Ir al contenido
Georgia Commons
Menú

Heard County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 34 - ROADS AND BRIDGES / Article II - ROADS / Division 2 - CONSTRUCTION STANDARDS

Sec. 34-51. Paving required; expense of developer or subdivision.

Sobre este texto

  • As published by Municode, current through 2024-07-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

No streets or roadways shall be accepted by the county unless they are paved at the time of the proposed conveyance in such a manner as to meet the minimum standards as provided in this division. The entire cost of construction, grading, drainage, sloping, grassing, engineering, surveying, and all other expenses shall be borne by the developer or subdivider.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:heard-county/code/34-51@2024-07-16-5970d4000f

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Heard County Code of Ordinances, Sec. 34-51. Paving required; expense of developer or subdivision | Georgia Commons