Heard County · Código de ordenanzas
Part II - CODE OF ORDINANCES / Chapter 34 - ROADS AND BRIDGES / Article II - ROADS / Division 2 - CONSTRUCTION STANDARDS
Sec. 34-50. Easements and installation of utilities.
Sobre este texto
- As published by Municode, current through 2024-07-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Streets and roadways sought to be conveyed to the county under the provisions of this division shall not contain within their right-of-way easements for public utilities.
Any installation of public utilities shall be paid in advance of the paving of such streets or roadways and, in circumstances wherein pavement breaks or required utility connections or extensions, such break shall be repaved by such utility company at its sole expense and in compliance with the rules and regulations for paving.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.