Jackson County · Código de ordenanzas
Jackson County Code of Ordinances
Este documento se muestra completo, como un solo texto: su fuente no lo divide en secciones.
Sobre este texto
- As published by Municode, current through 2025-06-16
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
Las notas de arriba, el texto de la sección y su línea de historia se muestran en inglés, tal como los publica la fuente y como los da el corpus.
Parte 8 de 10. Este texto es largo, así que su página lo muestra en partes, en el orden de la fuente. Un enlace a uno de sus párrafos lleva a la parte que lo contiene.
Diameter breast height (DBH): The standard measure of trunk diameter for those trees existing on a site. The diameter of a tree with diameter is measured in inches at a height of 4.5 feet above the ground.
If the tree splits into multiple trunks below 4.5 feet, the trunk is measured at its most narrow point beneath the split. Trees with foliage that is full to the ground are typically measured based on height (e.g., magnolia).
Drip line: The drip line of the tree is the imaginary perpendicular line on the ground that mimics the outer edge of a tree's canopy and is a circular area of the land surrounding the tree from the trunk to the outermost branches. This area is distinguished from, and not to be confused with, the critical root zone.
Evergreen: Evergreen trees retain most of their foliage that persists and remains green year-round.
Ground cover: Living, low growing plant material, other than turf grass, which forms a continuous 80 percent or more cover over the ground surface at the time of planting and that can be maintained at a height of not more than 18-inches.
Hardwood tree: This term refers to trees belonging to a botanical group with broad leafed foliage, versus needle-like foliage and typically go dormant in the winter. "Hardwood" mainly refers to leaf shape and not to hardness of the wood itself.
Landscape plan: A graphic and written document containing criteria, specifications, and detailed plans prepared by a registered landscape architect. A landscape plan consists of a site map showing the boundaries of the property and the location of proposed plant materials (trees, shrubs, and others) in relation to surroundings and improvements, along with the planting schedule and any additional specifications to be required by the public development department.
Landscaped open space: That portion of a given lot, not covered by buildings, parking, access and service areas, or detention ponds. This is designed to enhance privacy and the amenity of the development by providing open spaces and/or landscaping features, screening and buffering for the benefit of the occupants or those in neighboring areas, or a general appearance of openness. Landscaped open space areas may include but not be limited to, individual trees, existing wooded areas, water courses, grass lawns, decorative plantings, berms, walls, fences, walkways, ornamental objects such as fountains, statues, and other similar items all of which are designed and arranged to produce an aesthetically pleasing effect within the development.
Landscape strip: A planted area of specified width.
Landscaping: The modification of the landscape for an aesthetic or functional purpose. The area within the boundaries of an individual lot that includes the preservation of existing vegetation and the continued maintenance thereof, as well as, the installation of trees, shrubs, ground covers, grass and flowers. Landscaping areas may also be subject to the zoning administrator's approval including decorative rock, bark, mulch, and other similar materials in addition to vegetation and live plant material.
Mulch: Organic matter composed of pine straw, leaves or aged wood chips. Compost, pine bark, or a combination thereof, that is applied in a layer on the ground over the roots of a tree to retain soil moisture, improve soil texture, cover and suppress the unwanted growth of vegetation, increase soil nutrients, and provide a favorable habitat for beneficial soil organisms.
Opaque: Impenetrable to view Parking screen: A continuous hedge of evergreen shrubs attaining a height of at least three feet above grade.
Qualified professional: An ISA certified arborist, forester, registered landscape architect, county extension agent, technical staff of the Georgia Forestry Commission, or other professional accepted by the public development department as having the requisite qualifications as a professional regarding trees and landscaping and the preparation of plans. For purposes of preparing existing tree canopy calculations, a registered land surveyor or registered engineer shall be considered a qualified professional.
Replacement tree: A tree planted on a site to meet a required minimum site canopy percentage. This canopy requirement must be met or exceeded.
Required minimum site canopy percentage factor: A minimum canopy percentage based upon the requirements of the zoning district regardless of whether the site had sufficient tree canopy prior to development. For these sites, the canopy percentage may be achieved by retaining existing canopy to be preserved, planting new trees, or a combination of the two.
Screening: An opaque constructed or vegetative (preferred) visual screen with a height of at least six feet.
Shrub: A self-supporting, woody, perennial deciduous or evergreen woody plant that normally reaches a mature height of less than 15 feet and typically has multiple stems.
Structural buffer: A visual screen created through construction of a solid wooden fence, decorative masonry wall, earthen berm, or combination of fence or wall with an earthen berm. Such structures may be supplemented with vegetation so as to present an opaque visual separation when viewed from one side to the other throughout the year.
Tree: Any self-supporting, woody perennial plant, evergreen or deciduous, usually having a single trunk diameter of at least two inches, as well as many branches, and which normally attains a mature height of at least ten feet.
Tree canopy: The total area beneath the drip line of a qualifying tree Tree, large canopy: A tree species with a canopy that typically covers at least 1,600 square feet at maturity under urban conditions, with a crown diameter of at least 45 feet at maturity and makes up the uppermost layer of tree canopy. Also known as an overstory tree.
Tree, medium canopy: A tree species with a canopy that typically covers at least 900 square feet at maturity but less than 1600 square feet under urban conditions, with a crown diameter of at least 35 feet at maturity.
Tree, small canopy: A tree species with a canopy that typically covers at least 400 square feet at maturity but less than 900 square feet under urban conditions, with a crown diameter of at least 25 feet at maturity.
Tree canopy coverage: The total area of a development site or building lot with actual existing tree coverage which is measured in square feet. This coverage may, in some locations, include coverage provided by abutting properties even though the tree trunk is not located on the development site or building lot. The total coverage is to be reported as a percentage of required coverage, which, if less than the required coverage, must be augmented by additional tree planting to meet this percentage.
Tree protection area: A defined area surrounding and protecting existing trees and their root systems, as well as protecting natural buffers and, at the minimum, includes the critical root zone as well as the above ground portion of these trees.
Turf: Ground cover composed of one or more species of perennial grass grown in soil to form a permanent lawn.
Xeriscaping: Landscape design that uses low-water use or drought tolerant plants requiring little to no supplemental irrigation and may include the use of few or no plants.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1203. Zoning buffer requirements.
(a) When required. Zoning buffers are required to be provided at the time of construction of any new development, subject to the requirements of this article.
(b) Disturbance. Zoning buffers required by this division shall remain undisturbed, except where necessary to add vegetation to meet screening requirements, unless encroachments or grading are specifically authorized by this division. Unless encroachments or grading are specifically authorized, or unless a variance is granted by the board of adjustment in accordance with this UDC, existing trees within a buffer required by this UDC shall not be removed.
(c) Minimum required screening. Required buffers shall provide screening, as defined, with a natural buffer of existing vegetation. Where the full width of the required buffer does not exist or where existing vegetation is sparse such that it does not meet the screening standard, the buffer shall be replanted at the required minimum width. Natural buffers may contain deciduous vegetation but shall contain evergreen trees suitable to local growing conditions that will provide an opaque visual screen during all seasons of the year. Unless existing vegetation provides the required screening or another alternative that meets the requirements for opaque visual screening is approved by the public development department, one evergreen tree, with a minimum height of six feet at planting, with branches touching the ground shall be planted for each 30 feet of buffer length, for each ten feet of required buffer width. Rows of evergreen trees shall be staggered. Evergreen screening shrubs planted four feet on center should also be used where necessary to provide the required screening.
(d) Relocation. Zoning buffers may be relocated on the site to best achieve the screening required.
(e) Buffer encroachments.Zoning buffers shall contain no driveways, parking areas, patios, stormwater detention facilities, or any other structures or accessory uses except that underground utilities may be permitted to cross a buffer if the screening standards of this UDC will be subsequently achieved. Buffers required by this article (excludes stream buffers) may include structural buffers as specified in this division.
(f) Disturbance or grading in buffers. Disturbance or grading within a zoning buffer may be authorized by the public development director in certain limited instances:
1. Where existing topography is such that a berm or other change in elevation within the zoning buffer would be more effective in meeting the screening requirements of this section, in which case grading may be authorized;
2. Where existing vegetation is of limited screening value, in which case clearing and grubbing may be permitted;
3. When a structural buffer is authorized; and
4. In cases where a zoning buffer is authorized to be relocated, clearing, grubbing, and grading may be authorized in the original area of the zoning buffer.
(g) Maintenance. Every buffer required by this article shall be maintained by the owner of the property where the buffer is located, so as to provide an opaque visual screen to a height of at least six feet on a continuous, year-round basis.
(h) Shown on plans. All required buffers shall be shown on grading and landscaping plans.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1204. Structural buffer.
The minimum required width of a natural buffer required by this article (excludes stream buffers) may be reduced by as much as 50 percent if a structural buffer is installed along the entire buffer length where a reduction of width is sought, in accordance with the requirements of this section.
(a) Minimum required height. A structural buffer shall provide an opaque screen to a height of no less than eight feet.
(b) Slope of berm. If a berm is utilized as a structural buffer, it shall have a maximum side slope of 50 percent (i.e., one foot of vertical rise to two feet of horizontal run).
(c) Planting. Within the reduced natural vegetative buffer area, where no vegetation exists or where sparsely vegetated, at least two staggered rows of evergreen trees with branches touching the ground shall be required for each 25 feet of vegetated buffer width.
(d) Materials. Fences used in buffers must be constructed of cedar, redwood, treated wood, or other approved material. Walls used in buffers shall be masonry. Fences and freestanding walls shall present a finished appearance facing the abutting property.
(e) Setback. Fences or walls within required buffers shall be located interior to the natural vegetative buffer.
(f) Maintenance. Every structural buffer installed per the requirements of this section shall be maintained by the owner of the property where the structural buffer is located, so as to provide an opaque visual screen to a height of at least eight feet.
(Ord. No. 22-010, § 1, 8-15-2022) Secs. 1205—1210. Reserved.
DIVISION II. TREE PROTECTION PURPOSE
Sec. 1211. Findings, purpose, and intent.
(a) Trees improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for wildlife, moderate the climate, and enhance community image and property values. Therefore, it is the intent of this article to encourage the protection and provision of trees through sound, responsible land development practices.
(b) Landscaping enhances a community's environmental and visual character and improves the overall quality of life. Vegetation can also improve air and water quality, reduce soil erosion, reduce noise and glare, provide habitat for wildlife, moderate the climate, and enhance property, thus protecting the health, safety, and welfare of the community.
(c) It is the purpose of this article to provide trees, environmentally sound landscape amenities, and buffers which promote a positive community image by promoting quality development, enhancing property values, providing for landscape improvements, and promoting aesthetic quality. It is also the intent to promote a healthy, natural environment whenever possible by protecting and enhancing existing vegetation.
(d) Inappropriate landscaping can degrade the quality of the natural environment by requiring excess water and pesticides, or by creating unnecessary conflicts with sewers, sidewalks, and vehicle access. It is important to promote environmentally sound landscaping, including the use of low-maintenance, drought resistant, and native or noninvasive plants, and to ensure that the right tree is planted in the right place. Environmentally sound landscaping also means restricting the use of invasive and potentially invasive species. Although well-mannered nonnative species can be welcomed additions to a landscape, invasive species can cause severe economic and environmental harm (including crop damage and degradation of native habitats) and can engender significant control costs.
(e) This article also establishes standards for buffers and landscape strips. Buffers between two incompatible uses minimize harmful impacts such as transmission of noise, dust, and glare. Buffers can also lessen visual pollution, establish a greater sense of privacy or physical intrusion, and protect the public health, safety, and welfare of the community.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1212. Tree protection required.
Tree protection requirements of this article shall be applied to every activity that requires the issuance of a land-disturbance permit or development permit under this UDC, except for other activities otherwise exempted by this chapter.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1213. Designation of tree protection areas.
The following areas shall be designated as tree protection areas on grading plans, landscaping plans, and final plats, within which it shall be unlawful to remove trees unless specifically provided by this section.
(a) Stream buffers. Stream and any other riparian buffers required by state law or this UCD.
(b) Zoning buffers. Natural buffers when required by zoning district: Every required zoning buffer shall be maintained by the owner of the property where the buffer is located, so as to provide an opaque visual screen to a height of six feet on a continuous, year-round basis.
(c) Existing trees to be retained. Where a developer or subdivider proposes or is required to retain trees outside of required stream buffers and zoning buffers.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1214. Tree protection fencing to be required.
(a) Tree protection areas shall be actively protected during land disturbance and land development with tree protection fencing (see following figure), installed at the boundaries of all tree protection areas.
An inspection by the public development department (or their designee) is required of all installed tree protection prior to commencement of any land development or land disturbance activity.
(b) Tree fencing shall be a minimum of four feet in height and comprised on chain link fencing, orange laminated plastic fencing supported by posts, wooden post and rail fencing, or other equivalent barrier.
(c) The perimeter of the tree protection fencing shall be a radius of 1.5 feet for each inch of diameter.
(d) Tree protection is required by this section until land development and construction activities cease, or a certificate of occupancy is issued, or authorization by the public development department is given to remove tree protection fencing, whichever is later.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1215. Tree protection area signs required.
(a) Prior to any land development or land disturbance activity, tree protection signs shall be installed on or along tree protection all trees to be retained and along the perimeter of all tree save areas at a minimum of every 200 feet and shall include the following text: "Tree Protection Area. Do Not Enter" in both English and Spanish.
(b) The signs shall be fabricated of sturdy material, shall be a minimum of 18 inches by 24 inches, and shall be placed on a sturdy post with the bottom of the sign a minimum height of 30 inches above grade.
The signs must remain present at all times during land development and building construction.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1216. Prohibitions within tree protection areas.
(a) When a tree protection area is established and delineated on a recorded subdivision plat, or an approved land development plan, any and all trees within the tree save area delineated on the plan or land development plan shall be preserved by the subdivider and subsequent lot owner except as otherwise exempted or specifically authorized in this chapter.
(b) Except as specifically authorized in this chapter, tree protection areas shall remain in a natural, undisturbed condition; activities related to development with a tree protection area shall be prohibited.
These specifically includes prohibition of the following:
1. Vehicle or equipment traffic or storage.
2. Materials or supplies storage.
3. Placement of temporary or permanent structures.
4. Equipment maintenance or washout.
5. Wounding of tree trunks, or wounding or breakage of limbs or branches greater than four inches in diameter, topping or other improper pruning, such as stub cuts or flush cuts.
6. Fires or excessive heat from equipment exhausts.
7. Site or lot clearing or grubbing, soil excavation or soil cuts or fills, grading, trenching, tilling, soil compaction, top dressing with fill or soil greater than two inches in depth and paving.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1217. Damage to tree protection areas.
Any land disturbance within a tree protection area shall be cause for an issuance of a stop work order unless such disturbance is authorized by the public development department. Any tree within a tree protection area that is damaged during land disturbance, land development, or building or site construction shall be treated according to ANSI A300 standards.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1218. Replacement of damaged trees.
The property owner or his or her assigns shall replace any tree (required to be retained or that is planted in conformance with requirements of this article) that dies or is removed from a site, if such removal results in a tree canopy coverage less than that required by this article, or any other deficiency with regard to meeting the requirements of this article. Replacement is required by the next planting season with a tree of same or similar species and projected canopy size at maturity as determined by public development department.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1219. Protection of trees on public property.
(a) No person shall plant, spray, fertilize, prune, or remove, or otherwise disturb any tree on any road right-of-way or property owned by the county without first securing permission from the county. No person shall cause damage to trees on rights-of-way or other public property by cutting, carving, attaching any rope, wires, nails, signs, or other object to any such tree, or allowing any harmful gas, liquid, or solid substance to contact any tree, or to set fire or permit any fire to burn which may injure any portion of any tree, or causing harm to tree roots through construction activities, vehicle parking, or material storage.
(b) It shall be unlawful for any person or firm to top or severely prune any street tree, park tree, or other tree on public property. Topping is defined as the severe cutting back of limbs to stubs larger than three inches in diameter within the tree's crown to such a degree so as to remove the normal canopy and disfigure the tree. Severe pruning seriously affects a tree's food supply, can scald the newly exposed outer bark, make trees vulnerable to insect invasion, stimulates the re-growth of dense, upright branches below the pruning cut, make the tree more vulnerable to wind damage, disfigures the tree aesthetically, and sometimes results in the death of the tree. Where appropriate, crown reduction pruning according to ANSI standards by a qualified arborist may be substituted. Trees severely damaged by storms or other causes, or certain trees under obstructions such as utility wires where other pruning practices are impractical may be exempted from this section as determined by the public development department.
(Ord. No. 22-010, § 1, 8-15-2022) Secs. 1220—1230. Reserved.
DIVISION III. TREE CANOPY COMPLIANCE AND TREE REPLACEMENT
Sec. 1231. Determination of existing tree canopy coverage.
(a) Generally. Prior to engaging in land disturbance or land development, it shall be the duty of land developers to calculate existing tree canopy on any site to be disturbed or developed.
(b) Sites with trees. The extent of tree canopy coverage can and shall be estimated based on a current or reasonable current (i.e., not more than three years from the date an application for land disturbance or land development is submitted) aerial photograph of the site, or calculation through i-Tree software.
A copy of the aerial photograph utilized, or the i-Tree report, shall be provided as part of the application for land and disturbance or land development. Estimates of tree canopy coverage should be verified in the field by the applicant (with date of field verification so noted in the application) and subject to verification in the field by the county.
(c) Sites without trees. Where no tree canopy exists on the site to be subdivided, disturbed, or developed, the applicant shall indicate such in the application for land disturbance or land development.
Trees will have to be planted to meet the requirements of this article.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1232. Existing canopy to be retained.
Where a development site or lot has existing tree canopy, the developer or subdivider shall propose all or some of the existing trees to be retained and designated as tree protection areas. The following provisions will apply to designation of tree protection areas for purposes of meeting the tree canopy requirements of this chapter.
(a) Existing tree canopy on the parcel of land to be subdivided, disturbed or developed should be retained to the maximum extent possible. Land developers and subdividers will be required to consider designing land development in a way that protects existing trees to the maximum extent possible, while allowing for reasonable development of the site. This criterion applies even if the site can sustain significant tree removal and still meet minimum tree canopy coverage requirements of this article after such tree canopy removal.
(b) Trees that conflict with the building envelope, that are within areas that must be cleared for parking and loading spaces, or in other places on the site where infrastructure must be installed, are to be approved for removal unless an alternate site design is considered feasible and the trees within such area are of high value as determined by the public development department or qualified professional.
(c) If tree canopy must be, and is authorized to be removed from the site, healthy, native, hardwood trees that are 24 inches diameter breast height (DBH) or more, such trees retained and protected per this article shall be given 1.5 times the future tree canopy listed in the, and significant stands of trees, are the highest priority for retention.
(d) To incentivize retention of trees that are 24 inches DBH or more, such trees retained and protected per this chapter shall be given 1.5 times the future tree canopy listed in the approved landscape planting list, or 1.5 times the actual tree canopy, whichever is greater. In such cases, the area of the tree canopy for which credit is given shall always remain in the tree canopy and there shall be no other use of the area other than for tree growth. The area shall remain permeable and undeveloped. Pine tree canopy shall be considered a lower priority for preservation.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1233. Minimum tree canopy coverage requirements by land use.
(a) Minimum ratios. All subdivisions and land developments shall meet the minimum tree canopy coverage requirements for the land use as indicated in table 12-1.
Table 12-1.
Minimum Tree Canopy Coverage Requirements by Land Use Land Use Minimum Tree Canopy Coverage Required (% of development site or lot) Residential, single-family detached or duplexes (Note: 1) 20% Residential, multi-family 20% Land Use Minimum Tree Canopy Coverage Required (% of development site or lot) Residential, fee simple townhouse 20% Planned community development As per site plan or conditions of zoning approval Office or institutional 20%
Commercial 20% Industrial 20% Mixed use 20% Note 1: The total site area included within a major residential subdivision shall be required to meet the requirements of this section at the time of preliminary platting, also individual lots within a major or minor subdivision shall be subject to the minimum tree canopy requirements of this section.
(a) Exemption for lakes and ponds: The area within natural or manmade bodies of water of two or more acres may be subtracted from calculations of tree canopy required.
(b) Determination, uncertainty, and interpretation: With respect to classifying a land use for purposes of this section, the public development department shall determine the land use as that use which is the principal use of the development site or lot. The public development department shall be authorized to interpret the land use classifications in cases on uncertainty.
(c) Compliance: A major subdivision or land development may meet the minimum tree canopy coverage requirements of this section by virtue of the tree canopy existing and to be retained on site. In this case, additional tree canopy coverage is encouraged but not required to be provided.
Development sites and major subdivisions which have existing trees which result in a tree canopy coverage that meets or exceeds the requirements of this section will not be required to plant additional trees, except as may be required to meet parking lot landscaping, landscape strip, street tree planting, and/or buffer requirements of this land use management code. If a site does not have sufficient existing tree canopy, plans for the major subdivision or land development shall indicate additional tree planting in a manner that will meet the minimum requirements of this section.
(d) Timing of compliance: Compliance with the requirements of this article will be determined at the time of development plan review (including review of tree protection areas and a landscaping plan proposing tree canopy) for a land development and at the time of preliminary plat review for a major subdivision.
(e) Canopy cover credit for individual trees: For the purposes of this article, the tree canopy cover that is credited to an individual tree shall be either the actual square foot area of the crown's projection directly down onto the ground, or the tree canopy coverage at maturity as specified for the species listed in the approved landscape planting list, whichever is greater. Any tree of a species not on the approved tree species list must be approved for use by the public development director or their designee, and tree canopy credit at maturity will be determined using standard landscaping reference for the size typical of the species.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1234. Addition of trees to meet minimum tree canopy coverage requirements.
(a) When required: When a development site or major subdivision does not meet the minimum tree canopy coverage required via the maintenance of existing trees on site at the time of development or major subdivision, respectively, the developer or subdivider shall be required to plant trees on the development site or in the major subdivision's boundaries sufficient to meet the requirements of table 12-1.
(b) When requirements cannot be met: When tree canopy requirements of this article cannot be met due to site conditions or hardship (such as rock or other existing naturally occurring environmental constraints) a certified arborist shall be employed by Jackson County to make an assessment of the site conditions and the required tree planting limitations, if any.
(c) For purposes of calculating canopy at maturity, the approved tree species list canopy credit calculations are as follows:
a. Large canopy trees: 1600 square feet per tree;
b. Medium canopy trees: 900 square feet per tree;
c. Small canopy trees: 400 square feet per tree.
(d) Locations: Trees may be planted throughout the development site or lot, although preference should be given to parking lot, and the front yard of the property.
(e) Species selection standards: Species shall be selected that are tolerant of growing conditions on the site, including growing space, sunlight, soil moisture, temperature, and soil volume and conditions. No more than 25 percent of all trees planted on a lot shall be of any one species.
(f) Pine tree limitation: Where trees must be added to achieve the required tree canopy coverage requirement for the development site or lot, pine trees shall not compromise more than 25 percent of the tree canopy planted.
(Ord. No. 22-010, § 1, 8-15-2022) Secs. 1235—1249. Reserved.
DIVISION IV. LANDSCAPING
Sec. 1250. General provisions.
(a) Native plants: The use of native plants is encouraged.
(b) Invasive species: Invasive or potentially invasive plants are prohibited.
(c) Xeriscaping and water conservation: Xeriscaping is encouraged. Ground covers should be used to supplement landscaping in appropriate areas to reduce extensive grass lawns that require regular watering in drought conditions.
(d) Trees: Trees selected for planting must be free from injury, pests, disease, nutritional disorders or root defects, and must be of good vigor in order to assure a reasonable expectation of survivability.
(e) Diversity: No more than 25 percent of trees or shrubs planted on any given site shall consist of any one species.
(f) Grass: Grass lawn areas should be sodded. However, if grass seed must be used, it shall be a variety suitable to the area that produces complete coverage.
(g) Artificial landscaping: No artificial plants, trees or other vegetation shall be installed.
(h) ANSI 300 standards: Landscaping shall meet the requirements of ANSI 300 unless otherwise approved by the public development department.
(i) Curb stops: A curb or wheel stop shall be provided along interior parking lot landscape islands, perimeter landscape strips, and landscapes adjacent to street rights-of-way, to prevent cars from encroaching on trees, shrubs, and landscapes, as approved by the public development department.
Tree Protection and Landscape Plan Required:
A tree protection and landscaping plan, titled as such, which shall be graphically depicted at an engineering scale, shall be required to be approved by the public development department prior to the issuance of a development or building permit to demonstrate compliance with the provisions of this article. A building permit may be withheld if such plan has not been submitted and approved. The tree protection and landscape plan shall be based on an accurate boundary survey of the site. This plan must be developed by, and stamped by, a registered landscape architect.
(a) Existing trees to be retained: The extent, location, and existing individual trees on the development site or building lot that are proposed to be retained are to be noted on the plan, with tree protection zone illustrated. If existing individual trees are to be retained in order to meet canopy requirements, hardwood trees with a DBH of 24 inches or greater will qualify for 1.5 times their existing canopy credit (e.g. a large canopy tree is allotted credit of 1600 square feet; a 24 inch + DBH tree will be given credit for 2400 square feet). Existing vegetation to be retained must also be noted on the plan.
(b) Trees not on approved landscape planting list: Generally, all proposed replacement trees must comply with the approved landscape planting list. Trees not shown on the approved landscape planting list must receive approval from the public development department.
(c) Tree canopy: A spatial delineation of tree canopy coverage on site and a calculation of the existing tree canopy coverage as a percentage of the total development site area or lot.
(d) Tree protection: Location and specifications of tree protection fencing, which shall be installed along all limits of disturbance (this must be shown on the grading plan as well). The plan shall incorporate verbatim in their entirety the following sections of this article. Additional methods and details for protecting existing vegetation during construction may be required.
1. Obstructions to sight visibility.
2. Inspections.
3. Tree protection fencing required.
4. Tree protection area signs required.
5. Prohibitions within tree protection areas.
6. Damage to tree protection areas.
7. Tree replacement.
8. Tree planting standards.
9. Utility locations.
(a) Graphic plan and schedule with legend: The extent, location and species of trees and shrubs to be planted on the development site or building lot to meet the requirements of this article. All information shall also be shown in a tree planting schedule and a separate planting schedule for shrubs that includes Latin names, species common names, symbol used on the graphic plan, caliper or size at time of planting, number of trees (or shrubs) by each species type and percentage of total trees planted for each species.
The legend must show the label or symbol alongside each type of plant.
(b) Other landscape features: Location and description of other landscape improvements, such as earth berms, walls, fences, screens, sculptures, fountains, street furniture, lights, and courts or paved areas.
(c) Specifications: Other installation specifications and planting diagrams for trees and shrubs as appropriate or as supplied by the arborist or public development department.
(d) Tree plan summary: The tree protection and landscape plan shall include the following summary:
of total site area of total site area of total site area of total site area feet
(e) Plan preparer: Name, contact information, and signature/stamp of the professional preparing the tree protection and landscaping plan. The landscape plan shall be prepared by a registered landscape architect, however the public development department may authorize a landscaping plan applicable to a site of two acres or less to be prepared by another qualified professional.
(f) Tree species and planting locations must conform to the approved landscape plan: Substitution of an alternate species or deviation regarding the plant spacings indicated on the plan must be approved in advance by the public development department or qualified professional.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1251. Reference to requirements.
(a) Minimum requirements: Article 2, table 2-2 establishes minimum tree canopy requirements for certain uses in certain zoning districts, and minimum front landscape strips for certain uses which vary by zoning district.
(b) Special uses: The specific use requirements of article 3 may include requirements for landscape strips, depending on the particular use.
(c) Overlay districts: Unique landscaping requirements apply to developments within the East and West Jackson Overlay Districts (see article 4 of this UDC) which supersede in certain instances the general requirements of this division; there is also a planting list for the East and West Jackson Overlay Districts.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1252. Obstructions to sight visibility.
(a) All landscaping and trees planted adjacent to street rights-of-way and driveway intersections with rights-of-way must be installed in a manner that maintains minimum vision clearances specified in this
UDC.
(b) No shrub or tree with heights of between two and one-half feet and 12 feet shall be located within 20 feet of the intersection of the right-of-way lines of streets, roads, highways or railroads, or within 20 feet of the intersection of a street right-of-way and either edge of a driveway.
(c) No landscaping shall be allowed that obstructs or impairs the vision of any vehicle operator at the intersection of any public rights-of-way, at any entrance onto or exit from a public road, or any other location where said obstruction would create a hazard to life or property.
(d) The county shall have the right, but not the obligation, to prune any tree or shrub on private property when it interferes with street light lighting effectiveness, or it interferes with visibility of a street sign or any traffic control device, or sight lines necessary for the public's safe vehicular travel or foot travel, or poses an imminent danger to the public.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1253. Frontage landscape strip.
(a) Width.
1. Minimum width: The minimum width of a frontage landscape strip shall be as specified in table 2-2 of this UDC for the zoning district in which the development site is located, except as otherwise provided in this section.
2. Modification of width: The width of a minimum required frontage landscape strip shall typically be uniform across the frontage of the lot; provided, however, the public development department may authorize the width of a minimum required frontage landscape strip to be varied so long as the total area of the frontage landscape strip equals or exceeds the total area that would otherwise be required for the frontage landscape strip. In no event shall a required frontage landscape strip be reduced to less than three feet under the provisions of this paragraph.
3. Natural vegetation in lieu of frontage landscape strip: The public development department may authorize the retention of existing natural vegetation in lieu of a required frontage landscape strip, if retaining existing landscaping would provide an equivalent number of trees and shrubs as required by this section.
(b) Trees.
1. Planting rate: For any frontage landscape strip required by this UDC, trees shall be maintained or planted at the rate of at least one tree unit for every 40 feet of length of street frontage, or portion thereof (excluding driveways), for each ten feet of required landscape strip width.
2. Spacing and arrangement: Trees may be spaced in a uniform manner or they may be clustered for a more natural or decorative arrangement.
3. Species: Such trees may be hardwoods or softwoods, but must be of a type that is suitable to local growing conditions.
4. Minimum size: At the time of planting, trees within required front landscape strips shall have a minimum caliper of at least 2.5 inches.
5. Credit toward minimum canopy requirements: Trees required to be planted within frontage landscape strips shall be credited toward meeting the minimum canopy requirements of this article for individual development sites. A required front landscape strip shall be the priority location for the planting of trees as may be required to comply with the canopy requirements of this article.
(c) Shrubs.
1. Rate: Shrubs shall be installed within any required frontage landscape strip at the rate of at least ten shrubs for every 40 feet of length of street frontage, or portion thereof (excluding driveways), for each ten feet of required landscape strip width.
2. Minimum size: Shrubs installed within any required frontage landscape strip must be at least 18 inches in height at the time of planting and must be capable of reaching a height of at least two feet at maturity.
(d) Authorized accessory uses within front landscape strips. The following uses are authorized within frontage landscape strips:
1. Driveways and sidewalks: Driveways and sidewalks may be located within a required frontage landscape strip to the extent needed to cross the landscape strip.
2. Walls: Retaining walls, and walls or fences authorized by the director of public development for screening or aesthetic effect, may be located in a required frontage landscape strip.
3. Signage: If permitted by article 7 of this UDC, a ground sign may be located within a required frontage landscape strip.
4. Utilities: Underground utilities may cross a required frontage landscape strip. Fire hydrants shall also be authorized to be located within a required frontage landscape strip.
5. Stormwater: Detention ponds shall not be authorized within required frontage landscape strips.
However, a land development project that incorporates low impact development principles consistent with the Georgia Stormwater Management Manual (e.g., vegetative swale) may be authorized by the public development director, consistent with the requirements of article 11 of this UDC. Stormwater best management practices (BMPs) may be applied or incorporated within front landscaping strips, and a front landscaping strip may if appropriate be accepted as a BMP.
(e) Relationship to utility easements. Where a development site has an existing or proposed utility easement abutting and running parallel or approximately parallel to the right-of-way in the same location as a minimum required frontage landscape strip, the landscape strip shall be relocated interior to the utility easement that abuts and parallels or approximately parallels the right-of-way; provided, however, the public development department may authorize part of the minimum frontage landscape strip be located within the utility easement only if the utility easement owner authorizes the planting of trees and shrubs within the utility easement.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1254. Side lot line landscape strips.
(a) Landscape strips alongside lot lines are not required; provided, however, that where screening of a parking lot is required, a side landscape strip may be required.
(b) If this UDC requires a side landscape strip for a particular use, it shall be planted to the standards for a front landscape strip as required by this UDC.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1255. Parking lot landscaping.
(a) Applicability: This section shall apply to parking lots with ten or more car parking spaces.
(b) Planting island: One parking lot tree for each ten car parking spaces is required and shall be installed. No more than ten contiguous car parking spaces shall be allowed without a minimum of one landscape island or peninsula containing one or more trees.
(c) Minimum dimensions of islands: A landscape island within a parking lot shall have a minimum width of nine feet and minimum depth of 16 feet measured from interior face of curb to interior face of curb; however, wider (12 or more feet) landscaping islands are strongly encouraged and may be required to provide sufficient growing area for certain canopy tree species selected.
(d) Minimum planting: Each landscape island shall contain a minimum of one tree having a minimum caliper of two inches at the time of planting.
(e) Relation to canopy requirement: Trees planted within parking lot landscaping islands and existing trees if located within a parking lot and retained, shall count toward meeting minimum canopy requirements of this article.
(f) Parking screen: If the land development includes car parking within a front yard, the shrubs must be arranged to provide a continuous visual screen to a height of three feet above grade between the front right-of-way and the parking lot. If the land development includes parking within a side yard, the shrubs must be arranged to provide a visual screen along the front right-of-way and that portion of the side yard parking lot. Where parking spaces within a front yard are visible from the front public right-of-way even with the frontage landscape strip, the continuous visual screen required by this subsection shall be extended along the side lot line for the length of the parking area that is visible from front public right-of-way. Parking lot screening may require the planting of shrubs at a higher rate than is otherwise be required by this subsection.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1256. Approval of plant materials.
(a) Approved plant species: The public development director is authorized to promulgate and publish and amend from time to time a list of approved plant species. See section 448 of this UDC for species approved for planting within the East and West Jackson Overlay Districts.
(b) Department approval: Specific landscaping, trees, and buffer material are subject to the approval of the public development department.
(c) Flowering ornamental species: Flowering ornamental species are typically not acceptable for use in meeting the tree canopy requirements of this article.
(d) Pine trees: Where trees must be added to achieve the required tree units per acre for the site, pines may not comprise more than 25 percent of the required units. Where existing pines already comprise 25 percent or more of the required units, no more pines may be credited toward meeting the minimum required number of tree density units.
(e) Replacement tree diversity: Species selected as replacement trees must be quality specimens, and must be ecologically compatible with the intended growing site. To ensure diversity, a minimum of four species of tree shall be used. Sites requiring limited replacement shall be evaluated by the public development department and may be allowed to use fewer than four species.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1257. Plans.
(a) For any land disturbance, land development, or building subject to the requirements of this article, buffer, tree protection and landscaping plans are required to be submitted with any application for a land disturbance permit, development permit, tertiary land disturbance permit, or for a building permit for new construction of buildings. See article 8 of this UDC for plan submission requirements.
(b) The provisions of this section shall not apply to structures for which buffer, tree protection and landscaping plans have previously been submitted and approved for the subject site.
(c) Buffer, tree protection and landscaping plans shall be required for only that phase of development for which the land-disturbance permit, tertiary land-disturbance permit, development permit or building permit is being requested.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1258. Contents of tree protection and landscaping plans.
Tree protection and landscaping plans shall meet the following minimum requirements:
(a) A site plan with property boundaries, proposed buildings, parking areas, loading areas, required buffers, utility easements if any, and other pertinent information as may be required by the public development department. The site plan shall show the location of all trees, shrubs, and landscaping.
(b) A planting schedule for all trees, shrubs, and ground covers proposed, with scientific name and common names of each species, the total number of each species planted, and total numbers of trees. Trees and shrubs shall be indicated on the plan using symbols and the symbols must appear in the planting schedule.
(c) Calculations demonstrating the plan meets minimum landscaped open space and minimum tree canopy requirements of this article.
(d) A tree survey, if existing trees are proposed to be counted toward meeting the minimum tree canopy requirements of this article. Existing vegetation to be retained shall be shown on plans.
(e) Standard details and notes with regard to planting instructions.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1259. Tree planting standards:
(a) Quality: Trees planted to satisfy the requirements of this article shall meet minimum quality standards as established in ANSI A300 standards, as officially revised from time to time.
(b) Caliper and height: Trees shall be a minimum of two-and-one-half-inch caliper for deciduous trees, a minimum of eight feet in height for evergreen trees, and a minimum of one inch caliper per trunk for multi-stemmed trees at the time of planting.
(c) Critical root zone protection: Grading, excavating, or locating utilities within the critical root zones of trees shall be prohibited. No activity or materials, including solvents, construction equipment, portable toilets, construction trailers or temporary soil deposits shall encroach or be placed within the critical root zone of any tree protected under the requirements of this article.
(d) Soil depth: The soil within an area intended for tree planting shall be well aerated to a minimum depth of 12 inches; soils in tree planting islands surrounded by pavement shall be well aerated to a minimum depth of 18 inches.
(e) Soil composition: The soil shall contain a minimum of five percent organic matter. Soil pH shall be within a range of 5.8 to 7.0.
(f) Watering: Trees shall be "watered in" at the time of planting to eliminate air pockets.
(g) Staking: Although tree staking is not generally required, it may at times be required under certain site or other conditions. If installed, stakes shall be removed by the tree owner no later than six months after planting. Any staking shall comply with ANSI A300 standards.
(h) Mulching: Trees shall be mulched immediately, utilizing hardwood mulch, in accordance with the ANSI A300 standards as may be revised from time to time.
(i) Additional technical standards: The public development department, with arborist recommendation, may establish additional technical specifications or standard drawings for planting trees to implement the intention of this article.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1260. Maintenance of landscaping.
(a) A financial surety for maintenance is required, for a two-year period and in an amount equal to 100 percent of the installation cost of landscaping and trees. The owner, tenant and their agent, if any, shall be jointly and severably responsible for the maintenance in good condition of the plant materials used to meet the minimum requirements of this article for buffers, tree replacement, and landscaping.
This responsibility is in addition to and survives the release of any bond or financial surety provided for the land development by the developer.
(b) Plants that are diseased, damaged beyond point of survival, or are dead shall be removed and replaced with a plant of the same species, variety or cultivator, as approved by the public development department.
(c) All landscape materials shall be maintained and shall be kept clear of refuse and debris.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1261. Inspections.
An inspection shall be made by the public development department, or their designee, of all landscape plantings to assure compliance with plan requirements prior to release of the development surety. The surety will be drawn upon by Jackson County if the planting requirements of this article have not been fulfilled.
(a) Generally:Inspections shall be required to ensure that the purposes and provisions of this article are met.
(b) Preliminary inspections: A development site or lot shall be inspected with the applicant or his/her agent prior to plan review for the purpose of identifying options for tree conservation and compliance with technical standards. The preliminary inspection may be used to confirm the accuracy of the tree canopy requirement.
(c) Tree protection inspection: An onsite inspection shall be made prior to any land disturbance to ensure that all tree protection measures required have been installed and following land disturbance to ensure the required tree protection measures are being complied with.
(d) Pre-installation: An inspection shall take place at the time of the delivery of the trees and shrubs on site, prior to their installation, to assure their quality and to review planting requirements.
(e) Periodic inspections: Additional site inspections may occur periodically or at any time during development or construction or encroachment to ensure that all requirements of this article are being met.
(f) Certificate of occupancy inspection: A site inspection shall be required prior to issuance of a certificate of occupancy for the purpose of ensuring that all applicable requirements of this article have been met.
(Ord. No. 22-010, § 1, 8-15-2022) Sec. 1262. Approved landscape planting list. Canopy Category Plant Type Symbol Latin Name Common Name
Minimum Size Parking Lot Approved Piedmont Native Pollinator Firewise Rating Large Trees Over 30 Feet L D-OS AR Acer rubrum Maple, Red 2.5" Cal. x x Low L D-OS AS Acer saccharum Maple, Sugar 2.5" Cal. x x Low L D-OS BN Betula nigra Birch, River 8-10' x x Low L D-OS CG Carya glabra Hickory, Pignut 2.5" Cal. x Low L E-OS CD Cedrus deodara Cedar, Deodar 8-10' Med L E-OS CJ Cryptomeria japonica Cypress, Japanese 8-10' Med L E-OS AZ Cupressus arizonica Cypress, Arizona 2.5" Cal. Med L D-OS DV Diospyros virginiana Persimmon (male only) 2.5" Cal. x x Low L D-OS FG Fagus grandiflora Beech, American 2.5" Cal. Med L D-OS GB Ginko biloba Ginko (male only) 2.5" Cal. Med L E-OS JV Juniperus virginiana Redcedar, Eastern 8-10' x x x High L D-OS LS Liquidamber styraciflua Sweetgum 2.5" Cal. x Low L D-OS LT Liriodendron tulipfera Yellow (Tulip) Poplar 2.5" Cal. x x Low L E-OS MG Magnolia grandiflora Magnolia, Southern 8-10' x Med L D-OS ML Metasequoia glyptostroboides Redwood, Dawn 2.5" Cal. x High L D-OS NS Nyssa sylvatica Blackgum 2.5" Cal. x x x Low L E-OS PS Pinus strobus Pine, Eastern White 8-10' x x High L E-OS PT Pinus taeda Pine, Loblolly 8-10' x x x High L D-OS PO Platanus occidentalis Sycamore, American 2.5" Cal. x Med L D-OS QA Quercus alba Oak, White 2.5" Cal. x x x Low L D-OS QC Quercus coccinea Oak, Scarlet 2.5" Cal. x x x Low L D-OS QF Quercus falcata Oak, Southern Red 2.5" Cal. x x x Low L D-OS QL Quercus laurifolia Oak, Laurel 2.5" Cal. x x x Low L D-OS QY Quercus lyrata Oak, Overcup 2.5" Cal. x x Low L D-OS QM Quercus michauxii Oak, Swamp Chestnut 2.5" Cal. x x Low L D-OS QN Quercus nigra Oak, Water 2.5" Cal. x x x Low L D-OS QU Quercus nuttalii Oak, Nuttall 2.5" Cal. x x x Low L D-OS QP Quercus phellos Oak, Willow 2.5" Cal. x x x Low L D-OS QI Quercus prinus Oak, Chestnut 2.5" Cal. x x Low L D-OS QR Quercus rubra Oak, Northern Red 2.5" Cal. x x Low L D-OS QH Quercus shumardii Oak, Shumard 2.5" Cal. x x x Low L D-OS QS Quercus stellata Oak, Post 2.5" Cal. x x Low L D-OS TD Taxodium distchum Baldcypress 2.5" Cal. x Low L D-OS TN Taxodium distchum varnutans Pondcypress 2.5" Cal. x Low L E-OS TH Thuja plicata Arborvitae, Giant 2.5" Cal. Med L D-OS Tilia americana Basswood 2.5" Cal. x x Low L D-OS UA Ulmus alata Elm, Winged 2.5" Cal. x x x Low L D-OS UM Ulums Americana ("Princeton") Elm, American, Princeton 2.5" Cal. x x Low L D-OS ZS Zelkova serrata Zelkova, Japanese 2.5" Cal. x Low Medium Trees To 30 Feet M D-US AB Acer barbatum Maple, Southern Sugar 2.5" Cal. x x Low M D-US AU Acer buegeranum Maple, Trident 2.5" Cal. x x Low M D-US AL Acer leucoderme Maple, Chalk 2" Cal. x x Med M D-US AA Amalanchier arborea Serviceberry 6-8' x x Low M D-US CC Carpinus caroliniana Hornbeam, American, ironwood 2" Cal. x x Low M D-US CN Cercis canaensis Redbud, Eastern 2" Cal. x x Low M D-US CT Chamaecyparis thyoides Whitecedar, Atlantic 6-8' x High M D-US HC Halesia caroliniana Silverbell, Carolina 2" Cal. x x Low M E-US IO Ilex opaca Holly, American 6-8' x x High M E-US IF Ilex x attenuata "Foster" Holly, Foster 6-8' x x Low M E-US IN Ilex x attenuata "Nellie R.
Stevens" Holly, Nellie Stevens 6-8' x x Mod M E-US MV Magnolia virginiana Magnolia, Sweetbay 6-8' x x Low M D-US OV Ostrya virginiana Hophornbeam, Eastern 2" Cal. x x Low M D-US OA Oxydendron aboreum Sourwood 2" Cal. x x Low M E-US PV Pinus virginiana Pine, Virginia 6-8' x x x High M D-US PH Pistacia chinensis Pistache, Chinese 2" Cal. x Low M E-US PC Prunus caroliniana Cherry, Carolina Laurel 6-8' Mod M D-US SN Salix nigra Willow, Black 6-8' x x Low M D-US SA Sassafras albidum Sassafras 6-8' x Low M E-US TO Thufa occidentialis Arborvitae, Medium 6-8' x Mod M D-US UP Ulmus parvifolia Elm, Chinese 2" Cal. x Mod Small Trees to 20 Feet S D-US CH Cercis chinensis Redbud, Avondale 2" Cal. x x Low S D-US CV Chionanthus virginicus Fringe Tree 6-8' x Low S D-US CF Cornus florida Dogwood, Flowering 2" Cal. x x Low S D-US CO Cornus kousa Dogwood, Kousa 2" Cal x x Low S D-US Cratageus spp. Hawthorn 2" Cal. x x x Low S D-US HV Hamamelis virginiana Witchhazel, Common 6-8' x Low S E-US IV Ilex vomitoria Holly, Yaupon 6-8' x x High Deciduous Shrubs D AS Aesculus sylvatica Painted Buckeye 3 gal. x Low D CA Callicarpa americana American Beautyberry 3 gal. x Low D CF Calycanthus floridus Sweetshrub 3 gal. x x Low D CO Cephalanthus occidentalis Buttonbush 3 gal. x x Low D CL Clehra alnifolia Summersweet 3 gal. x Low D HZ Corylus Americana Hazel 3 gal. x Low D EA Euonymus Americana Strawberry Bush 3 gal. x Low D FG Fothergilla gardenii Dwarf Bottlebrush 3 gal. x x Low D JA Hydrangea arborescens Hydrangea 3 gal. x x Low D HQ Hydrangea quercifolia Oakleaf Hydrangea 3 gal. x Low D ID Ilex decidua Possumhaw 3 gal. Low D IV Ilex verticillata Winerberry 3 gal. x Low D IR Itea virginica Virginia Sweetspire 3 gal. x x Low D RC Rhododendron canadensis Azalea, Native 3 gal. x Mod D RA Rhus aromatica Sumac, Aromatica 3 gal. x Low D RG Rhus copallina Sumac, Winged 3 gal. x Low D SC Sambucus canadensis Elderberry 3 gal. x Low D SP Spirea spp. Spirea 3 gal. High D VA Vaccineum arboreum Sparkleberry 3 gal. Mod D VS Vaccineum spp. Blueberry 3 gal. x x Low D VC Viburnum acerifolium Viburnum, Mapleleaf 1 gal. x x Low D VD Viburnum dentatum Viburnum, Arrowwood 3 gal. x x Low D VP Viburnum prunifolium Viburnum, Blackhaw 3 gal. x x Low D VR Viburnum rudifulum Viburnum, Rusty 3 gal. x x Low D VG Vitex agnus-castus Chastetree 3 gal. x Mod Evergreen Shrubs E AB Abelia spp. Abelia 3 gal. x Mod E AO Agarista populifolia Leocothoe 3 gal. Mod E CH Chamaceyparis obtusa Chamaecyparis Goldthread 3 gal. Mod E LE Leucothoe axillaris Doghobble 3 gal. High E IG Ilex glabra Inkberry 3 gal. High E IF Illicium floridanum Anise, Florida 3 gal. Low E IP Illicium parviflorum Anise, Small Tree 3 gal. Low E KL Kalmia latifolia Mountain Laurel 3 gal. x x High E LO Loropetalum chinenses Loropetalum 3 gal. Low E MC Myrica cerifera Waxmyrtle 3 gal. High E OF Osmanthus fragrans Tea Olive 3 gal. Mod E RO Rhodendron obtusum Azalea, Evergreen 3 gal. Mod E YF Yucca filamentosa Yucca, Adam's Needle 3 gal. Low E IC Ilex cornuta Holly, Burford 3 gal. x Mod Legend: Firewise Flammability Ratings:
L= large M = medium S = small D = deciduous E = evergreen OS = overstory tree US = understory tree Spp = species Low These plants must be planted at least six feet from the structure.
Vertical and horizontal spacing is not critical, but mature size should be considered in plant selection and placement Moderate These plants can become highly flammable in certain environmental conditions such as drought. They must be planted 15 feet or more away from the structure, preferably with some space between plants at time of maturity High These plants ignite quickly and release large quantities of heat even when healthy and well-watered. They must be planted at least 30 feet from structures, and must be separated vertically and horizontally from other plants, both at planting and at maturity Extreme Most vines and ornamental grasses are considered to have an extreme flammability rating and will not generally be allowed in development landscape plans Notes:
This list is a guide, and any substitutions must be approved by the public development department or their designee prior to plan approval and issuance of a development permit. Plants must be considered to be non-invasive.
Drought tolerance, or suitability for wet sites, has not been specified. Determination as to the plant's suitability to a particular condition will be evaluated by the public development department or their designee at the time of plan submission.
(Ord. No. 22-010, § 1, 8-15-2022) Secs. 1263—1270. Reserved.
ARTICLE 14. VARIANCES, SPECIAL EXCEPTIONS AND APPEALS
DIVISION I. VARIANCES
Sec. 1401. Authority to grant variances.
(a) The board of adjustment shall have the power to authorize upon application in specific cases such variances to the Code sections enumerated in this subsection, from the terms of this UDC as will not be contrary to the public interest where, owing to special conditions, a literal enforcement of the provisions of this UDC will in an individual case result in unnecessary hardship or practical difficulty, so that the spirit of this UDC shall be observed, public safety and welfare secured, and substantial justice done. The board shall not be authorized to grant variances to any other code sections except those enumerated in this subsection:
(1) Minimum building setbacks.
(2) Maximum building height.
(3) Minimum lot width.
(4) Minimum separation between agricultural and residential uses.
(5) Minimum and maximum parking and minimum loading space requirements.
(6) Signage, in accordance with article 7 of this UDC.
(7) Variances to airport zone requirements as specifically authorized by section 423 of this UDC.
(8) Land disturbance within that portion of a required stream buffer between 25 feet and 75 feet of a stream, as specified in section 813(b) of this UDC.
(9) Variance to the requirements of article 10, flood damage prevention, as specifically authorized in division IV of article 10 of this UDC, and subject to the criteria specified in Sec. 1042 of this
UDC.
(10) Disturbance of a required zoning buffer, as may be authorized per section 1203(b) of this UDC.
(b) The board of adjustment may upon application approve, conditionally approve, or deny variances, subject to the requirements of this division. In granting a variance, the board of adjustment may impose such requirements and conditions with respect to the location, construction, maintenance and operation of any use or building, in addition to those expressly set forth in this UDC, as may be deemed necessary for the protection of adjacent properties and the public interest.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1402. Initiation of variance applications.
An application for variance may be initiated by any person, firm, corporation or agency, provided said individual, firm, corporation or agency is the owner or owner's agent of the property for which the variance is sought.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1403. Application requirements.
Applications for variance shall require submittal of the following items:
(a) Application fee as specified by resolution of the board of commissioners;
(b) Application form furnished by the public development department, including signed and notarized signature of property owner;
(c) Legal description of the property;
(d) Survey plat of the property;
(e) Letter of intent describing the proposed use of the property or other action requested;
(f) Site plan of the property at an appropriate engineering scale showing existing and proposed buildings and structures and other information as may be required by the public development department to describe and/or graphically depict the requested variance;
(g) Written analysis of how the proposed action compares to decision criteria specified for the granting of variances pursuant to this division; and
(h) Other information as may be required by the public development director.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1404. Criteria for granting variances.
Any applicant requesting consideration of a variance to any provision of this UDC shall provide a written justification that one or more of the condition(s) described in this section exist. The board of adjustment shall not approve a variance application unless it shall have adopted findings that one or more of the following conditions exist:
(a) There are extraordinary, exceptional, or peculiar conditions pertaining to the particular piece of property in question, because of its size, shape, topography or other physical condition that are not applicable to other lands or structures in the same district; and that such conditions cause unnecessary hardship, practical difficulty or adversely affect the reasonable use or usability of property as currently zoned and regulated;
(b) The requested variance will be in harmony with the purpose and intent of this UDC and will not be injurious to the neighborhood or to the general welfare;
(c) The special circumstances are not the result of the actions of the applicant; and/or
(d) The variance requested is the minimum variance that will make possible the proposed use of the land, building, or structure in the use district proposed;
For any variance to the flood damage prevention requirements of article 10 of this UDC, the specific requirements, procedures, and criteria in division IV of article 10 of this UDC shall apply in addition to the requirements of this division.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1405. Application compliance and completeness.
(a) A separate application (and fee) is required for each section of this UDC proposed to be varied.
In cases where more than one application for variance pertaining to a particular piece of property is filed, said applications may be processed simultaneously.
(b) No variance application shall be processed by the public development department unless it complies with the procedural requirements of this division and is found to be complete with regard to application materials, payment of fees, supportive materials, and any other application requirements specified by this division.
(c) The public development department shall not accept for processing, or process, a variance application that does not comply with all application submittal requirements of this division.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1406. Administrative processing of applications.
The public development director is hereby authorized to establish administrative deadlines for the receipt of variance applications. Upon a finding by the public development department that a variance application is complete and complies with the requirements of this division, including deadlines, the application shall be marked received and approved for initiation, and the date of such consideration shall be indicated in the file of the application.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1407. Concurrent variance application.
In cases where an applicant is proposing a rezoning (i.e., amendment to the official zoning map) or special use, or both, and where the applicant files an application to obtain a variance related to the same property as involved in the filing a rezoning or special use application, the applications may be administratively processed simultaneously, but no action shall be taken by the board of adjustment on the variance application until the rezoning or special use application, or both as appropriate, is approved by the board of commissioners.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1408. Investigation and recommendation.
(a) The public development department may send the application out for review by internal county departments and external agencies as may be appropriate (i.e., inter-agency review). Any written comments received in a timely manner shall be submitted to the applicant and board of adjustment, and any such comments shall become an official public record.
(b) The public development department shall investigate and make a recommendation regarding any or all of the relevant matters concerning the application. Any such investigation and recommendation shall if in writing be made available to the applicant and board of adjustment prior to public hearings and shall become an official public record.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1409. Published notice of public hearing.
At least 30 days and not more than 45 days immediately preceding the date of the board of adjustment's public hearing, the public development department shall cause to be published within a newspaper of general circulation within the county a notice of a public hearing on the matter before the board of adjustment. The notice shall state the time, place, and purpose of the public hearing and shall include the location of the property. The notice shall also include the nature of the variance request, including the section of this UDC requested to be varied.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1410. Public hearing notice - sign on property.
(a) Requirement and locations. The applicant shall be required to post and maintain signs supplied by the county near the right-of-way of the nearest public street, so as to be visible from the street at least 30 days and not more than 45 days immediately preceding the date of the board of adjustment's public hearing on the rezoning application. One such sign shall be placed in a conspicuous location along each street frontage of the property for which the variance has been requested. If the property has no street frontage, the sign shall be placed on each street where access to the property will be gained.
(b) Content. The sign providing notice shall state the time, place, and purpose of the public hearing and shall include the location of the property. The notice shall also include the nature of the variance request, including the section of this UDC requested to be varied.
(c) Time period. It is the responsibility of the applicant to post the signs and to maintain the signs during the posting period. Said signs pertaining to the board of adjustment's public hearing shall remain posted until a final decision by the board of adjustment has been rendered.
(d) Consequences of non-maintenance. Failure to post and maintain the signs continuously may prohibit consideration of the application at any scheduled public hearing. In the event the signs are not posted continuously, the county, in its sole discretion, may require the reposting and readvertising prior to any future public hearing, for which the applicant shall pay an additional readvertising fee. The county may also in its sole discretion, continue, hold, or dismiss the application if public notice requirements are not met due to applicant non-maintenance of the required public notice sign(s) on the property.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1411. Public hearing and procedures.
(a) The board of adjustment shall hold a public hearing on all variance applications.
(b) Procedures for calling and conducting a public hearing by the board of adjustment shall be the same as those procedures established in article 13, division V of this UDC, unless the board shall have adopted its own rules of procedure, in which case said rules of procedure shall be available to the public prior to and during any public hearing on a variance application.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1412. Decision.
(a) Time frame. Within 65 calendar days of the date of its public hearing held by the board of adjustment, the board of adjustment shall render a decision on the application for variance. This time limit may be extended if the applicant consents to extend the time frame.
(b) Decision.
(1) The board of adjustment may approve or disapprove the proposed variance, or it may approve the application with conditions.
(2) The board of adjustment shall consider information supplied by the applicant and the public development department prior to making a decision.
(3) The decision of the board shall be based on findings.
(4) If the board of adjustment's proposed action on the variance is consistent with the findings in the staff report prepared by the public development department, the board of adjustment may rely on the findings in the staff report, without the need to adopt any additional findings. In such instance, the motion shall be worded as follows: "I make a motion to approve [or deny] the application for variance based on the findings adopted in the staff report for the application."
(5) If the board of adjustment's proposed action on the variance is contrary to the findings in the staff report prepared by the public development department, the board of adjustment shall adopt its own findings to support its decision. In such instance, the board shall take one of the following actions prior to acting on a motion: adopt its own findings of fact; or request that the representative of the public development department articulate findings to support the proposed action; or recess to allow the board members or the public development department to articulate findings to support the proposed action; or continue the meeting to a later date certain to give the board and/or department time to articulate findings to support the proposed action.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1413. Withdrawal of application.
(a) No refund. There shall be no refund by the county of an application fee if an application is withdrawn.
(b) Prior to public notice. If a request for withdrawal is received prior to the publication of a notice for a public hearing, the application shall be withdrawn administratively by the public development department without restriction on the refiling of a variance application on the property in the future, as described in this division.
(c) After public notice. If a request for withdrawal is received after publication of a public notice has been published or when such public notice irretrievably set for publication but the variance application has not been heard by the board of adjustment, the application shall be withdrawn administratively by the public development department, provided that an application for a variance relating to the property shall not be resubmitted for 12 months from the date of withdrawal.
(d) After board of adjustment public hearing. No withdrawal of a variance application shall be permitted after the public hearing on said application has been convened.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1414. Notice of action.
The public development department, or secretary of the board of adjustment, shall notify the applicant in writing of the decision on the variance application by the board of adjustment.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1415. Finality and legal recourse.
A decision of the board of adjustment with regard to a variance application shall be final and may be appealed only to a court of competent jurisdiction. Such appeal must be taken within 30 days of the decision of the board of adjustment. Reconsideration of an action on a variance application under court order shall follow the same procedures of this division as though a new application.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1416. Limitations on the frequency of filing applications.
No variance application requesting variance to the same section of the UDC and affecting the same or any portion of property which was denied by the board of adjustment shall be accepted for filing by a property owner until 12 months shall have elapsed from the date said application for variance to the same section of the UDC was denied by the board of adjustment.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Secs. 1417—1420. Reserved.
DIVISION II. ADMINISTRATIVE VARIANCES
Sec. 1421. Authority.
(a) The director of public development shall have the power to authorize upon application in specific cases such variances from the terms of this UDC as will not be contrary to the public interest where, owing to special conditions, a literal enforcement of the provisions of this UDC will in an individual case result in unnecessary hardship or practical difficulty, so that the spirit of this UDC shall be observed, public safety and welfare secured, and substantial justice done.
(b) The director of public development may upon application approve, conditionally approve, or deny variances, subject to the requirements of this division. In granting a variance, the director of public development may impose such requirements and conditions with respect to the location, construction, maintenance and operation of any use or building, in addition to those expressly set forth in this UDC, as may be deemed necessary for the protection of adjacent properties and the public interest.
(c) The director of public development's authority to grant administrative variances shall be limited to granting administrative variances to the following provisions:
(1) Minimum building setbacks, whether established by zoning district, overlay district, or for a specific use, not to exceed a reduction of 25 percent, but not including any stream buffer required by article 5 or article 8 of this UDC or any other buffer requirement of this UDC.
(2) Maximum building height, not to exceed an additional four feet above the maximum allowed.
(3) Minimum parking space requirements, per section 667 of this UDC, not to exceed 20 percent below the minimum.
(4) Maximum parking space requirements, per section 667 of this UDC, not to exceed 20 percent above the maximum.
(5) Reduction or waiver of off-street loading requirements, per section 685 of this UDC.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1422. Initiation of administrative variance applications.
An application for administrative variance may be initiated by any person, firm, corporation or agency, provided said individual, firm, corporation or agency is the owner or owner's agent of the property for which the administrative variance is sought.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1423. Application requirements.
Applications for administrative variance shall require submittal of the following items:
(a) Application fee as specified by resolution of the board of commissioners;
(b) Application form furnished by the public development department, including signed and notarized signature of property owner;
(c) Legal description of the property;
(d) Survey plat of the property;
(e) Letter of intent describing the proposed use of the property or other action requested;
(f) Site plan of the property at an appropriate engineering scale showing existing and proposed buildings and structures and other information as may be required by the public development department to describe and/or graphically depict the requested variance;
(g) Written analysis of how the proposed action compares to decision criteria specified for the granting of variances pursuant to this division; and
(h) Other information as may be required by the public development director.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1424. Criteria for granting administrative variances.
Any applicant requesting consideration of an administrative variance shall provide a written justification that one or more of the condition(s) described in this section exist. The public development director shall not approve an administrative variance application unless he or she shall have adopted findings that one or more of the following conditions exist:
(a) There are extraordinary, exceptional, or peculiar conditions pertaining to the particular piece of property in question, because of its size, shape, topography or other physical condition that are not applicable to other lands or structures in the same district; and that such conditions cause unnecessary hardship, practical difficulty or adversely affect the reasonable use or usability of property as currently zoned and regulated;
(b) The requested variance will be in harmony with the purpose and intent of this UDC and will not be injurious to the neighborhood or to the general welfare;
(c) The special circumstances are not the result of the actions of the applicant; and/or
(d) The variance requested is the minimum variance that will make possible the proposed use of the land, building, or structure in the use district proposed.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1425. Application compliance and completeness.
(a) A separate application (and fee) is required for each section of this UDC proposed to be administratively varied. In cases where more than one application for administrative variance pertaining to a particular piece of property is filed, said applications may be processed simultaneously.
(b) No administrative variance application shall be processed by the public development department unless it complies with the procedural requirements of this division and is found to be complete with regard to application materials, payment of fees, supportive materials, and any other application requirements specified by this division.
(c) The public development department shall not accept for processing, or process, an administrative variance application that does not comply with all application submittal requirements of this division.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1426. Decision.
Within no more than 30 calendar days of the date an administrative variance application is determined complete, the public development director shall render a decision on the application which shall be based on findings.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1427. Recourse if denied.
An applicant who applies for an administrative variance that is denied by the public development director may file a variance application to be considered by the board of adjustment, as provided in division II of this article, to be heard as an appeal of an administrative decision.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1428—1430. Reserved.
DIVISION III. SPECIAL EXCEPTIONS
Sec. 1431. Authority to grant special exceptions.
(a) The board of adjustment shall have the power to authorize upon application in specific cases the following special exceptions as specifically provided for in this UDC:
(1) Approval of a metal building in a residential zoning district exceeding a building floor area of 500 square feet, per section 3-002 of this UDC.
(2) Approval of a building accessory to a residential use in a residential zoning district exceeding a building floor area of 1000 square feet, per section 3-002 of this UDC.
(3) Approval for a guest house to exceed the maximum building floor area requirement, per section 3-066 of this UDC.
(4) Outdoor display in a highway retail commercial (HRC) zoning district outside the East and West Jackson overlay districts, as provided per section 3-090 of this UDC.
(5) Approval to reduce the maximum length of a cul-de-sac per section 1616 of this UDC.
(b) The board of adjustment may upon application approve, conditionally approve, or deny applications for special exceptions, subject to the requirements of this division. In granting a special exception, the board of adjustment may impose such requirements and conditions with respect to the location, construction, maintenance and operation of any use or building, in addition to those expressly set forth in this UDC, as may be deemed necessary for the protection of adjacent properties and the public interest.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1432. Initiation of special exception applications.
An application for special exception may be initiated by any person, firm, corporation or agency, provided said individual, firm, corporation or agency is the owner or owner's agent of the property for which the variance is sought.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1433. Application requirements.
Applications for special exception shall require submittal of the following items:
(a) Application fee as specified by resolution of the board of commissioners;
(b) Application form furnished by the public development department, including signed and notarized signature of property owner;
(c) Legal description of the property;
(d) Survey plat of the property;
(e) Letter of intent describing the proposed use of the property or other action requested;
(f) Site plan of the property at an appropriate engineering scale showing existing and proposed buildings and structures and other information as may be required by the public development department to describe and/or graphically depict the requested variance;
(g) Written analysis of how the proposed action compares to decision criteria specified for the granting of variances pursuant to this Division;
(h) Elevation drawing of building proposed, as applicable; and
(i) Other information as may be required by the public development director.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1434. Criteria for granting special exceptions.
Any applicant requesting consideration of a special exception shall provide a written explanation of how the application meets the criteria for granting special exceptions of this section. The board of adjustment shall not approve a special exception application unless it shall have adopted findings that the application meets the following criteria for granting special exceptions:
The building or use, if approved:
(a) Will not impair the purpose and intent of this UDC;
(b) Will not damage the environment; and
(c) Will not be injurious to the use and enjoyment of property in the immediate vicinity or within the surrounding neighborhood.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1435. Application compliance and completeness.
(a) No special exception application shall be processed by the public development department unless it complies with the procedural requirements of this division and is found to be complete with regard to application materials, payment of fees, supportive materials, and any other application requirements specified by this division.
(b) The public development department shall not accept for processing, or process, a special exception application that does not comply with all application submittal requirements of this division.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1436. Investigation and recommendation.
The public development department shall investigate and make a recommendation regarding any or all of the relevant matters concerning the application. Any such investigation and recommendation shall if in writing be made available to the applicant and board of adjustment prior to public hearing and shall become an official public record.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1437. Published notice of public hearing.
At least 30 days and not more than 45 days immediately preceding the date of the board of adjustment's public hearing, the public development department shall cause to be published within a newspaper of general circulation within the county a notice of a public hearing on the matter before the board of adjustment. The notice shall state the time, place, and purpose of the public hearing and shall include the location of the property. The notice shall also include the nature of the special exception request.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1438. Public hearing notice - sign on property.
(a) Requirement and locations. The applicant shall be required to post and maintain signs supplied by the county near the right-of-way of the nearest public street, so as to be visible from the street at least 30 days and not more than 45 days immediately preceding the date of the board of adjustment's public hearing on the rezoning application. One such sign shall be placed in a conspicuous location along each street frontage of the property for which the variance has been requested. If the property has no street frontage, the sign shall be placed on each street where access to the property will be gained.
(b) Content. The sign providing notice shall state the time, place, and purpose of the public hearing and shall include the location of the property. The notice shall also include the nature of the variance request.
(c) Time period. It is the responsibility of the applicant to post the signs and to maintain the signs during the posting period. Said signs pertaining to the board of adjustment's public hearing shall remain posted until a final decision by the board of adjustment has been rendered.
(d) Consequences of non-maintenance. Failure to post and maintain the signs continuously may prohibit consideration of the application at any scheduled public hearing. In the event the signs are not posted continuously, the county, in its sole discretion, may require the reposting and readvertising prior to any future public hearing, for which the applicant shall pay an additional readvertising fee. The county may also in its sole discretion, continue, hold, or dismiss the application if public notice requirements are not met due to applicant non-maintenance of the required public notice sign(s) on the property.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1439. Public hearing and procedures.
(a) The board of adjustment shall hold a public hearing on all special exception applications.
(b) Procedures for calling and conducting a public hearing by the board of adjustment shall be the same as those procedures established in article 13, division V of this UDC, unless the board shall have adopted its own rules of procedure, in which case said rules of procedure shall be available to the public prior to and during any public hearing on a special exception application.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1440. Decision.
(a) Time frame. Within 65 calendar days of the date of its public hearing, the board of adjustment shall render a decision on the application for special exception. This time limit may be extended if the applicant consents to extend the time frame.
(b) Decision.
(1) The board of adjustment may approve or disapprove the proposed special exception, or it may approve the application with conditions.
(2) The board of adjustment shall consider information supplied by the applicant and the public development department prior to making a decision.
(3) The decision of the board shall be based on findings.
(4) If the board of adjustment's proposed action on the special exception is consistent with the findings in the staff report prepared by the public development department, the board of adjustment may rely on the findings in the staff report, without the need to adopt any additional findings. In such instance, the motion shall be worded as follows: "I make a motion to approve [or deny] the application for special exception based on the findings adopted in the staff report for the application."
(5) If the board of adjustment's proposed action on the special exception is contrary to the findings in the staff report prepared by the public development department, the board of adjustment shall adopt its own findings to support its decision. In such instance, the board shall take one of the following actions prior to acting on a motion: adopt its own findings of fact; or request that the representative of the public development department articulate findings to support the proposed action; or recess to allow the board members or the public development department to articulate findings to support the proposed action; or continue the meeting to a later date certain to give the board and/or department time to articulate findings to support the proposed action.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1441. Withdrawal of application.
(a) No refunds. There shall be no refund of application fee if an application is withdrawn.
(b) Prior to public notice. If a request for withdrawal is received prior to the publication of a notice for a public hearing, the application shall be withdrawn administratively by the public development department without restriction on the refiling of a special exception application on the property in the future, as described in this division.
(c) After public notice. If a request for withdrawal is received after publication of a public notice has been published or when such public notice irretrievably set for publication but the special exception application has not been heard by the board of adjustment, the application shall be withdrawn administratively by the public development department, provided that an application for a special exception relating to the property shall not be resubmitted for six months from the date of withdrawal.
(d) After board of adjustment public hearing. No withdrawal of a special exception application shall be permitted after the public hearing on said application has been convened.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1442. Notice of action.
The public development department, or secretary of the board of adjustment, shall notify the applicant in writing of the decision on the special exception application by the board of adjustment.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1443. Finality and legal recourse.
A decision of the board of adjustment with regard to a special exception application shall be final and may be appealed only to a court of competent jurisdiction. Such appeal must be taken within 30 days of the decision of the board of adjustment. Reconsideration of an action on a special exception application under court order shall follow the same procedures of this division as though a new application.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1444. Limitations on the frequency of filing applications.
No special exception application authorized by the same section of the UDC and affecting the same or any portion of property which was denied by the board of adjustment shall be accepted for filing by a property owner until 12 months shall have elapsed from the date said application for special exception authorized by the same section of the UDC was denied by the board of adjustment.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Secs. 1445—1450. Reserved.
DIVISION IV. APPEALS OF ADMINISTRATION DECISIONS
Sec. 1451. Appeal as a remedy.
It is the intent of this UDC that all questions arising in connection with the administration and enforcement of this UDC shall be presented first to the public development director for potential resolution. Persons may appeal to the board of adjustment for relief when aggrieved by an action or an interpretation of the public development director made under this UDC. All such requests for relief shall be taken as an appeal to the board of adjustment, as provided in this division.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1452. Initiation of an appeal.
Any person aggrieved by a decision of the public development director or any person acting administratively under authority of this UDC may initiate, by application, an appeal of an administrative action or interpretation to the board of adjustment. An application for an appeal for any property or properties may be initiated by the owner of a majority interest in the property affected, or his or her authorized representative.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1453. Bases for an appeal.
(a) An appeal may be filed where it is alleged that the public development director has misinterpreted or misapplied one or more requirements or other provisions of this UDC.
(b) An appeal may be filed where it is alleged that an enforcement officer erred in finding the person or property in violation of any provision of this UDC or in violation of permit conditions.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1454. Application requirements.
(a) All appeal applications shall be submitted to the public development director on forms provided by the department. The applicant shall be required to submit all documentation necessary to support the appeal application, which shall be transmitted by the public development director to the board of adjustment.
(b) All appeal applications shall be accompanied by a non-refundable fee, as set by resolution of the governing body from time to time.
(c) An application for an appeal shall include such descriptions, maps or drawings as needed to clearly illustrate or explain the action requested. The county may request such additional information from the appellant as necessary to provide a full understanding of the appeal.
(d) Such appeal application must be filed within 30 days of the action or interpretation that is the subject of the appeal. If the person aggrieved by an action by an administrative official with regard to this UDC does not file a complete appeal application within 30 days of the decision appealed from, then the decision of the public development director shall stand, and no further remedy shall be available under this UDC.
(e) The public development director shall review the application for completeness within five working days of the application submission deadline. Incomplete or improper applications will be returned to the applicant.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1455. Stay of proceedings.
The filing of a completed application for an appeal of an administrative decision stays all legal proceedings in furtherance of the action appealed from, unless the public development director certifies to the board of adjustment, after the notice of appeal shall has been filed, that by reason of facts stated in the certificate a stay would cause imminent peril to life or property. In such case, proceedings shall not be stayed unless the applicant for appeal of an administrative decision secures an order from a court of competent jurisdiction.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1456. Appeal procedures.
(a) Assembly of record. Upon receiving a complete and timely application for an appeal, the public development director or his/her designee shall assemble such memos, papers, plans, or other documents as may constitute the record for the appeal or as may provide an understanding of the issues involved.
(b) Schedule of appeal hearing. Once the record has been assembled, the public development director or his/her designee shall schedule the appeal for public hearing and consideration at the next meeting of the board of adjustment for which adequate public notice can be given.
(c) Notification to the general public. At least 30 days but not more than 45 days prior to public hearing, notice shall be published in a newspaper of general circulation within the county. The notice shall state the time, place and purpose of the hearing. The published notice shall also include the location of the property for which the appeal arises, if applicable and the nature of the appeal.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Sec. 1457. Authority and action.
(a) Decision or determination. The board of adjustment shall after application and public hearing make findings and render a decision on the appeal. The board of adjustment may affirm, overrule or modify, in whole or in part, the rulings, or decisions or interpretations of the public development director.
(b) Remedies. In cases where an appeal is granted, the board of adjustment may direct the issuance of land disturbance permits, development permits, building permits, and certificates of occupancy not otherwise inconsistent with this UDC or other ordinance adopted by the board of commissioners. The board of adjustment may interpret such provisions of this UDC as may require clarification or extension in specific cases.
(c) Notice. The public development director or secretary of the board of adjustment shall notify the applicant, in writing, of its decision within five calendar days after the board of adjustment has rendered its decision.
(d) Binding action. The public development director shall be bound by the decision of the board of adjustment on the appeal application.
(e) Finality. A decision of the board of adjustment pursuant to this division shall constitute final action and may be appealed only to a court of competent jurisdiction in the manner provided by law.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 23-001, § 1, 5-15-2023) Secs. 1458—1460. Reserved.
ARTICLE 15. SUBDIVISION OF LAND
DIVISION I. PURPOSES, AUTHORITY, AND DEFINITIONS
Sec. 1501. Purposes.
This article is adopted for the following purposes, among others:
(a) To assure equitable handling of all subdivision plats by providing uniform procedures and standards for the subdivider;
(b) To assure, in general, the wise development of new land areas, in harmony with the comprehensive plan of the county;
(c) To assure the accurate description of property, the identification of property boundaries with monuments, and the proper recording of property descriptions in public records;
(d) To help eliminate the costly maintenance problems which occur when streets and lots are laid out without proper consideration given to various public purposes;
(e) To protect lot purchasers who generally lack the specialized knowledge to evaluate subdivision improvements and design; and
(f) To implement the Georgia Plat and Condominium Plan Recording Act of 2017 and other applicable state laws.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1502. Authority of director of public development.
(a) In accordance with the provisions of this article, the director of public development shall have final authority with regard to the review and approval, conditional approval, or disapproval of preliminary plats, final plats, lot combination plats, boundary line adjustments, dedication plats and condominium plans; provided, however, the director does not have authority to accept any public improvements on behalf of the Jackson County Board of Commissioners. Public streets shall only be accepted by the Jackson County Board of Commissioners, following procedures for public dedications specified in this article.
(b) The director of public development shall not sign and approve any final or other plat required by this article, nor shall any plat be authorized for recording, unless the plat meets the minimum requirements of this article and any other applicable provision of this UDC.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1503. Definitions.
Block: An area of land that is entirely surrounded by streets, public lands, railroad rights-of-way, watercourses, or other well defined and fixed boundaries.
Condominium plan: A drawing that is required to be recorded prior to the first conveyance of a condominium unit pursuant to O.C.G.A. § 44-3-83(b), including, but not limited
to, a condominium floor plan, condominium plot plan, or condominium site plan.
Cul-de-sac: A dead-end street of limited length having a primary function of serving adjoining land, and constructed with a turnaround at its end.
Dedication plat: A plat drawn specifically for the purpose of dedicating public right-of-way or land for public use, drawn to meet final plat specifications and following procedures for final plat approval of this article.
Easement: A grant of one or more of the property rights by the property owner to and/or for use by the public, a corporation, or another person or entity.
Final plat: The final drawing of a subdivision and, as applicable, dedication, prepared for filing for record with the Clerk of Superior Court of Jackson County, and containing all elements and requirements set forth in this article.
Homeowners association: An organization formed for the maintenance and operation of the common areas of a subdivision or development, where membership in the association is automatic with the purchase of a dwelling unit or lot within the development, with the ability to legally assess each owner of a dwelling unit or lot and which has authority to place a lien against all dwelling units and lots within the subdivision or development.
Lot: A parcel or tract of land held in single ownership.
Lot, corner: A lot abutting upon two or more streets at their intersection.
Lot depth: The average horizontal distance between the front and rear lot lines.
Lot, double frontage: A lot other than a corner lot that has frontage upon two or more streets that do not intersect at a point abutting the property.
Lot, flag: A tract or lot of land of uneven dimensions in which the portion fronting on a street is less than the required minimum width required for construction of a building or structure on that lot.
Major subdivision: The division of a tract of land into any number of lots, which requires the construction of a new street or the widening of an existing roadway, the provision of stormwater drainage facilities (other than driveway culverts), or the construction or improvement of public utilities;
or the division of land into more than five lots, regardless of whether public improvements are involved.
Metes and bounds: A system of describing and identifying land by a series of lines around the perimeter of an area; "metes" means bearings and distances and "bounds" refers to physical monuments.
Minor subdivision: The division of a tract of land into five or less lots which does not require public improvements, as defined.
Preliminary plat: A professional drawing which shows the proposed layout of a subdivision in sufficient detail to indicate its general design. A preliminary plat is prepared by a professional engineer, a registered land surveyor, a landscape architect, a land planner, or any other person professionally familiar with land development and project construction activities. A preliminary plat is not a construction document.
Professional engineer: An engineer duly registered or otherwise authorized by the State of Georgia to practice in the field of civil engineering.
Protective covenants: Contracts made between private parties as to the manner in which land may be used, with the view toward protecting and preserving the physical and economic integrity of any given area.
Public improvement: The construction, enlargement, extension or other construction of a facility intended for dedication to the county or a public utility provider or to a facility already owned by the county, including but not limited to a street, curb and gutter, sidewalk, cross drain, catch basin, other roadway appurtenance, domestic water supply system main, fire hydrant, valve or other water system appurtenance, or sanitary sewerage main or outfall, lift station, force main, manhole or other appurteAPPENDIX A—UNIFIED DEVELOPMENT CODE § 1503 nance. Utility supply lines to a building are not considered public improvements. Construction of a driveway apron connection shall not be considered a public improvement for purposes of triggering preliminary plat approval.
Registered land surveyor: A land surveyor licensed and registered to perform the duties of a registered land surveyor (R.L.S.) by the State of Georgia.
Retracement: A survey, not required to be reviewed and approved by the local jurisdiction prior to filing or recording in the clerk's office, but drawn to specifications required by this article.
Septic tank: An approved watertight tank designed or used to receive sewage from a building sewer and to affect separation and organic decomposition of sewerage solids, and discharging sewage effluent to an absorption field or other management system.
Subdivider: Any person who undertakes the subdivision of land, and any person having such a proprietary interest in land to be subdivided as will authorize the maintenance of proceedings to subdivide such land under this UDC, or the authorized agent of such person.
Subdivision: The division of a property or tract of land into two or more tracts or lots; or a land development project in which two or more lots are created, along with the streets and utilities needed to support construction of buildings on the lots.
The word "subdivision" includes re-subdivision and, when appropriate to the context, relates either to the process of subdividing or to the actual land or area which is subdivided.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1504. Exemptions from plat approval.
The following types of land subdivisions, transfers, and sales are specifically exempted from the plat approval requirements of this article; provided, however, that such exemptions shall not apply to land development requirements and improvement requirements of this article or compliance with other applicable requirements of this UDC:
(a) Retracement surveys and easement surveys, as specifically authorized in this article;
(b) The creation and sale of cemetery plots;
(c) The sale of lots consistent with previously approved and recorded plats or deeds;
(d) The creation of leaseholds for space within a multiple-occupancy building or the division of property into leaseholds (but not for sale) for commercial, industrial, or institutional use;
(e) The creation of leaseholds (but not for sale) for the agricultural use of property where the use does not involve the construction of a building to be used as a residence or for other purposes not directly related to agricultural use of the land or crops or livestock raised thereon.
(f) Any division of land to heirs through a judicial estate proceeding, or any division of land pursuant to a judicial partition, or any division of land occurring from the foreclosure of a deed of trust; provided, however, that such exemption shall not require the public development department to issue permits if the resulting lots or parcels fail to meet any applicable zoning provisions regarding lot size, lot width, or other dimensional requirements.
(Ord. No. 17-003, § 1, 10-2-2017) Secs. 1505—1510. Reserved.
DIVISION II. GENERAL PROVISIONS
Sec. 1511. Land is one lot until subdivided.
Until property proposed for subdivision has received final plat approval and been properly recorded, the land involving the subdivision shall be considered as one lot, or as otherwise legally recorded.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1512. Subdivision of land.
(a) No person shall subdivide land except in accordance with this article and this UDC.
(b) It shall be unlawful to sell or transfer title to another person any lot or tract or portion thereof of land that has not been established as a lot of record, except in compliance with this article. Unless the lot to be sold or transferred is a lot of record, final plat approval by the county in accordance with this article shall be required. This section shall not be interpreted as limiting the sale or transfer of lots consistent with previously lawfully approved recorded plats or deeds.
(c) It shall be unlawful for any person, firm, corporation, owner, agent or subdivider, by deed or plat, to sell, transfer, agree to sell, offer at public auction, negotiate to sell or subdivide any land until a preliminary plat, if required, and final plat have been approved by the public development department and final plat recorded in accordance with this article. Said restriction applies to lands subdivided for non-residential as well as residential uses. The description by metes and bounds in the instrument of transfer or other document used in the process of selling or transfer shall not exempt the transaction from compliance with this article or from the penalties established for violations of this UDC.
(d) The county through its attorney or other designated official may enjoin such transfer of, sale, or agreement by appropriate action.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1513. Review of subdivisions along state routes.
(a) No subdivision plat containing land which abuts a state route shall be approved until such plat has been submitted for review and comment by the Georgia Department of Transportation, in accordance with the provisions of O.C.G.A. § 32-6-151.
(b) When the county receives such a plat, it shall submit two copies of the proposed subdivision plat to the Georgia Department of Transportation if such proposed subdivision includes or abuts on any part of the state highway system. The Georgia Department of Transportation, within 30 days of receipt of the plat, shall recommend approval and note its recommendation on the copy to be returned to the public development director or recommend rejection. Failure of the Georgia Department of Transportation to act within this 30-day period shall constitute approval. If the plat is recommended for rejection, the reasons for rejection and requirements for approval shall be given to the public development department in writing; but such recommendation shall be advisory only and shall not be binding.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1514. Lots must comply with UDC requirements.
No person shall subdivide land, and the public development director shall not approve any subdivision of land, unless the lots created pursuant to said subdivision meet or exceed all applicable requirements of the zoning district in which it is located, overlay district if applicable, environmental overlay district if applicable and any other applicable requirements of this UDC, and as may be amended from time to time. For minimum lot frontage, minimum lot width and minimum lot size requirements by zoning district, see table 2-2 of this UDC.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1515. Improvements required for final platting.
No final subdivision plat involving a public dedication of land or public improvement of streets or public utilities shall be approved by the public development department or accepted for recordation by the Clerk of Superior Court of Jackson County until all improvements, if required by this article or UDC generally, have been constructed or installed in a satisfactory manner and approved by the public development department and public utility provider as applicable.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1516. Creation of homeowner's association.
(a) Required. For any major subdivision involving common areas, open spaces, and/or a stormwater detention facility on a separate tract within the subdivision, a homeowner's or property owner's association shall be required to be created which shall be responsible for the ownership and maintenance of common areas, open spaces and/or stormwater detention facilities within the subdivision. The homeowner's or property owner's association must be maintained as the responsible owner of such facilities and lands and shall not be dissolved unless another ownership entity is accepted by the Jackson County Board of Commissioners.
(b) Mandatory membership. Membership in the homeowner's association must be mandatory for each property in the development.
(c) Bylaws and covenants. Such association must also include homeowner's or property owner's declaration and bylaws, including covenants, conditions and regulations applicable to each property in the development.
(d) Approval and recording. The instruments of such creation and financial endowment shall be submitted to the public development department for review and approval; covenants are also subject to approval by the county attorney, and such approval shall be obtained prior to recording. Said instru-ments shall also be recorded at the time of final plat recording with cross-references to recording information on both the instruments and the final plat. A copy of the recorded instruments shall be filed with the public development department following recording.
(e) Reserve account. At the time control of the association is passed from the declarant to the property owners, the association shall have a reserve account of not less than $125.00 per occupied residence for residential associations or for nonresidential subdivisions an amount approved by the public development director. There shall be no debt incurred to the association.
(f) Enforcement. The declaration and bylaws shall be enforced by an association management company, which shall have the power to compel the payment of membership dues and assessments.
(g) Condominium association. For condominium projects, incorporation of a condominium association consistent with state law will serve in lieu of the requirements of this section.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1517. Easements.
(a) Easements for drainage or public utilities may be required in connection with any major or minor subdivision as determined by
the public development department in conjunction with utility providers. A drainage easement is required and shall be provided along any manmade drainage channel or drainage
pipe located outside a street right-of-way.When required, easements shall be shown on the final plat.
(b) The minimum width of any drainage, water, or sanitary sewer easement shall be 20 feet. Easements for water, sanitary sewers and/or drainage purposes may be combined, but must be a minimum of 30 feet if in combination. Pedestrian easements, if required by the public development department, shall be at least ten feet wide.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1518. Retracement surveys.
Pursuant to O.C.G.A. § 44-2-26, the owner of real property, or of any interest therein or any holder of a lien thereon may file a plat of the property in the office of the clerk of superior court of the county in which the property or any part thereof is located. Said plat shall be considered a retracement survey, provided that it contains the surveyor certification box for retracement surveys as required by this article (see sections 1562 and 1563). Such retracement survey shall not require local approval and shall be entitled to be filed and recorded.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1519. Surveyor certification box for retracement surveys.
(a) Each plat of a retracement survey shall have depicted thereon a box which contains the following applicable certifications of the land surveyor:
"This plat is a retracement of an existing parcel or parcels of land and does not subdivide or create a new parcel or make any changes to any real property boundaries. The recording information of the documents, maps, plats, or other instruments which created the parcel or parcels are stated hereon.
RECORDATION OF THIS PLAT DOES NOT IMPLY APPROVAL OF ANY LOCAL JURISDICTION, AVAILABILITY OF PERMITS, COMPLIANCE WITH LOCAL REGULATIONS
OR REQUIREMENTS, OR SUITABILITY FOR ANY USE OR PURPOSE OF THE LAND.
Furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A. Section 15-6-67."
(b) The land surveyor shall sign on a line immediately beneath the certification on the plat. At the discretion of the land surveyor and in conformity with local regulations, the surveyor may electronically sign the certification using a facsimile signature. The facsimile signature may be a reproduction of an original signature or an electronically created signature. If the land surveyor elects to use a facsimile signature, the surveyor must maintain full control over the application and use of such signature.
(c) In the case of a plat that is a retracement survey, the land surveyor shall state clearly the recording information of any document, map, plat, or other instrument which created any of the parcels depicted.
The depiction of gores, overlaps, or other parcel delineation as may be necessary to remedy or address title issues or deficiencies shall be allowed as part of the retracement function.
(d) Plats bearing the certification required for retracement surveys shall be entitled to recordation without further review or local approval.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1520. Easement surveys.
Plats that depict existing or proposed easements, including for any purpose including utilities, access, no access, or for conservation purposes, may be recorded using the certification for retracement surveys, provided that there are no changes to any real property boundaries, and provided that the plat includes information required by sections 1562 and 1563 of this article. Plats bearing the certification required for retracement surveys shall be entitled to recordation without further review or local approval.
(Ord. No. 17-003, § 1, 10-2-2017) Secs. 1521—1530. Reserved.
DIVISION III. PRELIMINARY PLAT
Sec. 1531. Preliminary plat—When required.
Any subdivision involving the dedication of a public street or public land, any subdivision involving a new private street, and any subdivision requiring a public improvement as defined, shall require the submission and approval by the county of a preliminary plat.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1532. Relationship of preliminary plat to development permit.
(a) Preliminary plat approval requests shall be processed in conjunction with an application for development permit. No separate preliminary plat application shall be required to be submitted or approved; provided, however, that the application for development permit shall include information specified in this division.
(b) A development permit per article 8 of this UDC shall be required prior to initiation of any land disturbing or construction activities on the lands proposed for subdivision.
(c) Preliminary plat approval shall be valid so long as the development permit for the proposed subdivision remains valid. If the development permit for the proposed subdivision is invalidated or expires, so too will preliminary plat approval.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1533. Preliminary plat specifications.
The following specifications are required for a preliminary plat, which shall be submitted as part of the application for development permit:
(a) Proposed name of subdivision. The proposed name of the subdivision shall not duplicate or too closely approximate, phonetically, the name of any other subdivision in the city or county. If shown to the contrary, the public development department may refuse to accept such subdivision name.
(b) Plat scale and sheet size. The preliminary plat shall be clearly and legibly drawn at a scale of 100 feet or less to one inch. The recommended maximum dimensions of the sheet size is 36 inches by 48 inches and the minimum dimensions of 17 inches by 22 inches; however, the public development department may approve other sheet sizes and scales as appropriate.
(c) Owner and professional contact information. Name, mailing address, telephone and fax numbers and e-mail address of the property owner and the professional preparing the preliminary plat.
(d) Miscellaneous. Date of boundary survey, north point and graphic scale, source of data, date of plan drawing, and, if any, revision dates.
(e) Location and tract boundaries. Location (including militia district) and size of the property in acres (or in square feet if less than an acre), and the external boundaries of the tract to be subdivided or developed shown by bearings and distances. The preliminary plat must reference and be based on a boundary survey of the exterior boundaries of the proposed subdivision, prepared by a registered land surveyor.
(f) Vicinity map. A location map of the property in relation to the surrounding area with regard to well-known landmarks such as
arterial streets, railroads, and major water courses.
(g) Abutting property information. Names of adjoining property owners per recorded deeds, zoning district of all adjoining properties, and if applicable overlay district designations of all adjoining properties.
(h) Prior subdivision. Name of former approved subdivision, if any, for all of the land in the preliminary plat that has been previously subdivided, showing boundaries of same.
(i) Zoning. Zoning district boundaries and zoning designation(s) of the subject property and, if applicable, overlay district and environmental overly district boundaries.
(j) Application number and conditions. Rezoning, special use, and variance application number, date of approval, and conditions of approval, if applicable.
(k) Natural features and flood plains. Natural features within the property, including topographic contours at no less than five-foot intervals, drainage channels, bodies of water, wetlands, streams with required buffer designated, wooded areas and other significant natural features such as groundwater recharge areas and rock outcroppings. On all water courses entering or leaving the property, the direction of flow shall be indicated. The 100-year flood plain, if any, shall be delineated.
(l) Streets, easements, political boundaries and built features. Man-made features within and adjacent to the property, including street right-of-way and pavement widths, names of existing streets, all easements, city and county political boundary lines, and other significant information such as location and dimensions of bridges, existing buildings to remain, and other features.
(m) Subdivision block and lot layout. The proposed subdivision layout including lot lines and street right-of-way lines, with proposed street names or letter designations and right-of-way widths, along with the front building setback line and the approximate dimensions of the length and width of each lot. The total number of lots in the subdivision and the total acreage in the tract to be subdivided shall be indicated. Lots shall be numbered consecutively in a clockwise fashion, and the approximate land area of each lot shall be indicated for each lot. The proposed phasing of the subdivision shall be indicated, if it is proposed to be platted in phases.
(n) Water and sewage disposal. A statement as to the source of the domestic water supply and provisions for sanitary sewage disposal. For those properties that will not be served by a public sanitary sewerage system, location and results of soil tests or percolation tests as required and approved by the Jackson County Environmental Health Department.
(o) Stormwater management. The approximate location of proposed storm water detention facilities. Compliance with stormwater management requirements of this UDC will be required for the issuance of a development permit.
(p) Public land reservations. In addition to public streets, the preliminary plat shall indicate land if any to be dedicated for public use.
(q) Additional information. Additional information as may be required by the public development director to ensure compliance with this article and this UDC.
(r) Approval. Approval of a development permit for the proposed subdivision shall constitute approval of the preliminary plat.
(Ord. No. 17-003, § 1, 10-2-2017) Secs. 1534—1540. Reserved.
DIVISION IV. STANDARDS FOR BLOCKS AND LOTS
Sec. 1541. Suitability of land.
Land physically unsuitable for subdivision because of flooding, poor drainage, steep slopes, rock formations or other such features that may endanger health, life or property, aggravate erosion, increase flood hazard, or necessitate excessive expenditures of public funds for supply and maintenance of services shall not be approved for subdivision or development unless adequate methods are formulated by the
subdivider for solving the problems.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1542. Conformance with comprehensive plan and other plans.
(a) All proposed subdivisions shall conform to the comprehensive plan and development policies in effect at the time of submission to the public development department. All highways, streets and other improvements recommended in the county roadways plan shall be platted by the developer in the location and to the dimension indicated in the county roadways plan.
(b) When features of other plans adopted by the Jackson County Board of Commissioners (such as schools or other public-building sites, parks or other land for public uses) are located in whole or in part in a subdivision, such features shall be either dedicated or reserved by the subdivider for acquisition within a reasonable time by the appropriate public agency.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1543. Block length.
Intersecting streets shall be provided at such intervals so as to provide adequate cross traffic and connectivity. Blocks in residential subdivisions should not exceed 1,800 feet nor be less than 600 feet in length, except where topography
or other conditions justify a departure from these standards. In blocks longer than 800 feet, pedestrian ways and/or easements through the block shall be required near the center of blocks.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1544. Block width.
(a) The width of a block shall be sufficient to allow two tiers of lots of appropriate depth, except where reverse frontage lots on arterial streets are provided, or when prevented by topographic conditions or size of the property, or for lots along the periphery of the subdivision, in which case the public development department may approve a single row of lots.
(b) Blocks intended for business or industrial use shall be of such width as to be considered most suitable for their respective use, including adequate space for off-street parking, deliveries, and service.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1545. Lot depth.
The depth of lots intended for detached, single-family residential shall not be greater than four times the width of the lot at the regulatory building line, unless unusual circumstances make these limitations not practicable. Lots intended for other uses should observe this maximum lot depths standard where practicable.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1546. Adequate building site.
Each lot shall contain an adequate building site not subject to flooding and outside the limits of any existing easements, required building setback lines, and required stream buffers.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1547. Lot lines.
All side lot lines shall be perpendicular to street lines, and all rear lot lines shall be parallel or radial to street lines, unless not practicable because of topographic or other features.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1548. Double frontage lots.
Double frontage lots shall be avoided except where essential to provide separation of residential development from traffic arteries or overcome specific disadvantages of topography or orientation. The public development department may require a no-access, planting screen easement of at least ten feet in width, across which there shall be no right of access, along the line of lots abutting such a traffic artery or other disadvantageous use.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1549. Flag lots.
(a) Flag lots, which meet minimum lot area requirements and meet the minimum lot width at the front building setback line where the building is placed, may be allowed where conditions of hardship make standard design or frontage impossible, impractical, or inefficient with regard to land use.
(b) Where such lots are allowed, the street frontage of each panhandle portion of the lot shall not be less than 60 feet wide, and the panhandle portion of the lot shall be no less than 60 feet wide and not more than 300 feet long.
(c) Not more than two such panhandle access points shall abut each other. The public development department may require shared driveways for abutting flag lots.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1550. Lot remnants not permitted.
All remnants of lots less than the required minimum lot size which may be left over after subdividing a larger tract, must be added to adjacent lots, rather than allowed to remain as unusable or noncompliant parcels. The public development department may permit a lot remnant for a specific purpose such as a detention pond or buffering, provided that access and design is appropriate and the lot remnant is restricted to specific public, utility, or conservation use.
(Ord. No. 17-003, § 1, 10-2-2017) Secs. 1551—1560. Reserved.
DIVISION V. FINAL PLAT SPECIFICATIONS
Sec. 1561. Format for plats and condominium plans.
All images of a plat or condominium plan submitted for filing in the office of the clerk of superior court shall:
(a) Be at full size of the drawing scale stated thereon;
(b) Be an electronic image of a plat or condominium plan presented to the clerk electronically in conformance with all specifications set forth in any rules and regulations promulgated by the Georgia Superior Court Clerks' Cooperative Authority;
(c) Comply with the minimum standards and specifications adopted in the rules and regulations of the state board of registration for professional engineers and land surveyors; and
(d) Provide a box of not less than three inches square, if at full size, in the upper left-hand corner which shall be reserved for the clerk to append filing information.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1562. Data for plats required per state law.
This section enumerates data required to be shown on plats per the Georgia Plat and Condominium Plan Recording Act of 2017.
(a) County. The county where the property lies.
(b) City. Any municipality wherein the property lies.
(c) Owner. The name of the property owner or owners of the subject property as stated on the most current or applicable title instrument.
(d) Plat type. The type of plat (final subdivision, boundary line adjustment, lot combination, retracement survey, easement survey, dedication plat, etc.).
(e) Name. The name of any subdivision if the property lies within a named subdivision or if the plat is creating a new subdivision; or the name of any condominium if the property is within a condominium development.
(f) Division designations. The applicable units, pods, blocks, lots, or other subdesignations of any named subdivision or condominium.
(g) Developer. The name or names of the developer or developers of any named new subdivision or condominium.
(h) Land lots and districts. All applicable land lots, land districts, sections, reserves, or militia districts wherein the platted property lies.
(i) Date and revision dates. The date of initial preparation and issuance and any revision dates, including a brief explanation of each revision.
(j) Surveyor. The name, address, and telephone number of the land surveyor who prepared and sealed the plat and, if working for or through a firm, corporation, partnership, association, limited liability company, or other entity, then also the certificate of authorization number of that entity, in which case the address and telephone number of such entity are acceptable in lieu of the individual surveyor's address and telephone number.
(k) Surveyor registration. The registration number of the land surveyor or a statement that he or she is the county surveyor and is not required by law to be a registered surveyor.
(l) Surveyor seal. The seal of the land surveyor who has prepared the plat and is signing the surveyor certification, which shall be placed within or next to the surveyor certification box.
(m) Page numbers. If the plat has multiple pages the page number for each applicable page and the total number of sheets in the set shall be placed on each sheet in the same or similar location. The information required by this paragraph may be placed on all sheets or on different sheets within the set submitted for filing.
(n) Scale. The scale of the plat stated and shown graphically.
(o) Surveyor certification box for subdivision plats. Each plat involving a subdivision shall have depicted thereon a box which contains the following applicable certifications of the land surveyor:
"As required by subsection (d) of O.C.G.A. Section 15-6-67, this plat has been prepared by a land surveyor and approved by all applicable local jurisdictions for recording as evidenced by approval certificates, signatures, stamps, or statements hereon. Such approvals or affirmations should be confirmed with the appropriate governmental bodies by any purchaser or user of this plat as to intended use of any parcel. Furthermore, the undersigned land surveyor certifies that this plat complies with the minimum technical standards for property surveys in Georgia as set forth in the rules and regulations of the Georgia Board of Registration for Professional Engineers and Land Surveyors and as set forth in O.C.G.A. Section 15-6-67."
The land surveyor shall sign on a line immediately beneath the certification on the plat. At the discretion of the land surveyor and in conformity with local regulations, the surveyor may electronically sign the certification using a facsimile signature. The facsimile signature may be a reproduction of an original signature or an electronically created signature. If the land surveyor elects to use a facsimile signature, the surveyor must maintain full control over the application and use of such signature.
(p) Additional certifications. Additional dates, certifications, and signatures, which may be electronically created signatures, may be placed on plats. Such certifications may include, but are not limited to, those that may be required by local jurisdictions or agencies, the United States Small Business Administration, the United States Department of Housing and Urban Development, and the American Land Title Association.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1563. Data required for plats per state rules and regulations.
This section enumerates selected data required to be on plats per Rules and Regulations of the State of Georgia, Department 180, "State Board of Registration for Professional Engineers and Land Surveyors," chapter 180-7, "Technical Standards for Property Surveys," and local requirements. It is the land surveyor's responsibility to provide all data required by said rules, and the lack of inclusion of said rule requirements in this section shall not relieve a land surveyor from complying with said requirements:
(a) Point of beginning and point of reference. There shall be a point of commencement and/or a point of beginning that can be readily re-established. The direction and distance from a point of reference to a point on the boundary of the individual survey, and such additional data as may be required to relocate the boundary point from the point of reference with the same degree of accuracy required of the parcel surveyed. The point of reference shall be an established, monumented position which can be identified or relocated from maps, plats or other documents on public record, including state plane coordinates when applicable. The point of reference may lie on or within the boundary of the survey.
(b) Names of adjoining subdivisions and property owners and documents reviewed. The names of adjoining subdivision and/or property owners on all lines, as can be determined at the time of commencement of the survey through public records such as the county tax assessor and/or clerk of court records, along with a notation as to what documents were reviewed for each adjacent property.
(c) Roads. Adjacent streets, roads, or other rights-of-way, and the width and the former widths, if pertinent, of rights-of-way adjacent to or crossing the property.
(d) Water. All water boundaries.
(e) Easements. The width and the former widths, if pertinent, of easements adjacent to or crossing the property. Where water and sewer utilities are located within rights-of-ways to be dedicated to Jackson County, temporary easements shall be required for such utilities in favor of the service provider until the rights-of-way are officially accepted by resolution of the board of commissioners.
(f) Encroachments and cemeteries. Apparent encroachments and observed evidence of human burials or cemeteries.
(g) North arrow. An arrow to indicate the principal meridian and a notation as to the reference of bearings to magnetic north, astronomic north, record or grid north. A grid north reference shall indicate the zone. Record north shall reference the document or survey to which the meridian is oriented and the line of the survey to which the "record bearing" was applied to.
(h) Metes and bounds bearings and distances and areas. Bearings of all lines of the boundary or lot lines, and distances of all boundary or lot lines, and area of the parcels expressed in acres or square feet. The total acreage of the subdivision shall be shown. All bearings, distances, and areas shown on the survey shall be based upon the measurements of the surveyor, except that both the measured and the record measurements may be shown if the surveyor feels that such comparison is necessary or otherwise required, in which case a clear distinction shall be made as to which are measured and which are record. All angular directions shall be represented in degrees, minutes, and seconds. Distances that are shown for proximity purposes only and have not been measured shall be clearly labeled as "approximate"; a metes and bounds description shall describe all courses in logical sequence around a lot or tract in a clockwise direction such that the ending point is the beginning point. In the case of curved lines, the curve shall be defined by curve data to include the radius, arc length, chord bearing, and distance of regular curves.
Chord distances and directions shall be given for irregular curves.
(i) Equipment reference. A statement to indicate the type of equipment used to obtain the linear and angular measurements used in the preparation of the plat, or the proper notations required by Rule 180-7-.09 when GPS equipment is used in performing the survey.
(j) Closure precision. The closure precision of the data shown on the plat. The closure may be stated as follows: "This map or plat has been calculated for closure and is found to be accurate within one foot in ____ feet."
(k) Monuments. Monuments shall be set at all boundary corners. All monuments found, placed or replaced shall be described on the survey plat. The land surveyor shall set monuments, unless monuments already exist or cannot be set due to physical obstructions. Those monuments that cannot be set due to physical obstructions shall have a reference monument set. Said reference monument shall be referenced on the plat by bearing and distance from the true position of said monument. Also, said reference monument shall be set far enough away from the true corner so as not to be confused with the position of the true corner. Corner descriptions shall state the size, material and cap identification of the monument as well as whether the monument was set or found. In the case of badly disturbed or deteriorated monuments that are replaced for the purpose of position preservation, the survey shall indicate the size, type, and material of both the found monument and the monument with which it was replaced.
(l) Monument specifications. All monuments set shall be composed of a durable material and shall incorporate a ferrous material to aid in location by magnetic locators. Said monuments shall have a minimum length of 18 inches. Monuments placed at land lot corners, district corners or county corners shall if a rod have a minimum diameter of inches, a pipe of one-inch diameter or a concrete or stone monument of not less than four inches square. Every boundary monument set shall be identified with a durable marker or cap bearing the Georgia registration number of the land surveyor in responsible charge or the name of the business entity and/or Certification of Authorization number (COA #).
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1564. Additional plat data required locally.
In addition to the requirements of state law and state rules and regulations, all plats shall including the following additional information:
(a) Street names. Street names including both the name and the suffix, such as "street," "avenue," etc.
(b) Location sketch or vicinity map. A hand-drawn or map reproduction, whether or not to an engineering scale, showing the subject property in context of a larger area. Typical scale when a scale is used, is one inch equals 2,000 feet.
(c) Road centerlines, pavement widths and radii. The centerline of all roads within or adjacent to the subdivision, and the exact pavement width of the road or roads abutting the subject property and within the subdivision. For cul-de-sacs, both the right-of-way radius and the pavement radius shall be shown. In addition, the right-of-way and pavement radii of
all street intersections shall be shown.
(d) Lot and block identifiers. Lots numbered in numerical order and blocks lettered alphabetically.
(e) Addresses. Prior to recording, the street address number shall be shown on each lot as assigned by the department of emergency services.
(f) Building setbacks. Front building setback lines with dimensions as to length across each lot and distance from the street right-of-way.
(g) Flood hazard area note. A note indicating whether or not the property is located within a 100-year flood plain, as designated on Federal Emergency Management Agency Flood Insurance Rate Maps, along with the community map panel number and effective date.
(h) Dedications and common areas. Any areas to be reserved, donated, or dedicated to public use and common use shall be shown along with their acreage. If streets are to be dedicated, the total linear distance of streets to be dedicated shall be indicated on the plat.
(i) Private covenants. Statement of and reference to private covenants, conditions and restrictions, if any.
(j) Other data. The public development department may require that additional information be shown on the final plat, including but not limited to the existing zoning district and if applicable zoning conditions, zoning overlay and/or environmental overlay district, if applicable, variances if applicable, required stream buffers and zoning buffers, and wetlands.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1565. Locally required plat certifications.
The following certifications shall be required for final plats, as applicable:
(a) Owner's certification. A certificate signed by the owner directly on the final plat, as follows:
"The owner of the land shown on this plat and whose name is subscribed hereto, certifies that that he/she is the fee simple absolute owner of the land shown on this plat and that all state, city and county taxes or other assessments now due on this land have been paid.
Owner Signed, sealed and delivered in the presence of:
Witness Notary Public"
(b) Certificate of approval and signature block. The following certification of approval and signature block shall be provided on the plat:
"Pursuant to the Unified Development Code of Jackson County and all requirements of approval having been fulfilled, this final plat was given final approval by the Jackson County Director of Public Development or designee and it is entitled to be recorded in the Clerk's Office, Jackson County Superior Court."
Signature, Director of Public Development or designee Date"
(c) Certificate of dedication. If the subdivision involves the dedication of land or streets to the public, the following certification shall be provided on the plat:
The owner dedicates to the public for use forever the street right-of-way(s) and/or other public dedications shown on this plat, as follows:
Street right-of-way(s): linear feet and acres.
Other: acres.
A dedication is not final until acceptance of the warranty deed by resolution of the Jackson County Board of Commissioners per Division VII of the Unified Development Code.
Owner Signed, sealed and delivered in the presence of:
Witness Notary Public"
(d) Health department certificate. If the subdivision involves an on-site sewage management system or community water system, the following certification shall be provided on the plat:
"This final plat has been approved by the Jackson County Health Department as being consistent with applicable state and local environmental health requirements.
Signature, Director, Jackson County Health Department Date" For a minor subdivision, the Public Development Director may waive the requirement to include a signed health department certificate on a final plat; provided, however, that if the lot(s) included in the final plat of a minor subdivision are to be served by an on-site sewage management system (septic tank), in lieu of said certification the final plat shall contain the following note: "Each lot must be reviewed and approved by the Jackson County Environmental Health Department for on-site sewage management system placement prior to the issuance of a building permit."
(e) Engineer's utility certificate. If the subdivision involves water and/or sanitary sewer lines to be dedicated, the following certification shall be provided on the plat:
"The civil engineer responsible for the design and oversight of construction of water and/or sewer lines within this subdivision to be dedicated, hereby certifies that said water and sewer lines have been constructed and inspected as being in accordance with the standard specifications of the utility provider(s) and the requirements of the Jackson County Unified Development Code:
Signature, Name of Professional Engineer (affix seal) Date"
(f) Utility dedication certificate. If the subdivision involves water and/or sanitary sewer lines to be dedicated, the following certification shall be provided on the plat:
"The owner hereby dedicates to the Jackson County Water and Sewerage Authority forever the water and sanitary sewer lines within easements or within street rights-of-ways shown on this plat, as follows:
Water lines: linear feet.
Sanitary sewer lines: linear feet.
Owner Signed, sealed and delivered in the presence of:
Witness Notary Public"
(g) Temporary utility easement dedication.
"The subdivider hereby dedicates temporary easements to the Jackson County Water and Sewerage Authority within proposed rights-of-ways containing water and/or sewer lines to be dedicated, until such rights-of-ways are accepted by resolution of the Board of Commissioners."
Owner Signed, sealed and delivered in the presence of:
Witness Notary Public"
(h) Utility easement dedication. If easements for water and/or sewer are included in the subdivision but located outside of right-of-way to be dedicated, the subdivider shall include the following easement dedication statement:
The subdivider hereby dedicates utility easements to the Jackson County Water and Sewerage Authority as shown on this final plat."
Owner Signed, sealed and delivered in the presence of:
Witness Notary Public"
(i) Utility acceptance of dedication. If the subdivision involves water and/or sanitary sewer lines to be dedicated, the following certification shall be provided on the plat:
"The Jackson County Water and Sewerage Authority hereby accepts the water and/or sanitary sewer lines within easements or within street rights-of-ways shown on this plat:
Signature, Jackson County Water and Sewerage Authority Date" The exact language of the plat certifications specified in this section may be changed to match the requirements of the utility provider or health department, as may be appropriate and as approved by the public development department.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1566. Additional requirements for final plats involving private streets.
No final plat involving a private street shall be approved by the public development department for recording unless and until it shall contain the following on the face of the plat:
(a) The private street shall be located within an exclusive and irrevocable access and utility easement granted to the county. The access and utility easement shall be no less wide than that required for right-of-way for a similar public street. All lot area requirements, setbacks and other requirements of the applicable zoning district shall be measured outside of or from such access and utility easement. As an alternative, the private street may be located within a separate parcel of land, no less wide than that required for right-of-way for a similar public street, owned by a homeowner's association for the development and granting an exclusive and irrevocable access and utility easement to the county.
(b) Covenants, or reference to the deed book and page of the recorded covenants.
(c) Jackson County has no responsibility to build, improve, maintain, or otherwise service the private streets, drainage improvements, and other appurtenances contained within the general public purpose access and utility easement or easements for private streets shown on this plat.
(d) Grant of easement. The general purpose access and utility easement(s) shown on this plat for private street(s) is (are) hereby granted and said grant of rights shall be liberally construed to provide all necessary authority to Jackson County, and to public or private utility providers serving the subdivision, for the installation and maintenance of utilities, including, but not limited to, electric lines, gas lines, telephone lines, water lines, sewer lines, cable television lines, and fiber optic cables, together with the right to trim interfering trees and brush, together with a perpetual right of ingress and egress for installation, maintenance, and replacement of such lines.
/s/ Signature of Property Owner" At the discretion of the Public Development Director, a subdivision improvement guarantee as required for public streets per section 1581 of this UDC may be required for a subdivision containing private streets.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1567. Purchaser's acknowledgement for lot served by private street.
Prior to the sale or as a condition of the closing of a real estate transaction involving any lot served by a private street in the county, the subdivider or seller shall ensure that the purchaser of said lot shall execute a notarized purchaser's acknowledgement of private street construction and drainage maintenance responsibilities as set forth below. A copy of the purchaser's acknowledgement shall be retained by the purchaser and shall be required to be submitted as a condition of a building permit for a principal building on said lot.
"Purchaser's Acknowledgement of Private Street and Drainage Maintenance Responsibility.
(I) (We) have read the Declaration of Covenant which pertains to the lot that is the subject of this real estate transaction (insert address or attach legal description). (I) (We)
understand that the Declaration of Covenant applies to the lot that (I am) (we are) purchasing and requires (me) (us) to provide a specified percentage or amount of the financing for the construction and maintenance of any private street and drainage facilities serving the lot which (I am) (we are) purchasing, and that owners of other lots in this plat may sue for and recover those costs which this covenant requires (me) (us) to pay, plus their damages resulting from (my) (our) refusal to contribute, plus reasonable attorney's fees. (I) (we) further understand that the County has no obligation to assist with the maintenance and improvement of the private street, drainage facilities, and other appurtenances within the general purpose public access and utility easement for the private road serving the lot in question. I (we) understand that a copy of this purchaser's acknowledgement shall be required as a condition of the issuance of a building permit for a principal building on the lot (I am) (we are) purchasing.
/s/ Purchaser" A reference to this requirement to execute a purchaser's acknowledgment prior to the sale of any lot served by a private street shall also appear in the recorded. covenants, conditions, and restrictions for the subdivision.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1568. Combination plat.
(a) An existing lot line forming the boundary between two conforming platted lots located within the same subdivision or a lot line between lots or parcels that have merged to form one building lot may be removed or eliminated through
a final plat revision process which conforms to the final plat requirements of this article.
(b) Where separate lots of land are proposed to be combined, they shall be submitted to the department of public development as a final plat for review and approval. In the
case no final plat applies to the subject lots or parcels, a boundary survey and plat depicting all lots involved in the lot combination shall be required to be approved by the department of public development as a final plat.
(c) Such combination plat shall be titled with the same name as that of the original subdivision, if applicable, and shall indicate thereon that the replat is for the purpose of removing the lot lines between specific lots.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1569. Boundary line adjustment.
(a) One or more existing lot lines forming boundaries between conforming platted lots located within the same subdivision, or one or more lot lines between abutting lots or parcels may be adjusted through a final plat revision process that requires the approval of the public development department and recording of a plat meeting the specifications of a final plat. In the case no final plat
applies to the subject lots or parcels, a boundary survey and plat of the entire lots involved in the boundary line adjustment shall be required to be approved by the public development department.
(b) Such plat showing said boundary line adjustment shall be titled with the same name as that of the original subdivision and shall include thereon that the replat is for the purpose of adjusting the lot lines between specific lots.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1570. Reserved.
DIVISION VI. FINAL PLAT PROCEDURES
Sec. 1571. Application for final plat.
Applications for final plat approval shall include the following:
(a) Application form. Completion of an application form with information specified by the public development department, including but not limited to owner information. The owner, or agent if so authorized, shall sign the application attesting to the accuracy of the application and confirming authority and intent to submit the application for consideration.
(b) Copies of plat. Copies of the final subdivision plat in a number as established by the public development department, showing the entire ownership and drawn to the specifications required by division V of this article.
(c) Legal description of lots. A legal description for each lot in the subdivision shall be provided.
(d) Fee. Payment of the applicable application and review fees as established by the Jackson County Board of Commissioners from time to time for a final plat.
(e) Payment for signs and striping. Payment for materials and installation of traffic signs and street name signs in an amount determined by the Jackson County Roads Superintendent. Payment of the cost of street striping or signalization, if required and not completed by the owner, shall also be included with the application.
(f) Financial guarantee of improvements. For major subdivisions involving public improvements, a subdivision improvement guarantee as specified in this division VII of this article.
(g) Protective covenants and homeowners' association documents. If required by provisions of this UDC, a homeowners' association shall be created and the instruments of such creation and financial endowment shall be recorded at the time of final plat recording. Similarly, if a property owners association is required by this UDC or established by the developer, such association shall be created and instruments of creation and financial endowment shall be required at the time of final plat recording. Two copies of the recorded instruments or instruments to be recorded shall be filed with the public development department.
(h) A stormwater management maintenance agreement as required by section 1146 of this UDC.
(i) When street lights are involved in the final plat, a mechanism for payment of the operational costs of street lighting which may include a special tax district as specified in section 34-132 of the Jackson County Code of Ordinances. Once a final plat involving a special tax district for street lights has been approved by the public development department and recorded by the clerk of superior court, the utility bill for street lights shall be transferred over to the county government for payment. Subsequently, payment will be recovered through property taxes from properties located within the special tax district.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 24-005, § 1, 8-19-2024) Sec. 1572. Process for review and approval of a final plat.
Upon completion of all requirements, the subdivider or property owner can file an application for final plat approval. The procedures for final plat review and action shall be as specified in this section.
(a) Review for completeness and application acceptance. The public development department shall review the final plat application for completeness within no more than thirty calendar days from the posted submission deadline. Incomplete applications will not be processed and will be returned to the applicant.
(b) Distribution and agency review of final plat. The public development department may forward a copy of the final plat application to other county departments as may be appropriate, the Georgia Department of Transportation if the proposed subdivision has frontage on or proposes access to a state or federal road. The applicant shall be required to obtain approval from the Jackson County Environmental Health Department if septic tanks are proposed within a major subdivision, and public utility providers in cases where connection to public water and/or sewer is proposed or required.
(c) Time period for completion of review. Except for final plats that have frontage on or propose access to a state or federal road which require review by the Georgia Department of Transportation (which require a 30-day review period), within no more than 25 calendar work days following receipt of a complete final plat application, during which agency review shall be completed, the public development department shall indicate on the final plat or in writing all comments related to compliance with this article and the UDC. The department shall provide all comments to the applicant for resolution, who shall work with each department as necessary to resolve all issues.
(d) Action. When the department of public development has determined that the final subdivision plat is in compliance with the approved preliminary plat for the subdivision (if applicable) and the requirements of this UDC and consistent with the comprehensive plan, it shall be approved.
The owner shall be responsible for compliance with all codes, regulations, and zoning requirements and for the satisfaction of all the noted and written comments. If it is determined that the final plat is not in compliance with the requirements of this UDC, the department shall disapprove the final plat. Action must be taken by the department to approve, conditionally approve, or disapprove the final plat application within no more than 45 days from receipt of a completed application.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1573. Recording of final plat.
(a) Once the final subdivision plat has received approval as evidenced by the certificate of final plat approval, the applicant shall record the plat electronically with the Jackson County Clerk of Superior Court.
(b) The applicant is responsible for paying any required recording fees.
(c) All plats must be in the Georgia Coordinate System West Zone NAD 83 before the plat is recorded. If the project is within 1,000 feet of a Jackson County geodetic monument the plat must use the monument as a control/tie point. The applicant for final plat approval shall be responsible for forwarding an electronic copy of the final plat as recorded, along with recording information, to the department of public development. In addition, the subdivision applicant shall submit electronic (DWG/DXF and PDF) file copies of lot boundaries of subdivisions and related information as specified by the public development director and the director of geographic information services. Building permits may be withheld pending receipt of the electronic files and copy of the recorded final plat.
(d) Recordation of a final plat constitutes approval to begin the sale or transfer of subdivision lots.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1574. Distribution of approved final plat.
The final plat is a source of essential information to tax officials, public safety officials, and utility officials, among others. Accordingly, the public development department may forward recorded final plats to appropriate departments and agencies, such as the Jackson County Emergency Services Department; the county building official; the county road superintendent; and The United States Postal Service (local postmaster). At the discretion of the public development director, additional agencies or persons may be added to the distribution list.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1575. Revision of final plat.
The application requirements and procedures for amending final plats shall be the same as for final plat applications.
(Ord. No. 17-003, § 1, 10-2-2017) Secs. 1576—1580. Reserved.
DIVISION VII. IMPROVEMENT GUARANTEES AND ACCEPTANCE OF PUBLIC
IMPROVEMENTS
Sec. 1581. Subdivision improvement guarantee.
(a) Improvements. All public improvements required for subdivisions shall have been properly installed and completed in accordance with all requirements and standards of this UDC (other than traffic signs, street name signs, street striping, and signalization) prior to final plat approval.
(b) Submission. Prior to approval of a final subdivision plat, a subdivision improvement guarantee in a form acceptable to the public development director and county attorney is required for all completed improvements shown on the as-built surveys required by this UDC. Prior to final plat approval, the owner of a subdivision involving public improvements shall submit a subdivision improvement guarantee.
(c) Maintenance period and duration of guarantee. The subdivider shall maintain any public improvements in the subdivision, for a period of two years or until certificates of occupancy have been issued for 75 percent or more of the principal buildings on the lots shown on the final subdivision plat, whichever occurs later. The two-year maintenance period shall begin upon recordation of the final subdivision plat.
If the two-year term expires before the issuance of certificates of occupancy for 75 percent or more of the principal buildings on the lots shown on the final subdivision plat, the improvement guarantee shall be renewed or extended, until certificates of occupancy have been issued on 75 percent of the principal buildings on the lots shown on the final subdivision plat. The subdivider shall not assign this responsibility to another entity without permission of the county attorney and public development director.
(d) Amount of guarantee. The value of the improvement guarantee shall be equal to $15.00 per linear foot of street improvements shown on the as-built surveys or final plat. The cost of construction shall be evidenced by copies of contractor agreements or actual invoices paid, or as otherwise determined or accepted by the public development director.
(e) Inspection. Prior to the end of the maintenance period, the subdivider shall request an inspection of the subdivision's public improvements. The public development department shall perform the inspection. The subdivider shall be notified of the inspection results in writing at least 30 days prior to receipt of a request from the subdivider to the county to initiate an inspection.
(f) Repairs. If repairs are needed for the public improvements to meet county specifications during the two-year maintenance period, the subdivider shall be required to make such repairs within 30 days, after written notification by the public development director. The subdivider must correct all defects or deficiencies in materials or workmanship and make such repairs as necessary to approximate the as-built condition of the improvements. When the subdivider completes the necessary maintenance repairs, he or she shall request in writing that the public development department inspect the repairs. The public development department shall inspect the repairs and notify the developer of the inspection results.
(g) Remedy. If the repairs are not completed, the subdivision improvement guarantee shall be called to pay for the repairs. Should the amount of the subdivision improvement guarantee be inadequate to pay for the repairs, the developer shall pay the remaining amount. The county may withhold building permits if the remaining amount required by this paragraph is not paid.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1582. Warranty deed and resolution of acceptance.
Subdivision streets and rights-of-way and other lands to be dedicated to the public shall be accepted by the county only upon the approval by the Jackson County Board of Commissioners of a general warranty deed conveying fee simple title of such rights-of-way and lands. The warranty deed shall be accompanied by a certificate of title and a tax transfer form addressed to the Jackson County Board of Commissioners, certifying that the grantor in such deed is vested with marketable fee simple title to the property conveyed thereby, free and clear of all liens and encumbrances, and further that the individual executing such deed has full authority to do so. The subdivider shall forward executed deeds for the streets, and dedication of other public properties if applicable, to the public development director who will schedule the matters for the next available meeting of the Jackson County Board of Commissioners for consideration, and if approved, recording, along with a resolution accepting the public improvements for perpetual maintenance.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1583. Release of improvement guarantee.
Upon adoption by the Jackson County Board of Commissioners of a resolution accepting the public improvements within the subdivision for perpetual maintenance, the improvement guarantee shall be released by the public development director.
(Ord. No. 17-003, § 1, 10-2-2017) Secs. 1584—1590. Reserved.
ARTICLE 16. STREETS AND SIDEWALKS
DIVISION I. DEFINITIONS AND GENERAL PROVISIONS
Sec. 1601. Definitions.
AASHTO: The American Association of State Highway and Transportation Officials.
Access street, private: A private street built to standards required by this UDC and providing access to abutting properties.
Arterial, principal: A term used in the functional classification of roads. These roads, which include interstates and rural freeways: serve "substantial" statewide or interstate trips, as defined by high mileage or volume; connect most urban areas of 25,000 or more and virtually all urban areas of 50,000 or more;
and provide an integrated network without stub connections except where geography dictates otherwise.
Arterials are the longest roads with the highest speed limits. Principal arterials begin and end at principal arterials or interstates.
Arterial, minor: A term used in the functional classification of roads. With the principal arterial system, these roads form a rural network that links other cities, larger towns, and other traffic generators, such as major resort areas, capable of attracting travel over long distances; link all developed areas of the state; and serve corridors with trip lengths and travel density greater than those predominantly served by rural collector or local systems. Minor arterials, therefore, constitute routes whose design should be expected to provide for relatively high overall travel speeds, with minimum interference to the throughmovement. Minor arterials begin and end at minor or principal arterials or interstates.
Collector, major: A term used in the functional classification of roads. These roads, with minor collectors, primarily serve the county rather than state traffic. Consequently, more moderate speeds are typical. They serve any county seat or larger town not on an arterial route, and other traffic generators of equivalent intra-county importance, such as consolidated schools, shipping points, county parks, and important mining and agricultural areas; link the latter places with nearby larger towns or cities, or arterials and freeways; and serve the more important intra-county travel corridors. Collectors are shorter roads with slower travel speeds than arterial roads. Major collectors begin and end at other major collectors, at minor or principal arterials or at interstates.
Collector, minor: A term used in the functional classification of roads. Serving county-wide traffic, these roads should evenly collect traffic from local roads and bring all developed areas within a reasonable distance of a collector road; provide service to the remaining smaller communities; and link the locally important traffic generators with the hinterlands. Minor collectors begin and end at other minor collectors or any of the higher functional classifications.
Deceleration lane: A speed-change lane, including tapered areas, for the purpose of enabling a vehicle that is making an exit turn from a roadway to slow to a safe turning speed after it has left the mainstream of faster-moving traffic. Also called a "decel lane"; it denotes a right turn lane or a left turn lane into a development or subdivision.
Functional classification of roads: A system for the classification of roads used by the Federal Highway Administration, the Georgia Department of Transportation and Jackson County. The system is based on several factors, including: the amount of traffic currently on the road plus if any new major traffic generators (e.g., new schools, new subdivisions, new community level commercial centers, or new major employers) are being built in the next four years along that roadway; the length of the roadway in comparison with the functional classification of other roads in the same area.
Grade:
(1) The profile of the center of the roadway, or its rate of ascent or descent.
(2) To shape or reshape an earth road by means of cutting or filling.
(3) Elevation.
Highway: A term applied to streets and roads that are under the jurisdiction of the Georgia Department of Transportation or federal highway agency. Highways are major arteries of the circulation network, carry significant volumes of traffic for both long and short trips, and are designed with access to abutting properties with some degree of control and safe standards of design.
Horizontal alignment: Horizontal geometrics of the roadway.
Horizontal curve: A curve by means of which a road can change direction to the right or left.
Intersection: The general area where two or more roads join or cross, including the roadway and roadside facilities for traffic movements within the area.
Local road: A term used in the functional classification of roads. These roads primarily serve to provide access to adjacent land uses and serve low mileage trips as compared to collectors or other higher systems. Local roads constitute the rural mileage not classified as part of the principle arterial, minor arterial, or collector road systems. Local roads are the shortest roads with the slowest speeds when compared with other functional classifications of roads.
Left turn lane: A speed-change lane within the median to accommodate left turning vehicles.
Pavement markings: Devices or paint placed on the roadway to mark pavement for vehicular and pedestrian traffic control.
Profile: A longitudinal section of a roadway, drainage course, etc.
Right-of-way: Land reserved for and immediately available for public use as a street or other purpose.
Road: A state highway, a county road, a road adopted as a county-owned right-of-way approved for county maintenance, a street owned and/or maintained by a municipality, or where permitted, a private road. Roads afford the principal means of access to abutting property or properties and are required to meet specifications contained in this UDC. The term includes "street" but does not include "access easement."
Road, private: An improved road, distinguished from a public road in that the right-of-way which affords a principal means of access to abutting property or properties is privately owned and maintained.
Private roads are required to meet specifications contained in this UDC.
Road, public: A state highway, county road, a road adopted as a county-owned right-of-way approved for county maintenance, or a street owned and/or maintained by a municipality. New public roads are required to meet specifications contained in this UDC.
Shoulder: The portion of the roadway contiguous with the traveled way for accommodation of stopped vehicles, for emergency use, and for lateral support of base and surface courses.
Sidewalk: A hard-surfaced pedestrian access area adjacent to or within the right-of-way of a street.
Sight distance: The length of roadway ahead visible to a driver.
Street: A dedicated and accepted public right-of-way, or a private street approved by the Jackson County Board of Commissioners, which affords the principal means of access for motor vehicles to abutting properties.
Street jog: The incidence where two streets or two portions of a single street are separated by a relatively short distance, usually at their intersection with another street (see illustration).
Traveled way: The portion of the roadway provided for the movement of vehicles, exclusive of shoulders, auxiliary lanes and
bicycle lanes.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1602. Street access requirements and driveways.
(a) For access requirements, see article 6, division II of this UDC.
(b) For driveway requirements, see article 6, division III of this UDC.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1603. Additional specifications.
Unless otherwise specially set forth in this article or the standard drawings of Jackson County adopted in article 23 of this UDC, all of the materials, methods of construction, and workmanship for the work covered in reference to street construction and storm drainage construction shall conform to the latest standard specifications of the Georgia Department of Transportation.
(Ord. No. 17-003, § 1, 10-2-2017) Secs. 1604—1610. Reserved.
DIVISION II. STREETS
Sec. 1611. Standards generally.
Public streets contained wholly within a subdivision or land development shall be improved to the full standards contained in this article and article 23 of this UDC. See standard drawings T-1 through T-7 in article 23 of this UDC.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1612. Street right-of-way.
(a) All state or U.S. numbered highways shall meet all design requirements of and be approved by the Georgia Department of Transportation.
(b) All other roads shall meet the minimum street right-of-way requirements of table 16-1. The public development director shall determine which street classification applies in particular instances, based on the county's adopted roadways plan.
Table 16-1 Minimum Required Street Right-of-Way (Excludes State and U.S. Numbered Highways) Street Classification Minimum Required Right-of-Way Width Arterial 120 feet Major collector 100 feet Minor collector 80 feet Local commercial or industrial street 60 feet Local residential street with swale ditches 60 feet Local residential street with curb and gutter 55 feet Access street, private 50 feet Alley 24 feet
(c) Additional right-of-way may be required to accommodate turning lanes or other improvements.
(d) In residential subdivisions or land developments, streets that serve 100 dwelling units or more shall be improved to or exceed "minor collector" street standards, while those serving fewer than 100 dwelling units shall be improved to or exceed "local" street standards.
(e) Subdivisions or developments that adjoin an existing street that does not meet the right-of-way width required by this development code for said street as classified, shall dedicate up to one-half of the right-of-way needed to meet the minimum right-of-way width required for the street along the entire property frontage. If any part of a subdivision or land development fronts on both sides of an existing street, all of the right-of-way needed for the existing street to meet the right-of-way standards of this development code for the street shall be dedicated along the entire property frontage.
(Ord. No. 17-003, § 1, 10-2-2017; Ord. No. 22-008, § 1, 7-18-2022) Sec. 1613. Planned streets.
When a future street or road, proposed in the comprehensive plan or countywide roadways plan, adjoins or traverses a subdivision or development project, the future right-of-way shall be platted as part of the subdivision or development project. No development will be allowed within the platted future right-of-way except for drives and landscaping, and the platted future right-of-way is to be treated as a lot line for the provision of all setback lines as required by this article.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1614. Continuation of existing streets.
When a new street is proposed within a development or subdivision, the development or subdivision shall provide for the continuation or projection of any existing street adjoining the development or subdivision at the same or greater right-of-way and pavement width. Where, in the opinion of the public development director, it is necessary to provide for street access to adjoining property, proposed streets shall be extended by dedication of right-of-way to the boundary of such property through the development.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1615. Access streets, private.
Whenever a major subdivision is proposed abutting the right-of-way of a U.S. or state highway, a private access street approximately parallel and adjacent to such right-of-way shall be required at a distance suitable for the appropriate use of land between such access street and highway right-of-way.
Private access streets shall be constructed to county standard detail T-6 with regard to right-of-way, pavement width, and curb and gutter, and to county standard detail T-7 with regard to subgrade and paving details. The public development director shall also require a no-access easement of specified width and planting strip along the highway to ensure that lots fronting on said highway do not have access thereto.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1616. Dead-end streets and cul-de-sacs.
(a) Cul-de-sac required. Streets that dead-end shall terminate in a cul-de-sac meeting the requirements of this article. See also standard drawing T-22 in article 23 of this UDC. A dead-end street other than a cul-de-sac shall not be allowed except as a temporary stage of construction of a street that will be extended in a later stage of construction.
(b) Minimum length. A cul-de-sac street shall have a minimum length of at least 125 feet.
(c) Maximum length. The maximum length of a cul-de-sac street shall be 600 feet, unless necessitated by topographic or other conditions and approved by the public development director. If these conditions exist, the maximum length shall be 1,500 feet unless a greater length is approved as a special exception by the board of adjustment.
(d) Residential street. Cul-de-sacs in residential subdivisions shall terminate in a circular turnaround having a minimum right-of-way of at least 100 feet in diameter (50-foot radius) and a paved turnaround with a minimum outside diameter of 80 feet (40-foot radius).
(e) Commercial and industrial street. Cul-de-sacs in commercial and industrial subdivisions shall terminate in a circular turnaround having a minimum right-of-way of at least 120 feet in diameter (60-foot radius), and a paved turnaround with a minimum outside diameter of 100 feet (50-foot radius).
(f) Temporary cul-de-sac. Streets that are planned to continue at some future date shall provide a temporary cul-de-sac as required by the public development director. The minimum radius for a temporary cul-de-sac shall be 40 feet. Temporary turnarounds shall consist of three inches of graded aggregate base and one inch of asphalt. A temporary cul-de-sac shall be made permanent within 12 months if the next phase is not permitted. See also standard drawing T-23 in article 23 of this UDC.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1617. Alleys.
(a) Alleys may be required at the rear of all lots used for multi-family, commercial or industrial developments. Alleys may be provided to facilitate rear-access to garages on each lot at the discretion of the subdivider/developer with approval of the public development director.
(b) If alleys are provided, they must be paved.
(c) If alleys are provided, they must be private and shall not be publicly dedicated.
(d) Dead-end alleys shall be avoided were possible; but if unavoidable, they shall be provided with a turn-around having a radius of at least 40 feet, or a "T-head" turn-around approved by the public development director.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1618. Street alignment and offsets/jogs.
(a) Streets shall be aligned to join with planned or existing streets.
(b) No new street that intersects a state or U.S. numbered highway shall be approved unless there is maintained a separation of at least 800 feet from any other street.
(c) The Georgia Department of Transportation may require a greater separation between streets intersecting a state or U.S. numbered highway.
(d) Other, local, adjoining street intersections shall be spaced at least 250 feet apart measured from edge of right-of-way to edge of opposing right-of-way.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1619. Street intersection angles.
All streets shall intersect at no less than 75 degrees, and as near a right angle as possible. The angle of intersection is to be measured at the intersection of the street centerlines.
Such intersecting streets shall provide an uninterrupted line of sight from the center point of the intersection for not less than the minimum
sight distance required in accordance with this UDC.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1620. Street intersection curb radii.
Turning radii for street intersections shall be provided as follows, based on the highest street classification involved in the intersection as listed below.Where the angle of street intersection is less than 90 degrees, a longer radius may be required.
(a) Arterial: 50-foot radius.
(b) Major collector: 35-foot radius.
(c) Minor collector: 25-foot radius.
(d) Local street: 20-foot radius.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1621. Street grades.
(a) Minimum grades. All streets shall have a minimum grade of 0.5 percent. Minimum grade on cul-de-sacs shall be one percent. See also standard drawing T-11 in article 23 of this UDC.
(b) Maximum grades and minimum design speeds. Maximum grades and minimum design speeds for proposed streets by street type shall be as required in table 16-2. Design exceptions must be justified and approved by the public development director.
Table 16-2 Maximum Grades and Minimum Design Speeds Street Type Maximum Grade Minimum Design Speed Arterial street 6% 55 mph Major collector street 6% 45 mph Minor collector street 8% 35 mph Local street 12% 25 mph Access street, private 12% 25 mph Alleys Varies Varies (Ord. No. 17-003, § 1, 10-2-2017) Sec. 1622. Horizontal alignment of streets.
Where a deflection angle of more than five degrees in the alignment of a street occurs, the radius of curvature of the center line of said street shall be not less than as shown on table 16-3.
(Ord. No. 17-003, § 1, 10-2-2017) Table 16-3 Horizontal Alignment of Streets Street Classification Minimum Radius of Curvature of Center Line Arterial street 800 feet Major collector street 350 feet Minor collector street 200 feet Local street 100 feet Access street, private 100 feet Curved streets shall have a minimum tangent of 100 feet at intersections as measured from the centerline of cross streets. A tangent of a least 200 feet in length shall be introduced between reverse curves on collector streets, and 100 feet on local streets.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1623. Minimum sight distance.
(a) Sight distance requirements at intersections and driveways shall be as required in table 16-4. The design speed for sight distance requirements at entrance intersections shall be the existing posted speed limit. Distances shall be measured from a point on the centerline of the entering road or driveway ten feet back from the edge of the nearest traffic way in the abutting street, and extending in both directions along the abutting street. Minimum sight distances shall be measured from the driver's eyes, which are assumed to be 3.75 feet in height above the pavement surface, to an object six inches high on the pavement in the center of every on-coming travel lane. The sight distance shall be clear along its entire minimum length and unimpaired by intervening changes in street grade, horizontal alignment or obstructions. Examples of obstructions are vegetation, ground cover, signs, existing topography, etc.
Table 16-4 Minimum Sight Distance Requirements Design Speed (miles per hour) Distance in Feet (Each Way) 25 125* 30 125* 35 150 40 185 45 230 50 475 55 350 60 450 65 550 *One hundred twenty-five-foot street spacing for internal residential streets only. Any external nonresidential street spacing shall be a minimum of 150 feet.
(b) Minimum sight distance requirements of this section may be designed in accordance with AASHTO's Geometric Design of Highways and Streets if such standards conflict with the requirements of this section.
(c) See also standard drawings T-32 and T-33 in article 23 of this UDC.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1624. Pavement width.
Roadways shall be constructed and paved with top courses meeting the following standards. The minimum pavement width, measured from edge of pavement to edge of pavement, (or from the inner edge of curb where curbing exists) shall be as required for the street type in table 16-5. See also standard drawings T-1 through T-7 as appropriate in article 23 of this UDC.
(Ord. No. 17-003, § 1, 10-2-2017) Table 16-5 Street Base and Pavement Width Street Classification Width of Pavement Base Binder Topping Arterial 2-lane: 28 feet 4-lane: 52 feet Per GDOT Per GDOT Per GDOT Major Collector 2-lane: 26 feet 4-lane: 48 feet 10 inches GAB 3 inches B 2 inches E Minor Collector Street 24 feet 6 inches GAB 3 inches B 1½ inches E Residential Collector 22 feet 6 inches GAB 3 inches B 1½ inches E Local Commercial or Industrial Street 24 feet 10 inches GAB 4 inches B 2 inches E Local Residential Street 20 feet 6 inches GAB 2 inches B 1½ inches E Access street, private 24 feet 10 inches GAB 4 inches B 2 inches E Alley 16 feet 6 inches GAB 2 inches B 1½ inches E GAB = graded aggregate base.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1625. Deceleration and turning lanes.
(a) When required. See section 612 of this UDC for instances when development requires that turning lanes and deceleration lanes be installed by the developer. In addition, a deceleration lane shall be required at each street entrance to a multi-family development of 25 or more units and any commercial or industrial development. At the discretion of the public development director and county road superintendent, a deceleration lane shall be required at each street entrance to a single family residential subdivision of 25 lots or more.
(b) Length. See standard drawing T-12 in article 23 of this UDC for deceleration lanes and standard drawings T-13 and T-14 for left-turn lanes. Generally, deceleration lanes and turn lanes shall be a minimum length of 150 feet, with an additional 50-foot taper length, and a pavement width of 12 feet (exclusive of curb and gutter). Deceleration lanes and tapers may be required to be of greater length, based on the design speed of the road.
(c) Right-of-way. Additional right-of-way to accommodate the deceleration lane or turn lane and a ten-foot shoulder shall be dedicated by the developer to Jackson County.
(d) Drainage. Associated drainage improvements as deemed necessary by the county by the construction of the deceleration or turn lane shall also be required. The developer will pay the cost of any cross-drain pipe relocations and catch basins that must be constructed along an existing county road as a result of installing a required deceleration or turning lane.
(e) Utilities. Utilities shall be relocated at the developer's expense outside of a deceleration or turning lane. Waterlines can remain beneath the additional lanes.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1626. Street base.
(a) Graded aggregate base course. The base course shall consist of mineral aggregate and may be a combination of natural deposit or a blend of the materials specified. All materials are subject to approval by the public development director. If a blend of materials is used, it shall be blended through a base plant that meets the latest specifications of the Georgia Department of Transportation Specification 815.
(b) Thickness of material. Street base material shall conform to the thickness as required for the street type on table 16-5.
(c) Extension. For streets without curbs, the base shall extend at least one foot beyond the edge of payment.
(d) Replacement of unsuitable material. Wherever unsuitable material is found in the subgrade, the unsuitable material shall be replaced with graded aggregate stone.
(e) Standard detail reference. See also standard details T-1 through T-7 as applicable.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1627. Pavement topping.
(a) Prime. After the base has been placed, mixed, compacted, shaped, inspected and accepted, it shall be primed with suitable asphaltic materials as specified in Department of Transportation Specification 412.
(b) Roadway binder. After the prime has been inspected and accepted, the roadway or street shall be surfaced with type "B" binder as required for the street type on table 16-5.
(c) Tack coat. Tack coat shall be applied on a prepared road surface according to the requirements of Georgia Department of Transportation Specification 413.
(d) Final topping. Final topping shall consist of a course of type "E" asphaltic cement as required for the street type as required by table 16-5.
(e) Standard detail reference. See also standard details T-1 through T-7 as applicable.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1628. Testing requirements for street base and paving.
(a) Tests shall be conducted of street base and paving as per table 16-6.
Table 16-6 Testing Requirements and Standards Type of Test to be Performed Minimum Number of Tests Testing Standards Sub-grade Compaction Each 500 linear feet of roadway 95% Max Density
ASTM-1557
Field Tests
ASTM D-1556
F-2922 and D-2167 Base Compaction Each 500 linear feet of roadway 100% Max Density
ASTM-1557
Field Tests
ASTM D-1556
F-2922 and D-2167 Asphalt Density Each 1,000 linear feet of roadway 92% Laboratory Density Asphalt Thickness Each 500 linear feet of roadway Deficient in thickness not more than ¼"
(b) When testing is required, it is the responsibility of the developer to insure that all required tests are made and reported to the public development department for review and approval by the county roads superintendent. The cost of all testing and quality control shall be performed at the expense of the developer by qualified testing laboratories.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1629. Curb and gutter—Required.
Curb and gutter are required along:
(a) All new commercial and industrial streets;
(b) All new residential subdivision streets except for those serving lots with a minimum lot area of one acre and a minimum lot width of 150 feet;
(c) Existing county roads that abut a subdivision where curb and gutter are required, or abut a multi-family or nonresidential development; and
(d) New construction on existing county streets and roads, including deceleration lanes and travel lane widenings.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1630. Curb and gutter—Detail.
(a) Local residential street curbs shall be Portland cement concrete, six-inch x 24-inch x ten-inch vertical or roll back type, with a minimum strength of 3,000 psi at 28 days. For vertical curbing, see standard drawing T-24 in article 23 of this UDC.
(b) Curbs along collectors and local commercial or industrial street curbs shall be Portland cement concrete, six-inch x 24-inch x 12-inch vertical type only, with a minimum strength of 3,000 psi at 28 days.
(c) All curbing shall be backfilled and grassed. The curb and gutter shall be constructed so as to present a smooth, even line both horizontally and vertically. There shall be no areas of ponding.
(d) A valley gutter may be used across a driveway at its intersection with a street. However, valley gutters shall not be allowed across streets at street intersections unless specifically approved by the public development director.
(e) See also standard drawing T-08 in article 23 of this UDC for utility placement with curb and gutter.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1631. Slopes and shoulder improvements.
(a) On streets with curb and gutter, the shoulders shall slope one-quarter-inch to the foot toward the roadway for at least seven feet from back of curb, and no more than one-half inch to the foot for the remainder of the right-of way width.
(b) On streets with swale ditch drainage, the shoulders shall slope three-quarter-inch to the foot away from the roadway for at least five feet to the drainage channel. The maximum slope for the drainage channel shall be two feet of run for each one foot of fall, with a minimum two-foot wide channel at the bottom of the swale.
(c) Immediately after grading and filling and re-spreading of topsoil, all areas of disturbed soil shall be fertilized and seeded (or in steep areas sodded or otherwise appropriately treated) with suitable vegetative cover to retard erosion.
(d) When all construction is completed, all slopes and shoulders shall be cleared of all rubbish and shall have a stand of grass to prevent undue erosion, either by sprigging or seeding.
(Ord. No. 17-003, § 1, 10-2-2017) Sec. 1632. Street names and street name signs.
(a) Street names are subject to the approval of the Jackson County Emergency Services Department and the public development director. See also standard drawing T-26 in article 23 of this UDC.
(b) Proposed public or private streets, which are extensions of, or in alignment with, existing or other proposed streets shall have the same name.
(c) Street names shall not duplicate or be phonetically similar to existing street names.
Leer este código donde se publica (Municode) La fuente es el código del condado tal como lo publica su editorial o su propio sitio web. Consúltelo allí para ver cambios posteriores.