Fulton County · Código de ordenanzas
Fulton County Code of Ordinances
Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.
Sobre este texto
- As published by Municode, current through 2026-08-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
Este texto se leyó por OCR de una página escaneada: una letra, un nombre o un número pueden estar mal leídos.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Parte 8 de 14. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.
(b) Construction and maintenance of the transmission and distribution system shall be in accordance with the provisions of the National Electrical Safety Code, prepared by the National Bureau of Standards, the National Electrical Code and
the National Board of Fire Underwriters, and any applicable resolutions and regulations of Fulton County affecting electrical installations, which may be presently in effect, or changed by future resolutions.
(c) All installations of equipment shall be of permanent nature, durable, and installed in accordance with good engineering practices, and of sufficient height to comply with all existing county
regulations, resolutions, and state laws so as not to interfere in any manner with the right of the public or individual property owner, and shall not interfere with the travel and use of public places by the public and during the construction, repair, or removal thereof, shall not obstruct or impede traffic. Further, said construction shall be subject to inspection by the county.
( d) No poles are to be erected upon the public streets, alleys, avenues, and grounds, and no excavation of any type shall be done or caused to be done upon the public streets, alleys, avenues, and grounds unless permission in writing is first obtained from the county.
(e) If any of grantees' cables or wires are installed on existing aboveground systems which are placed underground at any future date, at no expense to the county, the grantee shall likewise place their cables or wires underground.
(f) In the event that a change is made in the grade, width, or location of public streets, alleys, avenues, and grounds by authority of the county, which shall necessitate the removal of any poles, wires, and transmission and distribution lines to conform to the change of grade, the grantee shall make the necessary changes in their lines, at their own expense, upon due notice from the county.
(g) In the maintenance and operation of their television transmission and distribution system in the streets, alleys, and other public places, and in the course of any new construction or addition to their facilities, the grantees shall proceed so as to cause the least possible inconvenience to the general public; any opening or obstruction in the streets or other public places made by grantees in the course of their operations shall be made only after having obtained prior written permission from the county to do so, and shall be guarded and protected at all times by the placement of adequate barriers, fences, or boardings, the bounds of which, during periods of dusk and darkness, shall
be clearly designated by red warning lights.
(h) All work in any way necessitated by the business of grantees which may involve the opening, breaking up, or tearing up of a portion of a street, sidewalk, or other part of any countyowned or county-controlled property, shall be done and repaired in a manner approved by the county,
and shall, at the option of the county, be done by the county, and the county shall be reimbursed by the grantee for the reasonable costs of the work.
Nothing herein shall be construed as a requirement that the county conduct an excavation or repair on behalf of or as agents for grantees.
(i) Grantees shall, at their expense, protect, support, temporarily disconnect, relocate on the same street, alley, or public place, or remove from the street, alley, or public place, any property of grantees when required by the county by reason of traffic conditions, public safety, street excavation, freeway and bridge construction, change of establishments of street grade, installation of
sewers, drains, water pipes, power lines, signal lines, and tracks or any other types of structures or improvements by governmental agencies when acting in a governmental or proprietary capacity, or other structures of public improvement; provided, however, that grantees shall in all such cases have the privileges and be subject to the
obligations to abandon any property of grantees in place as provided in section 76-49 hereof.
(j) Where located within the right-of-way of public streets, highways, alleys or other thoroughfares, the grantee's towers, poles, wires, and appurtenances shall be placed at such location within the right-of-way as is designated from time to
time by the county planning and community development department.
(k) No work within the right-of-way shall be commenced until a permit to perform the work shall have been applied for and granted by the planning and community development department of the county. Requests for permits to work upon the road rights-of-way must be filed with
said department not less than 24 hours prior to the time that the work is scheduled to commence.
Applications for permits to perform work within a street right-of-way must be filed in the name of the grantee, who shall at all times be responsible for the proper performance of the work that is scheduled. The application shall be upon such form as is customarily used or accepted by the county with respect to public utilities seeking permission to work within a street right-of-way.
The application shall be accompanied by maps, prints, or drawings showing the nature of the work to be done, the location of the work, the anticipated beginning and ending dates of the work, the location of all public utilities and improvements within the right-of-way involved, and how the same will be affected by the grantee's
proposed work, a general description of the proposed work, and such other information as the planning and community development department reasonably deems necessary before the granting of the requested permit.
(1) When performing any work within or adjacent to any public right-of-way, a grantee shall take all reasonable precautions to protect the
public, and erect such warning devices as shall be reasonably calculated to apprise the public of the presence of the work and the activities being undertaken.
(m) The granting of any permit to a grantee to perform work within or adjacent to public rightof-way shall not in any instance constitute an acceptance by the county of any responsibility for
the activities of a grantee.
(Code 1983, § 33-4-12) Sec. 76-43. Joint use of poles to be granted county.
Grantees shall grant to the county, free of expense, joint use of any and all poles owned by them for any proper municipal purpose, insofar as it may be done without interfering with the free use and enjoyment of the grantees' own wires and fixtures. Proper regard shall be given to all existing safety rules covering construction and maintenance in effect at the time of construction. If, in accommodating the county's joint use of their
poles, grantees are required to change or replace poles or install new poles, the county shall compensate grantees for such additional expense.
(Code 1983, § 33-4-13) Sec. 76-44. Insurance required by grantees.
(a) Grantees shall, at all times, keep in effect the following types of insurance coverage:
(1) Workmen's compensation upon their employees engaged in any manner in the management, operation, installation, or
servicing of their plant and equipment within the county.
(2) Property damage liability insurance to the extent of $300,000.00 as to any one person and $500,000.00 as to any one accident, and personal injury liability insurance to the extent of$500,000.00 as to any one person and $1,000,000.00 as to
any one accident.
(b) Through the foregoing contracts, the grantee shall indemnify and hold harmless the county, its officers, boards, commissions, agents, and employees, against and from any and all claims, demands, causes of actions, actions, suits, proceedings, damages (including, but not limited to, damages to county property and damages arising
out of copyright infringements, and damages arising out of any failure by the grantee to secure consents from the owners, authorized distributors, or licensees of programs to be delivered by the grantee's CATV system), costs or liabilities
(including costs or liabilities of the county with respect to its employees), of every kind and nature whatsoever including, but not limited to, damages for injury or death or damage to person
or property, and against all liability to others, and against any loss, cost, and expense resulting or arising out of any of the same, including any attorney fees, accountant fees, expert witness or consultant fees, court costs, per diem expense, traveling and transportation expense, or other costs or expense arising out of or pertaining to the exercise or the enjoyment of any franchise granted hereunder. Provided that the grantee shall not be liable for any damages, fees or expenses where any lawsuit is based on the actions or omissions of the county but not on any act or omission by the grantee.
(c) All of the foregoing insurance contracts shall be in a form satisfactory to the county, as determined by the county manager, and shall be issued and maintained by companies authorized to do business in the State of Georgia, and they shall require 30 days' written notice of any cancellation to both the county and a grantee herein, and a copy of the policy shall be filed with the
county manager.
(Code 1983, § 33-4-14) Sec. 76-45. Gross receipts payments required.
(a) Each grantee shall pay the franchise fee hereinafter set forth, in addition to the filing fee.
For the rights granted hereunder, the grantee shall pay to the county at the time hereinafter specified and subject to the terms of section 76-51 hereof, a franchise fee equal to four percent of the monthly total gross revenues of its cable television system. Gross revenues shall mean any and all compensation and other consideration derived
directly and indirectly by the grantee or its subsidiaries from subscribers in the unincorporated areas of Fulton County for regularly furnished
basic cable television service, installation fees, and pay programming services. This payment by the grantee to the county shall be in lieu of any applicable occupation tax, license tax, or other similar levy, and shall be paid monthly. Nothing herein contained, however, shall in any way relieve the grantee or their assigns or successors from the obligation of paying any property taxes
to Fulton County or any other governmental subdivision of the State of Georgia or any other taxes lawfully levied by the State of Georgia on the operation of grantees.
(b) Grantees shall file with the county manager, within 90 days after the expiration of any calendar year during the term of the rights granted
hereunder, a statement prepared by a certified public accountant showing the gross revenues as defined herein. It shall be the duty of the grantees to pay to the county within 15 days after the time for filing these statements, any unpaid balance for the calendar year covered by the statement. In any year or portions thereof, during which payments under this section amount to less than $200.00 per month, the grantees shall pay the
county the minimum amount of$200.00 per month, the payments to commence immediately upon the adoption and approval of this article and the grant of a franchise hereunder.
(Code 1983, § 33-4-15) Sec. 76-46. Sale, assignment or transfer of rights granted to grantees.
Any sale, assignment, or transfer of the rights hereunder shall be made only with the prior consent of the board of commissioners, which consent shall not be unreasonably withheld. The proposed transferee or assignee must show financial responsibility to the satisfaction of the board of commissioners and must agree to comply with
all the provisions of this article, and provided, further, that no consent shall be required for a transfer by trust deed, deed to secure debt, or other hypothecation as a whole, to secure an indebtedness.
(Code 1983, § 33-4-16) Sec. 76-47. Grantees subject to resolutions, rules, regulations and specifications, regulating street work.
Grantees are subject to all requirements of the county resolutions, rules, regulations, and specifications including, but not limited to, those concerning street work, street excavation, use, removal and relocation of property within a street, and other street work.
(Code 1983, § 33-4-17) Sec. 76-48. Rights reserved to county.
There is hereby reserved to the county every right and power which is required to be herein reserved or provided by any state statute or resolution of the county, and grantees, by their acceptance of the rights granted hereunder, agree to be bound thereby, and to comply with any action or requirement of the county in its exercise of any right or power. Further, the rights granted hereunder shall not preclude the county from granting to any other person a right to provide similar services in the unincorporated areas of the county.
(Code 1983, § 33-4-18) Sec. 76-49. Abandonment of property by grantees.
(a) In the event that the use of any part of the system should cease for any reason for a continuous period of 12 months, or in the event the system or property has been installed in any
street or public place without complying with the requirements ofthis article, or the rights granted hereunder have been terminated, cancelled, or have expired, grantees shall promptly remove from the streets and public places all property and poles of the system, other than any which the county may permit to be abandoned in place. In the event of this removal, grantees shall promptly restore the street or other area from which the property has been removed to a condition satisfactory to the county.
(b) Any property of grantees to be abandoned in place shall be abandoned in such manner as the county may prescribe. Upon permanent abandonment of the property of grantees in place, grantees shall submit to the county an instrument to be approved by the county, transferring to the county the ownership of the property.
(Code 1983, § 33-4-19) Sec. 76-50. Failure of grantee to complete required street work.
Upon failure of grantees to complete any work required by law or by the provisions of this article to be done in any street, within the time prescribed, and to the satisfaction of the county, the county may cause this work to be done, and
grantees shall pay the county the cost thereof in the itemized amount reported to grantees within 30 days after receipt of the itemized report.
(Code 1983, § 33-4-20) Sec. 76-51. Term and rates.
The terin for which each franchise is granted as provided herein shall be for a period of 15 years. A grantee may file an application for a renewal of a franchise at the end of the initial 15-year term and at the end of any subsequent renewal of the franchise as provided herein. A grantee shall not be required to submit a $10,000.00 filing fee with its application for renewal of a franchise. Upon receiving an application for renewal, the board of commissioners shall consider a grantee's legal, technical, character, financial, and public interest qualities in light of the grantee's past performance under its franchise. The application for renewal shall be granted by the county if the
county determines that the grantee is satisfying the obligations imposed upon it by the terms and conditions of this article and is otherwise in compliance with all applicable rules and regulations of the Federal Communications Commission. The renewal shall be for an additional tenyear period.
(Code 1983, § 33-4-21(a)) Sec. 76-52. Performance bond and deposit.
Upon being granted a franchise, the grantee shall file with the county manager, and shall, thereafter, annually, during the period of the franchise, maintain in full force and effect a corporate performance bond running in favor of the county, written by an approved corporate surety, in a sum no less than the highest monthly franchise fee paid by the grantee to the county in the preceding calendar year, plus ten percent thereof, or $25,000.00, whichever is greater. The amount of the bond shall be recoverable from the principal and sureties thereof for all damages resulting from the failure of the grantee to make any payment of all fees or amounts required herein to be paid to the county.
(Code 1983, § 33-4-22) Sec. 76-53. Installation deadline.
(a) The grantee, within two years from the date of the receipt of all necessary permits and authorizations which are required in the conduct of its business including, but not limited to, microwave carrier licenses and any other permits, licenses, and authorizations to be granted by duly
constituted regulatory agencies having jurisdiction over the operation of CATV systems or their associated microwave transmission facilities, shall
extend its energized trunk cable to the entire residential area within the county; provided, however, that in any event, energized trunk cable shall be extended to the entire residential area
within 30 months of the grant of a franchise.
Residential area shall mean that contiguous area within the unincorporated area in North Fulton County and that contiguous area within the unincorporated area of South Fulton County delineated on a map on file with the county manager on the date on which a franchise is granted.
(b) The following line extension provisions shall apply to the parts of unincorporated area of the county which are not within the residential area as herein defined:
(1) Each year the county manager shall designate those areas adjacent to the residential area with at least 50 homes per mile of public way or easement as additions to
the residential area, and the map on file with the county manager shall be revised to reflect these additions. The grantee shall extend its energized trunk cable to all these additional areas within one year of the completion of the initial system.
Thereafter, the grantee shall extend its energized trunk cable to all additional areas within one year of their designation as part of the residential area.
(2) The grantee, whenever it receives a request for aboveground service from at least eight subscribers within 1,320 feet
of its trunk cable, or for underground service from at least 12 subscribers within 1,320 feet of its trunk cable, shall extend its system to these subscribers, provided that the extension is technically and physically feasible. The 1,320 feet shall be measured in extension length of the
grantee's trunk cable required for service located within the public way or easement and shall not include length of necessary drop cable to any individual subscriber.
(3) Service shall be provided to any other person or persons within the unincorporated areas of Fulton County if requested upon payment to the grantee by the person or persons of the costs of extension including, without limitation, costs of material, labor, and easements.
(c) In the event that in any area of the county more than 150 feet of drop cable is necessary to connect a subscriber's home to the trunk cable, the grantee may charge the subscriber the actual cost of this extension over 150 feet.
(d) In the event more than one franchise is granted covering the same area, and if the franchisees commence the installation of their lines within the same area, no franchisee shall be
required to extend its lines down a street or road where another franchisee has already extended its lines.
(Code 1983, § 33-4-23) Sec. 76-54. Force and effect of article.
If any section, sentence, clause, or phrase of this article is for any reason held illegal, invalid, unconstitutional, or void, all other sections thereof not so held shall be and remain in full force and effect.
(Code 1983, § 33-4-24) Sec. 76-55. Limitations on rights, privileges, or exemptions granted.
No privilege, right, or exemption shall be granted or conferred under this article except those specifically prescribed herein.
(Code 1983, § 33-4-25) Sec. 76-56. Foreclosure or other judicial sale.
(a) Upon the foreclosure or other judicial sale of all or a substantial part of the system located in the unincorporated areas of Fulton County, or upon the termination of any lease covering all or a substantial part of the system, the grantee shall notify the county manager of this fact, and this notification shall be treated as a notification that a change in control of the grantee has taken place, and the provisions of section 76-46 hereof, governing the consent of the county to transfer the system, shall apply.
(b) The county shall have the right to cancel this franchise 120 days after the appointment of a receiver, or trustee, to take over and conduct the business of the grantee, whether in receivership, reorganization, bankruptcy; or other action or proceeding, unless the receivership or trusteeship shall have been vacated prior to the expiration of the 120 days, or unless:
(1) Within 120 days after his election or appointment, the receiver or trustee shall have fully complied with all the provisions of this article and remedied all defaults thereunder; and,
(2) The receiver or trustee, within 120 days, shall have executed an agreement, duly approved by the court having jurisdiction in the premises, whereby the receiver or trustee assumes and agrees to be bound by each and every provision of this article and the franchise granted to the grantee.
(Code 1983, § 33-4-26) Sec. 76-57. Cancellation of franchise.
(a) In addition to any other provision for the cancellation of a franchise set out herein, the county may terminate a franchise in the event of the willful failure, refusal, or neglect by the grantee to do or comply with any material requirement or limitation contained herein, or any material rule or regulation of the board of commissioners or county manager subject to the procedures set forth in this section.
(b) The county manager may make written demand that the grantee do or comply with any requirement, limitation, term, condition, rule, or regulation. If the failure, refusal, or neglect of the grantee continues for a period of 30 days following the written demand, the county manager may place his request for termination of the franchise upon the next regular meeting agenda of the board of commissioners. The county manager shall cause to be served upon the grantee at least ten days prior to the date of the meeting of the board of commissioners, a written notice of his intent to request termination, and the time and place of the meeting, notice of which shall be published by the county clerk at least once ten days before the meeting in a newspaper of general circulation within the county.
(c) The board of commissioners shall consider the request of the county manager and shall hear any persons interested therein, and shall determine, in its discretion, whether or not any failure, refusal, or neglect by the grantee was with just
cause.
(d) If the failure, refusal, or neglect by the grantee was with just cause, the board of commissioners shall direct the grantee to comply within such time and manner and upon any terms and
conditions as are reasonable.
(e) If the board of commissioners shall determine the failure, refusal, or neglect by the grantee without just cause, then the board of commissioners may, by resolution, declare that the franchise of the grantee shall be terminated and forfeited
unless there be compliance by the grantee within any period as the board of commissioners may fix.
(f) The termination and forfeiture of any franchise shall in no way affect any of the rights of the county under the franchise or any provision of
law.
(Code 1983, § 33-4-27) Sec. 76-58. Purchase of system upon cancellation, termination, or expiration of franchise.
(a) Upon the cancellation, termination, or expiration of a franchise, the county shall have the right to purchase the CATV system in the unincorporated areas of Fulton County in accordance with subsection (b) of this section and the county
may direct the grantee to cease operation of the CATV system. If the county elects to purchase the CATV system, the grantee shall promptly execute all appropriate documents to transfer title to the county, and shall assign all other contracts, leases, licenses, permits, and any other rights necessary to maintain continuity of service to the public.
The grantee shall cooperate with the county or with another person, partnership, corporation, or other legal entity authorized or directed by the county to operate the CATV system for a temporary period in maintaining continuity of service.
Nothing herein is intended as a waiver of any other rights the county may have.
(b) If a franchise:
(1) Is cancelled or terminated by the county as provided for in this article, the purchase price to the county for the CATV system shall be its then book value (i.e.,
cost less accumulated depreciation) according to generally accepted accounting principles with a reduction for any damages incurred by the county in connection with
the cancellation. The book value, if not agreed upon, shall be determined by arbitration pursuant to section 76-59 of this article, but shall not include any valuation based upon the franchise. Damages incurred by the county shall include, withCD76:13
out limitation, any payments made by the county to another person, partnership, corporation, or other legal entity, for the operation of the system for a temporary period until a franchise is granted.
(2) Terminates by expiration of its terms, the purchase price to the county for the CATV system shall be its then fair market value of the CATV system as of the date of expiration of the term of its franchise. The fair market value shall be the fair market value of all tangible and intangible property forming part of the CATV system, but shall not include any valuation based upon
the franchise. The fair market value, if not agreed upon, shall be determined by arbitration pursuant to section 76-59 hereof.
(c) Upon cancellation, termination, or expiration of a franchise, the county may direct the grantee to operate the CATV system for the
account of the county for a period of six months.
The county shall pay the grantee all reasonable and necessary costs incurred by it for the operation of the CATV system during this period.
(Code 1983, § 33-4-28) Sec. 76-59. Arbitration.
Matters which are expressly made arbitrable under provisions of this article shall be determined by a panel of three arbitrators. One arbitrator shall be appointed by the county, one by the Grantee, and the third by the presiding Judge of
the Superior Court of Fulton County, Georgia.
The fees of the arbitrators shall be fixed by the presiding judge. The expenses of the arbitration, including the fees of the arbitrators, shall be borne by the parties in any manner as the arbitrators may provide in their award, but in no event shall the county be obligated for more than
one-half of the expenses. The determination of a majority of the arbitrators shall be binding on the parties.
(Code 1983, § 33-4-29) Sec. 76-60. Renegotiation.
(a) Upon written notice given by the county or grantee, one to the other, not less than six months prior to the fifth and tenth anniversaries of the date of execution of a franchise agreement, the terms and conditions of the franchise agreement may be modified, provided that both the county and the grantee are agreeable to the modification.
Modification shall be directed toward effecting alterations in the terms and conditions to reflect those technical and economic changes which have occurred during the interim period.
(b) Any changes in the franchise agreement necessitated by modification to the Federal Communications Commission regulations shall be incorporated into the franchise agreement within the time limit provided for in the rules and
regulations of the Federal Communications Commission then in force and effect.
(Code 1983, § 33-4-30) Sec. 76-61. Emergency alert.
The system shall include an emergency alert capability which will permit the board of commissioners or its designee to override, by remote control, the video and/or audio of all channels
simultaneously except those involved in retransmission of television broadcast programming in the case of public emergencies.
(Code 1983, § 33-4-31) Sec. 76-62. Minority business enterprise objectives.
(a) By previous resolution and order, the board of commissioners has established as county policY, the objective that a minimum of 20 percent of county public contracts be awarded to bidders of established minorities in order to correct a serious underutilization of such firms in county contracting and purchasing activities. 'To assist this effort the grantee shall adopt the objective whereby
a minimum of 20 percent of its purchasing/ contracting activity to fulfill the terms of this franchise shall be with firms owned by members of an established minority.
(b) An established minority shall mean any group of people historically disadvantaged, and thereby hindered from free participation in economic activity, due to discrimination based on race, religion, color, sex, or national origin.
(c) The grantees compliance with this provision shall be evaluated by an annual report to the board of commissioners at the close of each
operational year of the grantee. However, the first such report covering the grantees actions from the start of this franchise shall be made 60 days after enactment of this article.
(Code 1983, § 33-4-32) Sec. 76-63. Basic service rates and charges.
(a) The county will follow the FCC rate regulations in its regulation of the basic service rates and charges of the companies and any other
cable television system operating in the county, notwithstanding any different or inconsistent provisions in the franchises.
(b) In connection with such regulations, the county will ensure a reasonable opportunity for consideration of the views of interested parties.
(c) The county manager, or his designee, is authorized to execute on behalf of the county and file with the FCC such certification forms or other instruments as are now or may hereafter be required by the FCC rate regulations in order to enable the county to regulate basic service rates and charges.
(93-RC-426, §§ 1—3, 8-18-93) Secs. 76-64—76-85. Reserved.
ARTICLE III. WIRELESS
TELECOMMUNICATIONS*
Sec. 76-86. Wireless enhanced 9-1-1 charge.
(a) Unless specified otherwise in this resolution, all terms shall be defined in the same manner as specified in O.C.G.A. § 46-5-122.
(b) Pursuant to O.C.G.A. § 46-5-133(a), there is imposed a monthly 9-1-1 charge upon each telephone service, subscribed to by a telephone subscriber, whose exchange access lines are in the areas served or which could be served by the 9-1-1 service. Pursuant to O.C.G.A. § 46-5- 134(a)(1)(A), the amount of such 9-1-1 charge shall be $1.50 per month per telephone service provided to the telephone subscriber.
(c) Pursuant to O.C.G.A. § 46-5-133(a), there is imposed a monthly wireless enhanced 9-1-1 charge upon each wireless telecommunications connection, other than a connection for prepaid wireless service, subscribed to by a telephone subscriber whose place of primary use is within the geographic area that is served by Fulton County, Georgia, or that would be served by Fulton County, Georgia, for the purpose of such an emergency 9-1-1 system. Pursuant to O.C.G.A.
46-5-134(a)(2)(A), the amount of such enhanced wireless 9-1-1 charge shall be $1.50 per month per wireless telecommunications connection provided to the telephone subscriber.
(d) All such 9-1-1 charges collected by service suppliers shall be remitted to the Georgia Department of Revenue, as the contracted collection partner of the Georgia Emergency Communications Authority, at the times and in the manner provided by O.C.G.A. § 38-3-185, O.C.G.A. § 38-
3-186, and any other Georgia Department of Revenue or Georgia Emergency Communications Authority rule or regulation adopted pursuant to Article 12 of Chapter 13 of Title 38 of the O.C.G.A. and Chapter 13 of Title 50 of the
O.C.G.A., the PGeorgia Administrative Procedures ActP.
(e) Pursuant to O.C.G.A. § 46-5-134, all proceeds received by Fulton County from 9-1-1 charges imposed by this ordinance shall be deposited in the emergency telephone system fund maintained by the Fulton County; kept separate from general revenue of the county; and used exclusively for the statutorily authorized purposes.
(f) The clerk to the Fulton County Board of Commissioners shall file with the state revenue commissioner a certified copy of the applicable resolution within ten days of the adoption thereof.
Any subsequent amendment to this resolution shall likewise be so filed by the clerk within ten days of the adoption thereof.
(Res. No. 18-0725, Att. B, 10-17-18) Secs. 76-87—76-100. Reserved.
ARTICLE IV. 911 PREPAID WIRELESS
SERVICE FEE*
Sec. 76-101. 9-1-1 charge on prepaid wireless transactions.
(a) Pursuant to O.C.G.A. § 46-5-134.2(b)(1), there is imposed a prepaid wireless 9-1-1 charge and the amount of such 9-1-1 charge shall be $1.50 per retail transaction occurring within the jurisdiction of the public safety answering point.
(b) All such 9-1-1 charges collected by service suppliers shall be remitted to the Georgia Department of Revenue, as the contracted collection partner of the Georgia Emergency Communications Authority, at the times and in the manner provided by O.C.G.A. § 38-3-185, O.C.G.A. § 38-
3-186, and any other Georgia Department of Revenue or Georgia Emergency Communications Authority rule or regulation adopted pursuant to Article 12 of Chapter 13 of Title 38 of the O.C.G.A. and Chapter 13 of Title 50 of the
O.C.G.A., the QGeorgia Administrative Procedures Act.Q
(c) The clerk to the Fulton County Board of Commissioners shall file with the state revenue commissioner a certified copy of the applicable resolution within ten days of the adoption thereof.
Any subsequent amendment to this resolution shall likewise be so filed by the clerk within ten days of the adoption thereof.
(d) Unless specified otherwise in this article, all terms in this article shall be defined in the same manner as specified in O.C.G.A. § 46-5- 122.
(e) Pursuant to O.C.G.A. § 46-5-134, all proceeds received by Fulton County from 9-1-1 charges imposed by this article shall be deposited in the emergency telephone system fund maintained by the county; kept separate from general revenue of the county; and used exclusively for the statutorily authorized purposes.
(Res. No. 18-0725, Att. B, 10-17-18) Chapter 77
RESERVED
CD77:l Chapter 78
TRAFFIC AND VEHICLES*
ARTICLE I. IN GENERAL
Sec. 78-1. Uniform rules of the road adopted.
Pursuant to O.C.G.A. §§ 40-6-372—40-6-376, O.C.G.A. §§ 40-1-1—40-6-376, known as the uniform rules of the road, are hereby adopted as and for the traffic regulations of this county with like effect as if recited herein.
(Code 1983, § 29-1-2) Sec. 78-2. Traffic engineering.
The public works department shall direct or perform all traffic engineering studies which may be necessary for the safe and efficient operation of the county road system. Based on these studies the department shall recommend to the board of commissioners necessary traffic control regulations to improve system operation.
(Code 1983, § 29-1-1) Sec. 78-3. Traffic control signs, markings, and devices.
(a) Upon approval of the board of commissioners, the county traffic engineer, or a designee thereof, is authorized to designate and maintain
by appropriate traffic control signs, markings, and devices:
(1) Crosswalks at intersections where there is particular danger to pedestrians crossing the roadway;
(2) Other safety zones for pedestrians;
(3) Traffic lanes;
(4) Speed, parking, or other traffic control zones;
(5) Stop, yield, one-way and other directional devices; and
(6) Any other sign, marking, device, or zone necessary for orderly and safe conditions on the roads and streets of the county.
(b) All traffic control signs, signals, devices, and markings shall conform to specifications in the Manual on Uniform Traffic Control Devices adopted by the state transportation board. All signs and signals required hereunder for a particular purpose shall so far as practicable be uniform as to type and location throughout the county. All traffic control devices so erected and not inconsistent with the provisions of state law or this chapter shall be official traffic control devices of the county.
(c) The county traffic engineer shall keep and maintain an accurate official schedule setting out all traffic zones, markings, signs, and other traffic control devices. The schedule and any amendments or changes thereto shall be known as the Official Traffic Control Schedule of Fulton County, Georgia, and shall be adopted by resolution of the board of commissioners. This traffic schedule, as amended, is incorporated herein
and made a part of this chapter by reference. An official copy thereof shall be kept in the office of the county clerk; shall be available to the public;
and copies certified by the county clerk shall be admissible in court as proof of the location of any traffic zone, marking, sign, or other traffic control device.
(d) No person shall be charged with violating a traffic zone, marking, sign, or other traffic control device unless appropriate signs, markings, or devices are in fact operating or in existence on the streets involved.
(e) Any violation of any traffic zone, marking, sign, or other traffic control device established hereunder shall be a violation of this chapter.
(Code 1983, § 29-1-3) Secs. 78-4—78-35. Reserved.
ARTICLE II. STOPPING, STANDING AND
PARKING*
Sec. 78-36. Parking violations; responsibility.
Whenever any vehicle shall be parked in violation of any provisions of any ordinance or state law prohibiting or restricting parking, the person in whose name such vehicle is registered shall be responsible for such violation and subject to the penalty thereof. It shall be a defense to said violation that the person was not the registered owner, and/or that said vehicle was not parked in violation of state law, and/or that said violation was committed while said vehicle was stolen from the registered owner.
(Code 1983, § 8-1-2) Sec. 78-37. Parking meters; authority for installation.
The traffic engineer is hereby authorized to provide for the installation, operation, maintenance, and policing of parking meters to be installed on the streets of the county. The exact number of meters to be installed on the streets or spaces to be metered shall be determined on the basis of traffic engineering studies which shall be thorough and complete of the areas in which the meters may be installed and the installation shall be restricted to those areas in which a parking time limit is provided in this article or by any ordinance of the county.
(Code 1983, § 29-2-1) Sec. 78-38. Parking time limits; fees.
(a) The period of time of parking in areas designated as parking meter zones shall be registered by mechanical parking meters, and the charges which are reasonable and necessary to defray the expenses incident thereto, for such parking shall be as set out in subsection (b) of this section.
(b) Such meters shall provide for maximum time limits as indicated on each meter of either 15 minutes, 18 minutes, 30 minutes, one hour or two hours. The fee in each instance shall be at the rate of $0.01 for each three minutes of time allowed; provided, however, that in those areas wherein ten-hour meters are installed, the parking time limits shall be ten hours, and the meter charges therefor shall be $0.05 per hour.
(Code 1983, § 29-2-2) Sec. 78-39. Cruising on public streets.
(a) Definitions. As used in this section, unless the context clearly requires otherwise, the following words or phrases shall have the following meanings:
Cruise, cruises or cruising means to operate a motor vehicle, or to permit the operation of a motor vehicle under one's care, custody, or control, so as to pass the same traffic point within a no cruising zone more than twice within any two-hour period.
Motor vehicle means every self-propelled device in, upon, or by which any person or property is or may be transported or drawn upon a highway, excepting devices used exclusively upon stationary rails or tracks.
No cruising zone means the area bounded by and includes the following streets or portions of streets and any other areas designated by the county board of commissioners:
Street Extent Extent Old National Highway From Old Bill Cook Road to Fulton County/Fayette County line Flat Shoals Road From the Fulton County/Clayton County line to Interstate 85 Traffic control point means any point
established by the county chief of police within a no cruising zone for the purpose of monitoring cruising.
(b) Violations.
(1) A person commits an offense if, on any Monday through Friday between the hours of 6:00 p.m. and 12:00 a.m., or on any Saturday or Sunday between the hours of 6:00 p.m. and 6:00 a.m., he or she cruises in an area marked in accordance with this section as a no cruising zone. A citation will be issued under this Code section any time after the third passage of the motor vehicle by the traffic control point.
(2) The department of public works shall mark a no cruising zone by conspicuously posting the appropriate signs at each entrance to the zone.
(c) Exclusions. This section shall not apply to:
(1) An official public safety or emergency vehicle;
(2) A licensed public transportation vehicle;
(3) A vehicle being used for legitimate business purposes; or
(4) Any special event as declared by the county board of commissioners.
(d) Penalties. Any person violating the provisions of this section shall forfeit the sum of $500.00.
(e) Effective date. This ordinance shall take effect immediately upon passage by the county board of commissioners.
(Res. No. 02-0369, 3-20-02) Sec. 78-40. Enforcement of parking restrictions on county property.
(a) Definitions. As used in this section, the following words or phrases shall have the following meanings:
County facility means any building or grounds owned, leased, or otherwise controlled by Fulton County.
County parking area means any area owned, leased, or otherwise controlled by Fulton County and designated by the county for parking.
Offending vehicle means any "motor vehicle," as defined at O.C.G.A. § 40-1-1(33), that is abandoned or otherwise parked in a location or for a duration that violates any rule or regulation established pursuant to the terms of this section.
Parking management service means any entity which has been authorized by Fulton County to manage or monitor parking in county parking areas and/or to take enforcement action against offending vehicles pursuant to this section.
(b) The director of the department of real estate and asset management (D.R.E.A.M.) may create and also modify from time to time such reasonable rules, regulations, restrictions, and/or fees related to the parking of motor vehicles in any county parking area, provided that such rules, regulations, and restrictions do not conflict with any state or municipal laws or regulations applicable to the location of the county parking area.
(c) All rules, regulations, restrictions, and/or fees related to the parking of motor vehicles in any county parking area shall be clearly posted to notify users of county parking areas of the conditions governing and the limitations on the use thereof.
(d) Parking without payment of posted fees, or during times, in locations, or for durations prohibited by the posted parking regulations in county parking areas shall be a violation of this section.
(e) Any vehicle parked in violation of this section ("the offending vehicle") shall be subject to towing or immobilization at the discretion of the county or its designee or assignee, with the vehicle owner responsible for all associated costs and fees that may be charged by towing or immobilization services, including storage fees.
(f) Notices posted in county facility parking areas shall include, at a minimum:
(1) The rules, regulations, restrictions, and limitations applicable to the parking area, including fees for parking where applicable;
(2) The penalties for violation of such posted rules, regulations, restrictions and limitations and/or the failure to pay the posted fees for parking in that location;
(3) The location and telephone number where any offending vehicle may be towed and recovered;
(4) The telephone number to call for the removal of any immobilization device;
(5) The cost of recovery of the offending vehicle and/or removal of the immobilization device; and
(6) The form of payment required to retrieve the offending vehicle.
(g) The owner of any offending vehicle towed or immobilized shall be responsible for the payment of any parking fees that were unpaid, if applicable, all costs associated with the towing
or immobilization of the offending vehicle, and any required storage thereof.
(16-0994, 11-2-16) Sec. 78-41. Street racing prohibited.
(a) The Purpose of this section is to prohibit illegal street races and reckless driving exhibitions with the aim of significantly curbing this dangerous criminal activity within unincorporated
areas of Fulton County.
(b) Illegal street racing and reckless driving exhibition means a motor vehicle speed contest using public highways, streets or rights of way in violation of applicable motor vehicle and traffic laws, including without limitation, O.C.G.A. § 40- 6-186, § 40-6-251 and § 40-6-390. Illegal street racing and reckless driving exhibitions may include, but are not limited to, situations in which:
(1) A group of motor vehicles or individuals has arrived at a location for the purpose of participating in the event;
(2) A group of individuals has gathered on private property open to the general public without the consent of the owner, operator, or agent thereof for the purpose of participating in the event;
(3) One or more individuals has impeded the free public use of a public street, sidewalk or highway by actions, words, or physical barriers for the purpose of conducting the event;
(4) Two or more vehicles have lined up with motors running for an illegal motor vehicle speed contest or exhibition of speed;
(5) One or more drivers is revving his engine or spinning his tires in preparation for the event; or
(6) An individual is stationed at or near one or more motor vehicles serving as a race starter.
(c) Organizer means any individual who in any manner knowingly takes part in the planning, organization, coordination, facilitation, advertising or sharing of the location for any
such illegal street race, or collect moneys in connection with an illegal street racing exhibition, as defined herein;
(d) Participant means any individual who is knowingly present at an illegal street racing exhibition for the purpose of actively taking part in the event, through conduct including riding in a race vehicle as a passenger; assisting the organizers and/or drivers in carrying out or promoting the event; or exchanging money or anything of value with any driver, car owner, or other participant in connection with the event.
For the purposes of this section, a person who is a mere bystander, passerby, or observer not aware of the illegal activity shall not be deemed a participant.
(c) It is unlawful for a person to:
(1) Drive a vehicle in an illegal street race or reckless driving exhibition within the unincorporated areas of Fulton County;
or
(2) Participate in an illegal street race or reckless driving exhibition on any public street within the unincorporated areas of Fulton County; or
(3) Organize an illegal street race or reckless driving exhibition to take place within the unincorporated areas of Fulton County.
(f) This section shall not apply to licensed or duly authorized racetracks, drag strips, or other designated areas set aside by proper authorities for such purposes.
(g) Any violation of this section shall constitute a separate offense and shall not merge with any other violation of County, State or Federal law. Violation of this code section shall result in the issuance of a citation pursuant to Code Section 46-200(b).
(Ord. No. 2021-0170, 3-3-21) Secs. 78-42—78-60. Reserved.
ARTICLE III. TRUCK ROUTES
Sec. 78-61. Enactment authority.
The Board of Commissioners of Fulton County, Georgia, under the authority of Article 9, Section 2, Paragraph 1 (Home Rule For Counties) and Article 9, Section 2, paragraph III (Supplementary Powers) of the 1983 Constitution of the State of Georgia, as amended, and Georgia Laws 1973, pages 947, § 1, Georgia Laws 1980, page 775, § 5 and Georgia Laws 1981, page 953, § 1, hereby ordains and enacts into law this article.
(Ord. No. 98-1059, 8-5-98) Sec. 78-62. Purpose.
The Governing Authority of Fulton County is authorized to adopt ordinances for the governing and policing of unincorporated areas of the county for the purpose of protecting the public health safety and welfare. Specifically, the governing authority may provide for the regulation and control of motorized vehicles on the streets of the county; plan, designate, improve, manage, control and maintain an adequate county road system;
and determine the maximum load, weight and vehicle dimensions which can be safely transported over each bridge on the county road system. Accordingly, the board of commissioners of the county hereby enacts the following provisions in an effort to regulate and control motorized vehicles in the unincorporated areas of the county for the purpose of protecting and preserving the public health, safety, and welfare of the citizens; to thereby curb the usage of certain
residential streets in the county by trucks as cut through routes, and to discourage the parking of such vehicles on these streets and public right of ways.
(Ord. No. 98-1059, 8-5-98) Sec. 78-63. Title.
This article shall be known and may be cited as the "Fulton County Truck Route Ordinance", and as Article III of Chapter 78, of the Code of Laws of Fulton County.
(Ord. No. 98-1059, 8-5-98) Sec. 78-64. Scope of article.
The provisions of this article shall apply only to unincorporated the county or any area within the jurisdiction of the governing authority of the county.
(Ord. No. 98-1059, 8-5-98) Sec. 78-65. Definitions.
As used in this article, unless the context clearly requires otherwise, the following words or phrases shall have the following meanings:
Driver means every person who drives or is in actual physical control of a vehicle.
Governing authority means Fulton County ("County"), its board of commissioners, and where delegated by the board of commissioners, the Director of the Fulton County Department of Public Works or his/her designee, and the Fulton County Police and Sheriff departments.
Gross weight means the weight of a vehicle without load plus the weight of any load thereon.
Motor vehicle means every vehicle which is self propelled.
Operator means any person who drives or is in actual physical control of a motor vehicle.
Owner means a person, other than a lienholder or security interest holder, having the property in or title to a vehicle. The term includes a person entitled to the use and possession of a vehicle subject to a security interest in or lien by another person but excludes a lessee under a lease not intended as security except as otherwise specifically provided in this title.
Person means every natural person, firm, copartnership, association, or corporation.
Pneumatic tire means every tire in which compressed air is designed to support the load. A vehicle shall be considered equipped with pneumatic tires when pneumatic tires are used on all wheels.
Pole trailer means every vehicle without motive power designed to be drawn by another vehicle and attached to the towing vehicle by means of a reach or pole, or by being boomed or otherwise secured to the towing vehicle, and ordinarily used for transporting long or irregularly shaped loads such as poles, pipes, or structural members capable, generally, of sustaining themselves as beams between the supporting connections.
Police officer means every officer authorized to direct or regulate traffic or to make arrests for violations of traffic regulations.
Public or private property means the right-ofway of any road or highway; any body of water or watercourse or the shores thereof; any park,
playground, building, refuge or conservation or recreation area, and residential or farm properties, timberland or forest.
Private road or driveway means every way or place in private ownership and used for vehicular traffic by the owner and those having express or implied permission from the owner, but not by other persons.
Roadway means that portion of a highway improved, designed, or ordinarily used for vehicular travel, exclusive of the berm or shoulder.
In the event a highway includes two or more separate roadways, the term "roadway" shall refer to any such roadway separately, but not to all such roadways collectively.
Semitrailer means every vehicle with or without motive power, other than a pole trailer, designed for carrying persons or property and for being drawn by a motor vehicle and so constructed that some part of its weight and that of its load rests upon or is carried by another vehicle.
Sidewalk means that portion of a street between the curb lines, or the lateral lines of a railway, and the adjacent property lines, intended for use by pedestrians.
Stand or standing means the halting of a vehicle, whether occupied or not, otherwise than temporarily for the purpose of and while actually engaged in receiving or discharging passengers.
Stop or stopping:
(1) When required, means complete cessation from movement; or
(2) When prohibited, means any halting, even momentarily, of a vehicle, whether occupied or not, except when necessary to avoid conflict with other traffic or in compliance with the directions of a police officer or traffic-control sign or signal.
Tractor means any self-propelled vehicle designed for use as a traveling power plant or for drawing other vehicles but having no provision for carrying loads independently.
Trailer means every vehicle with or without motive power, other than a pole trailer, designed for carrying persons or property and for being drawn by a motor vehicle and so constructed that no part of its weight rests upon the towing vehicle.
Truck means every motor vehicle designed, used or maintained primarily for the transportation of property.
Truck camper means any structure designed, used or maintained primarily to be loaded on or affixed to a motor vehicle to provide a mobile dwelling, sleeping place, office or commercial space.
Truck tractor means every motor vehicle designed and used primarily for drawing other vehicles and not so constructed as to carry a load other than a part of the weight of the vehicle and load so drawn.
Sec. 78-66. Restrictive vehicles in excess of weight and length limitations required to use truck routes; exceptions.
All motor vehicles having a gross weight in excess of 36,000 pounds, including the load thereon, or having an overall length in the excess of 30 feet, except vehicles designated as to carry passengers, are prohibited from using streets within the unincorporated areas of the county, except those streets authorized by this article as truck routes, including any amendments hereof, or as may be further designated by the governing authority as truck routes, except when:
(1) The terminal, parking lot, repair garage, or headquarters of the restricted motor vehicle is not a designated truck route, ingress to and egress from those places shall be made by the most direct route available between the terminal, parking lot, repair garage or headquarters and nearest designated truck route;
(2) A delivery or pickup is to be made at a location which is not on a designated truck route, and not within any areas bounded by certain specified streets that the county prohibits normal truck traffic because of congestion, ingress to and egress from that location shall be made by the most direct route available between that location and the nearest designated truck route;
(3) A delivery or pickup is to be made by a truck tractor, road tractor, combination road tractor-trailer within any areas which is not on a designated truck route, and not within any areas bounded by certain specified streets that the county prohibits normal truck traffic because of congestion, such delivery or pickup shall not be made between the hours of 7:00 a.m. and
7:00 p.m.
(Ord. No. 98-1059, 8-5-98) Sec. 78-67. Truck routes; posted regulatory signs.
The following routes, as further identified by posted regulatory signs, and as may be revised from time-to-time by the traffic administrator with the approval of the governing authority, are designated as truck routes:
(Ord. No. 98-1059, 8-5-98; Ord. No. 2018-0710, 10-3-18; Ord. No. 2018-0850, 11-7-18) Sec. 78-68. Use of temporary truck routes by restricted vehicles.
If a designated truck route, or any portion thereof, shall be under repair or otherwise temporary out of use, restricted vehicles, as defined in this article, shall use other temporary truck routes as may be designated by the governing authority and further identified by the posting of the regulatory traffic control sign.
Sec. 78-69. Evidence required for restricted vehicle to be off truck route.
When upon streets other than those designated as truck routes, any person driving or in charge or control of any of the motor vehicles restricted by this Article shall be prepared to present for inspection of police officers his log book, weight slips, delivery slips or other written evidence of his or her destination and point of origin to justify the presence of the restricted vehicle on a street other than a designated truck route.
(Ord. No. 98-1059, 8-5-98) Sec. 78-70. Weight of vehicle and loads.
No vehicle shall be operated on any public road within unincorporated Fulton County designated as a truck route, with a total gross weight in excess of 56,000 pounds unless the vehicle is making a pickup or delivery on such road. The maximum gross weight shall then not exceed 73,280 pounds.
(Ord. No. 98-1059, 8-5-98) Sec. 78-71. Weight limitations on wheels;
axle limitations.
No wheel on any vehicle operated upon any public road within unincorporated Fulton County, equipped with high pressure, pneumatic solid rubber or cushion tires shall carry a load which exceeds 8,000 pounds by more than 13 percent;
or any, or an axle load which exceeds 16,000 pounds by more than 13 percent; an axle load shall be defined as the total on all wheels whose centers may be included between two parallel transverse vertical planes 40 inches apart. If the driver of any vehicle can comply with the requirements of this section by shifting or equalizing the load on all wheels or axles and does so when
requested by the proper authority, said driver shall not be held to be operating in violation of this section.
(Ord. No. 98-1059, 8-5-98) Sec. 78-72. Weight limitations on streets, bridges and culverts.
(a) It shall be unlawful to operate any motor vehicle on any street in unincorporated Fulton County where the weight of such motor vehicle with or without load is in excess of the weight as limited by this article and where signs indicating such limitations are posted. Further, it shall be unlawful to drive any motor vehicle over a bridge or culvert in unincorporated Fulton County over the weight capacity shown on said bridge and/or culvert.
(b) The driver and/or owner shall be liable to the county for any and all damages caused by driving an overweight motor vehicle over any street, bridge and/or culvert with a posted sign.
These damages are in addition to any fine or punishment which may be assessed for violation of this article.
(Ord. No. 98-1059, 8-5-98) Sec. 78-73. Certain trucks prohibited on certain streets; posted signs.
(a) Any truck or truck tractor operated separately or in combination with any trailer or semi-trailer which has either two axles with six tires or three or more axles shall be designated for the purpose of this section as a small truck.
No such truck shall be operated on any street or portion of a street within unincorporated Fulton County where signs are posted prohibiting the trucks, except as provided in subsections (b) and
(c) of this section. Signs may be posted to prohibit the trucks from operation on a single street or a group of streets so as to form a closed area.
(b) A motor vehicle described in subsection (a) of this section may be operated on a street or in an area where prohibited by signs, if the vehicle has a gross weight in excess of 36,000 pounds and/or has an overall length in excess of 30 feet and is being operated off an established truck route as provided for in section 78-66.
(c) A motor vehicle described in subsection (a) of this section which has a gross weight of 36,000 pounds or less and has a length of 30 feet or less may be operated on a street or in an area where prohibited by signs, under the following conditions:
(1) When making a delivery of cargo, when proceeding to a location to pick up a load or to perform a service and the location of the delivery, loading or service is on a prohibited street or in a prohibited area.
(2) Ingress and egress from the location is made by traveling the most direct route between the locations and the nearest:
a. Street segment on which the vehicle is not prohibited; or
b. Designated truck route.
(d) The driver of any truck as defined in subsection (a) of this section shall be prepared to present to police officers for inspection the drivers log books, delivery slips and other written evidence of the drivers destination and the point
of origin to justify, under subsection (c) of this section, the presence of the truck on a section of street from which the truck would otherwise be prohibited under subsection (a) of this section.
(Ord. No. 98-1059, 8-5-98) Sec. 78-74. Enforcement of weight and load limitations.
(a) Any person who violates the load limitations provisions of this article shall be conclusively presumed to have damaged the public roads,
including bridges of the unincorporated areas of the county by reason of such overloading and shall, in addition to any other penalty at law, recompensed the county for such damages in accordance with O.C.G.A. § 32-6-27, as same may be amended.
(b) Any owner or operator of a vehicle which is operated on the public roads of unincorporated Fulton County in violation of the weight limits provided in this article shall be required, in addition to paying the monies provided in subsection (a) of this section, to unload all gross weight in excess of 6000 pounds over the legal weight
limit before being allowed to move the vehicle.
(c) Any person authorized by state law and section 78-78 of this article to enforce this article may seize the offending vehicle of an owner who fails or whose operator has failed to pay the monies proscribed in subsection (a) of O.C.G.A.
§ 32-6-27 and hold such vehicle until the proscribed moneys are paid. Any authorized person seizing such vehicle under this subsection or subsection (b) of this section may, when necessary, store the vehicle, and the owner thereof
shall be responsible for all reasonable storage charges thereon. When any vehicle is seized, held, unloaded or partially unloaded under this section, the load or any part thereof shall be removed or cared for by the owner or operator of the vehicle without any liability on the part of the authorized person or the county because of damage to or loss of such load or any part thereof.
(Ord. No. 98-1059, 8-5-98) Sec. 78-75. Parking of commercial vehicles weighing 6,000 pounds or more.
It shall be unlawful to park any nonmotorized vehicle or conveyance of any motorized commercial vehicle which are designated by the department of public safety for a license tag in a weight category heavier than 6,000 pounds on the rightof-way of any residential street or upon residential zoned property, unless said vehicle is making a delivery to said residential property. School
buses shall not fall under this section. This section shall not apply to construction vehicles, trailers, or equipment temporarily located within a construction area, provided such vehicles, trailers
or equipment are used in connection with dwelling units under construction within such construction area. Any vehicle or conveyance parked in a manner that violates this provision shall be considered an abandoned vehicle and a nuisance posing a threat to the public health or safety and
shall be subject to removal as otherwise authorized in this article.
(Ord. No. 98-1059, 8-5-98; Res. No. 09-0288, 3-4- 09) Sec. 78-76. Overnight parking of vehicles weighing 6,000 pounds or more.
It shall be unlawful for any person to park between the hours of 10:00 p.m. and 6:00 a.m., on the right-of-way of any residential street, any nonmotorized vehicle or conveyance or any motorized vehicle designated by the department of public safety for a license tag in any weight
category higher than the 6,000 pounds commercial classification. Any vehicle or conveyance parked in a manner that violates this provision shall be
considered an abandoned vehicle and a nuisance posing a threat to the public health or safety and shall be subject to removal as otherwise authorized in this article.
(Ord. No. 98-1059, 8-5-98; Res. No. 09-0288, 3-4- 09) Sec. 78-77. Parking or storage of unlicensed, inoperable vehicles, trailers or equipment.
Vehicles and trailers of any kind without current license plates shall not be parked or stored on or about any property within a residential
zoned district or on the right-of-way of any residential street. Further, vehicles, trailers or equipment permitted to remain in an inoperable condition for more than 30 days shall not be parked or stored on or about any property within a residential zoned district. Provided, however, this section shall not apply to vehicles, trailers or equipment
stored in an enclosed structure or appropriately covered and located in the rear yard area. Any vehicle, conveyance or trailer parked in a manner that violates this provision shall be considered an abandoned vehicle and a nuisance posing a threat to the public health or safety and shall be subject to removal as otherwise authorized in this article.
(Ord. No. 98-1059, 8-5-98; Res. No. 09-0288, 3-4- 09) Sec. 78-78. Penalties; enforcement generally.
(a) Any person who violates this article shall be guilty of a misdemeanor and, upon conviction thereof, shall be punished by a fine of not more than $1,000.00 or no more than 60 days in jail or both for each occurrence; and each occurrence shall be deemed a separate offense. These penalties shall be separate and apart from any costs associated with the removal, towing, seizure, holding or storage of an offending vehicle authorized elsewhere in this article.
(b) Unless otherwise specifically provided by resolution of the county board of commissioners, the enforcement of this article shall be within the jurisdiction of the county's police department, and department of sheriff and any other county officer authorized by the State of Georgia to make misdemeanor criminal arrests. Enforcement of this article shall also lie with the Fulton County Code
Enforcement Division. Specifically, but not by way of limitation, any violation of this section may be tried upon citations issued by enforcement personnel, pursuant to O.C.G.A. § 51-20-63 et seq., and any successor statute. Persons designated by the governing authority are hereby authorized to issue citations or summons or both,
charging violations under this article, returnable to a court or courts having jurisdiction over state traffic offenses or other courts having jurisdiction over violations of county ordinances.
(c) Any person authorized by state law or by this code section to enforce this article may remove an offending vehicle from any road, rightof-way or other public property or have an offending vehicle that is parked on any road, right-ofway or other public property towed to an appropriate location immediately upon its discovery. The notice provisions of O.C.G.A. § 40-11-3 shall be followed as to any vehicle so removed.
The owner of the offending vehicle so removed shall be responsible for all reasonable costs associated with the removal or towing of the offending vehicle and any required storage thereof. Any
person authorized by state law or by this code section to enforce this article may seize an offending vehicle from any road, right-of-way or other public property and may hold such vehicle until
any and all fines imposed upon the owner of the offending vehicle based on the violation(s) are paid in full and any and all costs associated with the removal or towing of the offending vehicle and any required storage thereof have been satisfied in accordance with O.C.G.A. § 40-11-2. Neither the county nor any person authorized by state law or by this code section to enforce this article shall be liable for any damage or loss when an offending vehicle or a vehicle reasonably considered to be offending at the time enforcement action was
taken is removed, towed, seized, held or stored in accordance with this provision.
(d) Nothing in this section is intended to allow or shall be interpreted to allow the removal, towing, seizure, holding or storage of any offending vehicle located on private property unless and to the extent such actions are otherwise authorized in state law.
(e) For purposes of enforcing the provisions of this section, any Fulton County Court or courts having jurisdiction over state traffic offenses or other courts having jurisdiction over violations of county ordinances shall be entitled to take such action to ensure compliance, and the person convicted shall reimburse the county for any cost or expense associated with such compliance efforts
and the county shall be entitled to place a lien on the property or require a bond from the person to secure payment and reimbursement for these expenses.
(Ord. No. 98-1059, 8-5-98; Res. No. 09-0288, 3-4- 09) Secs. 78-79—78-100. Reserved.
ARTICLE IV. TRAFFIC CALMING
PROGRAM
Sec. 78-101. Introduction.
Many local jurisdictions throughout the United States have been researching and developing measures to manage and control problems associated with traffic flow through their residential neighborhoods. The problems of excessive speeding, cut through traffic, and pedestrian safety are common to many of these jurisdiction.
The rapid rate of growth of the Metropolitan Atlanta Area Counties has resulted in a significant increase in the volume of traffic on area roadways. Motorists have sought alternative routes
to avoid traffic congestion and length of delay experienced on these roadways. Some of these alternative routes are cut-thru routes through residential streets, which has resulted in a proliferation of traffic related problems in residential neighborhoods. Additionally, motorists tend to
travel through residential areas, at speeds that greatly exceed the posted speed limit. Residents and neighborhood associations have voiced their concerns about these traffic problems. In light of this, the county board of commissioners has requested that the transportation division of the public works department develop a traffic calming program.
The mission of the traffic calming program is to improve and enhance the quality of life in residential neighborhoods, by reducing the negative impact of automobile traffic on neighborhood
streets. The objective of the program is to develop and implement traffic calming initiatives which may provide corrective remedies to traffic prob- lems associated with excessive speeding, cut-thru traffic, and vehicle and pedestrian safety. The transportation division will implement the program utilizing engineering, enforcement, education, and community participation. The traffic calming program although developed by the county,
is meant to be a community driven program. The community will choose the type of traffic calming initiative that they deem suitable, based on the recommendations of county transportation division. The community may be required to pay for the cost of implementing, maintaining, and removing any device associated with the traffic calming initiatives. The funding mechanism will
be determined by the board of commissioners. A complete description of various traffic calming devices, estimated costs, warrants and the county associated policies are included in this document.
(Ord. No. 98-1103, § 1.0, 9-2-98) Sec. 78-102. Definition.
Traffic calming devices are measures that are implemented to reduce the negative impact created by automobile usage of residential streets.
They regulate the travel speeds of motorists, and allow the roadway to be shared safely by pedestrians and bicyclists. Traffic calming is often referred to as reverse traffic engineering because
in traffic engineering, the approach is to increase the level of service of the roadway by adding capacity and reducing the lengths of delay time, whereas in traffic calming the general approach is to slow the traffic thereby increasing the lengths of delay time experience by motorists. These traffic calming measures include geometric changes to the existing roadway such as narrow lane
widths, chokers, traffic circles, speed humps, and cul-de-sacs.
(Ord. No. 98-1103, § 1.2, 9-2-98) Sec. 78-103. Purpose.
The county traffic calming program establishes a policy guide for the county to consistently deal with traffic related matters, and promote safe and convenient travel in residential neighborhoods.
The program outlines policies, processes and warrants for implementing traffic calming measures that may be used as possible remedies for traffic
related problems in residential neighborhoods.
Standardized designs for various devices are included as a part of this program, to ensure uniformity and safety. Variation from these standards may be approved by the county transportation administrator.
(Ord. No. 98-1103, § 1.3, 9-2-98) Sec. 78-104. Implementation.
Before any traffic calming measure can be implemented, a traffic study must be undertaken by the transportation division, who will analyze the data and make the appropriate recommendations. Staff of the transportation division are available to make presentations and discuss their
findings and recommendations to neighborhood associations and community groups. The recommendations that are made are based on engineering and design standards publications such as the AASHTO Green Book, the MUTCD (Manual on
Uniform Traffic Control Devices), the TRB-Highway Capacity Manual, Fulton County Public Works Design Standards, and other design standards
and regulations. Staff will use prudence and good judgement in their recommendations, so that the health, welfare and safety of the community are considered when recommending a traffic calming device. The following are some of the factors that will be consider for any traffic calming device to be implemented.
(1) The county will only consider installation of traffic calming devices on streets classified as local, residential streets.
(2) Traffic studies must confirm that a traffic related problem exist before the county will recommend a traffic calming device.
(3) For speeding, the study must find that a speeding problem exist, based on the standard 85th percentile speed of at least 11 MPH over the posted speed limit of the
road.
(4) For cut-thru traffic problems to be confirmed, the average daily traffic, peak hour volumes and directional turning
movements will be compared to theoretical estimations as outlined in the most current (ITE) Institute of Transportation
Trip Generation Guide.
(5) For pedestrian and other safety related problems, confirmation will be made based on the accident data reports, inadequate roadway geometrics (such limited sight distance), school locations and other safety related parameters.
(6) The county requires that there must be wide support from the community for implementing traffic calming measures in their neighborhood.
(7) It is required that a formal petition be submitted to the county, showing that 75 percent of the property owners in the neighborhood and 90 percent of the property owners along the affected roadway affirm their support for installation of the
traffic calming device. In certain circumstances, if number of residents supporting the petition is slightly less than that stated
above, but a clear overwhelming majority support is shown for the initiative, the board of commissioners county may opt to waive these percentages.
(8) The county transportation administrator may recommend the installation of traffic calming devices without the above percentages based on traffic safety.
(9) The design of traffic calming devices must be safe and effective. The county requires that all traffic calming devices be designed as those outlined in this document (Appendix) [Not included in this Code].
Any variation from the standard designs must be approved by the transportation administrator, or his designee.
(10) Once the traffic calming devices are installed, the county transportation division reserves the right to move, modify or remove the devices for operational or safety
reasons at any time.
( 11) The neighborhood association may request to have any traffic calming device installed in their community removed. A
formal petition will be required showing that 75 percent of the property owners in the neighborhood, and 90 percent of the property owners along the affected roadway affirm their support for removing these devices. Additionally, the neighborhood will be required to cover the cost associated with removing these devices.
(12) The county may deny a request to remove a traffic calming device based on operational and safety reasons.
(Ord. No. 98-1103, § 2.0, 9-2-98) Sec. 78-105. Petition for installing traffic calming devices.
(a) [Petition.] Where engineering studies indicate that installing traffic calming devices on county-maintained neighborhood roads would correct or improve a traffic situation, and their installation is favored by a majority of property
owners in the area, a petition must be submitted to the transportation division of the county for review. All of the property owners in the subdiviSupp. No. 4 CD78:11 sion should be contacted and given an opportunity to sign this petition, indicating their "yes" or "no" concerning the installation of the traffic
calming device. Unless property is undergoing change of ownership, a spouse's signature will not be acceptable if he/she is not the legal owner. If both husband and wife are joint legal owners, both signatures are required. A "Mr. and Mrs."
signature is not is not acceptable. All owners must sign individually, including owners of undeveloped lots. Renting tenants are not an acceptable substitute for the legal homeowner. The purpose
of the homeowner's association officer attesting to the signatures is to verify the signatures of the property owners. The percentages will be calculated, based on individual lots where owners sign affirmatively, divided by the total number of lots
in the plotted subdivision, units, or "defined service area." Each lot counts as only one lot regardless of owners signing. At least 75 percent of the homeowners in the neighborhood and 90 percent
of the homeowners along the affected roadway must vote in favor of installing the traffic calming device, before the petition can be presented to the board of commissioners.
The completed petition must be signed, notarized and the returned to the transportation division, where it will be checked by tax records
and land lot maps to insure that it meets all requirements. It will be returned to the sender if it does not meet the requirements. Petitions that do meet the requirements will be presented to the commissioners at their regular Wednesday meeting. A public hearing will be
announced at that time for each petition. At the public hearing, the petition will be approved or disapproved by the board of commissioners.
(b) Installation funded by the neighborhood.
The installation of the traffic calming devices by a private contractor will not be considered final until personnel of the department of public works inspect them for compliance with design standards. Charges associated with the installation of these devices are handled by the homeowners
association at the time of installation. All installation cost will be funded by the subdivision with the county acting in the role of project administrator. The county will assist the neighborhood in securing a private contract for the construction of
speed humps. It is the responsibility of the neighborhood association or the contractor to file for a land disturbance permit with the county development services department. County personnel will inspect and approve the construction of said devices to insure that they meet the design criteria outlined in this document.
Annualized charges for the maintenance and repair of traffic calming devices are assessed to the neighborhood association through a private agreement with the county at the end of the year. It is the responsibility of the neighborhood association to assess fees to members as determined by the association. The neighborhood association may enter into a private agreement with county for the private maintenance of the traffic calming at such that a yearly
maintenance fee will not be collected by the county but the association will be required to maintain these devices to county standards within a reasonable time period as determined by the county.
(c) Installatwn funded by the county. The county will be responsible for all cost associated with the installation at traffic calming devices. Material and repair cost will also be assumed by the county.
(Ord. No. 98-1103, § 3.0, 9-2-98) Sec. 78-106. Types of traffic calming devices.
Various types of traffic calming devices/techniques are presented in this section. They are presented and categorized according to their suitability to correct problems associated with each type of neighborhood traffic problem. Some of
these devices have been shown to be effective in solving one or more types of traffic-related problems. Results of studies released through the Institute of Transportation Engineers (ITE) of
technical papers, indicate that the following were quite effective in residential speed control. These are speed humps, traffic circles, traffic chokers, and traffic diverters. Others mentioned later are suited to correcting problems associated with cutthru traffic and pedestrian safety.
(1) Speed humps (speed reduction device).
a. Purpose: To reduce vehicle speeds.
b. Effectiveness: 22-foot speed humps are very effective at encouraging 30 mph vehicle speeds.
c. Advantages:
1. Effectively reduce vehicle speeds.
2. It poses no restrictions for bicycles.
3. Does not affect intersection operations.
d. Disadvantages: Can possibly increase traffic noise from braking and acceleration of vehicles, particularly buses and trucks.
e. Cost: Between $2,500 and $3,500 each.
f. Transit service impacts: Experience shows 22-foot speed humps do not impede transit services or scheduling.
g. Emergency services impacts: When speed humps designs are selected for any street, one must consider whether it is used as a primary response route.
h . Other considerations: Speed humps are not considered on grades greater than eight percent.
(2) Chicane (speed reduction device).
a . Description: A feature that changes the physical characteristics of a roadway section from an existing straight alignment to a series of horizontal
curves.
b. Purpose: To reduce the speed of vehicles by providing a narrowed vehicle travel path for a section of roadway.
c. Advantages:
1. Reduces vehicle speeds with less impact on emergency service vehicles.
2. May reduce cut-through traffic.
d . Disadvantages:
1. Most residents would have driveway affected by the type of installation.
2. Increased maintenance for landscaping and pavement.
3. Significant loss of on-street parking.
e. Cost: Between $5,000 and $10,000 per location.
f. Transit service impact: Impact not significant.
g. Emergency service impacts: Impact not significant. ;ol2.; h.Other considerations: NIA.
(3) Radar trailer (speed reduction device).
a. Description: A portable radar speed meter capable of measuring vehicle speed graphically and displaying the speed of the motorist.
b. Advantages: Speeds may be reduced during short intervals where the radar trailer is located.
c. Disadvantages:
1. Not an enforcement tool.
2. No noticeable effect on deterring rat-running traffic.
d. Cost: NIA - County purchasing and operates.
e. Transit service impacts: NIA.
f. Emergency service impacts: NIA.
g. Other services: NIA.
(4) Narrowing lanes (speed reduction device).
a. Description: Striping is used to create narrow travel lanes to 10-foot wide lanes. This gives drivers the
feel of a narrow street that does not lend itself to high speeds.
b. Purpose: To restrict the width of available road space.
c. Advantages:
1. Speed may decrease and safety is improved through the provision of positive guidance to drivers.
2. The striping can be easily modified if paint is used.
d. Disadvantages: Residents do not always perceive striping to be an effective tool for speed reduction.
e. Cost: The cost varies on the length of a street.
f. Transit service impact: It will not have significant impact.
g. Emergency service impacts: It will not have significant impact.
h. Other considerations: NIA.
(5) Diagonal diverter (reduce cut-through traf fie).
a.
b.
C.
d.
e.
f.
Description: A barrier between diagonally opposite corners of a fourlegged intersection, thus creating two unconnected L-shaped intersections.
Advantages:
l. Effectively reduces cut-through traffic.
2. Creates no dead-end streets, local residents and service vehicles may view this as a benefit in that their routes can be more
direct.
3. Reduces motorist speed.
4. Can restrict access while retaining bicycle and pedestrian access.
Disadvantages:
1. In a large neighborhood, can shift problems elsewhere unless a strategic pattern of diverters are used.
2. May inconvenience local residents who are forced to drive longer more circuitous paths to
and from their homes.
Cost: Approximately $15,000 to $35,000.
Transit service impacts: Should not be considered on transit streets.
Emergency service impacts: Even though diagonal diverters would restrict turns to EMS vehicles, they can be designed and installed to provide for emergency access.
g. Other considerations: NIA.
(6) Semi-diverters (reduce cut-thru-traffic).
a. Description: A barrier to traffic in one direction of a street which permits traffic in the opposite direction to pass through.
b. Advantages:
1. Serve as an alternative to a one-way street designation by allowing residents within the block to continue to use the street for two-way travel opportunity.
2. Emergency service vehicles travel time is expedited.
c. Disadvantage: Because they block only one-half of the street, these are easily violated.
d. Cost: $5,000 to $20,000.
e. Transit service impacts: May affect transit routes, however, careful planning will be incorporated to minimize any effects.
f. Emergency service impacts: Allows a higher degree of emergency vehicle access than cul-de-sacs or diagonal diverters can be designed to allow emergency vehicle access, but careful consideration needs to be given to their use on primary fire response
routes.
g. Other considerations: NIA.
(7) Median barrier (reduce cut-thru traffic).
a. Description: A physical barrier on a non-local street which can effectively eliminate left turns from that non-local street onto a local street
and eliminate local street straightthrough and left turn traffic across the non-local street. A median barrier usually is an asphalt/concrete curbed island with or without a decorative landscaping and surface treatment.
b. Advantages:
1. Makes the intersection move safely by reducing the number of conflicting movements.
2. Reduces local street volumes.
3. Negates the possible need for future expensive traffic signal.
c. Disadvantages:
1. The physical barrier may sift traffic to other locations where left-turn opportunities exist.
2. This tool may inconvenience local residents who will be forced to drive longer more circuitous
paths to reach their destination.
d. Cost: Cost vary widely.
e. Transit service impacts: Transit routes will be planned to accommodate median barriers so the effect should be minimal.
f. Emergency service impact: Consultations with emergency service providers will take place before median barriers will be installed. Careful
planning of these facilities should minimize any negative impact.
g. Other considerations: A full median with no breaks can also be used to prohibit all left turns.
(8) Culs-de-sac (reduce cut-thru traffic).
a. Description: Complete closure of a street either at an intersection or at a mid-block location.
b. Advantages:
1. Very effective at eliminating most of the previously speeding traffic on the block.
2. Very effective at reducing volumes.
3. Can be landscaped for an attractive effect to convey street discontinuity.
4. Improves traffic safety.
c. Disadvantages:
1. Can negatively affect response times for emergency service.
2. In large neighborhoods, can shift a problem elsewhere unless a strategic pattern of cul-de-sacs are used.
3. Can generate confusion on the part of users unless signed carefully.
4. May inconvenience local residents.
d. Cost: $20,000 each.
e. Transit service impacts: Should not be placed on transit routes.
f. Emergency service impacts: Emergency service providers will be consulted before these are installed.
g. Other considerations: Inhibits provision of emergency services, but can be used using break away posts.
(9) Chokers (reduce cut-through traffic).
a. Description: Narrowing of a street at an intersection, mid-block or a segment of a street in order to reduce width of the traveled way by construction of a wider sidewalk or landscape strip.
b. Advantage:
1. Slight slowing is normally the result.
2. Shorter pedestrian crossing distances and better motorist-pedestrian visibility of each other.
3. Can discourage truck entry.
c. Disadvantages:
1. Potential obstacle for motorist to run into.
2. May impede bicycle mobility and safety.
3. May require reworking of surface drainage.
4. May result in loss of curbside parking.
d. Cost: $7,000 to $10,000 each.
e. Emergency service impacts: The impact should not be significant.
f. Transit service impacts: Doesn't impede service, but might affect scheduling.
g. Other considerations: Chokers will be 14 to 16 feet wide.
(10) Raised crosswalks (pedestrian safety).
a. Description: Crosswalks constructed 3 to 4 inches above the elevation of the street.
b. Purpose: Intended to reduce vehicle speeds specifically where pedestrians will be crossing a street.
c. Effectiveness: Effective at reducing vehicle speeds.
d. Cost: Between $2,000 and $5,000 each.
e. Noise impact: May generate noise from vehicle decelerating and accelerating.
f. Transit service impacts: N/A.
g. Emergency service impacts: N/A.
h. Other considerations: Consideration for visually impaired persons dictates not placing the raised crosswalk at the same elevation as the sidewalk. Though the crosswalk is
raised from the street surface, a pedestrian should also be able to tell when they are entering an area
shared with automobiles.
(11) Curb extensions (pedestrian safety).
a. Purpose: Employed to make pedestrian crossing easier and to narrow the roadway.
b. Effectiveness: Improve pedestrian safety by reducing the street crossing distance and improving sight distance. These may also slightly influence driver behavior by changing the appearance of the street. They can
be installed either at intersections or midblock.
c. Advantages:
1. Reduce pedestrian crossing distance and time.
2. Make pedestrian crossing points more visible to drivers.
3. Prevent vehicles from passing other vehicles that are turning.
4. May visually enhance the street through landscaping.
5. Does not slow fire vehicles.
d. Disadvantages:
1. Require some parking removal.
2. May make it difficult to accommodate full bicycle lanes.
e. Cost: Between $7,000 and $10,000.
f. Transit service impact: Enhance service by moving the curb so riders step directly between the sidewalk
and bus door.
g. Emergency service impacts: N/A.
h. Other considerations: N/A.
(Ord. No. 98-1103, §§ 4.0—4.11, 9-2-98) Secs. 78-107—78-149. Reserved.
ARTICLE V. FULTON COUNTY
AUTOMATED TRAFFIC ENFORCEMENT
Sec. 78-150. General definitions.
The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning:
Owner means the registrant of a motor vehicle, except that such term shall not include a motor vehicle rental company when a motor
vehicle registered by such company is being operated by another person under a rental agreement with such company.
Recorded images means images recorded by a traffic-control signal monitoring device:
(1) On:
a. Two or more photographs;
b. Two or more microphotographs;
c. Two or more electronic images;
or
d. Videotape; and
(2) Showing a traffic-control signal displaying a circular red or red arrow signal along with the rear of a motor
vehicle apparently operated in disregard or disobedience of such signal and, on at least one image or portion
of tape, clearly revealing the number or other identifying designation of the license plate displayed on the motor vehicle.
Traffic-control signal monitoring device means a device with one or more motor vehicle sensors working in conjunction with a traffic-control signal to produce recorded images of motor vehicles being operated in disregard or disobedience of a circular red or red arrow signal.
(Res. No. 05-0692, 6-1-05) Sec. 78-151. Authorization of traffic-control signal monitoring devices.
Subject to the provisions of O.C.G.A. § 40-14- 21, the board of commissioners authorizes the use of traffic-control signal monitoring devices for purposes of automated traffic enforcement. Use of said devices shall be governed by the provisions of
O.C.G.A. §§ 40-6-20, 40-14-21, 40-14-22, 40-14-23,
and 40-14-24, and any other applicable provisions of law.
(Res. No. 05-0692, 6-1-05) Sec. 78-152. Identification of intersections for use of traffic-control signal monitoring devices.
The Fulton County Police Department shall be responsible for the identification and selection of intersections where traffic-control signal monitoring devices will be utilized and for compliance with O.C.G.A. § 40-14-22 and 40-14-23.
(Res. No. 05-0692, 6-1-05) Sec. 78-153. Enforcement.
The Fulton County Police Department shall be responsible for the administration and enforcement of this article as required by O.C.G.A. § 40- 6-20.
(Res. No. 05-0692, 6-1-05) Sec. 78-154. Civil penalty.
The driver of a motor vehicle cited pursuant to this article shall be liable for a civil monetary penalty not to exceed $70.00. Citations shall be issued by the Fulton County Police Department in accordance with O.C.G.A. § 40-6-20(f)(3)(B).
(Res. No. 05-0692, 6-1-05) Sec. 78-155. Contesting the civil penalty.
(a) In accordance with O.C.G.A. § 40-6- 20(f)(3)(D), liability shall be determined based upon a preponderance of the evidence. Primafacie evidence that the vehicle described in the citation issued pursuant to this article was operated in violation of O.C.G.A. § 40-6-20(a), together with proof that the defendant was at the time of
such violation the registered owner of the vehicle, shall permit the trier of fact in its discretion to infer that such owner of the vehicle was the driver of the vehicle at the time of the alleged violation.
Such an inference may be rebutted if the owner of the vehicle:
(1) Testifies under oath in open court that he or she was not the operator of the vehicle at the time of the alleged violation;
(2) Presents to the court prior to the return date established on the citation a certified copy of a police report showing that the vehicle had been reported to the police as stolen prior to the time of the alleged violation; or
(3) Submits to the court prior to the return date established on the citation a sworn notarized statement identifying the name of the operator of the vehicle at the time of the alleged violation.
(b) The provisions of this article shall not limit law enforcement agencies to the use of trafficcontrol signal monitoring devices in enforcing O.C.G.A. § 40-6-20(a); and, when there is evidence obtained from another source or sources which constitutes a prima-facie case of a violation
of O.C.G.A. § 40-6-20(a), such violation may be prosecuted as otherwise provided by law in lieu of, but not in addition to, enforcement under this article.
(Res. No. 05-0692, 6-1-05) Sec. 78-156. Warning period.
In accordance with O.C.G.A. § 40-6-20(f)(3)(B), only warning notices and not citations for violations shall be sent during the 30-day period following the installation of any traffic-control
signal monitoring device.
(Res. No. 05-0692, 6-1-05) Chapters 79-81
RESERVED
Chapter 82
UTILITIES*
Appendix A1 Local Limits: North Fulton County Industrial Pretreatment Limits Big Creek and John's Creek WRPs
Appendix A2 South Fulton County Industrial Pretreatment Limits Camp Creek WRP Appendix A3 Organics Discharge Limits Based on Fume Toxicity Appendix A4 Combined Waste Formula Appendix A5 Groundwater Remediation Criteria Appendix B1 Minimum Treatment Requirements for Commercial Facilities Appendix B2
Typical Food Service Piping Layout Appendix B3 Fee Schedule for Commercial Pretreatment
ARTICLE I. IN GENERAL*
Sec. 82-1. Water conservation program.
(a) This section shall be known as the Fulton County Water Conservation Program. Its purpose is to conserve potable water; to meet requirements of state and federal regulations; and similar related purposes.
(b) The Fulton County Water Conservation Program shall be that document entitled RFulton County, Department of Public Works, Water Conservation Plan,R dated January 2003 or any subsequent revision thereof approved by the board of commissioners.
(c) It is the policy of Fulton County to promote water conservation by regulating outdoor water use and by complying with the laws and regulations imposed by the state on outdoor water use.
(d) Restrictions for outdoor water use during non-drought periods.
(1) Restricted uses. The following uses are restricted by hours of the day or by days of the week.
a. In accordance with O.C.G.A. § 12- 5-7, during non-drought periods persons may irrigate for purposes of planting, growing, managing, or maintaining ground cover, trees, shrubs, or other plants, seven days a week, but only between the hours of 4:00 p.m. and 10:00 a.m.
b. Other outdoor water use not listed in subsections (d)(1)a. immediately above and (d)(2) below may occur during non-drought periods 24 hours per day but only on the following days:
1. Outdoor water use at oddnumbered addresses is allowed on Tuesdays, Thursdays, and
Sundays.
2. Outdoor water use at evennumbered addresses is allowed on Mondays, Wednesdays, and
Saturdays.
(2) Unrestricted uses. In accordance with O.C.G.A. § 12-5-7, the following outdoor uses are allowed during drought and non-drought periods, seven days a week, 24 hours per day:
a. Commercial agricultural operations as defined in O.C.G.A. § 1-3-3;
b. Capture and reuse of cooling system condensate or stormwater in compliance with applicable Fulton County ordinances and state guidelines;
c. Reuse of gray water in compliance with O.C.G.A. § 31-3-5.2 and applicable Fulton County Board of Health regulations adopted pursuant thereto;
d. Use of reclaimed wastewater by a designated user from a system permitted by the environmental protection division of the department to provide reclaimed wastewater;
e. Irrigation of personal food gardens;
f. Irrigation of new and replanted plant, seed, or turf in landscapes, golf courses or sports turf fields during installation and for a period of 30 days immediately following the date of installation;
g. Drip irrigation or irrigation using soaker hoses;
h. Hand watering with a hose with automatic cutoff or handheld container;
i. Use of water withdrawn from private wells or surface water by an owner or operator of property if such well or surface water is on said property;
j. Irrigation of horticulture crops held for sale, resale, or installation;
k. Irrigation of athletic fields, golf courses, or public turf grass recreational areas;
l. Installation, maintenance, or calibration or irrigation systems;
m. Hydroseeding.
(e) Any violation of section 82-1(c)(d) shall constitute a misdemeanor as set forth in article II, section 82-44.
(f) This amended section shall be effective January 1, 2011. Nothing in this article is intended to repeal any other duly enacted ordinance, resolution, or parts of ordinances or resolutions of the county, except where such ordinance, resolution, or parts of ordinances or resolutions are in direct conflict with this article.
Any such repeal under this section shall be to the extent of such conflict only and no further.
(Res. No. 04-1326, 12-15-04; Ord. No. 10-1248, 10-15-10; Ord. No. 18-0340, Att. A, 5-16-18) Sec. 82-2. Water cross connection control and backflow prevention program.
(a) This section shall be known as the Fulton County, Water System, Backflow Prevention and Cross Connection Control Program. Its purpose is to prevent water contamination via interconnections with unsafe and nonpotable sources; to meet requirements of state and federal regulations; and similar related purposes.
(b) The Fulton Water System Backflow Prevention and Cross Connection Control Program shall be that document entitled SFulton County,
Department of Public Works, Backflow Prevention Program,S dated October 2004 or any subsequent revision thereof approved by the
board of commissioners.
(Res. No. 04-1326, 12-15-04) Secs. 82-3—82-30. Reserved.
ARTICLE II. WATER SYSTEM*
DIVISION 1. GENERALLY
Sec. 82-31. Statement of necessity.
It is hereby determined necessary to the protection of the public health, safety, welfare, and convenience of the citizens of Fulton County, and
for the orderly development of the water distribution system of the county to establish three water service districts within the county, to
provide procedures for the laying of water mains, assessing the cost thereof, and fixing the service charges for the use of the facilities pursuant to the authority granted by article IX, section III of the Constitution of Georgia, as amended, the Fulton Water and Sewer System Act of 1929 (1929 Ga. Laws, page 621 et seq.), and the Fulton County Local Improvement Assessment Law of 1949 (1949 Ga. Laws, page 1423 et seq.).
(Res. No. 04-1326, 12-15-04) Sec. 82-32. Establishment of water service districts.
The following water service districts are hereby established:
(1) The North Fulton County Water Service District, consisting of that portion of unincorporated Fulton County lying north of the Chattahoochee River, including annexed areas of Alpharetta, Roswell, and Mountain Park where the water distribution system was installed by Fulton County.
(2) The South Fulton County Water Service District, consisting of that portion of unincorporated Fulton County lying south of the city limits of the City of Atlanta.
(3) The Sandy Springs Water Service District, consisting of that portion of unincorporated Fulton County lying north of the city limits of the City of Atlanta and south of the Chattahoochee River.
(Res. No. 04-1326, 12-15-04) Sec. 82-33. Procedures for construction of main by assessing all or a part of the cost thereof against abutting landowners.
(a) Whenever a petition to lay a water main in any public roadway, with the exception of subdivisions, at the expense, in whole or in part, of the owners of the abutting property, has been filed with the board of commissioners, or the commissioners of their own motion have considered a proposal to lay such main, the director of public works shall survey the route of the proposed water main and obtain an estimate of the cost of the facilities, including labor and materials. When the foregoing has been accomplished, the board of commissioners shall consider the matter and take such action thereon as in its judgment shall be proper. However, any extension of water mains in these water service districts will be considered by the board of commissioners only upon agreement of the interested property owners to pay the assessment fees applicable to their district as may be established from time to time by the board of
commissioners.
(b) Whenever the board of commissioners shall determine from a preliminary survey that the project has merit and will serve a public need, it shall set a time and place for public hearing thereon before the board of commissioners. Notice of the public hearing shall be given to the owners of the abutting property, in writing by regular mail, at least ten days in advance of the hearing, and by the publication of the notice, one time not less than ten days in advance of the hearing, in the newspaper in which notices of sheriff's sales for Fulton County are published. The notice shall describe generally the facility to be constructed and the route thereof, and shall further state the cost to be assessed against the owners of the abutting property, and the nature of the work or improvement proposed to be made.
(c) At the time and place fixed for the hearing and after publication of the notice, the board of commissioners shall proceed to hear the proposal, including objections thereto, if any, of any party at interest, and shall take any action on the proposal as in the judgment of the board of commissioners will best promote the public interest, either approving or disapproving the proposal or postponing decision to a later date. Such
action shall be by resolution of the board of commissioners and may be adopted at the next meeting after its advertisement, and after having heard objections thereto, or at any subsequent meeting.
(d) After the passage of a resolution ordering the installation of the water main, all property owners to be assessed for the cost of the main who do not, within 15 days thereafter, commence legal proceedings to prevent the assessment being made, shall be conclusively presumed to have accepted the terms of the assessment and shall have agreed that the assessment may be made.
(e) In all cases where the proposal is approved, the board of commissioners shall by proper resolution, entered on the minutes of the meeting, authorize the construction of the facility in accordance with the plans and cost estimates
prepared by the department of public works. The board of commissioners may undertake the construction with county forces and material purchased by the county, or may proceed to let a contract with an independent contractor, or with some municipality or some other governmental entity. It shall be the duty of the finance director and director of public works to maintain complete and accurate records of the cost of each project, separate and apart from the records maintained on other projects.
(f) The cost of such work shall be assessed against the owners of all property abutting the public roadways in which the main is laid and their respective properties, except on corner lots where the first 200 feet on the side, shall be exempt. The assessments shall be charged in accordance with the fee schedule prevailing at the time of approval by the board of commissioners.
(g) When the work on any project authorized under the foregoing procedure shall have been completed, the director of public works shall make a full report thereof to the board of commissioners, which report shall include the cost of the facility, a complete description thereof, and a
statement of the cost, whether in whole or in part, to be assessed against the owners of the abutting property, on each side of the water main so constructed.
(h) The director of public works shall also prepare for the approval of the board of commissioners a resolution and assessment roll, setting forth in detail the names of the owners of the
property to be assessed where the owners are known, the frontage of the property to be assessed, together with a statement of the total assessment against the individual property owner, which resolution and assessment roll shall be
placed upon the minutes of the board of commissioners.
(i) The cost of any improvement made pursuant to this article shall be a lien upon the respective properties from the date of the completion of the improvement and shall be enforceable in the same manner as executions for taxes, and
shall have the same rank and character as liens for taxes.
(j) The director of finance shall notify the owner, by regular mail, of any property assessed in the manner aforesaid and collect the assessment in full in accordance with the terms and payments as hereinafter set forth. Failure to
receive the notice shall not invalidate the assessment.
(k) Payment of an assessment may be made without interest or penalty at any time within 60 days from the date of the assessment.
(l) Should any property owner, so notified of an assessment against his property desire to pay it in installments, he shall apply to the director of finance, who is authorized and directed to approve payments of the total assessment on a deferred payment plan: one-fourth down within 60 days of date of notice, with the remainder in three equal annual installments. Payments made after 60 days shall draw interest from date of assessments at the rate of interest from time to being charged on unpaid state and county taxes.
All deferred installments shall be evidenced by a lien upon the property so improved by the construction of the water main and abutting the same. The director of finance is authorized to provide suitable forms to carry out this section.
(m) In all cases where the owner of the property assessed under this article shall fail to acknowledge the lien upon his property, pay the required cash payment, and agree to pay the remainder in installments, as provided herein, or shall fail to pay any installment when due, it shall be the duty of the director of finance to prepare and issue in the name of the board of commissioners an execution against the property and the owner thereof, if the owner is known, for the full amount of the assessment, or for the balance thereof if any portion has been paid, and file the execution with the Sheriff of Fulton County for levy upon and sale of the property so assessed in the same manner that executions for taxes due the state and county are issued, levied and collected.
(Res. No. 04-1326, 12-15-04) Sec. 82-34. Procedure for upgrading existing service.
In cases where the board of commissioners should, on its own motion, and without a public petition, authorize the construction of a new water main to improve the pressure and circulation of the system, the cost of such new main shall be assessed as otherwise provided in this
article. However, no assessment shall be levied against the owner of any property which has previously been assessed for and who has tapped onto the old existing water main, and collection of the assessment from any other owner shall be deferred until application is made by the owner for connection to the new water main. Upon making the application for connection to the new water main the assessment shall be paid either in cash or by the deferred payment procedure provided under this article. The assessment, although deferred under this section, shall be recorded and shall constitute an inchoate lien against the property, to be perfected upon the filing of the application for connection. All assessments under this section shall be paid at the prevailing rate at the time of application.
(Res. No. 04-1326, 12-15-04) Sec. 82-35. Procedures for connection to a water main.
(a) Any provision of this article to the contrary notwithstanding, no person shall be allowed to tap or connect to any water main constructed pursuant to this article until the person shall have paid all sums required of him/her hereunder and/or executed the notes and lien acknowledgements provided herein, to the extent and in the amount the same are applicable; provided, further,
no connection shall be allowed in any event until a tapping permit is issued by Fulton County.
(b) Nothing herein shall permit connection to a water main until a water meter has been installed, and no water shall be taken from any main except through a water meter unless otherwise provided. Nothing herein shall operate to relieve any person from the payment of such charges for water service as the quantity of
water used shall require, based upon the prevailing consumer rate in effect.
(c) Applicants for connection to the water system in the Sandy Springs Water Service District and in the South Fulton Water Service District shall make application in advance for the City of Atlanta Water Works Department and pay for the meter installation by the city. A tapping permit must be issued by Fulton County pursuant to subsection (a) of this section before applying to the city for a meter.
(d) Property owners desiring to connect to the water system in North Fulton County Water Service District shall make application for a water meter with Fulton County. A charge will be made for the water meter in accordance with the size meter required by the prevailing fee schedule. All meters shall be the property of Fulton County and shall not be removed or altered by any person, unless authorized by Fulton County.
(e) It shall be unlawful for any unauthorized person, firm, or corporation to perform any taps or connections to a water main, or remove or alter any water meter in the Fulton County Water Service District.
(Res. No. 04-1326, 12-15-04) Sec. 82-36. Charges for water service.
(a) Established. It is hereby determined necessary for the protection of the public health, safety, welfare and convenience of the citizens of
Fulton County, to repair and maintain the water system of the county and for the furnishing of the benefits of the system to the citizens of the county who are connected to the system, to fix and collect charges upon all property served by the Fulton County Water System.
(b) Rates. For the purpose provided in subsection (a) of this section, there is hereby charged and assessed to each parcel of property served by
connection to the Fulton County Water System, a water charge and assessment payable as hereinafter provided, and in the amount determinable as follows:
(1) South Fulton and Sandy Springs Water Service Districts. The water charge and assessments in the South Fulton and Sandy Springs Water Service Districts shall be in accordance with the regulations of the City of Atlanta Water System pursuant to the existing contracts between
Fulton County and the City of Atlanta.
(2) North Fulton Water Service District. The water charge, deposit, and assessment in the North Fulton Water Service District shall be based upon the prevailing fee schedule approved by the board of commissioners.
(3) Sprinkler system ready-to-serve charge.
There shall be charged and assessed against each connection of a fire sprinkler system, a monthly ready-to-serve charge as may be established from time to time by the board of commissioners. Interest on late payments may be charged in accordance with charges established.
(Res. No. 04-1326, 12-15-04) Sec. 82-37. Underwriter approved factory mutual fire line meter required on all fire service systems having fire hydrant or hydrants installed inside private property.
(a) Purpose of section. The purpose of this section is to require the installation of a factory mutual fire line water meter on all fire service systems having fire hydrants or hydrants attached to them on private property.
(b) Effective date. As of the adoption of this section, all persons making application for new fire service connections with private fire hydrant or hydrants will be required to have a factory mutual fire line meter installed as a part of the fire service system.
(c) Work to be performed by the department of public works forces. Installation of meters as required by this section will be handled by the department of public works crews at the expense of the building owner or lessee.
(Res. No. 04-1326, 12-15-04) Sec. 82-38. Damage to county-owned material; injury to equipment of Fulton County.
It shall be unlawful for any unauthorized person, firm, or corporation to tamper with, maliciously open, move, switch, mar, deface, destroy, paint, damage, or injure any fire hydrant, water main, water meter, or other appurtenances of the water distribution system of Fulton County, or any other property owned by Fulton County.
Violations of this section shall be punished as a misdemeanor.
(Res. No. 04-1326, 12-15-04) Sec. 82-39. Meters; disconnection; testing.
(a) Water meters may be disconnected at the owner's request received by the finance department and may be removed at the option of Fulton County for a fee as may be established from time
to time by the board of commissioners.
(b) Meters may be checked for misreading and obvious leaks by county personnel.
(c) A fee, as may be established from time to time by the board of commissioners, shall be charged should the property owner desire to have the meter tested and the meter is recording water consumption within acceptable limits.
(Res. No. 04-1326, 12-15-04) Sec. 82-40. Payment of bills.
(a) The water service charge provided by this article shall be payable to Fulton County by all customers in the North Fulton Water Service District and to the City of Atlanta by all customers in the South Fulton and the Sandy Springs Water Service Districts.
(b) Fulton County shall maintain properly indexed records in its office reflecting all unpaid accounts based on charges and assessments which constitute liens on real property under the provisions of this article and shall make such records available to title examiners and other members
of the public for examination.
(Res. No. 04-1326, 12-15-04) Sec. 82-41. Liens.
(a) All charges and assessments levied under this article shall become liens upon the property benefited from the date due and payable.
(b) Whenever the owner of any property chargeable under this article shall fail to pay any charge or assessment when it shall become due,
execution of a lien against the property shall be issued in the name of the board of commissioners and shall be signed by the director of finance or a designated representative.
(c) Said execution shall issue in rem against the property benefited by the service, and in personam against the owner thereof, and shall include, in addition to principal and interest, a fee for the issuance of the same as may be established from time to time by the board of commissioners.
(d) All executions issued against the property and the owner thereof shall immediately be recorded on the general execution docket in the office of the Clerk of the Superior Court of Fulton County. All executions issued under this article shall be subject to enforcement in the same manner as now provided for the enforcement of state and county tax fi. fas., including levy thereon and the filing and subsequent proceedings in connection with affidavits of illegality.
(Res. No. 04-1326, 12-15-04) Sec. 82-42. Discontinuance of service for nonpayment of bills.
Whenever the owner of any property chargeable under this article shall fail to pay any charge or assessment when the same shall become
due, and is given an opportunity to pay, and does not promptly pay the same, water service to the premises shall be discontinued.
(Res. No. 04-1326, 12-15-04) Sec. 82-43. Theft of service.
It shall be unlawful for any person, firm, or corporation to receive water service by deception and with the intent to avoid payment for said service which is available only for compensation.
When such theft of service is discovered, the appropriate law enforcement officials shall be notified and cases shall be prosecuted to the full extent of Georgia Law.
(Res. No. 04-1326, 12-15-04) Sec. 82-44. Violations of article;
misdemeanor.
(a) Any person who intentionally violates any provision of this article and who shall continue any violation beyond the time limit provided for the satisfactory correction, shall be guilty of a misdemeanor. Each day in which a violation shall continue shall constitute a separate offense.
(b) Any person convicted of violating the provisions of this article shall be punished in the manner prescribed by law for misdemeanors,
and shall further reimburse the county for any expenses, loss, or damage occasioned the county by reason of such violation such as the total cost incurred by the county to repair or replace facilities, e.g., damaged meters, service connections, pipelines, fire hydrants, or other appurtenances and lost revenue.
(c) Persons designated by Fulton County are hereby authorized to issue citations or summonses, or both, charging violations under this article, returnable to the State Court of Fulton
County, or to any other court having the jurisdiction of a commitment court throughout the entire county, for trial.
(d) No provision of this section shall prevent Fulton County from prosecuting theft of service to the full extent of Georgia law.
(Res. No. 04-1326, 12-15-04) Secs. 82-45—82-50. Reserved.
DIVISION 2. NORTH FULTON WATER
SERVICE DISTRICT*
Sec. 82-51. Scope of division.
The revisions of this division shall apply to all connections to the system in the North Fulton Water Service District.
(Res. No. 04-1326, 12-15-04) Sec. 82-52. Meters and recording devices.
(a) Required. Meters and indicating or recording devices of such size and kind as are required or approved by the director of water resources or
his representative shall be attached to all premises where county water is used.
(b) Ownership; maintenance. All such meters, indicating or recording devices shall be the property of the county and shall be installed according to the requirement of this article, or as provided by the current standards of the water resources department. After the installation of the first meter, indicating or recording device, the county shall keep same in repair and replace with a new one when necessary, except where it has been damaged by some neglect or act of the owner or any person on the property within the consent of the owner. In such case, the cost of repairs shall be charged to the owner or tenant.
Upon failure of any owner or tenant served by a meter so damaged to pay, within 30 days from date of bill, for the cost of such repairs, the water shall be shut off and service discontinued until the bill has been paid.
(c) Two or more premises on one service meter.
In cases where two or more premises with common ownership are supplied through one meter and one service, if at any time one or more of such premises are sold or otherwise transferred, the new owner of the transferred property shall be required to discontinue service to premises so acquired and shall have a separate meter installed.
(d) Obstructing or covering up meters and devices. No person shall obstruct, cover up, or hide any water meter, or any water indicating or recording device so that the inspector or meter reader or other employee of Fulton County cannot find or reach such meter or device.
(e) Right of entry for inspection, meter reading and other purposes. Authorized representatives of Fulton County shall have the right at all hours to enter upon the premises where county water is used for the purpose of inspecting the pipes;
setting, reading, and repairing meters; turning off or on the water; enforcing the ordinances and rules of the county; or regulating water service in any manner necessary. If any water user, whether owner or tenant, should refuse to allow entrance upon any premises for the purposes herein stated, the water shall be shut off from such premises until the requirements of this section are complied with.
(f) All new multi-family buildings shall be constructed so that each individual dwelling unit shall be metered in such a way that all water used by said dwelling unit can be recorded and billed.
(Res. No. 04-1326, 12-15-04; Res. No. 08-0195, 2-20-08; Res. No. 14-0331, 5-7-14) Sec. 82-53. Turning water on by person other than an authorized representative of Fulton County.
It shall be unlawful for any person other than an authorized representative of Fulton County to turn water into any service pipe.
(Res. No. 04-1326, 12-15-04) Sec. 82-54. Interfering with waterworks system; tapping; using water without permission.
No person shall interfere with or in any way intermeddle with any of the wells, reservoirs, basins, water mains, pipes, plugs, meters, or connection of the waterworks; nor make any connection therewith by tapping any of the mains or pipes, or otherwise, without the written permission of the department of water resources;
nor permit any such connections or tapping to be made on premises in his control as owner or tenant; nor use water from such unauthorized connections; nor supply water through such unauthorized connections without a permit from Fulton County for use of water.
(Res. No. 04-1326, 12-15-04; Res. No. 14-0331, 5-7-14) Sec. 82-55. Unauthorized possession of fire hydrant meter It shall be unlawful for any person to have in his possession any unauthorized fire hydrant meter.. Fire hydrant meters shall be installed by the department of water resources after the requesting party makes proper application and pays applicable fees. The hydrant meter shall be installed as close as possible to the requested location.
(Res. No. 04-1326, 12-15-04; Res. No. 14-0331, 5-7-14) Sec. 82-56. Use of water without permit.
It shall be unlawful for any owner or tenant to supply water to any other property, person, or user, from the pipes or meters serving water from the system, or to use water from any such water pipe, meter, hydrant, or other device or fixture through which county water may be drawn or used, without a permit from Fulton County. No person shall turn water off or on from any county water pipeline or related appurtenance unless the person has permission from an authorized representative of Fulton County. It shall be unlawful for any person to take or use water from any fire plug, hydrant, valve, pipe, other device or fixture, opening or connection of the system, or to open any plug, hydrant, valve, pipe, or other fixture for the purpose of taking or using the water, unless the person shall have permission from the department of water resources, or is an authorized representative of Fulton County and is acting in
the discharge of his duty as such. No person to whom a permit is issued for the use of water for any purpose whatever, including construction purposes, tamping, irrigating, testing, flushing, and the like, shall use or consent to the use of water not authorized by permit from Fulton County.
(Res. No. 04-1326, 12-15-04; Res. No. 14-0331, 5-7-14) Sec. 82-57. Supplying county water to premises of another.
No person, whether owner or tenant, receiving water supplied from the county system shall supply any other person, family, or premises except for a common association or commercial authority such as a master metered multi-family housing complex, shopping center, etc. If any person, either as owner or tenant, shall violate or permit other persons to violate any provision of this article, the supply of water to the premises shall be shut off and service discontinued forthwith. The water shall not again be turned on until such unauthorized use of water is stopped and there shall have been paid to the county any charges as the finance director or his representative may determine to be due for water used in violation of this article and for the expense of cutting off and restoring water service.
(Res. No. 04-1326, 12-15-04) Sec. 82-58. Effect of fraudulent representation or unauthorized use of water.
If the supply of water shall have been turned on to any premises, and afterwards it shall be found that false representation has been made by such applicant, or that water is being used in or upon the premises for purposes not set forth in the application made for the water supply to the premises, the water shall be shut off, and shall remain shut off, until all unauthorized use of water has been stopped, and any sum of money determined due for the use has been paid to the county.
(Res. No. 04-1326, 12-15-04) Sec. 82-59. Waste of water.
If it is found that there is a waste of water in or about any premises to which water is supplied from the system, either by willful waste or by means of a leak in any water pipe or fixture located in or upon the premises, Fulton County may cause the water to be cut off from the premises upon 24 hours notice to the occupant, unless special circumstances require that such waste shall be immediately stopped. Where the water supply is cut off as herein provided, the water shall not again be turned on until all water bills and the bill for the cost of cutting off and again turning on the water shall have been paid.
(Res. No. 04-1326, 12-15-04) Sec. 82-60. Shutting off water in case of emergency or necessity.
Fulton County may shut off the supply of water from any pipe or water main in case of emergency, or for repairs or extensions as necessity may require. Reasonable notice shall be given when practicable; however, the county, its
officers, and employees shall not be held liable for any damage for shutting off the water in such cases as herein provided, or for insufficient supply of water.
(Res. No. 04-1326, 12-15-04) Sec. 82-61. Opening streets; protection for water pipes required.
(a) Generally. Any person who may open the streets or roadways in which there are water pipes, valves or other appurtenances of the system, shall provide for the protection of these pipes where they are exposed by the opening, and the protection shall be such as to preserve the pipes and prevent them from freezing or breaking or from injury in any manner. This section shall apply to all water pipes, mains, laterals, services, connections, or other appurtenances of the water distribution system
(b) Cost of work. If county resources are required to protect water pipes, valves or other appurtenances, the cost or expense to the county for this work shall be charged to and paid by the person who is responsible for the exposure of the system.
(Res. No. 04-1326, 12-15-04) Sec. 82-62. Connection of private water system to county system.
It shall be unlawful to connect any private water pipe, which takes water from any point, well, reservoir, or other source, to pipes which are connected with the water system of the county. Any violation of this section shall cause the permit for the connection from the county's water service to be immediately revoked, and the water shall be shut off until each connection or cross connection to the private well, pond, or reservoir is disconnected and removed.
(Res. No. 04-1326, 12-15-04) Sec. 82-63. Extension of water pipes inside county by person at his own expense.
All contracts made between the county and persons who, at their own expense, desire the county to extend water pipes inside the county service area shall provide that the design shall be approved and the cost of the extension shall be estimated by the department of water resources, and the amount of such estimate shall thereupon be paid into the county treasury. The work of the extension shall then be done by the county, and subsequent connections to the pipes shall be made only upon permission of the county and upon any terms as the county may, at the time, prescribe.
(Res. No. 04-1326, 12-15-04; Res. No. 14-0331, 5-7-14) Sec. 82-64. Discontinuance of service.
If the sums due for water service are not paid by the due date, the water may be cut off from the service to the owner or tenant of the premises.
No claim for damage, therefore, shall be urged or claimed by the owner or tenant on account of discontinuance of water service. Fulton County may discontinue service to any customer found to be delinquent on any water or sewer account.
(Res. No. 04-1326, 12-15-04) Sec. 82-65. Water to be cut off in case of violation.
Upon the discovery of the violation of any provision of this article, any ordinance regulating the use of water, or any rule adopted by the department of water resources, it shall be the
duty of Fulton County to discontinue water service to the person guilty of the violation and to the property owned, occupied or controlled by him.
(Res. No. 04-1326, 12-15-04; Res. No. 14-0331, 5-7-14) Sec. 82-66. Persons responsible for violations.
Responsibility for failure to comply with the requirements of this article, or any ordinance, rule, or regulation relating to the system or the use of water therefrom, and responsibility for the violation of any provision thereof, shall be upon the owner and the tenant as well as upon the individual guilty of the violation.
(Res. No. 04-1326, 12-15-04) Sec. 82-67. Use of fire hydrants.
(a) Schedule of charges. No person shall be allowed to use water from any fire hydrant connected to the water system owned by Fulton County, except by special permit from the department of water resources; and in cases where a permit is granted, charges shall be made as
follows: the department of water resources shall install a hydrant meter with backflow preventer as prescribed by the department of water resources and the quantity of water used shall be charged to the customer at the prevailing rates in effect in the North Fulton Water District.
(b) Deposits required. A deposit, as established from time to time by the board of commissioners, shall be required with each application for installation of a hydrant meter. Part of the deposit may be credited against the water charge for the
hydrant usage when the meter is removed. If the meter is damaged prior to removal by the county, charges against the deposit shall be applied.
(c) Backflow prevention. Proper backflow prevention measures shall be incorporated as provided by the cross connection control program referenced elsewhere in this article.
(Res. No. 04-1326, 12-15-04; Res. No. 14-0331, 5-7-14) Sec. 82-68. Temporary use of water by contractors and others.
(a) Charges. Contractors and other persons may be supplied with metered water for temporary use according to the regular rates prevailing in the North Fulton Water Service District.
(b) Deposit. Prior to any temporary connection, the applicant therefore shall be required to deposit an amount equal to twice that required
for water meter installation under the terms of section 82-36(d) of this article. This deposit shall be held by the department of water resources as a guarantee of the safety of the meter and other equipment owned by the county furnished to such persons, and to cover the cost of installation and removal of the meter and temporary service line. Upon payment of all charges and the removal and discontinuance of service through the meter, and the return of the meter to the department of water resources in good condition, one-half of the amount of the deposit shall be refunded.
(c) [Effect of rezoning.] Should zoning changes occur during the time period of temporary service which requires upgrading the service; all modifications will be performed at no expense to Fulton County.
(Res. No. 04-1326, 12-15-04; Res. No. 14-0331, 5-7-14) Sec. 82-69. Charges where two or more meters supply one person.
Where two or more meters supplying one person are used in supplying one premises, the water consumption as shown by all meters may, in the director's discretion, be consolidated and the rates as fixed be charged for all water consumed.
(Res. No. 04-1326, 12-15-04) Sec. 82-70. Blueprints of industrial, commercial, and high-rise buildings to show proposed location and
size of water mains, recommended water meter sizes, and to identify organizations assuming financial responsibility during the construction period.
(a) Purpose of section. The purpose of this section is to require blueprints used in applying for a building permit on commercial, industrial, and high-rise buildings contain the proposed size and location of water meters to serve these facilities; in order to determine the availability of an adequate water supply to meet domestic, industrial, and fire service requirements; and to set up a schedule of recommended water meter sizes. It is also the intention of this section to authorize billing for six-inch or larger fire line water meters during building construction to measure actual water consumption. Minimum billing for water consumption shall be not less than the minimum charge for a five-eighths-inch by three-quarters-inch water meter.
(b) Authority to determine meter size. The department of water resources shall be authorized to use its discretion in requiring the installation of water meters of adequate size in existing buildings.
(c) Authority to discontinue service; waive cutoff fees. Authorized representatives of Fulton County shall be authorized to cut off water services to buildings whose owners refuse to comply with the provisions of this section upon proper notification, and shall be authorized to waive cutoff fees established by other ordinances.
(d) Authority to render bill for actual consumption for six-inch and larger fire line water meter during building construction. The department of
finance shall be authorized to render bills for six-inch and larger fire line water meters during building construction for the amount of actual water consumption, but not less than the minimum charge for a five-eighths-inch by threequarters-inch water meter, as an inducement to property owners to have the fire line meters
turned on and connected to building piping as soon as possible to ensure water for firefighting purposes. After completion of the building, all six-inch and larger fire line water meters will be billed at regular rates for the size of meter actually installed.
(Res. No. 04-1326, 12-15-04; Res. No. 14-0331, 5-7-14) Sec. 82-71. Allowance for old meter when larger meter installed.
Where it is necessary to enlarge a water service by installation of a meter larger than the one in use, the department of water resources is authorized to allow for service values as established from time to time by the board of commissioners.
(Res. No. 04-1326, 12-15-04; Res. No. 14-0331, 5-7-14) Sec. 82-72. Charges for terminating water service.
Whenever it is necessary for the county to terminate water service because of nonpayment of a bill, the department of finance is authorized to charge fines as may be established from time to time by the board of commissioners. All charges incurred must be fully paid before water service is restored unless Fulton County waives such charges or authorizes partial payment.
(Res. No. 04-1326, 12-15-04) Sec. 82-73. Penalty for having water illegally turned on.
Should the water be cut off from any premises by Fulton County for nonpayment of any bills, or any other cause, and afterwards the water is found to be on, the water meter may be removed or the water service plugged; and a fine, as may be established from time to time by the board of commissioners, shall be levied against the property and must be paid before the water is again turned on.
(Res. No. 04-1326, 12-15-04) Sec. 82-74. Penalty for illegally using water through other meter.
Whenever water service has been cut off for any reason, and it is found that the occupants are using water through another meter or service, the department of finance is authorized to terminate service and fine the responsible party;
and if the bill or charge is not paid, Fulton County shall shut off and discontinue water from all meters serving the property until the bill is paid in full.
(Res. No. 04-1326, 12-15-04) Sec. 82-75. Using water through unauthorized connection.
(a) Imposition of charges. Should any person use water through any unauthorized pipe or connection, or without the permission of Fulton County, in addition to a tampering fine, charges shall be made against the premises for the estimated quantity of water used; and the water shall be cut off and not turned on again until the bill is paid and permission given for continuance of the supply.
(b) Amount of charges. If water is used from an unauthorized connection, the charges shall be in accordance with the schedule of rates then in effect, plus a penalty listed on the current fee schedule approved by the board of commissioners. In addition, if the unauthorized use of unmetered water is from a fire hydrant, a connection charge and a daily charge for water used, plus the necessary repairs to the fire hydrant or
to the waterworks system, may be made by the department of finance for each such unauthorized connection.
(Res. No. 04-1326, 12-15-04) Sec. 82-76. Charges for moving water meters.
The department of water resources is hereby authorized to establish and collect charges for moving water meters for the convenience of the consumer in accordance with the current material, labor, and equipment charges as determined by the department of water resources.
(Res. No. 04-1326, 12-15-04; Res. No. 14-0331, 5-7-14) Sec. 82-77. Potable water distribution systems within new detached single-family residential developments.
(a) Scope. This section shall apply to all potable water distribution systems within gated or nongated detached single-family residential developments connecting to the North Fulton Water System and approved for construction after the
effective date of this section.
(b) Construction and installation. All construction plans for the potable water distribution system shall be approved by the department of
water resources. No subdivider of land shall proceed with any construction work on the proposed water system before obtaining the necessary approvals and permits. The water system shall be constructed in accordance with the
approved plans and Fulton County standards, including but not limited the following:
(1) Construction material shall meet Fulton County standards;
(2) The development shall be constructed in accordance with Fulton County standards;
and
(3) Necessary access and easements shall be granted to Fulton County for the county to inspect, operate and maintain the system.
The department of water resources shall have full authority to inspect, test, accept or reject all water mains laid within the new development, and to withhold water service until the installation is accepted for use by the county.
(c) Authority to establish minimum standards.
The department of water resources shall be authorized to establish and revise minimum standards for the construction, inspection, and assessment of all such potable water distribution systems.
(d) Ownership and maintenance. Fulton County shall take ownership of and maintain responsibility for the operation and maintenance of all potable water distribution systems within new detached single-family residential developments, whether gated or non-gated within the North Fulton Water Service area.
(e) Right of entry; easements; special conditions. Where a development is served by private streets, the subdivider shall provide Fulton County
with any and all easements, access and special conditions necessary, which shall be established by the department of water resources and included in the final plat and in an owner/development agreement. Under the terms of section 82-52(e) of this article, authorized representatives of Fulton County shall have the right to enter upon the premises where county water is used for any purpose related to the operation and/or maintenance of the potable water system.
(f) Warranty of installation. Upon receipt of plan approval from the Fulton County Department of Water Resources, the developer shall submit a fully executed copy of the standard
Towner/developer agreement,T as furnished by Fulton County, for the water main installation.
This agreement shall provide that the developer warrants the installation of new mains and appurtenances, including fire hydrants and services from the mains to the water meters for a period of one calendar year from the date of acceptance of the mains by Fulton County. If within that one year, it is determined that the developer's contractor failed to follow Fulton County standards and specifications for construction, or utilized non-specified materials or procedures, the developer shall extend the warranty for an additional four years.
(g) Authority to execute development agreements. The director of the department of water resources shall be authorized to execute any and
all agreements in his or her discretion, as may be necessary for Fulton County ownership, operation and maintenance of proposed potable water distribution systems, subject to approval as to
form and substance by the office of the county attorney.
(Res. No. 14-0331, 5-7-14) Secs. 82-78—82-105. Reserved.
ARTICLE III. SEWERS AND SEWAGE
DISPOSAL*
DIVISION 1. GENERALLY
Sec. 82-106. Purpose of article.
The purpose of this article is to ensure adequate public facilities are available to serve new growth and development in Fulton County and to regulate the use and development of land so that new growth and development bears a proportionate share of the cost of new public facilities needed to serve new growth and development.
(92-RC-527, art. II, § 2, 11-18-92; Res. No.
06-1167, 11-15-06) Sec. 82-107. Definitions.
For the purposes of this article, the following words and terms are defined:
Building drain means that part of the lowest horizontal piping of a drainage system which receives the discharge from drainage pipes located inside the walls of the building and conveys it to the building sewer or sewer service lateral, beginning five feet (1.5 meters) outside the inner face of the building wall.
Building sewer or sewer service lateral means the extension from the building drain to the public (county) sewer.
Capacity is a measure of the sewage carrying ability of given components of the sewerage system and is the maximum flow of sewage, measured in gallons per day, that can be safely and efficiently transported.
Line capacity means the maximum quantity of sewage in a given segment of sewer line for a given time period at a minimum slope and maximum depth of flow.
System capacity means the capacity of a given sewerage system of pumps, pipelines and appurtenances.
Development generating sewage flow means any additional flow of sewage into the sewerage system resulting from construction, expansion, change in use of a building or structure, or any change in the use of land.
Direct improvements are always project improvements, not system improvements. Direct improvements include, but are not limited to, any sewers and lines, or any portion thereof, exclusively destined for a development generating sewage flow.
Excess capacity means that proportion of the capacity of a given sewer line segment or sewerage system which is beyond that necessary to provide a specified level of service insofar as
such excess is not a result of engineering design factors such as prudent safety margins or functions of standard material sizes.
Impact means the effect of additional sewage flow on a sewer system in a given basin or service area.
Level of service is a measure of the relationship between capacity and service demand expressed in terms of demand to capacity ratios
or the comfort and convenience of use or both.
More specifically for sewers, level of service is a qualitative measure describing the collective factors of sewer line segment or sewerage system capacity, service demand, depth of flow, overflow
conditions and operating costs for specified service conditions.
Project improvements means site improvements and facilities that are planned and designed to provide service for a particular development
project and that are necessary for the use and convenience of the occupants or users of the project and that are not system improvements.
The character of the improvement shall determine whether an improvement is a project improvement or a system improvement and the physical location of the improvement onsite or offsite
shall not be considered determinative of whether an improvement is a project improvement or a system improvement. If an improvement or facility provides or will provide more than incidental service or capacity to persons other than users or
occupants of a particular project, the improvement or facility is a system improvement and shall not be considered a project improvement.
*Local Constitutional Amendments and Local Acts reference—Authority to provide sewer service, § 1-114.
No improvement or facility included in a plan for public facilities approved by the Fulton County Board of Commissioners shall be considered a project improvement.
Proportionate share means that portion of the cost of improvements which is reasonably related to the service demands and needs of the project.
Sanitary sewer means a sewer which carries sewage and to which storm water, surface water and groundwater are not intentionally admitted.
Sewage means a combination of the watercarried wastes from residences, business buildings, institutions and industrial establishments, together with such groundwater, surface water
and storm water as may be present.
Sewage works means all facilities for collecting, pumping, treating and disposing of sewage.
Sewerage system means a combination of methods for collecting and transporting untreated wastewater, from its source of generation to a sewage treatment plant. This includes street sewers (which collect sewage from building sewers or sewer service laterals), outfalls which collect sewage from the street sewers and interceptors or main collector sewers which collect sewage from outfalls and lead directly to the treatment plant.
Sewerage improvements means the improvements to system of pipes, pumps, and facilities necessary to provide collection, treatment and
disposal of sanitary sewage. The improvements include, but are not limited to, the following:
(1) Rights-of-way and easements;
(2) Collection sewer mains;
(3) Outfall, interceptor, and relief sewers;
(4) Pumping and discharge stations;
(5) Wastewater treatment facilities; and
(6) Sludge handling systems.
System expansion means those capital improvements which expand the capacity of a system to carry and/or treat additional sewage flows.
System extension means those capital improvements which extend a system to new geographic areas, but do not necessarily expand capacity to
carry and/or treat additional sewage flows. Any sewerage system extension or portion thereof which provides capacity only for the development to which it is being extended is considered a project improvement not a system improvement;
only that proportion of a sewerage system extension which provides excess capacity beyond that required by the development to which the extension is made is not a project improvement.
System improvements means capital improvements that are public facilities designed to provide service to the community at large, in contrast to project improvements.
System improvement costs mean costs incurred to provide additional sewerage system capacity needed to serve new growth and development associated with planning, design, engineering, construction, land acquisition and land improvement. Specifically, costs include, but are not limited to, the construction contract price, surveying, engineering fees, related land acquisition costs
including land purchases, court awards and costs, attorneys' fees, expert witness fees, expenses incurred for qualified staff or any qualified engineer, planner, architect, landscape architect, or financial consultant for preparing or updating the
capital improvement element, and administrative costs, provided that such administrative costs shall not exceed three percent of the total amount of the costs. Projected interest charges and other finance costs may be included if the fees are to be used for the payment of principal and interest on bonds, notes, or other financial obligations issued by or on behalf of Fulton County to finance the capital improvements element, but such costs do not include routine and periodic maintenance expenditures, personnel training, and other operating costs.
(92-RC-527, art. IV, § 1, 11-18-92; Res. No. 06- 1167, 11-15-06) Sec. 82-108. Rules of construction.
For the purposes of administration and enforcement of this article, unless otherwise stated in this article, the following rules of construction
shall apply to the text of this article:
(1) In the case of any difference of meaning or implication between the text of this article and any caption, illustration, summary table or illustrative table, the text shall control.
(2) The word "shall" is always mandatory and not discretionary; the word "may" is permissive.
(3) Words used in the present tense shall include the future, and words used in the singular number shall include the plural and the plural the singular, unless the context clearly indicates the contrary.
(4) The word "person" includes an individual, a corporation, a partnership, an incorporated association, or any other similar entity.
(5) Unless the context clearly indicates the contrary, where a regulation involves two or more items, conditions, provisions, or events connected by the conjunction "and," "or," or "either ... or," the conjunction shall be interpreted as follows:
a. "And" indicates that all the connected terms, conditions, provisions, or events shall apply.
b. "Or" indicates that the connected items, conditions, provisions, or events may apply singly or in any combination.
c. "Either... or" indicates that the connected items, conditions, provisions, or events shall apply singly but not
in combination.
(6) The word "includes" shall not limit a term to the specific example but is intended to extend its meaning to all other instances or circumstances of like kind or character.
(7) The section headings used in this article are included solely for convenience and shall not affect, or be used in connection with, the interpretation of this article.
(8) The intent of this article in granting credits and/or refunds is to make such grants to persons or entities who actually paid or
will pay fees whether they be "developer" or "property owner" or some other entity.
(92-RC-527, art. III, § 2, 11-18-92; Res. No. 06- 1167, 11-15-06) Sec. 82-109. Violations of article; misdemeanor.
(a) Any person found to be violating any provisions of this article shall be served written notice stating the nature of the violation and
providing a reasonable time limit for the satisfactory correction thereof. The offender shall, within the period of time stated in such notice, permanently cease all violations.
(b) Any person who intentionally violates any provision of this article or who shall continue any violation (intentional or otherwise) beyond the time limit provided for the satisfactory corrections thereof shall be guilty of a misdemeanor.
Each day in which such violation shall continue shall constitute a separate offense.
(c) Any person, firm, or corporation convicted of violating the provisions of this article shall be punished in the manner prescribed by law for misdemeanors, and shall further reimburse the county for any expense, loss, or damage occasioned by the county by reason of such violation.
(d) A failure of the property owner to connect to the sewer collection system within the specified time shall authorize the county to discontinue water service to the premises in addition to the penalties otherwise provided for violation of this article.
(e) Persons designated by the Fulton County Board of Commissioners are hereby authorized to issue citations or summonses, or both, to persons violating these regulations returnable to the State Court of Fulton County, or to any other court having the jurisdiction of a commitment court throughout the entire county, for trial.
(Code 1983, § 28-2-222; Res. No. 06-1167, 11-15- 06) Sec. 82-110. Application of article.
This article shall apply to all unincorporated areas of Fulton County and any other area served by the Fulton County Sewer System.
(92-RC-527, art. I, § 4, 11-18-92; Res. No. 06-1167, 11-15-06) Sec. 82-111. Interpretation of article.
(a) The provisions of this article shall be liberally construed so as to effectively carry out its purpose in the interest of the public health, safety,
and general welfare.
(b) The provisions of this article shall not be construed to limit the power of the county to adopt such an ordinance pursuant to any other source of local authority or to use any other methods or powers otherwise available for accomplishing the purposes set forth herein, either in substitution of or in conjunction with this article.
(92-RC-527, art. I, § 3, art. III, § 1, 11-18-92; Res.
No. 06-1167, 11-15-06) Sec. 82-112. Effect of article on fees and charges related to physical improvements to sewerage system.
Insofar as this article affects fees and charges related to physical improvements to the sewerage system, it is intended to implement and be consistent with the Development Impact Fee Act (O.C.G.A. § 36-71-1 et seq.) as such act directly or
indirectly affects extension of the sewerage system from existing facilities to development sites.
(92-RC-527, art. II, § 1, 11-18-92; Res. No. 06- 1167, 11-15-06) Sec. 82-113. Powers of inspectors specified.
(a) Duly authorized employees of the county shall be permitted to enter all properties for the purposes of inspection, observation, measurement, sampling, and testing in accordance with the provisions of this article. Such inspectors
shall have no authority to inquire into any processes including metallurgical, chemical, oil, refining, ceramic, paper, or other industries beyond that point having a direct bearing on the kind and
source of discharge to the sewers or waterways or facilities for wastewater treatment
(b) While performing the necessary work on private properties referred to in subsection (a) of this section, duly authorized employees of the county shall observe all safety rules applicable to the premises established by the owner, and the owner shall be held harmless for injury or death to the county employees, and the county shall indemnify the owner against loss or damage to its property by county employees and against liability claims and demands for personal injury or property damage asserted against the owner and
growing out of the gauging and sampling operations, except as such may be caused by negligence or failure of the owner to maintain safe conditions.
(c) Duly authorized employees of the county shall be permitted to enter all private properties through which the county holds a duly negotiated easement for the purpose of, but not limited to, inspection, observation, measurement, sampling, repair, and maintenance of any portion of the sewage works lying within the easement. All entry and subsequent work, if any, on the easement, shall be done in full accordance with the provisions of the current county approved standards and the terms of the duly negotiated easement pertaining to the private property involved
(d) Duly authorized employees of the county shall be authorized to issue summons to appear before the State Court of Fulton County to answer charges of violations of this article.
(Code 1983, § 28-2-221; Res. No. 06-1167, 11-15- 06) Sec. 82-114. Entry on property.
The director of public works and other duly authorized employees of the county department, bearing proper credentials and identification, shall be permitted to enter upon all properties, at all reasonable times, for the purpose of inspection, observation, measurement, sampling, and testing, in accordance with the provisions of this article.
(Code 1983, § 28-2-199; Res. No. 06-1167, 11-15- 06) Secs. 82-115—82-145. Reserved.
DIVISION 2. SERVICE CHARGES
Sec. 82-146. Required.
It is hereby determined necessary to the protection of the public health, safety, welfare, and convenience of Fulton County, Georgia, to fix and
collect charges upon all premises or facilities connected to the county's sewerage system.
(92-RC-527, art. V, § 1, 11-18-92; Res. No. 06-1167, 11-15-06) Sec. 82-147. Determination of charges.
There is hereby charged to each premises or facility connected to the Fulton County Sewerage System or otherwise discharging sewage, industrial wastes, water, or other liquids, either directly or indirectly into the sewerage system, a sewer service charge payable as hereinafter provided, and in the amount determinable as follows:
(1) A regularly billed sewer service charge based upon the quantity of water used by the premises or facility therein or thereon as measured by a water meter or meters.
In addition to the normal sewer service charge herein provided, there may be an industrial wastewater sewer service surcharge based on the quality of waste discharge in the system.
(2) The sewer service charge shall also be based on rates to be set or approved from time to time by the board of commissioners.
(3) Water used from private sources shall be metered as required in subsection (4) of this section or estimated by the county, and the sewer service charges shall be billed accordingly.
(4) In the event that a lot, parcel of land, premises, or facility discharging sewage, industrial waste, water, or other liquids, either directly or indirectly into the county's sewerage system, or which ultimately enters the sewerage system, is supplied either in whole or in part with water from wells, or any other source other than a
municipal or other governmental water system, then such wells or other source of supply shall be registered with the county;
and:
a. If the water from said wells or other supply is not measured by a water meter, the owner or occupant shall, at his own cost, install and maintain a meter on said supplies in such location and in such manner as is satisfactory to the county.
b. If the county deems it practicable, it may establish an estimate of the volume of water used by said premises in lieu of requiring the installation of a meter.
c. In either instance, the sewer service charge for said premises shall be based on the volume of water used as established by the meter or the estimate.
(92-RC-527, art. V, § 2, 11-18-92; Res. No. 06-1167, 11-15-06) Sec. 82-148. Use of revenues collected.
The revenue received from the collection of such charges, together with all other revenue derived from the operation of the sewerage system of the county shall, except as hereinafter provided, be deposited and credited to the "Fulton
County Water and Sewerage System Revenue Fund," and shall be used to defray:
(1) First, the operation and maintenance costs of the sewerage system, and incidental expenses connected therewith.
(2) Second, to pay debt requirements on revenue bonds issued to provide funds for the improvement, repair, and extension of the
sewerage system and to provide necessary reserves for debt service.
(3) Third, to pay for facilities and appurtenances used in connection with the operation of said system, to acquire necessary easements or the purchase of land, and to
provide funds for the necessary reserves and improvements.
(4) Such revenues shall not be used for the construction of sewers that are project improvements which shall be paid for by assessment against abutting landowners, or as otherwise provided herein.
(5) Revenues received as a result of repayment or recapture of funds extended by the "Fulton County Water and Sewer Renewal and Extension Fund" shall be deposited and credited to the "Fulton County Sewer System Renewal and Extension
Fund."
(92-RC-527, art. V, § 3, 11-18-92; Res. No. 06-1167, 11-15-06) Sec. 82-149. Payment of bills.
It shall be the duty of the authorized Fulton County Department to prepare and mail to each owner or commercial lessee of all premises or facilities served by sewerage connection within the Sewerage System of Fulton County, at the end of each service period, a statement showing the entire amount due for such service period. The sewer service charge as so billed shall be payable at the office of the Fulton County Finance Department, or a municipality within Fulton County, as an agent for Fulton County, when so designated,
on or before the 15th day of the month following each period.
(Code 1983, § 28-2-197; Res. No. 06-1167, 11-15- 06) Sec. 82-150. Liens.
(a) Failure to pay such charge or assessment.
All of the charges and assessments levied under this article shall become liens upon the property benefited from the date due and payable. Whenever the owner of any property chargeable under this article shall fail to pay any such charge or
assessment when the same shall become due, whether service was extended to the property on the order of the owner or of a tenant thereof, execution shall issue in the name of the Board of Commissioners of Fulton County, and shall be signed by the director of finance or his designated representative. The execution shall issue in rem against the property benefited by the service, and in personam against the owner thereof, which shall include, in addition to the principal and interest, the sum of $1.50 for the issuance of the same. All executions issued against the property and the owner thereof shall immediately be recorded on the general execution docket in the office of the Clerk of the Superior Court of Fulton
County. All executions issued under this article shall have the same lien dignity and priority as fi.
fas. or executions issued for county taxes, and shall be subject to enforcement in the same manner as now provided for the enforcement of state or county tax fi. fas., including a levy thereon and
the filing and subsequent proceedings in connection with affidavits of illegality.
(b) Disconnection of water service for failure to pay. Where there remains a delinquent sewer service charge bill on any premises or facilities served by sewerage connection with the Sewerage System of Fulton County, after the occupant of the premises thereof has been notified by the inclusion thereof of the amount of the past due bill and a current bill or a separate bill, and given an opportunity to pay the bill, and refuses to promptly pay the same, water and sewerage service to such premises shall be discontinued regardless of whether the bill remaining delinquent was incurred by a prior owner or occupant of
premises; and the county shall not again supply water to any such premises until such arrears shall be fully paid.
(Code 1983, § 28-2-198; Res. No. 06-1167, 11-15- 06) Sec. 82-151. Special authorization payment plan.
In situations where the director of the department of finance determines that payment of mandatory fees or charges for connecting to the county sanitary sewer system, according to the procedures described in other parts of this article will pose an undue economic hardship on an applicant, a special authorization payment plan is permitted. Under the special authorization plan
the applicant's total cost for connecting to the sanitary sewer system is paid in four annual installments with one-fourth paid initially, and the remaining principal amount being divided into not more than three equal annual installments maturing one, two, and three years, respectively, from the date of the initial payment. Documents will be executed to evidence this payment plan, a lien will be filed on the property served,
and the outstanding balance shall bear interest at the rate charged on unpaid state and county taxes at the time the agreement is entered into. Said evidence of indebtedness shall be negotiable in form, and Fulton County shall reserve the right to transfer and assign such indebtedness to third parties.
(93-RM-094, 3-17-93; Res. No. 06-1167, 11-15-06) Sec. 82-152. Refunds.
(a) Refunds shall be made to sewer customers charged for sewer services and not connected in any manner to the county's system of sewers as determined by an authorized representative of Fulton County.
(b) The customer must provide written documentation that payment for sewer charges has been made to the county.
(c) The customer must provide a written certificate from a licensed plumber that the facility is not connected or serviced by the county system or
sewers.
(d) Refunds shall not be for a period in excess of four years back from the time a written claim for refund is first made.
(Code 1983, § 28-2-200; Res. No. 06-1167, 11-15- 06) Secs. 82-153—82-185. Reserved.
DIVISION 3. EXTENSION FEES
Sec. 82-186. Required payments.
(a) Any person who, after the effective date of this section, engages in development activity generating sewage flow and who connects to the Fulton County Sewer System for the purpose of
discharging sewage flow into the system or who connects or is required to connect existing development to the Fulton County Sewer System for the purpose of discharging flow into the system
shall pay sewerage extension fees in the manner and amount set forth herein, or as described elsewhere.
(b) Unless otherwise provided, a sewerage extension fee is a one-time fee, as opposed to regularly recurring sewer use fees, paid before connection to and use of the sewerage system is permitted.
No building permit for any land development activity generating sewage flow requiring payment of a sewerage extension fee pursuant to this article shall be issued by the county unless and
until the required sewerage extension fee has been paid as per the provisions of this article.
(92-RC-527, art. VI, §§ 1, 2, 11-18-92; Ord. No.
93-RM-094, 3-17-93; Res. No. 06-1167, 11-15-06) Sec. 82-187. Basis for extension; petition or request; intent of article.
The Fulton County Sewerage System may be extended to serve existing development upon petition of property owners or upon request by an authorized agent of the county due to a public
health emergency. Additionally, the sewerage system may be extended to serve new private development sites at the request of developers. Sewer system extension is, prima facie, a project improvement, as defined herein, and is ultimately a financial responsibility of developers and property owners. The intent of this article is that developers and/or property owners bear a proportionate share of the cost of any sewerage system extensions needed to serve a development. Sewerage extension fees shall be determined by using one of the methods in section 82-188 or section
82-189.
(92-RC-527, art. VII, 11-18-92; Res. No. 06-1167, 11-15-06) Sec. 82-188. Extension to existing development.
(a) Petition sewer. On any given street segment, the owners of more than 50 percent of the road frontage of existing residential property may
petition the board of commissioners for installation of a sewer system extension to serve such properties. Upon installation of such sewer, all
abutting property owners shall be assessed a proportionate share of the cost of such installation.
(1) The costs to be borne by the property owners is associated strictly with installing system capacity to serve those property owners and does not include any additional costs that may be associated
with the provision of excess capacity for future development. The proportionate share of the cost to be borne by each property owner is based on its relative sewage flow contribution and proportionate length of system extension attributable to that property.
a. The sewage flow contribution of each property is estimated using standard engineering practices and methods applied by the Fulton County Department of Public Works.
b. If, in the event a sewerage system extension is designed, at the county's request, to provide excess capacity for the purpose of providing service to additional development in the future, then the Fulton County Sewerage System shall pay, with cash or in-kind contribution, the proportionate share of the cost of the excess capacity, such cost to be reimbursed
to the county on a proportionate basis as new development enters the system.
(2) Whenever a petition for installation of a sewer extension has been presented to the board of commissioners by owners of existing residential property, the county manager or the manager's designee shall:
a. Set a date for a public hearing thereon before the board of commissioners.
b. Give notice of the petition and date of the hearing to all persons concerned through publication of a notice of the date, time, and place of the hearing and a general description of the proposed sewer extension location and cost. Such notice shall
be published in a newspaper of general location circulation or in the newspaper wherein the sheriffs notices are published. Such notice shall be published at least ten days prior
to the date set for the hearing.
c. Give notice, in writing, by regular mail, to all property owners of property abutting said sewer line against which the cost of installation is to be
assessed, notice of the time and place of the hearing, and a general description of the proposed sewer extension location and cost. Such notice shall
be posted at least ten days prior to the date set for the hearing. Such notice shall be addressed to the person whose name appears on the last tax digest as the owner thereof and
sent to the address listed in the tax digest.
(3) At the hearing, any person whose property or interest is affected by the proposed sewer may in person or through an agent
or attorney, object to or support the proposed sewer extension.
(4) The decision of the board of commissioners regarding approval or rejection of the proposed sewer extension shall be final
and conclusive and is also final and conclusive regarding the public necessity for construction of the sewer and the assessment of cost against abutting property owners.
(b) Public health. Notwithstanding subsection
(a) of this section, an authorized representative of the county may request of the board of commissioners installation of a sewer system extension.
Such request must be accompanied by evidence that a situation immediately adverse to the public health exists and that such situation will be alleviated by installation and use of the proposed sewer system extension.
(1) Upon approval by the board of commissioners, such sewer system extension shall be installed immediately.
(2) All property abutting such sewer system extension shall be assessed a proportionate share of the cost of installation.
(3) The costs to be borne by the property owner is associated strictly with installing system capacity to service those property owners and does not include any additional costs that may be associated
with the provision of excess capacity for future development. The proportionate share of the cost to be borne by each property owner is based on its relative sewage flow contribution and proportionate length of system extension attributable to that property.
a. The sewage flow contribution of each property is estimated using standard engineering practices and methods applied by the Fulton County Department of Public Works.
b. If, in the event a sewerage system extension is designed to provide excess capacity for the purpose of providing service to additional development in the future, then the Fulton County Sewerage System shall pay
the proportionate share of the cost of the excess capacity, with cash or in-kind contribution, such cost to be reimbursed to the county on a proportionate basis as new development enters the system.
(c) Assessments; petition sewers and installations for reasons of public health. Whenever a petition sewer extension has been installed or
whenever a sewer system extension has been installed for reasons of public health, the county manager or the manager's designee shall prepare an assessment roll. Such assessment roll shall describe the system extension and show the abutting property, the existing use (or if undeveloped, the permitted use) of the abutting property, and
the names of the owners of the abutting property.
All abutting property on both sides of the street shall be assessed a proportional share of the cost of installation as set forth herein.
(1) The assessment role as prepared by the county manager or the manager's designee shall be presented to the board of commissioners at a regular or called meeting and adopted and spread on the minutes of the commission.
(2) All assessments against property and the owners thereof for the construction of sewer system extensions installed as petition sewers or for reasons of public health shall be liens upon the property from the
date of the adoption of an action of the board of commissioners authorizing construction of said sewer system extension.
(3) The county manager or the manager's designee shall prepare and keep an improvement register which records all assessments against properties for sewer system extensions installed as petition
sewers or for reasons of public health.
Such register shall be updated immediately upon passage of authorization for sewer system extension construction by
the board of commissioners. The register shall describe the sewer system extension to be built and the properties affected.
(4) All properties served shall be assessed a proportionate share of the cost of the extension based on relative sewage flow contributions and proportionate share of the length of extension as described in the remainder of this section.
(5) Whenever a sewer system extension abuts a tract of land other than a corner property on more than one side and when said tract is incapable of subdivision because
of zoning regulations, building code restrictions, topography, or other reasons, said property shall be assessed only on
the side having the greater frontage.
(6) Corner property shall be assessed as follows:
a. Where the sewer system extension line abuts corner property only on the front, the property shall be assessed for the amount of frontage.
b. Where the sewer system extension line abuts corner property on both the front and a side, the property shall be assessed for the frontage;
and:
1. The first 150 feet of each side abutting a line shall be exempted from assessment.
2. The next 100 feet of each side abutting a line shall be subject to assessment.
c. Where the sewer system extension line abuts corner property only on a side, the property shall be assessed for the frontage and:
1. The first 150 feet of each side abutting a line shall be exempted from assessment.
2. The next 100 feet of each side abutting a line shall be subject to assessment.
d. Where the sewer system extension line abuts property, but does not abut such property on any street, the property shall be assessed for its street frontage.
e. Whenever property has been exempted from assessment for abutting sewers under the terms of this article and the condition of the property or improvements is later changed so that the owner requests a sewer
connection be granted, the owner shall be required to pay the amount said property would have been as- sessed had there been no exemption, but at rates prevailing at the time the connection is granted.
(7) Whenever a sewer line has been constructed in accordance with the sections and the cost thereof assessed against the
property benefiting thereby and the owners thereof, said owners shall be notified of such assessment and the amount thereof.
a. Within 60 days after the date of the assessment, such property owner shall pay the amount of such assessment in full or, upon request, such property owner shall be allowed to
elect an installment payment plan.
b. If the installment payment plan is elected, the owner shall pay not less than one-fourth of the total assessment in cash within said 60 days and execute and deliver therewith
the necessary documents hereafter specified to document and evidence such plan and the assessment lien on the property.
c. The remainder of the assessment, after deduction of such cash payment, may, upon the request of the property owner, be divided into not
more than three equal annual installments, maturing one, two and three years, respectively, from the date of
said assessment, provided proper evidence of such extension shall be executed by the owner of the property, and the unpaid balance shall bear interest from the date of the
assessment of the cost until paid at the rate of interest thus being charged on unpaid state and county taxes.
Said evidence of indebtedness shall be negotiable in form, and Fulton County shall reserve the right therein to transfer and assign the same to third parties.
d. No extension of time for the payment of any assessment shall affect the validity of said assessment or
the right of Fulton County, or its assignee, to proceed to enforce the same against said property and the owner thereof. In case of default in any installment, the entire assessment shall become due and payable forthwith.
e. Whenever the owner of any property desires to extend the payment of all or any part of any assessment levied against him or his property as provided in the preceding sections, at the time of the application for such
extension and the execution of evidences thereof, such owner shall likewise execute an acknowledgement of the lien upon his property for the
sewer assessment against the same, which acknowledgement shall be upon a form provided by the county of such nature that it may be recorded and which shall be recorded on the deed records of Fulton County
in the office of the Clerk of the Superior Court.
f. Should the owner of any property against which assessment for sewers has been levied fail either to execute the instruments required for an extension, as provided in the preceding sections, or to pay same in cash
within 60 days of the due date, execution shall issue forthwith against the property improved and the owner
thereof.
g. Assessments against property and the owners thereof for the construction of sewer line and charges made for connection of sewer line shall be
paid to the Department of Finance of Fulton County covering the same.
h. Whenever the owner of any property shall fail to pay any sewer assessment or extension thereof when the same shall become due, the holder of
such evidence, whether the holder is Fulton County or its assignee, shall be entitled to have an execution issued therefore, which execution shall issue in the name of the board of
commissioners, be signed by the chairman of the board and be recorded on the general execution docket in the
office of the Clerk of the Superior Court of Fulton County. Said execution shall be issued in rem against the property described in the assessment roll and in personam against the owner thereof, and shall include
in addition to principal and interest a fee for the issuance of the same as may be established from time to time by the board of commissioners. Subsequent costs thereon shall be the same as those now allowed by law to
the sheriff for the performance of similar services. All adjoining property owned by the same party or parties shall be covered in any execution issued and only one such execution shall be issued against any property owner covering adjacent lots.
i. All executions for sewer assessment shall be handed to the Sheriff of Fulton County and subsequent proceedings had thereon shall be as provided by law for the enforcement
of execution of taxes.
(92-RC-527, art. VII, § 1, 11-18-92; Res. No. 06- 1167, 11-15-06) Sec. 82-189. Extension to new development.
(a) Responsibility of developer. Any sewerage improvement, extension, and/or expansion, or portion thereof, which is a project improvement is the sole responsibility of the developer.
(1) In the event the county requires sewerage system extensions to be built with excess capacity so that additional anticipated development in the geographic area accessed by the extensions may be served by the extensions presently or in the future,
then the developer is ultimately liable only for the proportionate share of the cost of the sewer extension attributable to the sewage flow contribution (estimated using standard engineering practices and methods applied by the Fulton County Department of Public Works) of the development compared to the capacity of the extension and length of pipe required to
reach the development as compared to total length of pipe constructed.
(2) The County must provide credits, in accord with the construction and intent of section 88-19 of the Fulton County Development Impact Fee Ordinance (incorporated herein by reference), to the developer for provision of excess capacity or directly compensate the developer for the
proportionate cost of the excess capacity.
(3) Sewerage extension project improvements must:
a. Be submitted for review and approval at or prior to the time a land disturbance permit is requested.
b. Be designed with a minimum capacity to serve the entire project as defined in zoning petitions and/or
approved subdivisions, as opposed to phases of such project.
(4) Installation of such project improvements may not proceed until:
a. The developer has received all required reviews and permits from the county.
b. The developer has paid any fees which may be required under other parts of this article and any other applicable ordinance, resolution, rule, or regulation of Fulton County.
c. The developer has agreed to dedicate or otherwise provide all necessary easements, rights of access, and other necessary property rights associated with the project improvement to the county.
(b) Developer requests. Notwithstanding subsection (a) of this section, a developer may request permission, and the county may grant permission, to install sewer extensions to a site at the expense of the developer.
(1) If a developer seeks to install a sewer extension to a development and such extension, for whatever reason, can serve only that site, the developer must bear
the entire cost of such extension by, at the developer's option, either:
a. Causing the extension to be installed using the developer's own means and funds; or
b. Paying to the county, before commencement of actual construction, an amount the county has established by contract to be the cost of sewer extension installation.
(2) If a developer seeks to install a sewer extension to a development and the county requires such extension to be built with excess capacity so that additional anticipated development in the geographic area accessed by the extension may be served
by the extension presently or in the future, then the developer is ultimately liable for the proportionate share of the cost of the sewer extension attributable to the
sewage flow contribution (estimated using standard engineering practices and methods applied by the Fulton County
Department of Public Works) of the development compared to the capacity of the extension. In this event, at the developer's
option, either:
a. The developer may cause the extension to be installed using his/her own means and funds; or
b. The developer may pay to the county, before commencement of actual construction, an amount the county has established by contract to be the cost
of sewer extension installation.
c. In either case, the county shall:
1. Accept and record the developer's cost of sewer extension installation and reimburse the developer or his/her successors in title the proportionate cost of
the excess capacity as it is taken up and paid for by additional development using the extension;
2. At the county's option, the county may participate with the developer in providing excess capacity by providing materials necessary for the excess capacity; or
3. At the county's option, the county may, upon completion of construction, reimburse the developer for the proportionate share of unused capacity, calculated using the methodology described above, maintain records of the actual cost of installation, and reimburse itself the cost of excess capacity taken up
and paid for by additional development using the extension.
(3) A developer may request the county and the county may, at its option and using its own resources, install sewer extensions to a site. Using records of actual direct and indirect cost to the county of individual extension installations, the county will charge any developer, including a developer initiating an original request for installation of a sewer system extension, a proportionate share, using methodology
described above, of the actual cost of sewer system extension installation.
(4) A developer may request, and the county may grant, permission to use unused excess capacity in an existing sewerage system extension to meet the sewage flow contribution of a planned development. In
this event, the county shall charge a fee calculated on the basis of the proportionate share of the cost of the sewer extension attributable to the sewage flow contribution of the development compared to the line segment capacity flow rate of the
extension and length of pipe required to reach the development site.
a. In the event the county has records that may be used to determine the actual cost of installation of the specific system extension requested for use, the cost of the proportionate
share (adjusted to present value) shall be based on that actual cost of installation.
b. In the event adequate records reflecting actual cost of installation of a specific system extension are not
available, the average unit cost of installation of similar system extensions from the previous fiscal year (adjusted to present value) shall be
used as the cost basis of calculating proportionate share.
c. For the purposes cited above, present value shall be calculated using the Bloomberg AAA GO Municipal
Bond Yield Index (or equivalent).
(92-RC-527, art. VII, § 2, 11-18-92; Res. No. 06- 1167, 11-15-06) Sec. 82-190. Fee rate schedules.
(a) The fee rate schedules are developed and administratively adopted from the department of public works. Such schedules shall be based on the best estimates available to the department of public works of average sewage flow contribution generated by various land uses and shall be used to directly calculate fees and charges.
(b) If there is an application to provide a sewer to a type of land use not included in the fee rate schedule, the county manager shall cause a fee to be established, based on flow generation rates found acceptable by the county.
(c) Whenever sewerage extension fees are based upon an assumed discharge flow, either the county, at its option, or the developer, at its option, may recalculate the fee based on actual water usage or measured sewer discharge after six months of actual experience. In this event, the owner shall be entitled to receive as a refund, or shall be required to pay as an additional charge, the difference between the initial charge as estimated by the county and the recalculated charge based on actual usage.
(92-RC-527, art. VIII, §§ 1—3, 11-18-92; Res. No.
06-1167, 11-15-06) Sec. 82-191. Individual sewer extension assessment determination.
(a) In the event that an applicant for sewer system extension, or an applicant for use of excess extension capacity, under the provisions of this article elects, an individual sewer extension assessment determination may be requested. If it is found that the data, information, and assumptions used by the applicant to calculate the individual sewer assessment determination satisfy the requirements of section 58-173 of this Code
(incorporated herein by reference) and the requirements of this section, the individual sewer extension assessment determination shall be deemed the sewerage extension fee due and owing for the
proposed development.
(b) In addition to meeting the requirements of section 58-173 (incorporated herein by reference), the applicant shall show the basis of the individual sewer extension assessment determination including, but not limited to, the following:
(1) Sewer engineering studies including documentation of sewage flow generation rates appropriate to the specific development
activity proposed.
(2) Sewer engineering studies including documentation of the line capacity of the sewer system extension proposed for installation and the proportionate share of that capacity used by the development.
(3) If applicable, sewer engineering studies used to calculate the extent to which an individual sewer line is used as a system extension as opposed to a system expansion (designed to provide excess capacity for the purpose of providing service to
additional development in the future) for the purpose of establishing an attribution for base cost of the system extension, the proportionate share of which will serve as a basis for fees.
(c) All documentation shall be prepared and presented by qualified professionals registered to practice in their respective fields and shall follow best professional practices and methodologies.
(d) A developer may request a preapplication conference with the county manager or the manager's designee.
(e) The county manager or the manager's designee shall provide the developer with an independent fee determination within 30 working days of the formal submittal of a complete application for an individual assessment
determination, including an individual assessment study.
(f) All other requirements being met, nothing in this article shall prevent a developer from receiving a building permit upon payment of fees as required and calculated herein and proceeding while awaiting an individual fee assessment determination. When an individual fee assessment is established, any excess payments shall be refunded.
(92-RC-527, art. IX, §§ 1—6, 11-18-92; Res. No.
06-1167, 11-15-06) Sec. 82-192. Private agreements.
(a) In accord with the general provisions of section 58-177 of this Code, and the more specific provisions of this section, any applicant or group of applicants may propose to enter into a private agreement with the county designed to establish proportional share system improvements appropriate to the circumstances of the specific development or developments proposed.
(b) Such an agreement may include, but shall not be limited to, provisions which:
(1) Modify calculations of sewage generation set forth herein and provide a fee which may differ from that set forth in this article by specifying the nature of the proposed development for purposes of computing actual sewage generation, provided that the agreement shall establish legally enforceable means for ensuring that the actual sewage generated will not exceed the agreed upon estimated sewage generated by the
development.
a. The agreement must contain language acceptable to the county manager or the manager's designee showing that the assumptions made for sewage generation will be met.
Further, language must be included in the agreement to allow the county to assess additional fees if, two years after the completion of construction, the development has not, in fact, met the reduced assumptions
of sewage generation and/or if, five years following the completion of construction the development has not, in fact, maintained such reduced sewage generation.
b. The agreement must also contain language requiring the developer to report to the county manager or the manager's designee the status of the project relative to assumptions of reduced sewage generation on the second and fifth anniversaries of the completion of construction.
Figures to be reported shall include both actual sewage generation figures and sewage generation as a factor of the project's occupancy rate.
Failure to report may result in assessment of additional fees.
(2) Permit the construction of specific sewer system improvements in lieu of or with a credit against the sewer fee assessable.
(3) Permit a schedule and method for the payment of fees in a manner appropriate to the particular and unique circumstances of the proposed development in lieu of other requirements for payment set forth herein, provided that
security is posted ensuring payment of the fees, in a form acceptable to the county, which security may be in the form of a cash bond, surety bond, irrevocable letter of credit, negotiable certificate of deposit or escrow account, or lien or mortgage on lands to be covered by the building permit.
(4) Permit the substitution of sewer system related projects in lieu of or with a credit against the sewerage extension fee assessable.
a. Dedication and use of land application sewage treatment sites.
b. Dedication of land for use by other sewer related facilities.
(92-RC-527, art. X, §§ 1, 2, 11-18-92; Res. No.
06-1167, 11-15-06) Sec. 82-193. Use of public sewers.
(a) Unsanitary, offensive deposits on property.
It shall be unlawful for any person to place, deposit or permit to be deposited any human excrement, garbage or other noxious waste on public or private property within Fulton County, or in any area under the jurisdiction of said county.
(b) Discharging wastes to natural outlets. It shall be unlawful to discharge to any natural outlet within the county, or in any area under the jurisdiction of the county, any sewage or other polluted waters, except where suitable treatment has been provided in accordance with the subsequent provisions of this article.
(c) Private disposal prohibited unless expressly permitted. Except as hereinafter provided, it shall be unlawful to construct or maintain any privy, privy vault, septic tank, cesspool or other facility intended or used for the disposal of sewage.
(d) Sewer connection required if available.
The county may require the owners of all houses, buildings or properties used for human occupancy, employment, recreation or other purposes, situated within the county and abutting on any street, alley or right-of-way in which there is
now located, or may in the future be located, a public sanitary sewer of the county, to install at their expense suitable toilet facilities therein and to connect such facilities directly to the public sewer within 90 days from notice to do so and in accordance with applicable regulations of the Fulton County Board of Health (incorporated by reference in chapter 34 of this Code).
(e) Sewer service to adjacent, unincorporated areas. Any user of Fulton County's Wastewater Collection and Treatment System who is located in an unincorporated area adjacent to Fulton County will be subject to the provisions and requirements of this article.
(Res. No. 06-1167, 11-15-06; Ord. No. 18-0340, Att. A, 5-16-18) Sec. 82-194. Private sewage disposal.
(a) Except as provided in this section, the construction, installation, or operation of central on-site sewage management systems is prohibited for residential developments. Central on-site sewage management may be permitted, where public sewer is not available, if the Fulton County Board of Health or the Georgia Environmental Protection Division approves a permit.
(1) In addition to the private sewage disposal system, a sewerage collection and conveyance system shall be designed pursuant to the current Fulton County standards.
(2) All related permanent and construction easements shall be dedicated to Fulton County.
(3) The sewer system design and easements shall include an outfall to the furthest downstream point of the development property.
(4) Fulton County accepts no responsibility for private on-site sewerage disposal systems.
(b) Applications, permits. When a public sanitary sewer is not available, building sewers shall be connected to private onsite sewage management systems subject to board of health approval and the following considerations:
(1) Applications for permits to construct, repair, alter, enlarge and/or use privies, privy vaults, cesspools, aeration systems and septic tanks shall be referred to the Fulton County Board of Health. The owners shall operate and maintain the private wastewater disposal system in a sanitary manner at all times in accordance with the conditions of the operating permit, at no expense to the county. Such facilities shall be subject to inspection by the board of health at reasonable times.
The type, capacities, location and layout of a private wastewater disposal system shall comply with all requirements of the Fulton County Board of Health or applicable state or federal laws. No permit shall be issued for any private wastewater disposal systems employing subsurface soil disposal where the lot area is less than the minimum requirements enforced by the board of health.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.