Ir al contenido
Georgia Commons
Menú

Heard County · Código de ordenanzas

Part II - CODE OF ORDINANCES / Chapter 8 - BUILDINGS AND BUILDING REGULATIONS / Article V - ISSUANCE OF CERTIFICATES

Sec. 8-125. Certificates of—Occupancy.

Sobre este texto

  • As published by Municode, current through 2024-07-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.

(a) Required. A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the building official has issued a certificate of occupancy. The certificate shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the technical codes and other applicable laws and ordinances and released by the building official.

(b) Issuance of certificate of occupancy. Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical and plumbing systems in accordance with the technical codes, reviewed plans and specifications, and after the final inspection, the building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor in accordance with the provisions of this chapter.

(c) Temporary or partial occupancy. A temporary or partial certificate of occupancy may be issued for a portion of a building that may safely be occupied prior to the final completion of the building.

(d) Existing building certificate of occupancy. A certificate of occupancy for any existing building may be obtained by applying to the building official and supplying the information and data necessary to determine compliance with the technical codes for the occupancy intended. Where necessary, in the opinion of the building official, two sets of detailed drawings, or a general inspection, or both, may be required. When, upon examination and inspection, it is found that the building conforms to the provisions of the technical codes and other applicable laws and ordinances for such occupancy, a certificate of occupancy shall be issued.

Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.

Versión local-code:heard-county/code/8-125@2024-07-16-51b783244a

El asistente puede decir lo que dice esta sección en esta edición, citándola y enlazándola. No aplicará la ley a su situación, y nada de esto es asesoría legal.

Heard County Code of Ordinances, Sec. 8-125. Certificates of—Occupancy | Georgia Commons