on a violator as follows:

(1) A fine not to exceed $1,000.00 per day for a violation involving the health or safety of a third party.

(2) A fine not to exceed a total of $1,000.00 for a violation not involving the health or safety of a third party.

(3) The board shall determine fines considering the following factors:

a. The gravity of the violation;

b. Any actions taken by the violator to correct the violation; and

c. Any previous violations committed by the violator.

(4) The board may reduce a fine imposed pursuant to this section.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-39. Failure to pay fine.

(a) A certified copy of an order to pay fine may be recorded in the public records of any county and thereafter shall constitute a lien against the land on which the violation exists and upon any real or personal property owned by the violator.

Upon petition to the Superior Court, such order may be enforced in the same manner as a court judgment by the sheriffs of the state, including levy against personal property, but such order shall not be deemed to be a court judgment except for enforcement purposes. After three months from the filing of any such lien which remains unpaid, the board may request that the county attorney foreclose on the lien.

(b) No lien imposed under this chapter shall continue for a period longer than 20 years after the certified copy of an order to pay fine has been recorded, unless within that time an action to foreclose on the lien is commenced in Superior Court. In an action to foreclose on a lien, the prevailing party is entitled to recover all costs, including a reasonable attorney's fee, which it incurs in the foreclosure. The continuation of the lien affected by the commencement of the action shall not be good against creditors or subsequent purchasers for valuable consideration without notice, unless a notice of lis pendens is recorded.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-40. Remedies.

Nothing contained in this ordinance shall prohibit the board, acting through the code inspector, from enforcing this ordinance by any other lawful

means which include both criminal and civil proceedings; provided, however, that the board shall not pursue a specific instance of an alleged violation of the Code of Laws against the violator before both the board and a court authorized to

hear violations of local ordinances.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-41. Appeal and transfer.

An aggrieved party, including Fulton County, may appeal a final administrative order of the board to the Superior Court of Fulton County as provided for in the Act.

(Ord. No. 05-0290, Exh. A, 2-16-05) Sec. 22-42. Severability.

It is declared to be the intent of the board of commissioners that, if any section, subsection, sentence, clause, phrase, or portion of this chapter is for any reason held invalid or unconstitutional by any court of competent jurisdiction, such portion shall be deemed a separate, distinct and

independent provision, and such holding shall not effect the validity of the remaining portions thereof.

(Ord. No. 05-0290, Exh. A, 2-16-05) Chapters 23-25

RESERVED

Chapter 26

ENVIRONMENT*

ARTICLE I. IN GENERAL*

Secs. 26-1—26-34. Reserved.

ARTICLE II. EROSION, SEDIMENTATION

AND POLLUTION CONTROL†

Sec. 26-35. Authority and title of article.

This article is adopted by the Fulton County Board of Commissioners pursuant to the authority and mandate of the Georgia Erosion and Sedimentation Act of 1975 (O.C.G.A. § 12-7-1 et

seq.), as amended. [A memorandum of agreement authorizes Fulton County as a local issuing authority. As a local issuing authority, Fulton County is certified to provide and maintain an erosion

control program which includes, but is not limited to, development plan review, permitting and erosion control enforcement.] This article will be known as "The Fulton County Soil Erosion, Sedimentation and Pollution Control Ordinance of 2010", and repeals the Fulton County Soil Erosion

and Sedimentation Control Ordinance of 2005 and any other ordinances or regulations in conflict herewith.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-36. Intent.

It is the intent of this article to establish soil erosion, sedimentation, and pollution control minimum requirements, standards, and enforcement procedures for land disturbance activities in order

to conserve and protect the environment, public health, and the general welfare of the citizens of unincorporated Fulton County.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-37. Definitions.

The following definitions shall apply in the interpretation and enforcement of this article, unless otherwise specifically stated:

Best management practices (BMPs). These include sound conservation minimize erosion and resultant sedimentation, which are consistent with,

and no less stringent than, those practices contained in the "Manual for Erosion and Sediment Control" published by the commission as of January of the year in which the land-disturbing activity was permitted.

Board. The Georgia Board of Natural Resources.

Board of zoning appeals. Board appointed by the Fulton County Board of Commissioners which hears appeals of stop work orders.

Buffer. The area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat.

Commission. The State of Georgia Soil and Water Conservation Commission. (GSWCC) CPESC. Certified professional in erosion and sediment control with certification by Certified Profession in Erosion and Sediment Control Inc., a Corporation Registered in North Carolina, which is also referred to as CPESC or CPESC, Inc.

Cut. A portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below the original ground surface to the excavated surface, also known as excavation.

Department. Fulton County Department of Environment and Community Development.

Design professional. A professional licensed by the State of Georgia in the field of: engineering, architecture, landscape architecture, forestry, geology, or land surveying; or a person that is a certified professional in erosion and sediment

control (CPESC) with a current certification by Certified Professional in Erosion and Sediment Control, Inc.

Development. The alteration of property for any purpose involving building, subdividing, and/or the preparation of land for any of the above purposes. Development includes, but is not limited to, providing utilities, access, parking, storm water management, sewage disposal systems,

and/or construction of a structure.

Development sequence. The sequence of activities to be completed, in order, during the development of a land disturbance project as per approved construction plans.

Director. The director (or his/her designee(s)) of the Fulton County Department of Environment and Community Development.

Director, DPW. The director of the Fulton County Department of Public Works or his/her designee.

Director, EPD. The director of the Environmental Protection Division of the Georgia Department of Natural Resources.

Division. The Environmental Protection Division of the Department of Natural Resources.

District. The Fulton County Soil and Water Conservation District.

Drainage structure. A device composed of a virtually non-erodible material such as concrete, steel, plastic, or other such material that conveys water from one place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control, or flood control purposes.

EPD. The Environmental Protection Division of the Georgia Department of Natural Resources.

Erosion. The process by which land surface is worn away by the action of wind, water, ice, or gravity.

Erosion and Sedimentation Control Manual. A field manual produced by the Georgia Soil and Water Conservation Commission that illustrates vegetative and structural best management practices (BMPs), and their use for land-disturbing activities.

Erosion, sediment, and pollution control plan.

A plan required by the Erosion and Sedimentation Act, O.C.G.A. ch. 12-7, that includes, as a minimum protection at least as stringent as the

state general permit, best management practices, and requirements in section 26-39(c).

Fill. A portion of land surface to which soil or other solid material has been added; the depth above the original ground surface or elevation.

Final Stabilization. All soil disturbing activities at the site have been completed, and that for unpaved areas and areas not covered by permanent structures and areas located outside the waste disposal limits of a landfill cell that has

been certified by EPD for waste disposal, 100 percent of the soil surface is uniformly covered in permanent vegetation with a density of 70 percent or greater, or equivalent permanent stabilization measures (such as the use of rip rap, gabions, permanent mulches or geotextiles) have

been used. Permanent vegetation shall consist of planted trees, shrubs, perennial vines: a crop of perennial vegetation appropriate for the time of year and region: or a crop of annual vegetation and a seeding of target crop perennials appropriate for the region. Final stabilization applies to each phase of construction.

Finished grade. The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.

Grading. Altering the shape of ground surfaces. This includes stripping, cutting, filling, stockpiling, and shaping or any combination

thereof, and shall include the land in its cut or filled condition.

Ground elevation. The elevation of the ground surface as measured from sea level prior to cutting or filling.

Land disturbing activity. Any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavat- ing, transporting, and filling of land but not including agricultural practices as described in subsection 26-38(5).

Larger common plan of development or sale. A contiguous area where multiple separate and distinct construction activities are occurring under one plan of development or sale. For the purpose of this paragraph, "plan" means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or survey markings, indicating that construction activities

may occur on a specific plot.

Local issuing authority. The governing authority of any county or municipality which is certified pursuant to O.C.G.A. § 12-7-8(a).

Metropolitan River Protection Act (MRPA). A state law referenced as O.C.G.A. § 12-5-440 et seq., which addresses environmental and developmental matters in certain metropolitan river corridors and their drainage basins.

Natural ground surface. Original site topography/ground surface prior to land disturbance activities.

Nephelometric turbidity units (NTU). Numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate

the extent of turbidity in water in which colloidally dispersed or suspended particles are present.

Notice to comply. Enforcement action based on noncompliance through failure to either properly install or maintain BMPs, where sediments remain within the boundaries of the property. This enforcement action provides the violator five days

to achieve compliance.

NOI. A notice of intent form provided by EPD for coverage under the state general permit.

NOT. A notice of termination form provided by EPD to terminate coverage under the state general permit.

Official notice. A posting of a notice to comply or a stop work order on a property that is noncompliant or in violation.

Operator. The party or parties that have: (A) operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications; or

(B) day-to-day operational control of those activities that there are necessary to ensure compliance with an erosion, sedimentation and pollution control plan for the site or other permit conditions, such as a person authorized to direct workers at a

site to carry out activities required by the erosion, sedimentation and pollution control plan or to comply with other permit conditions.

100-year flood plain. Land in the flood plain subject to a one percent or greater statistical occurrence probability of flooding in any given year.

Outfall. The location where storm water is discernible, confined and discrete conveyance leaves a facility or site or, if there is a receiving water on site, becomes a point source discharging into the receiving water.

Permit. The authorization necessary to conduct a land disturbing activity under the provisions of this article.

Person. Any individual, owner, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality, or other political subdivision of this state, any interstate body, or any other legal entity.

Phase or phased. Sub-parts or segments of construction projects where the sub-part or segment is constructed and stabilized prior to completing construction activities on the entire construction site.

Project. The entire proposed development project, regardless of the size of the area of land to be disturbed.

Properly designed. Designed in accordance with the design requirements and specifications contained in the "Manual for Erosion and Sediment Control in Georgia" (Manual published by the

Georgia Soil and Water Commission as of January 1 of the year in which the land-disturbing activity was permitted and amendments to the

manual as approved by the commission up until the date of NOI submittal).

Reinspection fee. A fee assessed to the developer/ owner/operator or responsible party for reinspecting the project if requested by the developer/owner/ operator or responsible party prior to the end of

the compliance period, provided that upon that reinspection the project remains out of compliance.

Roadway drainage structure. A device such as a bridge, catch basin, culvert, or ditch, composed of a virtually non-erodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting

the flow on one side of a traveled way (public or private) consisting of one or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.

Sediment. Solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by air, water, ice, or gravity as a product of

erosion.

Sedimentation. The process by which eroded material is transported and deposited by the action of water, wind, ice, or gravity.

Soil and water conservation district approved plan. An erosion and sedimentation control plan approved in writing by the Fulton County Soil and Water Conservation District.

Stabilization. The process of establishing an enduring soil cover by the installation of temporary or permanent structures or vegetation for the purpose of reducing to a minimum the erosion

process and the resultant transport of sediment by wind, water, ice, or gravity.

State general permit. The National Pollution Discharge Elimination System general permit or permits for storm-water runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state's authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. Section 1251, et seq., and O.C.G.A. § 12-5-30(f).

State waters. Any and all rivers, streams, creeks, branches, lakes, ditches, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial,

lying within or forming a part of the boundaries of the state which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation.

Stop work order. Enforcement action that ceases all work onsite or a portion of the site.

Structural erosion and sedimentation control measures. Practices for the stabilizing of erodible or sediment-producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing,

regulating, or disposing of runoff to prevent sediment loss. Examples of structural erosion and sediment control measures are: riprap, sediment

basins, dikes, level spreaders, waterways, outlets, diversions, grade stabilization structures, sediment traps, and sediment barriers, etc. Such measures as defined in the publication "Manual

for Erosion and Sediment Control in Georgia."

Trout streams. All streams or portions of streams within the watershed as designated by the Wildlife Resources Division of the Georgia Department of Natural Resources under the provisions of the Georgia Water Quality Control Act, O.C.G.A.

§ 12-5-20, in the rules and regulations for Water Quality Control, Chapter 391-3 at www.gaepd.org.

Streams designated as primary trout waters are defined as water supporting a self-sustaining population of rainbow, brown, or brook trout.

Streams designated as secondary trout waters are those in which there is no evidence of natural trout reproduction, but are capable of supporting trout throughout the year. First order trout waters are streams into which no other streams flow except springs.

Turbidity. A measure of clarity of a water sample.

Underbrush. Any small shrubs, ground cover, or similar plants growing beneath the canopy of mature trees.

Vegetative erosion and sedimentation control measures. Measures for the stabilization of erodible or sediment-producing areas by covering the soil with:

(1) Permanent seeding, sprigging, or planting, producing long-term vegetative cover;

(2) Temporary seeding, producing short-term vegetative cover; or

(3) Sodding, covering areas with a turf of perennial sod-forming grass. Such practices can be found in the publication "Manual for Erosion and Sediment Control in Georgia".

Watercourse. Any natural or artificial watercourse, stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or

wash in which water flows either continuously or intermittently and which has a definite channel, bed, and banks, and including any area adjacent thereto subject to inundation by reason of overflow or flood water.

Wetlands. Those areas that are inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, bogs, and similar areas.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-38. Exemptions to article.

This article shall apply to any land disturbing activity undertaken by any person on any land except for the following:

(1) Surface mining, as the same is defined in O.C.G.A. § 12-4-72, "The Georgia Surface Mining Act of 1968".

(2) Granite quarrying and land clearing for such quarrying;

(3) Such minor land disturbing activities as home gardens and individual home landscaping, repairs, maintenance work, fences and other related activities which result

in minor soil erosion;

(4) The construction of single-family residences when such construction disturbs less than one acre and is not a part of a

larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this section; provided, however, that construction of any such residence shall conform to the minimum requirements as set forth in O.C.G.A.

§ 12-7-6 and this paragraph. For singlefamily residence construction covered by provisions of this, there shall be a buffer

zone between the residence and any state waters classified as trout streams pursuant to O.C.G.A. tit. 12, ch. 5, art. 2, the Georgia Water Quality Control Act. In

any such buffer, no land-disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or

wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the director, EPD may

grant variances to no less than 25 feet.

Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to smaller buffer shall be granted. The minimum requirements of section 26-39 of this article and the buffer zones provided by this section shall be enforced by the issuing authority;

(5) Agricultural operations as defined in O.C.G.A. § 1-3-3 to include raising, harvesting, or storing of products of the field or orchard; feeding, breeding, or managing livestock or poultry; producing or storing feed for use in the production of livestock including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits or for use in the production of poultry, including but not limited to chicken, hens

and turkeys; producing plants, trees, fowl, or animals; the production of aquaculture, horticultural, dairy, livestock, poultry, eggs,

(6) Forestry land management practices, including harvesting; provided, however, that when such exempt forestry practices cause

or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in paragraphs (14) and (15) of

section 26-39(c), no other land-disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry

practices were conducted for a period of three years after completion of such forestry practices;

(7) Any project carried out under the technical supervision of the Natural Resource Conservation Service (NRCS) of the United

States Department of Agriculture;

(8) Any project involving less than one acre of disturbed area; provided, however, that this exemption shall not apply to any land disturbing activity within a larger common plan of development or sale with a planned disturbance equal to or greater

than one acre or within 200 feet of the bank of any state waters, and for purposes of this paragraph, "state waters" excludes channels and drainage ways

which have water in them only during and immediately after rainfall events and intermittent streams which do not have water in them year round; provided, however, that any person responsible for a project which involves one acre or less,

which involves land disturbing activity, and which is within 200 feet of any such excluded channel or drainage way, must prevent sediment from moving beyond the boundaries of the property on which such project is located and provided, further, that nothing herein shall prevent the local issuing authority from regulating any such project which is not specifically exempted by paragraphs (1), (2), (3), (4), (5), (6), (7), (9) or (10) of the section;

(9) Construction or maintenance projects, or both, undertaken or financed, in whole or in part, or both, by the Department of Transportation, the Georgia Highway Authority, or the State Road and Tollway Authority; or any road construction or

maintenance project, or both, undertaken by any county or municipality; provided, however, that construction or maintenance projects of the department of transportation or state road and tollway authority which disturb one or more contiguous acres of land shall be subject to provisions

of O.C.G.A. § 12-7-7.1; except where the department of transportation, the Georgia Highway Authority, or the state road and tollway authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the

state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth

in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;

(10) Any land disturbing activities conducted by any electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system

as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electric system or any public utility under the regulatory jurisdiction of the public service commission, any utility under the regulatory jurisdic-

tion of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located

within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in

O.C.G.A. § 12-7-6 as if a permit had been issued and violations shall be subject to the same penalties as violations by permit holders; and

(11) Any public water system reservoir.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-39. Minimum requirements.

(a) General provisions. Excessive soil erosion and resulting sedimentation can take place during land disturbing activities if requirements of the article and the NPDES general permit are not

met. Therefore, plans for those land disturbing activities which are not exempted by this article shall contain provisions for application of soil erosion, sedimentation, and pollution control measures and practices. The provisions shall be incorporated into the erosion, sedimentation, and pollution control plans. Soil erosion, sedimentation, and pollution control measures and practices shall

conform to the minimum requirements of subsection (b) and (c) of this section. The application of measures and practices shall apply to all features

of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements. Measures shall be installed to prevent or control erosion, sedimentation and pollution during all stages of any land disturbing activity in accordance with requirements of this article and the NPDES general permit.

(b) Minimum requirements/BMPs.

(1) Best management practices as set forth in subsections (b) and (c) of this section shall be required for all land disturbing activities. Proper design, installation, and maintenance of BMPs shall constitute a complete defense to any action by the director or to any other allegation of noncompliance with subsection (b)(2) of this section or any substantially similar terms contained in a permit for the discharge of stormwater issued pursuant to O.C.G.A.

§ 12-5-30(f) of the "Georgia Water Quality Control Act". As used in this subsection, the terms "proper design" and "properly designed" mean designed in accordance with the hydraulic design specifications contained in the "Manual for Erosion and Sediment Control in Georgia" specified in O.C.G.A. § 12-7-6(b).

(2) A discharge of stormwater runoff from disturbed areas where BMPs have not been properly designed, installed, and maintained shall constitute a separate violation of any land disturbing permit issued by Fulton County or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), the "Georgia Water Quality Control Act" for each day on which such discharge results in

the turbidity of receiving waters being increased by more than 25 nephelometric turbidity units for waters supporting warm water fisheries or by more than ten nephelometric turbidity units for waters classified as trout waters. The turbidity of the receiving waters shall be measured in accordance with guidelines issued by the director, EPD. This paragraph shall not apply to any land disturbance associated with the construction of single-family homes which are not part of a larger common plan of development or sale unless the planned disturbance for such construction is equal to or greater than five acres.

(3) Failure to properly design, install, or maintain BMPs shall constitute a violation of any land disturbance permit issued by a

local issuing authority or of any state general permit issued by the division pursuant to O.C.G.A. § 12-5-30(f), The "GeorENVIRONMENT § 26-39 gia Water Quality Control Act" for each

day on which such failure occurs. When such non-compliance is identified by the director, official notice will be posted on that property.

(4) The director may require, in accordance with regulations adopted by the board, reasonable and prudent monitoring of the turbidity level of receiving waters into which discharges from land disturbing activities occur.

(5) The LIA may set more stringent buffer requirements than stated in subsections (c)(15) and (16) in light of O.C.G.A. § 12- 7-6(c).

(c) The rules and regulations, ordinances, or resolutions adopted pursuant to O.C.G.A. § 12-7-1 et seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and BMPs, including sound conservation

and engineering practices to prevent and/or minimize erosion and resultant sedimentation, which are consistent with, and no less stringent than,

those practices contained in the "Manual for Erosion and Sediment Control in Georgia," published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land disturbing activity was permitted, as well as

the following:

(1) Stripping of vegetation, regrading and other development activities shall be conducted in a manner so as to minimize erosion.

(2) Cut-fill operations must be kept to a minimum.

(3) Development plans must conform to topography and soil type so as to create the lowest practicable erosion potential.

(4) When ever feasible, natural vegetation shall be retained, protected and supplemented.

(5) The disturbed area and the duration of exposure to erosive elements shall be kept to practical minimum;

(6) Disturbed soil shall be stabilized as quick as practicable;

(7) Temporary vegetation or mulching shall be employed to protect exposed critical areas during development;

(8) Permanent vegetation and structural erosion control measures shall be installed as soon as practicable;

(9) To the extent necessary, sediment in runoff water must be trapped by the use of debris basins, sediment basins, silt traps,

or similar BMPs as outlined in the erosion and sediment control manual until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of this section, and O.C.G.A. § 12- 7-1 et seq.

(10) Adequate provisions must be provided to minimize damage from surface water to the cut face of excavations or the sloping of fills.

(11) Cuts and fills may not endanger adjoining property;

a. All slopes shall be stabilized immediately and shall remain so for a period of no less than one year from

the issuance of the project's final certificate of occupancy and/or the recording of a final plat.

b. All slopes greater than or equal to 3H:1V must be permanently stabilized with structural or vegetative BMPs.

c. A plan must be submitted to demonstrate that all slopes associated with fill/cut sections have been adequately

designed to be stabilized structurally (such as retaining walls) or vegetatively (erosion mat/blanket, tree bark mulch, etc). Such analysis, reports, or design shall be prepared and approved by a design professional.

(12) Fills may not encroach upon natural watercourses or constructed channels in a manner so as to adversely affect other

property owners;

(13) Grading equipment must cross flowing streams by means of temporary or permanent bridges or culverts except when such methods are not feasible, provided, in any

case, those such crossings are kept to a minimum. Migrated soil materials or soil materials displaced by mechanical means from land disturbing sites to adjacent water courses, such as lakes, ponds, streams, and creeks etc. must be remediated. The remedial work shall be conducted as per a remedial plan approved by Fulton County.

(14) Land-disturbing activity plans for erosion, sedimentation and pollution control shall include provisions for treatment or

control of any source of sediments and adequate sedimentation control facilities to retain sediments on-site or preclude sedimentation of adjacent waters beyond the levels specified in section 26-39(b)(2).

(15) Except as provided in paragraph (16) of this section, there is established a 25-foot buffer along the banks of all state waters, as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, except where the director, EPD determines to allow a variance that is at least as protective of natural resources and the environment, where otherwise allowed by the director, EPD pursuant to O.C.G.A. § 12-

2-8, or where a drainage structure or a roadway drainage structure must be constructed, provided that adequate erosion control measures are incorporated in the

project plans and specifications are implemented or along any ephemeral stream.

As used in this provision, the term 'ephemeral stream' means a stream: that under normal circumstances has water flowing

only during and for a short duration after precipitation events; that has the channel located above the ground-water table year round; for which runoff from precipitation is the primary source of water flow, Unless exempted as along an ephemeral stream, the buffers of at least 25 feet

established pursuant to part 6 of Article 5, Chapter 5 of Title 12, the "Georgia Water Quality Control Act shall remain in force unless a variance is granted by the director, EPD as provided in this subsection.

The following requirements shall apply to any such buffer:

a. No land disturbance activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed, except as otherwise provided by this paragraph.

Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed

by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetative cover remains to protect water quality and aquatic habitat and a

natural canopy is left in sufficient quantity to keep shade on the stream bed; and

b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet

within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) stream crossings for water lines; or

(ii) stream crossings for sewer lines;

and

(16) There is established a 50-foot buffer as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action, along the banks of any state waters classified as "trout streams" pursuant to Article 2 of Chapter 5 of Title 12, the "Georgia Water Quality Control Act", except where a roadway drainage structure must be constructed; provided, however, that small springs and steams classified as trout

streams which discharge an average annual flow of 25 gallons per minute or less shall have a 25-foot buffer or they may be

piped, at the discretion of the landowner, pursuant to the terms of a rule providing for a general variance promulgated by the board, so long as any such pipe stops short of the downstream landowner's property and the landowner complies with the buffer requirement for any adjacent trout streams. The director, EPD may grant a

variance from such buffer to allow landdisturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The

following requirements shall apply to such buffer:

a. No land-disturbance activities shall be conducted within a buffer and a buffer shall remain in its natural, undisturbed state of vegetation until all land-disturbing activities on the construction site are completed.

Once the final stabilization of the site is achieved, a buffer may be thinned or trimmed of vegetation as long as a protective vegetative cover remains to protect water quality and aquatic habitat and a natural canopy is left in sufficient quantity to keep shade on the stream bed; provided, however, that any person constructing a single-family residence, when such residence is constructed

by or under contract with the owner for his or her own occupancy, may thin or trim vegetation in a buffer at any time as long as protective vegetation cover remains to protect water quality and aquatic habitat and natural canopy is left in sufficient

quality to keep shade on the stream bed; and

b. The buffer shall not apply to the following land-disturbing activities, provided that they occur at an angle, as measured from the point of crossing, within 25 degrees of perpendicular to the stream; cause a width of disturbance of not more than 50 feet

within the buffer; and adequate erosion control measures are incorporated into the project plans and specifications and are implemented: (i) stream crossings for water lines; or

(ii) stream crossings for sewer lines.

c. Nothing contained in this chapter shall prevent any local issuing authority from adopting rules and regulations, ordinances, or resolutions which contain stream buffer requirements that exceed the minimum requirements in subsections 26-39(b) and (c).

d. The fact that land-disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute

proof of nor create a presumption of a violation of the standards provided for in this article or terms of the permit.

e. Additional requirements. Where the director finds, through inspection, that property owners have been adversely affected due to violations clearly identified by the director, or

that the approved current plans do not adequately address the features of the site, the director can require additional BMPs, drawings, and re- visions to comply with the minimum requirements as outlined in section 26-39.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-40. Land disturbance application/ permit process.

(a) General. The property owner, developer, and designated planners and engineers shall design and review before submittal of the general development plans. They shall review the zoning

resolution, stormwater management ordinance, subdivision ordinance, flood damage prevention resolution, this article, and other ordinances which regulate the development of land within the jurisdictional boundaries of unincorporated Fulton County. However, the property owner or operator

are the only parties who may obtain a permit.

(b) Application requirements.

(1) Prior to any land disturbing activity, the property in question must be part of an approved and recorded legal lot of record (exemption plat or final plat). Additionally, no land disturbing activity, including grading, excavating, filling, and/or foundation work, shall be conducted within the unincorporated area of Fulton County

or in any area where Fulton County has jurisdiction, until a land disturbance permit or a building permit (for those projects not requiring a land disturbance permit under this article) shall have been issued by the director allowing such activity and providing a copy of notice of intent submitted to EPD if applicable. If a project is to be developed in phases, then a separate land disturbance permit or building permit is required for each phase not to exceed 25 acres increments and the

development sequence should be followed on all projects issued a land disturbance permit.

(2) No person shall conduct any land disturbing activity within the jurisdictional boundaries of Fulton County without first obtaining a permit from the Fulton County Department of Environment and Community Development or its successor to perform such activity.

(3) The application for a permit shall be submitted to the department of environment and community development and must

include the applicant's erosion, sedimentation and pollution control plan with supporting data, as necessary. Said plans

shall include, as a minimum, the data specified in subsection (c) of this section.

Soil erosion, sedimentation and pollution control plans, together with supporting data, must demonstrate affirmatively that the land disturbing activity proposed will be carried out in such a manner that the provisions of subsections 26-39(b) and (c) will be met. Applications for a permit will not be accepted unless accompanied by nine copies of the applicant's soil erosion, sedimentation and pollution control plans and a physical address of the property owner (Post Office box not acceptable). All applications shall contain a certification stating that the plan preparer or the designee thereof visited the site prior to creation of the plan in accordance with EPD Rule 391-3-7-10.

(4) A minimum fee of $125.00, as set by the board of commissioners of Fulton County, shall be charged for each acre or fraction thereof of the project area.

(5) In addition to Fulton County's permitting fees, fees will also be assessed pursuant to O.C.G.A. § 12-5-23(a)(5), provided that such fees shall not exceed $80.00 per acre of land-disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of landdisturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance

permit. Half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A.

§ 12-7-17(9) or (10) shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction.

(6) The permit applicant shall be required to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof prior to issuing the permit. The bond amount shall be determined as established by the department. If the applicant does not comply with this article or with the conditions of

the permit after issuance, Fulton County may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land disturbing activity and bring it into compliance. These corrective actions may include, but are not limited to, de-silting detention ponds, water bodies, stormwater facilities, roadways, installing fence with locking device, re-establishing damaged buffer, etc. If a permit applicant has had two or more outstanding violations of previous permits, this article, or the Erosion and Sedimentation Act of 1975 (O.C.G.A.

§ 12-7-1 et seq.), as amended within three years prior to the date of filing of the application under consideration, Fulton County may deny the permit application.

(7) If applicable, immediately upon receipt of an application and plan for a permit, Fulton County shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion and sedimentation control plan. The district shall approve or disapprove a plan within 35 days of receipt. Failure of the district to act

within 35 days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to Fulton County. No permit will be issued unless the plan has been approved by the district, and any variances required by section 26-39(c)(14) or (15) and bonding, if required as per subsection (b)(5) of this section, have been obtained. Such review will not be required if Fulton County and the district have entered into an agreement which allows Fulton County to conduct such review and approval of the plan without referring the application and plan

to the district. The local issuing authority with plan review authority shall approve or disapprove a revised Plan submittal within 35 days of receipt. Failure of the local issuing authority with plan review authority to act within 35 days shall be considered an approval of the revised plan submittal.

(8) If a permit application has had two or more violations of previous permits, this article, or the Erosion and Sedimentation Act, as amended, within three years prior to the date of filing of the application under consideration, Fulton County may deny the permit application.

(9) The local issuing authority may require the permit applicant to post a bond in the form of government security, cash, irrevocable letter of credit, or any combination thereof up to, but not exceeding, $3,000.00

per acre or fraction thereof of the proposed land-disturbing activity, prior to issuing the permit. If the applicant does

not comply with this article or with the conditions of the permit after issuance, the local issuing authority may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the landdisturbing activity and bring it into compliance. These provisions shall not apply unless there is in effect an ordinance or

statute specifically providing for hearing and judicial review of any determination or order of the local issuing authority with respect to alleged permit violations.

(c) Plan requirements.

(1) Plans must be prepared to meet the minimum requirements as contained in section 26-39(b) and (c), or through the use of more stringent, alternate design criteria

which conform to sound conservation and engineering practices. The Manual for Erosion and Sediment Control in Georgia is hereby incorporated by reference into this

ordinance. The plan for the land disturbing activity shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography,

watershed. Vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local

ordinances and state laws. Maps, drawings and supportive computations shall bear the signature and seal of the certified design professional. Persons involved in land development design, review, permitting, construction, monitoring, or inspections or any land disturbing activity shall meet the education and training

certification requirements , dependent on his or her level of involvement with the process, as developed by the commission and in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.

(2) Data required for site plan shall include all the information required from the appropriate erosion, sedimentation and pollution control plan review checklist established by the commission as of January 1 of the year in which the land-disturbing

activity was permitted.

(d) Permits and development activity.

(1) Permits shall be issued or denied as soon as practicable but in any event not later than 45 days after receipt by Fulton County of a completed application, provided that any necessary variances have been obtained, bonding has been provided, and specifications developed and maintained

by the department of public works and permitted by the department of environment and community development have been met, and all applicable fees have

been paid prior to permit issuance. The permit shall include conditions under which the activity may be undertaken.

(2) No permit shall be issued by Fulton County unless the erosion, sedimentation and pollution control plan has been approved by the district or Fulton County, and unless

Fulton County has affirmatively determined that the plan is in compliance with this article, any variances required by

subsections 26-39(c)(14) or (15) are obtained, bonding requirements, if necessary, as per subsection 26-40(b)(5) are met and all ordinances and rules and regulations in effect within the jurisdictional boundaries of unincorporated Fulton

County are met. If the permit is denied, the reason for denial shall be furnished to the applicant.

(3) Any land-disturbing activities by a local issuing authority shall be subject to the same requirements of this article, and any other ordinances relating to land development, as are applies to private persons and the division shall enforce such requirements upon the local issuing authority.

(4) If the tract is to be developed in phases, then a separate permit shall be required for each phase to include the development sequence.

(5) The permit may be suspended, revoked, or modified by Fulton County, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this article. A holder of a permit shall notify any successor in title to him of the conditions contained in the permit as to all or any portion of the land affected by the

approved plan.

(6) Fulton may reject a permit application if the applicant has had two or more violations of previous permits or the Erosion and Sedimentation Act permit requirements within three years prior to the date of the application, in light of O.C.G.A.

§ 12-7-7-(f)1.

(7) Sedimentation basins shall not be allowed in state waters or other perennially flowing streams.

(8) The permittee shall ensure that engineering and construction on any land within unincorporated Fulton County shall be

carried out in such a manner as to protect neighboring persons and property from damage or loss resulting from stormwater runoff, soil erosion, or deposition upon private property or public streets or watertransported silt or debris.

(9) The director or designee during field inspections may require revisions, addendum and modifications that address any and all features to ensure compliance

with this article and any permit issued hereunder.

(10) It shall constitute non-compliance with this article to engage in land disturbance activity involving clearing, grading, timber harvesting or grubbing without a permit, which activity may immediately warrant citation(s).

(11) Design and installation of properly functioning detention facilities, including outflow and overflow control devices, shall be the responsibility of the owner. If any

erosion control devices are damaged or destroyed during grading or construction, all construction processes shall cease until the devices are restored to their functioning capability. The owner, through application for grading or construction permits, accepts the responsibility of maintenance of the control devices.

(12) The owner and operator shall be responsible for the maintenance of the storm drainage facilities during grading, construction, and for a 15-month period following the final approval of the completed project. Maintenance will be construed to

include preserving the enclosing walls or impounding embankment or the detention basin and sedimentation ponds, in good condition; ensuring structural soundness, functional adequacy, and freedom from sediment of all drainage structures;

and rectifying any unforeseen erosion problems.

(13) The developer shall provide stabilization by covering the soil with: permanent seeding, sprigging or planting, producing longterm vegetative cover, temporary seeding producing short-term vegetative cover, sodding or covering areas with a turf of perennial sod forming grass; and security

fences for safety purposes at detention facilities as prescribed by and prior to approval by Fulton County.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-41. County construction; compliance with article.

All engineering and construction involving land disturbance performed by or on behalf of Fulton County and under the direction of the department of public works or any other Fulton County entity, whether such engineering or construction is being accomplished on existing and proposed public land or on public easement, shall comply with the requirements of sections 26-39 and 26-44.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-42. Residential construction.

Notwithstanding any other provisions of this article, the construction of single-family detached dwellings shall be subject to the following rules:

(1) Building permit. No land disturbing activity or other work (including moving and demolition) shall commence on a project until the owner or the contractor undertaking the work shall have applied for, and been issued, a land disturbance permit or building permit by the director. The owner/contractor shall prominently display on site the building permit, a signed erosion and sedimentation control agreement and approved site plan in full public view, until issuance of certification of occupancy. Demolition projects shall be required to install BMPs where necessary to prevent erosion. Failure to install BMPs

shall constitute non compliance with this article.

(2) Notice to comply. The director shall issue a notice to comply for failure to either install or maintain BMPs, even though sediments remain contained within the boundaries of the property by the use of debris basins, sediment basins, sediment barriers, and construction exits in accordance with this article. Subsequently, a stop work order shall be issued if compliance with a notice to comply is not achieved by the end of the specified compliance

period of five days.

(3) Stop work order. The director or representative shall issue an order to cease all work ("stop work order") on a project

covered by this section if any work on that project is proceeding without a land disturbance permit or building permit, or, when silt, mud, or other waterborne debris leave the property boundary, or (if such a permit has been issued) it is found

by the director or representative that all or any portion of the project remains out of compliance with any requirements of subsections 26-39(b) or (c), any other provision of this article or any other Fulton County ordinance, regulation or requirement after the specified compliance period or a site has been in violation at least two prior occurrences, to include any applicable fines and penalties. All other requirements of subsection 26-45(b) of this article also apply to projects covered by

this section.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-43. Progress report required.

(a) The licensed professional referenced in the administrative guidelines (see subsection 26- 40(c)) or his representative as approved by the director shall ensure, inspect and evaluate the installation of the erosion control measures (BMPs) within one week after the initial installation of BMPs. All deficiencies shall be corrected within two business days after inspection, and a summary of corrective measures taken shall be submitted to the director within three days after inspection. A written biweekly report shall be

submitted to the director from the beginning to the completion of grading and construction on projects for which a land disturbance permit has been issued. This report shall be the responsibility of the owner or developer and shall be prepared by a professional licensed to practice such activity within Georgia, as stipulated in Fulton

County Soil Erosion and Sediment Control Administrative Guidelines. The report shall record the quality and progress of the work required to show

full compliance with the provisions of this article, including compliance with or adherence to vegetative practices. In order to ensure full compliance with the approved construction plans, final approval will be withheld until as-built drawings,

prepared by a professional licensed to practice such work in Georgia, have been submitted and accepted by the director. The director shall withhold the occupancy permit until full compliance has been achieved.

(b) Additional reporting requirements. Applicants/owners/operators shall provide the Director with a copy of any monitoring results submitted

to EPD regarding National Pollutant Discharge Elimination System (NPDES). Reports shall be in a format as prescribed by EPD. A copy of the notice of intent which has been sent to EPD in compliance with the permit requirements must be presented to the site inspector at all pre-construction meetings.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-44. Inspection and enforcement of article.

(a) The director or designee will periodically inspect the sites of land disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the approved plan, permit and this article and to determine if the measures required in the plan are effective in controlling soil erosion and sedimentation. Also, Fulton County shall regulate both primary, secondary and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary

permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting landdisturbing activities. Tertiary permittees shall be responsible for installation and maintenance of

best management practices where the tertiary permittee is conducting land disturbing activities.

If, through inspection, it is deemed that a person engaged in land disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this article, an official notice shall be posted on-site, and as a courtesy a written notice

to comply shall also be served upon that person, except for working without a permit or working under a stop work order, which warrant immediate citation(s). The notice shall set forth the measures necessary to achieve compliance and

shall state the time within which such measures must be completed. If the person engaged in the land disturbing activity fails to comply with the corrective measures specified in the posted official notice within the time specified, he shall be deemed in violation of this article, and the director may take such additional enforcement actions as he/she deems appropriate.

(b) The local issuing authority must amend its ordinances to the extent appropriate within 12 months of any amendments to the Erosion and Sedimentation Act of 1975.

(c) The director shall have the power to conduct such investigation as the director may deem reasonably necessary to carry out duties as prescribed in this article, and for this purpose shall have the power to enter at reasonable times upon

any property, public or private, for the purposes of investigation and inspection of the sites of land disturbance or building activities.

(d) No person shall refuse entry or access to any authorized representative or agent of Fulton County, the commission, the district, or division who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representative while in the process of carrying out his official duties including, but not limited to, the review of reports, studies, calculations, drawings, revisions, practices, actions and bonds.

(e) A copy of a current approved plan shall be kept on site until project completion or issuance of certificate of occupancy.

(f) The district or the commission or both shall semi-annually review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7- 8(a). The district or the commission or both may provide technical assistance to any county or municipality for the purpose of improving the effectiveness of the counties or municipality's erosion and sedimentation control program. The districts or the commission shall notify the division and request investigation by the division if any deficient or ineffective legal program is found.

(g) The division may periodically review the actions of counties and municipalities which have been certified as local issuing authorities pursuant to O.C.G.A. § 12-7-8(a). Such review may include, but shall not be limited to, review of the

administration and enforcement of a governing authority's ordinance and review of conformance with an agreement, if any, between the district and the governing authority. If such review indicates that the governing authority of any county or municipality certified pursuant to O.C.G.A.

§ 12-7-8(a) has not administered or enforced its ordinances or has not conducted the program in accordance with any agreement entered into pursuant to O.C.G.A. § 12-7-7(e), the division shall notify the governing authority of the county or

municipality in writing. The governing authority of any county or municipality so notified shall have 90 days within which to take the necessary corrective action to retain certification as a local issuing authority. If the county or municipality does not take necessary corrective action within 90 days after notification by the division, the division may revoke the certification of the county or municipality as a local issuing authority.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-45. Penalties and incentives.

(a) Failure to obtain a permit for land disturbing activity. If any person commences any land disturbing activity requiring a land disturbing

permit, as prescribed in this article, without first obtaining said permit, the person shall be subject to revocation of his business license, work permit, or other authorization to conduct any business and associated work activities within the jurisdictional boundaries of Fulton County. Failure to comply may result in a citation being issued to

appear in state magistrate court which may result in monetary fines.

(b) Stop work orders and notice to comply.

(1) On development and residential land disturbance sites for the first and second violations of the provisions of this article,

the director or the LIA shall post an official notice to comply and as a courtesy issue a written letter. The violator shall have five days to correct the violation. If the violation is not corrected within five days, the director or the LIA shall issue a stop-work order requiring the land-disturbance activity be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to

public health or waters of the state or if the land-disturbing activities are conducted without obtaining the necessary permit, the director shall issue an immediate stop-work order in lieu of notice to comply.

(2) For the third and each subsequent violation, the director or the LIA shall issue an immediate stop-work order; and

(3) All stop-work orders shall be in effect until the necessary corrective action has occurred.

(4) It shall be unlawful for any representative of the owner to remove an official notice to comply or stop work posting. If

this action is observed by a county representative, the owner will be responsible for any and all possible fines. Upon issuance of a stop work order, the director or representative shall post official notice at

such locations on the project site as deemed appropriate. Such posted official notice(s) shall be prominently displayed on the owner's property until the stop work order is rescinded by the director, at which time said posted notice(s) will be removed

by the director or representative.

(5) When a violation in the form of taking action without a permit, failure to maintain a stream buffer, or significant amounts of sediment, as determined by director or

his or her designee, have been or are being discharged into state waters and where best management practices have not been properly designed, installed, and maintained, a stop work order shall be issued by the director or his or her designee. All such stop work orders shall be effective immediately upon issuance and

shall be in effect until the necessary corrective action or mitigation has occurred.

Such stop work orders shall apply to all land-disturbing activity on the site with the exception of the installation and maintenance of temporary or permanent erosion and sediment controls.

(c) Reinspection fee. The director shall assess a minimum $50.00 reinspection fee to a project if a reinspection is requested prior to the end of a compliance period and the site is found to remain out of compliance upon that inspection. Such fees (to cover administrative, field inspections, and transportation costs) must be satisfied prior to the issuance of a final erosion inspection or a certificate of occupancy.

(d) Bond forfeiture. If, through inspection, it is determined that a person engaged in land disturbing activities has failed to comply with the approved plan and permit, an official notice to comply shall be posted on-site and a letter will be

issued as a courtesy. The notice shall set forth the measures necessary to achieve compliance with the plan and shall state the time within which such measures must be completed. If the person engaged in the land disturbing activity fails to comply within the time specified, he shall be deemed in violation of this article and, in addition to other penalties, shall be deemed to have forfeited his performance bond, if required to post one under the provisions of subsection 26-40(b)(6).

Fulton County may call the bond or any part thereof to be forfeited and may use the proceeds to hire a contractor to stabilize the site of the land disturbing activity and bring it into compliance.

(e) Non-compliance. Non-compliance with this article shall be dealt with as follows:

Any person found to be in non-compliance with any provision of this article shall be served official notice by the department of environment and community development. The offender shall, within the period of time stated in the notice, take all necessary action to gain

compliance and shall permanently cease such non-compliance.

(f) Monetary penalties. Any person who violates any provisions of this article, or any permit condition or limitation established pursuant to

this article or who negligently or intentionally fails or refuses to comply with any final or emergency order of the director issued as provide in this article shall be liable for a civil penalty not to

exceed $2,500.00 per day. Notwithstanding any limitation of law as to penalties which can be assessed for violations of county ordinances, any magistrate court or any other court of competent jurisdiction trying cases brought as violations of this article shall be authorized to impose penalties for such violations not to exceed $2,500.00 for each violation. Each day during which violation or

failure or refusal to comply continues shall be a separate violation.

(1) The following minimum penalties shall be imposed:

Conducting land disturbance activities without a land disturbance permit or building permit (first offense)—$250.00 for each violation or each day on which a violation

exists.

Conducting land disturbance activities without a land disturbance permit or building permit (second or subsequent offense)— $1,000.00.

Lack of proper installation or maintenance of structural/vegetative best management practices—$250.00 per violation.

Working under a stop work order (first offense)—$500.00.

Working under a stop work order (second or subsequent offense)—$1,500.00.

(2) Upon violation of the provisions of this article, Fulton County shall be entitled to take such remedial action as the director deems necessary to ensure compliance, and the violator shall reimburse Fulton County for any cost or expense associated with such compliance efforts and Fulton County shall be entitled to place a lien on the property to secure payment and reimbursement for these expenses.

(3) The department of environment and community development has the primary responsibility for the enforcement of this article.

(4) Persons designated by the director are hereby authorized to issue official notices, citations, and/or summons charging violations under this article, returnable to the state or magistrate courts of Fulton County,

or any other court of competent jurisdiction.

(Res. No. 05-0690, 6-15-05; Ord. No. 10-0576, 6-2-10) Sec. 26-46. Education and certification.

(a) Persons involved in land development design, review, permitting, construction, monitoring, or inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the

commission in consultation with the division and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.

(b) For each site on which land disturbing activity occurs, each entity or person acting as either a primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification

requirements developed by the commission present on site whenever land-disturbing activities are conducted on that site. A project site shall

herein be defined as any land-disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.

(c) Persons or entities involved in projects not requiring a state general permit but otherwise requiring certified personnel on site may contract with certified persons to meet the requirements of this article.

(d) If a state general permittee, who has operational control of land-disturbing activities for a site has met the certification requirements of

O.C.G.A § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A. § 12-7-19(b)(4) and shall not be required to meet any requirements

specified in said paragraph.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-47. Administrative appeal; judicial review.

(a) Administrative remedies. The issuance of a stop work order, as well as the suspension, revocation, modification, or grant with condition of a permit by Fulton County upon finding that the

holder is not in compliance with the approved erosion, sediment and pollution control plan; or that the holder is in violation of permit conditions; or that the holder is in violation of this article shall entitle the person submitting the

plan or holding the permit to a hearing before the Fulton County Board of Commissioners within 30 days after receipt by the director of written notice of appeal.

(b) Judicial review. Any person aggrieved by a decision or order of Fulton County, after exhausting his administrative remedies, shall have the right to appeal de novo to the Superior Court of

Fulton County.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Sec. 26-48. Effectivity, validity and liability.

(a) This article shall become effective on the 15th day of June 2010.

(b) Validity. If any section, paragraph, clause, phrase, or provision of this article shall be adjudged invalid or held unconstitutional, such decisions shall not affect the validity of remaining portions of this article.

(c) Liability.

(1) Neither the approval of a plan under the provisions of this article, nor the compliance with provisions of this article, shall relieve any person from responsibility for

damage to any person or property otherwise imposed by law nor impose any liability upon Fulton County, the district or their officers, employees or agents for

damage to any person or property.

(2) The fact that a land disturbing activity for which a permit has been issued results in injury to the property of another shall neither constitute proof of nor create a presumption of a violation of the standards provided for in this article or the terms of the permit.

(3) No provision of this article shall permit any person to violate the Georgia Erosion and Sedimentation Act of 1975, the Georgia Water Quality Control Act or the rules and regulations promulgated and approved thereunder or pollute any waters of the state as defined thereby.

(Res. No. 05-0690, Exh. A, 6-15-05; Ord. No.

10-0576, 6-2-10) Secs. 26-49—26-75. Reserved.

ARTICLE III. HAZARDOUS WASTES*

Sec. 26-76. Definitions.

The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:

Accident shall mean any event involving the spillage, discharge, leakage, release, or exposure in any other fashion of any hazardous materials in or to the physical environment, whether air, water, or land, within the territorial boundaries of unincorporated Fulton County.

Hazardous materials shall include but not be limited to, all chemicals, materials, or substances that may be so defined as provided for in 49 USCA 1803 including, but not limited to, explosives, radioactive materials, etiologic agents, flammable liquids or solids, poisons, oxidizing or corrosive materials, and compressed gases which, because of quantity, concentration, or physical, chemical or infectious characteristics may pose a substantial present or potential hazard to human health or the environment when improperly treated,

stored, transported, disposed of, or otherwise handled.

Person shall include any individual, company, organization, association, or other entity, that manufactures, uses, transports, stores, or otherwise handles hazardous materials as defined herein, whether or not such entity continually or

only incidentally engages in such activity and whether or not such activity is entered into for profit.

Responsible person shall mean any person as defined herein who has caused, whether directly or indirectly, a hazardous material to be manufactured, used, stored, transported, or otherwise introduced within the territorial boundaries of

unincorporated Fulton County.

Violative act shall mean any act, taken by or attributable to, whether directly or indirectly, any person as defined herein that in any way violates or in any manner fails to comply with any of the provisions of the following federal and state laws or regulations concerning hazardous wastes:

(1) Federal statutes:

a. The Atomic Energy Act, 42 USCA 2011 et seq. (1971).

b. The Clean Water Act, 33 USCA 431 et seq.

c. The Clean Air Act, 42 USCA 1857 et seq.

d. The Hazardous Materials Transportation Act, 46 USCA 170; 49 USCA 1801—1812.

e. The Solid Waste Disposal Act, 42

USCA 251—3259.

f. The Resource and Recovery Act, 42 USCA 3251 et seq.

g. The Toxic Substance Control Act, 15

USCA 2601—2629.

(2) Federal Code of Regulations:

a. 10 CFR: Energy. 10 CFR D.735-1 et seq.

b. 40 CFR: Protection of Environment.

10 CFR 15.1—15.41; 10 CFR 25.1—

25.4; 10 CFR 50.1—50.12; 10 CFR

51.1—51.328.

c. 49 CFR: Transportation. 49 CFR 171.7171.500-18.

(3) Georgia Statutes:

a. The Georgia Civil Defense Act of 1951, as amended, O.C.G.A. § 34-3-1 et seq.

b. Interstate Civil Defense and Disaster Compact Act, O.C.G.A. § 38-3-70 et seq.

c. The Water Quality Control Act,

O.C.G.A. §§ 12-5-21—12-5-41.

d. The Erosion and Sedimentation Control Act of 1975, as amended, O.C.G.A.

§§ 12-7-11—12-7-16.

e. The Radiation Control Act of 1964, as amended, O.C.G.A. §§ 31-13-1— 31-13-12.

f. The Georgia Safe Drinking Water Act of 1977, as amended, O.C.G.A.

§§ 12-5-171—12-5-173.

g. The Georgia Air Quality Act of 1978, as amended, O.C.G.A. § 12-5-170 et seq.

h. The Transportation of Hazardous Materials Act of 1979, as amended,

O.C.G.A. §§ 36-6-220—36-6-224.

i. The Hazardous Waste Management Act of 1979, O.C.G.A. §§ 12-8-60— 12-8-76.

(4) Georgia regulations:

a. The State of Georgia Natural Disaster Operations Plan, Executive Order of the Governor, February 8, 1978.

b. Department of Natural Resources, Rules and Regulations, Solid Waste Management, chapter 391-3-4.

c. Department of Natural Resources, Rules and Regulations, Radioactive Waste Material Disposal, chapter 391- 3-9.

d. Department of Transportation, Rules and Regulations, Transportation of Hazardous Materials, chapter 672- 10.

e. Department of Natural Resources, Rules and Regulations, Governmental Protection, Inspection and Maintenance, chapter 391-3-10.

(Code 1983, § 27-5-1) Sec. 26-77. Accidents; reporting procedures;

failure; fine.

(a) Any and all accidents involving hazardous materials within the territorial boundaries of unincorporated Fulton County must be reported immediately by the responsible person, or any agent thereof to the Chief of the Fulton County Fire Department, setting out complete information as to the location, time, and nature of the accident. Any responsible person who fails to

report any such accident immediately to the Chief of the Fulton County Fire Department shall be subject to a fine not to exceed $1,000.00.

(b) Whether or not such responsible person has reported any such accident as provided herein, such responsible person will be liable only for the costs incurred by any department or agency of Fulton County in handling, controlling, or otherwise neutralizing the hazardous wastes involved in such accident. Failure of any person to make

full and complete restitution on demand by Fulton County for all amounts incurred by any agency or department thereof as herein provided shall subject such person to a fine not to exceed $2,000.00.

(Code 1983, § 27-5-2) Secs. 26-78—26-110. Reserved.

ARTICLE IV. STORMWATER

MANAGEMENT

DIVISION 1. GENERALLY

Sec. 26-111. Short title of article.

The provisions of this article shall constitute and be known as the "Stormwater Management Ordinance of Fulton County, Georgia."

(95-0093, art. I, § A(1), 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-112. Definitions.

For the purposes of this article, unless specifically defined below, words or phrases shall be interpreted so as to give them the meaning they

have in common usage and to give this article its most effective application. Words in the singular shall include the plural, and words in the plural shall include the singular. Words used in the present tense shall include the future tense. The word "shall" connotes mandatory and not discretionary; the words "should" or "may" are permissive. Unless otherwise specified, or apparent from the context, definitions herein will be the same as

those in other Fulton County codes. For the purpose of this article, the following terms, phrases, and words, and their derivatives, shall have the meaning given herein:

Accidental discharge means a discharge of any non-stormwater related substance into the separate storm sewer that occurs by chance and without planning or consideration prior to occurrence.

Agricultural practices means practices involving the establishment, cultivation, or harvesting of products of the field or orchard; the preparation

and planting of pasture land and farm ponds; and the construction of farm buildings, or other related activities per section 5.1 of the Zoning Resolution.

Applicant means a person submitting a postdevelopment stormwater management application and plan for approval.

As-built plan or record drawing means a set of engineering or site drawings that delineate the specific permitted stormwater management facility as actually constructed.

Best management practices (BMPs) means a wide range of management procedures and structures, activities, prohibitions or practices that have been demonstrated to effectively control the

quality and/or quantity of stormwater runoff and which are compatible with the planned land use.

Board means the Fulton County Board of Commissioners.

Channel means a natural or artificial watercourse with a definite bed and banks that conveys continuously or periodically flowing water.

Clean Water Act means the Federal Water Pollution Control Act, as amended (32 USC 1251 et seq.).

Conservation easement means an agreement between a land owner and the county or other government agency or land trust that permanently protects open space or greenspace on the owner's land by limiting the amount and type of

development that can take place, but continues to leave the remainder of the fee interest in private ownership.

Cooling water means water used exclusively as cooling medium in an appliance, device, or apparatus.

County means unincorporated Fulton County, Georgia.

County commissioner means an elected official of the Fulton County Board of Commissioners.

County/separate storm sewer system means a conveyance or system of conveyances (including roads with drainage systems, highways, rights-ofway, county streets, catchbasins, curbs, gutters, ditches, manmade channels, pipes, culverts, storm

drains, detention ponds, other stormwater facilities) which are:

(1) Owned or maintained by the county;

(2) Designed or used for collecting or conveying stormwater;

(3) Not a combined sewer; and

(4) Not a part of publicly owned treatment works (POTW).

Design report means the report that accompanies the stormwater management plan and includes data used for engineering analysis, results of all analysis, design and analysis calculations

(including results obtained from computer programs), and other engineering data that would assist the county in evaluating proposed

stormwater management facilities.

Detention means the temporary storage of stormwater runoff in a stormwater management facility for the purpose of controlling the peak discharge.

Detention facility, structure and/or pond means a permanent stormwater management structure whose primary purpose is to temporarily store stormwater runoff and release the stored runoff at controlled rates.

Developer means a person who undertakes land development activities.

Development means a land development or land development project.

Director of the department of public works or director means the duly designated department head of the public works department or his/her designee.

Discharge means the release of treated or untreated water, fluid or other substance to the county separate storm sewer system.

Drainage easement means an easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other

persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement.

Erosion and sedimentation control ordinance means the ordinance adopted by the county that controls, reduces, or eliminates soil erosion and its transportation to the county's lakes, rivers, and streams, latest revision.

Erosion and sedimentation control plan means a plan that is designed to minimize the accelerated erosion and sediment runoff at a site during land disturbance activities.

Existing land use conditions means the ground surface in its original state before grading, excavating, or filling.

Extended detention means the detention of stormwater runoff for an extended period, typically 24 hours or greater.

Extreme flood protection means measures taken to prevent adverse impacts from large lowfrequency storm events with a return frequency of 100 years or more.

Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from:

(1) The overflow of inland waters; or

(2) The unusual and rapid accumulation or runoff of surface waters from any source.

Grading means excavating, filling (including hydraulic fill), or stockpiling of earth material, or any combination thereof, including the land in its excavated or filled condition.

Greenspace or open space means permanently protected areas of the site that are preserved in a natural state.

Hotspot means an area where the use of the land has the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater.

Hydrologic soil group (HSG) means a Natural Resource Conservation Service classification system in which soils are categorized into four runoff potential groups. The groups range from group A

soils, with high permeability and little runoff produced, to group D soils, which have low permeability rates and produce significant runoff.

Illicit connection means any connection to the county's separate stormwater conveyance system (pipe, culvert, road, ditch, channel, draw or watercourse) that is not composed entirely of stormwater runoff or a connection that does not

conform to an approved stormwater management plan from the county, other than the NPDES permit for discharging from the county separate storm system.

Impervious cover means a surface composed of any material that significantly impedes or prevents the natural infiltration of water into soil.

Impervious surfaces include, but are not limited to, rooftops, buildings, streets and roads, and any concrete or asphalt surface.

Industrial stormwater permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of

industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies.

Infiltration means the process of percolating stormwater runoff into the subsoil.

Inspection and maintenance agreement means a written agreement providing for the long-term inspection and maintenance of stormwater management facilities and practices on a site or with respect to a land development project, which

when properly recorded in the deed records constitutes a restriction on the title to a site or other land involved in a land development project.

Issuing department means that department in the county that has been designated as the department with the authority over the issuance, inspection, enforcement, and acceptance of permits for the sole purpose of developing or improving land, or building or constructing structures, utilities, public improvements (including

stormwater management facilities), or other facilities located within the county.

Jurisdictional wetland means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted

for life in saturated soil conditions, commonly known as hydrophytic vegetation.

Land development means any land change, including, but not limited to, clearing, digging, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting and filling of land, construction, paving, and any other installation of impervious cover.

Land development activities means those actions or activities which comprise, facilitate or result in land development.

Land development project means a discrete land development undertaking.

Land disturbance permit means a permit issued by the county which must be obtained prior to the beginning of any land disturbing activity.

Land disturbing activity means any use of the land by any person that results in a change in the natural cover or topography that may cause erosion and contribute to sediment and alter the quality and/or quantity of stormwater runoff.

Maintenance means any action necessary to preserve stormwater management facilities in proper working condition, in order to serve the intended purposes set forth in this article or prevent structural failure of such facilities. Maintenance shall not include actions taken solely for the purpose of enhancing the aesthetic aspects

associated with stormwater management facilities and BMPs.

National Pollutant Discharge Elimination System (NPDES) permit means a permit issued by the appropriate authority in accordance with the

U.S. Environmental Protection Agency (EPA) regulations which require certain jurisdictions to obtain permits to discharge stormwater into

waterbodies of the U.S.

New development means a land development activity on a previously undeveloped site.

Non-erodible means a material, e.g., natural rock, riprap, concrete, plastic, etc., that will not experience surface wear due to natural forces of wind, water, ice, gravity, or a combination of those forces except over a long period of time.

Nonpoint source pollution means a form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to

surface water and groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollution is a byproduct of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources.

Non-structural stormwater management practice or non-structural practice means any natural or planted vegetation or other non-structural component of the stormwater management plan that provides for or enhances stormwater quantity

and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and greenspace areas,

overland flow filtration areas, natural depressions, and vegetated channels.

Off-site facility means a stormwater management facility located outside the boundaries of the site.

On-site facility means a stormwater management facility located within the boundaries of the site.

Overbank flood protection means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e. flow events that exceed the capacity of the channel and enter the floodplain), and that are intended to protect downstream properties from flooding for the twoyear through 25-year frequency storm events.

Owner means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.

Permit means the permit issued by the county to the applicant which is required for undertaking any land development activity.

Permittee means the applicant who has applied for and/or been granted a permit for disturbance of the land by the governing agency.

Person means any and all persons, natural or artificial, and includes any individual, firm, corporation, government agency, business trust, estate trust, partnership, association, two or more persons having a joint or common interest or any

other legal entity.

Person responsible for the land disturbing activity means:

(1) The person who has or represents having financial or operational control over the land disturbing activity; and/or

(2) The landowner or person in possession or control of the land who directly or indirectly allowed the land disturbing activity or has benefited from it or who has failed

to comply with any provision of this article.

Pollution means the contamination or other alteration of any water's physical, chemical, or biological properties, including changes in the temperature, taste, color, turbidity, or odor of such waters or the discharge of any liquid, gaseous, solid, radioactive, or other substance into any such waters as will or is likely to create a

nuisance or render such waters harmful, detrimental, or injurious to the public health, safety, or welfare or to domestic, commercial, industrial,

agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish, or other aquatic life.

Post-development refers to the time period, or the conditions that may reasonably be expected or anticipated to exist, after completion of the land development activity on a site as the context may require.

Private means property or facilities owned by individuals, corporations, and other organizations and not by the county government or other governing entity.

Pre-development refers to the time period, or the conditions that exist, on a site prior to the commencement of a land development project and at the time that plans for the land development of a site are approved by the plan approving authority. Where phased development or plan approval occurs (preliminary grading, roads and utilities,

etc.), the existing conditions at the time prior to the first item being approved or permitted shall establish pre-development conditions.

Procedure means a procedure adopted by the utility, by and through the director, to implement a regulation or regulations adopted under this article, or to carry out other responsibilities as may be required by this article or other codes, ordinances, or resolutions of the county.

Project means the entire proposed development regardless of the size of the area of land to be disturbed.

Public works department means the department within the county responsible for all stormwater management activities and implementation of the provisions of this article.

Redevelopment means a land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which

do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution.

Regional stormwater management facility or regional facility means stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for on-site controls is either eliminated or reduced.

Responsible personnel means any foreman, superintendent, or similar individual who is the onsite person in charge of land disturbing activities.

Retention structure and/or pond means a permanent structure whose primary purpose is to permanently store a given volume of stormwater

runoff. Release of the given volume is by infiltration and/or evaporation.

Right-of-way means a portion of land over which a local or state government has designated a right of use.

Runoff means stormwater runoff.

Site means the parcel of land being developed, or the portion thereof on which the land development project is located.

Stormwater better site design means nonstructural site design approaches and techniques that can reduce a site's impact on the watershed

and can provide for non-structural stormwater management. Stormwater better site design includes conserving and protecting natural areas and greenspace, reducing impervious cover and

using natural features for stormwater management.

Stormwater concept plan means the overall proposal for a storm drainage system, including stormwater management structures and BMPs and supporting documentation, as specified in the Stormwater Management Design and Criteria Manual. The purpose of the stormwater concept plan is to define on a conceptual level the nature of the proposed development or project and to describe all existing conditions and proposed facilities needed to conform the requirements of the county.

Stormwater management means the collection, conveyance, storage, treatment, and disposal of stormwater runoff in a manner to minimize accelerated channel erosion, increased flood damage, and/or degradation of water quality and in a

manner to enhance and ensure the public health, safety, and general welfare, which shall include a system of vegetative or structural measures, or both, that control the increased volume and rate of stormwater runoff caused by manmade changes to the land.

Stormwater Management Design and Criteria Manual means the most recent approved manual of design, performance, and review criteria for stormwater management practices, prepared under the direction of the director of the department of public works or his/her agent. Copies of this

manual can be obtained from the public works department.

Stormwater management districts means any districts established by the board of commissioners where there are special assessments of property owners for the purpose of management and maintenance of stormwater.

Stormwater management facilities means those structures and facilities that are designed for the collection, conveyance, storage, treatment, and disposal of stormwater runoff into and through the drainage system. In most cases, stormwater management facilities will refer to facilities whose primary purpose is related to the quantity of stormwater, and where the BMPs primary purpose will be related to water quality concerns of stormwater.

Stormwater management master plan means the plans for the unincorporated county that govern storm drainage and related facilities, existing and proposed, for all drainage basins and/or watersheds within the county.

Stormwater management measure means any stormwater management facility or non-structural stormwater practice.

Stormwater management plan means the plan and supporting documentation that serves to define and expand the concepts shown as part of the stormwater concept plan, or is sufficient of itself

to ensure conformance to the criteria in the Comprehensive Stormwater Management Design and Criteria Manual and this article.

Stormwater management qualitative control means a system of vegetative, structural, or other measures that reduce or eliminate pollutants that might otherwise be carried by stormwater runoff.

Stormwater management system means the entire set of structural and non-structural stormwater management facilities and practices that are used to capture, convey and control the quantity and quality of the stormwater runoff from a site.

Stormwater retrofit means a stormwater management practice designed for a currently developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site.

Stormwater runoff means the direct response of a watershed to precipitation and includes the surface and subsurface runoff that enters a ditch, stream, storm drain, or other concentrated flow during and following the precipitation.

Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the

characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of such runoff.

Subdivision means the division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes

divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street

or roadway.

Variance means the modification of the minimum stormwater management requirements for specific circumstances where strict adherence of

the requirements would result in unnecessary hardship and not fulfill the intent of this article.

Waiver means the relinquishment from stormwater management requirements by the director of the issuing department or his/her agent for a specific land disturbing activity on a case-by-case review basis.

Waste means materials that are discarded, disposed of, or no longer usable.

Water quality means those characteristics of stormwater runoff from a land disturbing activity that relates to the physical, chemical, biological, or radiological integrity of water.

Water quantity means those characteristics of stormwater runoff that relate to the rate and volume of the stormwater runoff to downstream areas resulting from land disturbing activities.

Zoning Resolution of Fulton County (Z.R.F.C.)

means the rules and regulations that address zoning and development within the unincorporated areas of the county, latest revision.

(95-0093, art. II, § B, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-113. Penalties for violation of article.

(a) Upon determination that a violation of this article has occurred, the person responsible for the land disturbing activity shall be given a written notice of the violations and a time in which to correct the deficiencies.

(b) If construction violations of the approved plan are occurring, an immediate stop work order may be issued by the director of the issuing department or his/her designee.

(c) All non-construction related violations of this article shall be issued a citation by the county.

(d) The magistrate court of the county and the state court of the county shall each have jurisdiction to try offenses alleging violations of this article by any person, firm, corporation, partnership, or other entity. Violations of this article shall be deemed to be a misdemeanor. Each day any

violation of this article shall continue shall be considered a separate offense. Upon conviction, any person, firm, corporation, partnership, or other entity shall be subject to a fine of $1,000 per violation or imprisonment in the county jail for not more than 60 days, or by both this fine and imprisonment for each offense.

(e) The county attorney on behalf of the county may institute injunctive, or other appropriate action or proceedings at law or equity for the enforcement of this article or to correct violations of this article, and any court of competent jurisdiction shall have the right to issue restraining orders, temporary or permanent injunctions, mandamus, or other appropriate forms of remedy or relief.

(95-0093, art. VII, § F, 3-15-95; 99-0644, § II, 5-5-99; Ord. No. 08-0194, 2-20-08) Sec. 26-114. Authority of article.

(a) This article is established as a new article to and under the authority of this Code.

(b) The authority for this article is based on home rule provisions of Ga. Const. art. IX, § II.

(c) In compliance with the provisions of the Clean Water Act, 33 USC 1251 et seq., as amended, by the Water Quality Act of 1987, PL 100-4.

(95-0093, art. I, § A(2), 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-115. Purpose/objectives of article.

The purpose of this article is to protect, maintain and enhance the public health, safety, environment and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-development

stormwater runoff and nonpoint source pollution associated with new development and redevelopment. It has been determined that proper management of post-development stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment and general welfare

of the public, and protect water and aquatic resources. This article seeks to meet that purpose through the following objectives:

(1) Protect, maintain, and enhance the shortterm and long-term public health, safety, and general welfare. This objective will be

achieved by:

a. Establish decision-making processes surrounding land development activities that protect the integrity of the watershed and preserve the health

of water resources.

b. Require that new development and redevelopment maintain the predevelopment hydrologic response in their post-development state as nearly

as practicable in order to reduce flooding, streambank erosion, nonpoint source pollution and increases in

stream temperature, and maintain the integrity of stream channels and aquatic habitats.

c. Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater

runoff quantity and quality.

d. Establish design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum post-development

stormwater management standards.

e. Encourage the use of non-structural stormwater management and stormwater better site design practices, such as the preservation of greenspace and other conservation

areas, to the maximum extent practicable. Coordinate site design plans, which include greenspace, with the

county's greenspace protection plan.

f. Establish provisions for the longterm responsibility for and maintenance of structural stormwater control facilities and non-structural stormwater management practices

to ensure that they continue to function as designed, are maintained, and pose no threat to public safety.

g. Establish administrative procedures for the submission, review, approval and disapproval of stormwater management plans, and for the inspection of approved active projects, and long-term follow up.

(2) To satisfy federal (EPA) and state (DNR) regulations that require local programs to control stormwater discharges of pollution.

(3) To keep streets open to emergency vehicle traffic by reducing the flooding of streets.

(4) Require construction of drainage systems which aesthetically and functionally approximate natural systems.

(5) Establish the development and implementation of stormwater management districts.

(95-0093, art. I, § A(3), 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-116. Application and scope of article.

The application of this article and the provisions expressed herein shall be the minimum stormwater management requirements and shall

not be deemed a limitation or repeal of any other powers granted by state statute. In addition, if site characteristics indicate that complying with the minimum requirements of this article will not provide adequate designs or protection for local property or residents, the county may impose requirements greater than those set forth in this article. The director of the department of public works or his/her designee shall be responsible for the coordination and enforcement of the provisions of this article.

This article shall be applicable to all land development, including, but not limited to, site plan applications, subdivision applications, and grading applications, unless exempt pursuant to section 26-125 below. These standards apply to any new development or redevelopment site that meets one or more of the following criteria:

a. New development that involves the creation of 5,000 square feet or more of impervious cover, or that involves other

land development activities of one acre or more;

b. Redevelopment that includes the creation, addition or replacement of 5,000 square feet or more of impervious cover,

or that involves other land development activity of one acre or more;

c. Any new development or redevelopment, regardless of size, that is defined by the director to be a hotspot land use; or,

d. Land development activities that are smaller than the minimum applicability criteria set forth in items a. and b. above if such activities are part of a larger common plan of development, even though multiple, separate and distinct land development activities may take place at different times on different schedules.

(95-0093, art. I, § A(4), 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-117. Conflict with other laws.

Whenever the provisions of this article impose more restrictive standards than are required in or under any other ordinance, the regulations herein contained shall prevail. Whenever the provisions of any other law require more restrictive standards than are required herein, the requirements of such law shall prevail.

(95-0093, art. VII, § H, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-118. Severability.

If any term, requirement, or provision of this article or the application thereof shall, to any extent, be invalid or unenforceable, the remainder of this article or the application of such terms, requirements, and provisions shall not be affected

thereby and each term, requirement, or provision of this article shall be valid and be enforced to the fullest extent permitted by law.

(95-0093, art. VII, § I, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-119. Amendments.

This article may be amended in the manner as prescribed by law for its original adoption.

(95-0093, art. VII, § J, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-120. Liability of county.

Neither the approval of a plan under the provisions of this article nor the compliance with the provisions of this article shall relieve any person

from the responsibility for damage to any person or property otherwise imposed by law nor shall it impose any liability upon the county for damage to any person or property.

(95-0093, art. VII, § K, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-121. Other ordinances.

This article does not negate the following codes, laws, and ordinances or any other applicable ordinance:

(1) Erosion and sedimentation control ordinance of the county.

(2) Zoning resolution of the county including the floodplain management section.

(3) Rules for dam safety under the Environmental Protection Division by the State of Georgia Safe Dam Act of 1978 (O.C.G.A.

§ 12-5-370 et seq.). All other impounding structures (dams) criteria not covered by the Safe Dam Act (O.C.G.A. § 12-5-440 et seq.) shall be addressed in the Fulton County Comprehensive Stormwater Manual.

(4) MRPA, Metropolitan River Protection Act (O.C.G.A. § 12-5-440 et seq.).

(5) South Fulton Chattahoochee River Corridor (Georgia River and Mountain Protection Act).

(95-0093, art. VII, § L, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-122. Effective date.

This article shall take effect 60 calendar days after board of commissioners approval.

(95-0093, art. VII, § M, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-123. Scope of article; scope of responsibilities.

(a) Imposition of stormwater management measures. No person shall develop any land without having provided for stormwater management measures in compliance with this article, unless exempted under the terms of this article, particularly section 26-125.

(b) Geographic scope of measures. The provisions of this article shall apply throughout the unincorporated area of the county.

(95-0093, art. I, § C, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-124. Powers of the department of public works.

(a) The department of public works shall have the power to administer and enforce all regulations and procedures adopted to implement this article, including the right to maintain an action

or procedure in any court of competent jurisdiction to compel compliance with or restrain any violation of this article.

(b) The director of the department of public works or his/her designee shall be responsible for the coordination and enforcement of the provisions of this article. In addition, it shall be the duty of all officers and employees of the county,

especially members of the police department, sheriff's department and marshal's office, to assist the director in the course of his/her duties to enforce this article.

(c) The director of the department of public works or his/her designee shall be responsible for the conservation, management, maintenance (where applicable), extension, and improvement of the county separate storm sewer system, including activities necessary to control stormwater runoff and activities necessary to carry out

stormwater management programs included in county NPDES stormwater permit.

(d) The director of the department of public works or his/her designee shall develop, or cause to be developed and updated periodically, a stormwater management design manual for the guidance of persons preparing stormwater management plans, and designing or operating stormwater management systems.

(e) The director of the department of public works or his/her designee shall prepare or cause to be prepared and updated a stormwater management master plan.

(f) The director of public works shall interpret the provisions of this article and may use the opinions of the county attorney and others in arriving at interpretations. Appeals from an interpretation of the director shall be in accordance with the provisions of section 26-131.

(g) The director of public works or his/her designee shall:

(1) Administer, coordinate, and oversee acquisition, design, construction, and operation and maintenance of municipal/county

stormwater facilities and conveyances;

(2) Establish or oversee establishment of development standards and guidelines;

(3) Determine the manner in which stormwater facilities should be operated;

(4) Inspect private systems which discharge to the municipal/county separate storm sewer system;

(5) Advise the other departments on issues related to stormwater;

(6) Protect facilities and properties controlled by the county and prescribe how they are to be used by others;

(7) Require new, increased, or significantly changed stormwater contributions to comply with the terms of this article;

(8) Develop programs or procedures to control the discharge of pollutants into the municipal/county separate storm sewer

system;

(9) Adopt and implement the stormwater management program for county government.

(95-0093, art. I, § D, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-125. Exemptions from article requirements.

All development, construction or improvements that occur within the boundaries of the county shall be governed by the provisions of this

article and the county's Comprehensive Storm Drainage Design and Criteria Manual. The following activities are exempt:

(1) Individual single-family or duplex residential lots that are not part of a subdivision or phased development project.

(2) Additions or modifications to existing single-family or duplex detached residential structures.

(3) Developments that do not disturb more than 5,000 square feet of land area.

(4) Any maintenance or renovation of an existing structure or system not materially changing or affecting the rate or volume

of stormwater runoff, in the sole discretion of the director of the issuing department.

(5) Those exemptions spelled out in section 26-38, provided the activities listed do not contribute pollutants to the county's stormwater conveyance system and the state's waters, or do not increase the turbidity of stormwater runoff from the site due to erosion or land disturbing activity, or the activities listed are governed by other rules and regulations that are more restrictive than this article.

(6) Repairs to any stormwater management facility or practice deemed necessary by the director.

(7) Agricultural or silvicultural land management activities within areas zoned for these actives.

(95-0093, art. I, § E, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-126. Grandfather clause.

Any applicant or owner of a parcel of land within the jurisdiction of the county who has constructed the required stormwater management facility or BMP or who is in the process of meeting the stormwater management requirements of the law at the time of the effective date of this article, may elect to apply to the director

for reconsideration under the provisions of this article.

(95-0093, art. VII, § G, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-127. Stormwater Management Design and Criteria Manual.

(a) Through the passage of this article, the board of commissioners adopts the Fulton County Comprehensive Storm Drainage Design and Criteria Manual (the manual) and all the rules, regulations, and definitions contained therein.

This manual was developed to assist in the design and evaluation of stormwater management facilities and practices. The director of public works shall be responsible for the promulgation of the

manual and its contents. The manual shall be updated periodically to reflect the most current and effective practices, rules, and regulations, and shall be made available to the public.

(b) The following topics will be set forth in the Comprehensive Stormwater Management Design and Criteria Manual:

(1) Stormwater concept and management plan approval process;

(2) Stormwater quantity management facilities;

(3) Minimum runoff quality control requirements;

(4) Maintenance agreement for privately owned stormwater facilities; and

(5) All technical criteria and procedures related to stormwater quality and quantity.

(95-0093, art. I, § F, art. VII, § A, 3-15-95; Ord. No.

08-0194, 2-20-08) Sec. 26-128. Variances.

(a) The director of public works may grant a variance from the requirements of this article if there are hardships applicable to the site.

(b) A written request for a variance shall be required and shall state the specific variance sought and the reasons, with supporting data, for their granting.

(c) The director may grant a variance from requirements of this article if the proposed development activity:

(1) Does not change or increase the rate, velocity or volume of runoff significantly;

or

(2) Does not have a significant, negative impact on wetland, watercourse, or water body; or

(3) Does not contribute to degradation of downstream water quality or quantity; or

(4) If the construction of proposed improvements will create a safety, traffic or drainage hazard; or

(5) Are impractical to construct; or

(6) The grading, or construction of any of the facilities, related to the development activity that are needed to meet the requirements of this article and will have an adverse impact to an adjacent or downstream property owner.

(95-0093, art. VII, § B, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-129. Off-site drainage facilities.

Guidelines for consideration of off-site facility/ conveyance system use are defined in the Fulton County Comprehensive Stormwater Management Design and Criteria Manual and section 26-172 of this article.

(95-0093, art. VII, § C, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-130. Stormwater management districts.

Upon the recommendation of the director of the department of public works, the board of commissioners shall designate stormwater management districts throughout the unincorporated areas of

the county. It shall be the responsibility of the director of the department of public works to determine the boundaries of each stormwater district and shall use the stormwater management master plan as a guide.

(95-0093, art. VII, § D, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-131. Appeals.

(a) Any person aggrieved by a decision of the director of the issuing department, including any decision with reference to the granting or denial of a variance from the terms of this article, may appeal the same by filing a written notice of appeal with the director within 30 calendar days of the issuance of said decision by the director.

(b) All appeals shall be heard by the director or his/her designee who is hereby granted specific authority to hear and determine such appeals.

The hearing shall be held within 30 days after receipt of notice of appeal or a date mutually agreed upon in writing. The final decision of the director shall be based on published guidelines of appeals established by the county and amended from time to time.

(c) Any appeal of said final decision may be made to the superior court within 30 days from the date of the notice of a final decision. Said notice shall be sent registered mail to the permittee.

(95-0093, art. VII, § E, 3-15-95; Ord. No. 08-0194, 2-20-08) Secs. 26-132—26-165. Reserved.

DIVISION 2. STORMWATER DRAINAGE

MANAGEMENT, PLANNING AND

DEVELOPMENT REQUIREMENTS

Sec. 26-166. General requirements.

(a) Adequate drainage and control of stormwater are an integral and important part of any development. Proper drainage planning shall be considered an essential element of any stormwater concept plan or stormwater management plan

submitted to the county. The design and construction of a site shall also follow the rules and regulations found in article XXXIV of Z.R.F.C.

and section 26-39 of this Code.

(b) At the time of the initial submittal to the county with an application for a preliminary plat, every sub-divider or developer shall, at his/her sole expense, be required to submit to the stormwater management section of the department of public works, a stormwater concept plan for review and approval. At the time of the site

visit, it shall be determined if drainage studies and reports, design computations, and such other information need to be required to ensure that stormwater originating both from the proposed subdivision or development and lands lying upgradient will be adequately drained and controlled in order to approve the stormwater concept plan. The stormwater concept plan shall be a preliminary drawing of the proposed location of

storage facilities, stormwater discharge path of detention/retention pond(s), other downstream and upstream constraints and other matters with potential stormwater implications. Such plans and supplementary information shall be consistent with the requirements of this article, the Z.R.F.C., and the Comprehensive Stormwater Management Design and Criteria Manual.

(c) Upon approval of the stormwater concept plan and prior to the issuance of any building or land disturbance permits, the subdivider shall, at his/her sole expense, prepare and submit for review and approval by the development services department a stormwater management plan. The

stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this article, including the performance criteria set forth below. This plan shall be in accordance with the criteria

established in this section and be prepared under the direct supervisory control of either a registered professional engineer or a registered landscape architect licensed in the State of Georgia.

Subsections (3), (4), (5) and (6) shall be prepared under the direct supervisory control of a registered professional engineer, who shall seal and sign the work. Portions of the overall plan may be

prepared and stamped by a registered land surveyor licensed in the State of Georgia as appropriate, such as boundary surveys, contour maps, erosion and sedimentation control plans. The

stormwater management plan must ensure that the requirements and criteria in this article are being complied with and that opportunities are being taken to minimize adverse post-development stormwater runoff impacts from the development. The plan shall consist of maps, narrative, and supporting design calculations (hydrologic

and hydraulic) for the proposed stormwater management system. The plan shall include all of the information required in the stormwater management site plan checklist found in the stormwater design and criteria manual. This includes:

(1) Common address and legal description of site.

(2) Vicinity map.

(3) Existing conditions hydrologic analysis.

The existing condition hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of existing site conditions with the drainage basin boundaries indicated; acreage, soil types and land cover of areas for each subbasin affected by the

project; all perennial and intermittent streams and other surface water features;

all existing stormwater conveyances and structural control facilities; direction of flow and exits from the site; analysis of runoff provided by off-site areas upstream of the project site; and methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. For

redevelopment sites, predevelopment conditions shall be modeled using the established guidelines for the portion of the site undergoing land development activities.

(4) Post-development hydrologic analysis. The post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of developed site conditions with the post-development drainage basin boundaries indicated; total area of post-development impervious surfaces and

other land cover areas for each subbasin affected by the project; calculations for determining the runoff volumes that need to be addressed for each subbasin for the development project to meet the postdevelopment stormwater management performance criteria in section 26-173; location and boundaries of proposed natural feature protection and conservation areas; documentation and calculations for any applicable site design credits that are

being utilized; methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. If the

land development activity on a redevelopment site constitutes more than 50 percent of the site area for the entire site, then the performance criteria in Section

26-173 must be met for the stormwater runoff from the entire site.

(5) Stormwater management system. The description, scaled drawings and design calculations for the proposed post-development stormwater management system, which shall include: a map and/or drawing or sketch of the stormwater management facilities, including the location of non-structural site design features and

the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; a narrative describing how the selected structural stormwater controls will be appropriate

and effective; cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria; a hydrologic and hydraulic analysis of the

stormwater management system for all applicable design storms (including stagestorage or outlet rating curves, and inflow and outflow hydrographs); documentation

and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management performance criteria in section 26-173; drawings, design calculations, elevations and hydraulic grade

lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas

of overland flow; and where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans and/or local greenspace protection plan.

(6) Post-development downstream analysis.

A downstream peak flow analysis which includes the assumptions, results and supporting calculations to show safe passage of post-development design flows downstream. The analysis of downstream conditions in the report shall address each and every point or area along the project

site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is

10 percent of the total basin area. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes. The analysis shall be in accordance with the stormwater design manual.

(7) Construction-phase erosion and sedimentation control plan. An erosion and sedimentation control plan in accordance with the Georgia Erosion and Sedimentation

Control Act (or reference to the local erosion and sedimentation control ordinance) or NPDES permit for construction activities. The plan shall also include information on the sequence/phasing of construction and temporary stabilization measures and temporary structures that will be

converted into permanent stormwater controls.

(8) Landscaping and open space plan. A detailed landscaping and vegetation plan describing the woody and herbaceous vegetation that will be used within and adjacent to stormwater management facilities and practices. The landscaping plan must

also include: the arrangement of planted areas, natural and greenspace areas and other landscaped features on the site plan;

information necessary to construct the landscaping elements shown on the plan drawings; descriptions and standards for the methods, materials and vegetation that are to be used in the construction;

density of plantings; descriptions of the stabilization and management techniques used to establish vegetation; and a description of who will be responsible for ongoing maintenance of vegetation for the

stormwater management facility and what practices will be employed to ensure that adequate vegetative cover is preserved.

(9) Operations and maintenance plan. Detailed description of ongoing operations and maintenance procedures for

stormwater management facilities and practices to ensure their continued function as designed and constructed or preserved. These plans will identify the parts or components of a stormwater management facility or practice that need to be regularly or periodically inspected and

maintained, and the equipment and skills or training necessary. The plan shall include an inspection and maintenance schedule, maintenance tasks, responsible

parties for maintenance, funding, access and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan.

(10) Maintenance access easements. The applicant must ensure access from public right-of-way to stormwater management

facilities and practices requiring regular maintenance at the site for the purpose of inspection and repair by securing all the maintenance access easements needed on a permanent basis. Such access shall be sufficient for all necessary equipment for maintenance activities. Upon final inspection and approval, a plat or document indicating that such easements exist shall

be recorded and shall remain in effect even with the transfer of title of the property.

(11) Inspection and maintenance agreements.

The applicant must execute an easement and an inspection and maintenance agreement binding on all subsequent owners of land served by an on-site stormwater management facility or practice.

(12) Evidence of acquisition of applicable local and non-local permits. The applicant shall certify and provide documentation to the county that all other applicable environmental permits have been acquired for the site prior to approval of the stormwater

management plan.

(d) The stormwater management plan shall conform to the stormwater concept plan for said development. Such plans and supplementary information shall be consistent with the requirements of this article, the Z.R.F.C., and the Comprehensive Stormwater Management Design and Criteria Manual.

(e) A developer and his/her professionals should discharge the drainage from their site into a storm conveyance system that is publicly owned and maintained. Every subdivider shall provide, at no cost to the county, an easement up to a maximum width as is necessary to accommodate drainage from a 100-year storm for the purpose of constructing and maintaining the drainage system for the transmission, through the subdivider's property, of all stormwater generated upstream from the subdivision. Notwithstanding

this requirement, any natural drainageway which traverses any sub-divider's property or adjacent properties, shall not be encroached upon or altered so as to render the same less suitable to accept and transport stormwater that has historically flowed through such drainageway. Should a subdivider fail to obtain an off-site easement for

the purpose of drainage conveyance, then the design discharge at the outlet facilities of the subdivision shall be limited to the pre-developed conditions for all storm events, including the discharges and velocities, whichever is more restrictive shall apply.

(f) Site visit. Prior to the submittal of a land disturbance permit, or in connection to the stormwater concept plan, the developer/engineer must contact the department of public works stormwater management section to arrange an onsite evaluation visit. By way of example and not limitation, the visit should include an evaluation of the location of storage facilities, stormwater discharge path of detention/retention ponds, other downstream and upstream constraints and other matters with potential stormwater implications.

(g) It shall be the responsibility of the developer to demonstrate that the development and/or stormwater conveyance facilities will not cause a

violation of local, state, and federal laws or regulations to occur at the time of the application for a land disturbance permit. Evidence that the applicant has complied with requirements to obtain other state and federal permits which may be

applicable, such as, but not limited to wetlands

(404) permit, NPDES permit, and Metropolitan River Protection Act, must also be supplied to the county as part of the stormwater management plan and study.

(h) It shall be the responsibility of the developer/ engineer to accurately depict the conditions of the site, both onsite and off-site, on the plans submitted to the county that are affected by this article.

Any modifications, changes, or construction that occur to the plans or in the field, as a result of having to conform to the county's Storm Drainage Criteria Manual or other criteria found in this article, and the cost to rectify shall be borne entirely by the developer.

(95-0093, art. II, § A, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-167. Specific requirements.

(a) Prior to the issuance of a land disturbance permit by the development services department the following must be in effect:

(1) Documentation that authorizes the right of entry by the county for emergency maintenance of stormwater management facilities.

(2) Documentation that authorizes the right of entry by the county for the purpose of inspecting the stormwater management facilities.

(3) Any off-site easements necessary to effectuate subsections (a)(1) and (a)(2) of this section (easements must be recorded), or

to implement the stormwater management plan.

(4) Written authorization from an adjacent property owner allowing any proposed off-site grading, construction, storage, or other improvements to their property.

(5) An approved stormwater concept plan or stormwater management plan, as adjudged appropriate in the discretion of the director of the department of public works

or his/her designee.

(b) In accordance with section 24.1 of the Z.R.F.C. and with sections 26-40 and 2642 of this chapter, all applications for building permits, and the accompanying plot plan, shall correspond with the approved grading plan or the approved stormwater management plan on file with the county. The issuing authority may require spot elevations, flow direction arrows, contour lines, or other information that it deems necessary prior to the issuance of the building permit to ensure compliance to the approved grading plan or the approved stormwater management plan.

(c) Prior to the issuance of a certificate of occupancy by the county, all stormwater management facilities required as part of the stormwater management plan shall be completed and approved by the county.

(d) Prior to the issuance of the certificate of occupancy by the appropriate department, the following must be submitted to the county:

(1) Recorded easements for stormwater management facilities.

(2) Receipt by the county of an as-built/record drawing of the stormwater management facilities that is signed and sealed by a registered engineer. Discrepancies between the record drawing and the approved stormwater management plan must be identified to the county, and the county

shall give its approval to any discrepancies prior to the issuance of the certificate of occupancy.

(e) Any and all land disturbance permits may be revoked at any time if the construction of the site or the stormwater management facilities are not in strict accordance with the approved stormwater management plans or other sections of this article.

(f) It shall be the responsibility of the person, firm, corporation, or other entity to maintain the drainage patterns and the stormwater management facilities that are in existence at the time of the issuance of the certificate of occupancy. They,

their heirs, or assigns are prohibited from performing any improvements or regrading of the site, that in any way block, alter, or redirect the

existing drainage patterns or facilities, except for the occasional maintenance to facilities to keep them operating as originally designed. Conviction by a person, firm, corporation, or other entity for violating this section shall be a misdemeanor and shall be subject to the penalties found in section 26-113.

(95-0093, art. II, § B, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-168. Development in flood hazard area.

Should a subdivider or owner wish to develop within a flood hazard area, then the subdivider or owner shall prepare, at his/her sole expense, an engineering study and supporting information per section 4.24 of the zoning resolution of the county and follow all the other criteria, rules and regulations that are indicated therein. Per section 4.24.9F of the Z.R.F.C., any revisions or amendments to the FEMA FIRM maps required shall be completed prior to the county's issuance of a

certificate of occupancy.

(Ord. No. 08-0194, 2-20-08) Sec. 26-169. Drainage system connection.

Permission is required from the county to connect to or discharge into any drainage system, conveyance system, or watercourse within the

county. Permission shall be implied as part of an approved stormwater management plan from the county. Deviations from the approved stormwater management plan, that do not have the permission of the county, shall be deemed an illicit connection and in violation of division 6 of this

article, and shall prohibit the county from issuing a certificate of occupancy or recording of the final plat, even if the deviations result from mistakes to or omissions from the stormwater management plan or changes that occur in the field.

(95-0093, art. II, § D, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-170. Permit suspension and revocation.

(a) A land disturbance, building or grading permit, or any type of certificate of occupancy may be suspended or revoked by the issuing department if one or more of the following occurs:

(1) Violations of the conditions of the stormwater management plan approval;

(2) Construction not in accordance with the approved plans;

(3) Noncompliance with correction notices or stop work orders; or

(4) The existence of an immediate danger in the judgment of the director of the department of public works or his/her designee.

(b) If one or more of these conditions are found, a written notice of violation from the issuing department shall be served upon the owner or authorized representative and an immediate stop work order may be issued. The notice shall set forth the measures necessary to achieve compliance with the plan. Correction of these violations must be initiated within seven days of the notice,

or the owner shall be deemed in violation of this article and subject to penalties for the said violation.

(95-0093, art. II, § E, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-171. Professional registration requirements.

(a) All stormwater concept and stormwater management plans and design reports shall be prepared, certified, and stamped/sealed by a qualified registered Georgia professional engineer, using acceptable engineering standards and practices.

(b) The engineer shall undertake to perform services only in areas of his/her competence, and only when qualified by education and/or experience in the specific technical field. In addition, the engineer must certify that the plans have been

designed in accordance with the standards and criteria stated or referred to in this article.

(95-0093, art. II, § F, 3-15-95; Ord. No. 08-0194, 2-20-08) Sec. 26-172. Modifications for off-site facilities.

The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and

there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In

addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility.

A stormwater management plan must be submitted to the county which shows the adequacy of the off-site or regional facility.

To be eligible for a modification, the applicant must demonstrate to the satisfaction of the county that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas:

(1) Increased threat of flood damage to public health, life, and property;

(2) Deterioration of existing culverts, bridges, dams, and other structures;

(3) Accelerated streambank or streambed erosion or siltation;

(4) Degradation of in-stream biological functions or habitat; or

(5) Water quality impairment in violation of State water quality standards, and/or violation of any state or federal regulations.

(Ord. No. 08-0194, 2-20-08) Sec. 26-173. Post-development stormwater management performance criteria.

The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this article:

(1) Water quality. All stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if:

a. It is sized to treat the prescribed water quality treatment volume from the site, as defined in the Georgia Stormwater Management Manual;

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:fulton-county/code/whole@2026-08-05-d6b7da632d

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.